Loading...
101158552 YEL-23 REPL 1 POLE-signed (2)CØEIG691 CN C 25T 8947 # 2 A C S R CN C 9037 N Vicinity Map N.T.S. Owner / Developer Contact Info officeATTN: PSE - - KELLY ULICNY 425-429-0949 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. PHONE CABLE TV 11813402 101158552 N/A 593250182 N/A 594153860 N/A N/A N/A N/A N/A 108144697 PROJECT PHASE PWR NOTIF# ORDER# Superior OH Misc Expense UG Misc Expense OH Xfmr Expense UG Xfmr Expense Removal DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP K. ULICNY 425-429-0949 4/4/23 S. REEVES 253-331-3897 4/4/23 ... J. WATT 509-714-3143 4/4/23 N/A YELM YEL-23 REPL 1 POLE DISTRIBUTION POLE REPLACEMENT 8947 CANAL RD SE, YELM, WA 98597 ASPLUNDH CONSTRUCTION N/A N/A N/A 101158552 AS NOTED 1 OF 1 THURSTON N/A N/A QSTHLE SE18-T17N-R02E N/A N/A 1702E072 1702E068 1702E072 YEL-23 COMCAST . . . . . . . . . . . E-Mail: Cell Phone: Project Manager Contact Information: Manager:KELLY ULICNY 425-429-0949 KELLY.ULICNY@PSE.COM ... ... ... 10 1 1 5 8 5 5 2 YEL-23 REPL 1 POLE DISTRIBUTION POLE REPLACEMENT No No No Yes Yes Yes "Flagging Required" "Outages Required" "Locates Required" ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE P01: 559881-147726 (Avg. Span = 321', Angle = 0°) TREE TRIMMING REQ'D -EX 40' CL 1, 1961 POLE TO BE REPLACED -INST 45' CL 1 (PD451) 6010.1000 -DEEP SET +1' DUE TO CROSSWIND -INST 1Ø PTP #2ACSR (TAN112) 6031.1010 -ROLL NEUT TO COMMON POSITION -SLEEVE THROUGH WIRES -TRANSFER 1Ø #2ACSR PRI & NEUT (NW/SE) -RM EX 1Ø TERM & C/O -RM EX RISER -INST 2" RISER (RIS2CSS) 6042.1000 -INST 1Ø TERM & L/B C/O (TSU1C1) 6043.1000 (SW#Y645) -FUSE @ 25T (3412400) -TRANSFER 1Ø 1/0AL UG PRI (SW); EXTEND AS REQ'D -ACTUAL 1Ø 1/0AL UG PRI ADDED L=_________ BATCH YEAR_________ -ACTUAL TRENCH L=_________ -RM EX DG & ANC -CUT ANC 6" BELOW GRADE -TOP POLE ABOVE COMM -REMOVE POLE STUB AFTER COMM HAS TRANSFERRED SITE PLAN 1" = 50' POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS SITE # POLE DATA POLE TEL TV FIBER TRAN RMVD ID NUMBER GRID # HEIGHT CLASS YEAR TOPPED RMVD P01 559881-147726 40 1 1961 POLE TABLE (NEW) Site # Pole Data Grid #Height Class Year Remarks / Location Ref. P01 559881-147726 45 1 LEGEND CONDUIT RISER OVERHEAD TRANSFORMER JUNCTION VAULT/JUNCTION BOX NEW CONDUCTOR AND OR TRENCH LINE DISCONNECT - FUSED PULL VAULT OR SPLICE VAULT EXISTING POLE DOWN GUY DISCONNECT - UNFUSED NEW POLE PADMOUNT TRANSFORMER SECONDARY HANDHOLE EXISTING CONDUCTOR TO BE REMOVED OR ABANDONED STREET LIGHT TOTAL UNDERGROUND TRANSFORMER ENERGY CUSTOMER DEMAND POINT OR OR OR OVERHEAD JUMPER CONNECTION C A N A L R D S E CANAL CT SE T H E A R O S E D R S E SITE Standoff Bracket 15" Min Length Conduit Clamp Conduit Field Face Quadrant Climbing SpaceRoad Face Quadrant Climbing Space 5" Min CL LC Direction of Vehicular Traffic CONDUIT RISER PLACEMENT DETAIL TOP VIEW NOT TO SCALE General - Return removed materials to the local storeroom or PSE storeroom. OVERHEAD CONSTRUCTION Poles & Structures - Poles are to be installed or relocated as staked. Unless otherwise noted, all pole location measurements are from the roadside face of the pole. - All new poles set shall be the class indicated on the sketch, or better. Do not set a lower class pole than specified. - Install ground plate assembly on all new poles. Install Switch Ground Assembly per standard specification 6014.1000 at new gang operated switch locations. - Install grid numbers on all new and existing poles as shown on sketch. - Straighten existing poles as indicated or as necessary. - Treat all field-drilled poles with copper napthenate wood preservative. - Remove old poles after communication companies have transferred off and return to PSE storeroom. Fill and crown pole holes and restore area similar to adjacent landscaping. Conductors & Equipment - Transfer all overhead and underground primary, secondary and service conductors and guys to new poles set, unless otherwise indicated on this sketch. - Transfer existing transformers to new poles unless otherwise indicated on this sketch. - Use stirrups to connect all overhead and underground primary taps, and all transformers. Install at all sites being worked within the scope of the project where they are currently missing. - For 12kV construction, always install avian protection with 4/0 Cu covered jumpers and #4 SD aluminum-covered tie-wire (MID 8454500), For 34 kV construction, use bare wire primary jumpers with preformed helical grip ties. - Apply avian protection devices when required per Standard 6015.2000. - Apply grit inhibitor on all Ampact, stirrup, and dead-end connections. - Connect primary taps and transformers to same phase as existing unless otherwise shown on the drawing. - All neutral connections to be made with solid compression connectors. Connect all pole grounds to common neutral. - Use Load-interrupter cutouts (with arc shields) on all primary overhead and underground taps with fused protection above 40T. - Install Wildlife Protectors on all transformers. UNDERGROUND CONSTRUCTION Excavation -Trenching outside of the Right-of-way shall be of sufficient depth to provide a minimum of 36” of cover for primary conductors and 24” of cover for secondary conductors. -Road crossings and all trenches within the Right-of-way shall be of sufficient depth to provide a minimum of 36” of cover for all conductors or as required by the permitting Agency. -All conductors/conduits shall have a minimum of 3” of bed and 3” of clean sand cover. -No rocks larger than 6” shall be included in backfill. -Backfill in road crossings and within the Right-of-way shall be compacted to 95% density or as required by the permitting Agency. -Restore all excavated areas to original condition. UTILITY POLE EROSION CONTROL DETAIL TOP VIEW FLOWING DITCH or BODY OF WATER SLOPE Secure bottom of fence with gravel bags Place straw mulch on disturbed areaExcavated or Augered Hole Pole SLOPE Not to scale Adjacent to flowing ditches or bodies of water Install silt fence around pole excavation J. WATT 4/10/23 2-81 2-572-45XX 2-54 x ______' 2-129