Loading...
Jimenez WBEleaptodigital.com 2.23.0 Existing & New Measurements - Tub Measuring From:Drywall To Drywall A. Old Base Length 47 A. New Base Length 60 B. Old Base Projection 32 B. New Base Projection 34 C. Old Right Wall to Obstruction 36 C. New Right Wall to Obstruction 36 What is the obstruction?Dividing Wall C2. Old Right Surround 32 C2. New Right Surround 34 D. Room Height 96 Existing Surround Height 70 New Surround Height 96 E. Old Left Wall to Obstruction 42 E. New Left Wall to Obstruction 34 What is the obstruction?Closet Door E2. Old Left Surround 32 E2. New Left Surround 34 F. Ceiling Projection NA G. Soffit Height NA Notes California Bathroom upgrade. The main desire for the customer is to have a larger footprint for their shower. This will require moving the dividing wall over to the right about 4”. This will allow for (2) 60” open areas on either side of the dividing wall. A 60” Shower pan will be installed on the right and a 60” Jetted Tub will be installed on the right of the dividing wall. Our wall panels will cover all existing walls, up to the ceiling, on the shower/bath wall of bathroom. This space intentionally left blank Page 3 of 50 leaptodigital.com 2.23.0 Existing & New Measurements - Shower Measuring From:Drywall To Drywall A. Old Base Length 47 A. New Base Length 60 B. Old Base Projection 32 B. New Base Projection 34 C. Old Right Wall to Obstruction 36 C. New Right Wall to Obstruction 36 What is the obstruction?Dividing Wall C2. Old Right Surround 32 C2. New Right Surround 34 D. Room Height 96 Existing Surround Height Yes New Surround over 96”?No E. Old Left Wall to Obstruction 42 E. New Left Wall to Obstruction 34 What is the obstruction?Closet Door E2. Old Left Surround 32 E2. New Left Surround 34 F. Ceiling Projection NA G. Soffit Height NA H. Old Pony Wall Projection 39 H. New Pony Wall Projection 40 I. Old Pony Wall Height 96 I. New Pony Wall Height 96 J. Old Pony Wall Width 7 J. New Pony Wall Width 4-5” This space intentionally left blank Page 4 of 50 leaptodigital.com 2.23.0 Site Considerations/Measurements: Level of Home:2 Condo/Co-Op:No Manufactured Home:No Distance from SD Wall to Center of Drain:17.5 Distance from Wet Wall to Center of Drain:9 Drain Measurement Taken From:Left Sidewall Drain Access Underneath:No Moving Drain in Floor:Yes Concrete Sub Floor:No Post Tension Concrete:No Distance Between Base and Center of Toilet:NA 15" Min?YES Header?No Electrical Panels Are we installing or removing a jetted tub?Installing Brand of Electrical Panel GE Amperage 100 Size of Water Heater 40 Using Existing Panel?Yes Window Measurements: Is there a window inside wet area?Yes Measurement of Window (Height x Width)47 x 47 Distance from top of window to ceiling 18 Distance from bottom of window to base 31 Depth of Window 5 Confirmed Tempered Glass?Yes Site Notes California Bathroom upgrade. The main desire for the customer is to have a larger footprint for their shower. This will require moving the dividing wall over to the right about 4”. This will allow for (2) 60” open areas on either side of the dividing wall. A 60” Shower pan will be installed on the right and a 60” Jetted Tub will be installed on the right of the dividing wall. Our wall panels will cover all existing walls, up to the ceiling, on the shower/bath wall of bathroom. This space intentionally left blank Page 5 of 50 leaptodigital.com 2.23.0 Bathroom Sketch This space intentionally left blank Page 6 of 50 leaptodigital.com 2.23.0 New Bathroom Sketch Financing Is customer financing project?Yes This space intentionally left blank Page 7 of 50