Jimenez WBEleaptodigital.com 2.23.0
Existing & New Measurements - Tub
Measuring From:Drywall To Drywall
A. Old Base Length 47
A. New Base Length 60
B. Old Base Projection 32
B. New Base Projection 34
C. Old Right Wall to Obstruction 36
C. New Right Wall to Obstruction 36
What is the obstruction?Dividing Wall
C2. Old Right Surround 32
C2. New Right Surround 34
D. Room Height 96
Existing Surround Height 70
New Surround Height 96
E. Old Left Wall to Obstruction 42
E. New Left Wall to Obstruction 34
What is the obstruction?Closet Door
E2. Old Left Surround 32
E2. New Left Surround 34
F. Ceiling Projection NA
G. Soffit Height NA
Notes
California Bathroom upgrade. The main desire for the customer is to have a larger footprint for their shower. This will
require moving the dividing wall over to the right about 4”. This will allow for (2) 60” open areas on either side of the
dividing wall. A 60” Shower pan will be installed on the right and a 60” Jetted Tub will be installed on the right of the
dividing wall. Our wall panels will cover all existing walls, up to the ceiling, on the shower/bath wall of bathroom.
This space intentionally left blank
Page 3 of 50
leaptodigital.com 2.23.0
Existing & New Measurements - Shower
Measuring From:Drywall To Drywall
A. Old Base Length 47
A. New Base Length 60
B. Old Base Projection 32
B. New Base Projection 34
C. Old Right Wall to Obstruction 36
C. New Right Wall to Obstruction 36
What is the obstruction?Dividing Wall
C2. Old Right Surround 32
C2. New Right Surround 34
D. Room Height 96
Existing Surround Height Yes
New Surround over 96”?No
E. Old Left Wall to Obstruction 42
E. New Left Wall to Obstruction 34
What is the obstruction?Closet Door
E2. Old Left Surround 32
E2. New Left Surround 34
F. Ceiling Projection NA
G. Soffit Height NA
H. Old Pony Wall Projection 39
H. New Pony Wall Projection 40
I. Old Pony Wall Height 96
I. New Pony Wall Height 96
J. Old Pony Wall Width 7
J. New Pony Wall Width 4-5”
This space intentionally left blank
Page 4 of 50
leaptodigital.com 2.23.0
Site Considerations/Measurements:
Level of Home:2
Condo/Co-Op:No
Manufactured Home:No
Distance from SD Wall to Center of Drain:17.5
Distance from Wet Wall to Center of Drain:9
Drain Measurement Taken From:Left Sidewall
Drain Access Underneath:No
Moving Drain in Floor:Yes
Concrete Sub Floor:No
Post Tension Concrete:No
Distance Between Base and Center of Toilet:NA
15" Min?YES
Header?No
Electrical Panels
Are we installing or removing a jetted tub?Installing
Brand of Electrical Panel GE
Amperage 100
Size of Water Heater 40
Using Existing Panel?Yes
Window Measurements:
Is there a window inside wet area?Yes
Measurement of Window (Height x Width)47 x 47
Distance from top of window to ceiling 18
Distance from bottom of window to base 31
Depth of Window 5
Confirmed Tempered Glass?Yes
Site Notes
California Bathroom upgrade. The main desire for the customer is to have a larger footprint for their shower. This will require
moving the dividing wall over to the right about 4”. This will allow for (2) 60” open areas on either side of the dividing wall. A
60” Shower pan will be installed on the right and a 60” Jetted Tub will be installed on the right of the dividing wall. Our wall
panels will cover all existing walls, up to the ceiling, on the shower/bath wall of bathroom.
This space intentionally left blank
Page 5 of 50
leaptodigital.com 2.23.0
Bathroom Sketch
This space intentionally left blank
Page 6 of 50
leaptodigital.com 2.23.0
New Bathroom Sketch
Financing
Is customer financing project?Yes
This space intentionally left blank
Page 7 of 50