Loading...
Roof Truss Layout - ATruss Connector Total List Manuf Product Qty Simpson LUS24 5 3- 1 / 2 " x 1 0 - 1 / 2 " G L B ( D r o p p e d ) 3- 1 / 2 " x 1 0 - 1 / 2 " G L B ( D r o p p e d ) 3-1/2"x 10-1/2" GLB (Dropped) 2190-A F22 M0 1 E M0 2 M0 2 M0 2 M0 2 M0 2 M0 1 E LU S 2 4 LU S 2 4 LU S 2 4 LU S 2 4 LU S 2 4 6/12 19-00-00 11-00-00 10 - 0 0 - 0 0 10 - 0 0 - 0 0 C01E C02 B01E A04E A03 A03 A03 A03 A03 A03 A03 A03 A03 A03 A03 A03A03 A03 A02 A02 A02 A02 A02 A02 A02 A01E 6/12 6/12 6/12 6/12 30-00-00 49 - 0 0 - 0 0 11-08-00 4- 0 0 - 0 0 2-00-00 43 - 0 0 - 0 0 13-00-005-04-00 ** IMPORTANT ** = INDICATES LEFT ENDAddress:,Yelm,WA 98597 M-2155 Date: Sales Rep: Ryan KittelsonRoof Trusses Soundbuilt NW, LLC Plan: 2190/A/Gar RT Job Name: - THIS IS A TRUSS PLACEMENT PLAN ONLY. All trusses are designed as individual building components built to the building designer's specifications as given to us in the plans, see individual truss design sheets for specific loading and design. - VERIFY ALL DIMENSIONS. Temporary truss bracing is the responsibility of the general contractor, permanent bracing is the responsibility of the building designer. Individual bracing of "at- compression" truss pieces is marked out on the truss seals and it is the responsibility of the contractor to verify it is installed as specified. - Do not install broken/damaged trusses or trusses that do not match the jobsite conditions, please inform your salesman if any such conditions are discovered. - All Truss-To-Structural element connections shown on this layout are a suggestion provided as a courtesy to the builder and must be specified in the construction documents as approved by the building designer per ANSI/TPI 1-2014 2.3.2.4 prior to their installation. 10/30/2024 Estimate By: Marco Fimbres Crystal Springs Drawing Type: Job Number: Finalized By: Marco Fimbres Loading TC/LL=25.0 lb/ft² TC/DL=8.0 lb/ft² BC/LL=0.0 lb/ft² BC/DL=7.0 lb/ft² WIND=110 mph EXP=SuburbanAreas Customer: