PSE FINAL 105104609 TAHOMA TERRA APARTMENTS PH 2 - peer signedN
Vicinity Map
46.9453, -122.6275
Owner / Developer Contact Info
officeATTN:
TAHOMA TERRA HOLDINGS, LLC
PO BOX 73790
PUYALLUP, WA 98373
EVAN MANN 253.820.7835
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
514615707 105104609
N/A 101185984
N/A 108164006
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Relocation
Removal
UG XFMR
Temporary
Job Order
Distribution
Service Stubs
HP Svc/MSA
10
5
1
0
4
6
0
9
N
/
A
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
J. CALLAHAN 206.503.1520 .
A. DUNN . 02.10.25
N/A .N/A
S. LEWISON . 02.10.25
REDT # ( RW-134414 )YELM
TAHOMA TERRA APARTMENTS PH 2
3Ø PRIMARY U/G LINE EXTENSION - 8 M/F BLDGS, 103 UNITS
14730 TAHOMA BLVD SE (P#78640000010), YELM, WA 98597
PUGET SOUND ENERGY
N/A N/A
N/A 105104609
N/A 1 OF 4
THURSTON N/A N/A QSTHLE
24SW-T17N-R01E N/A N/A
1701E095 1702E116 1701E095 YEL-25
COMCAST
TED AXTELL
253.878.2794
LUMEN
DEWAYNE RICHERT
253.221.0133
RIGHT OF WAY
LINDA OLSON
425.786.4806
.
.
.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:JESSICA CALLAHAN
206.503.1520
jessica.callahan@pse.com
x
x
x
...
...
...
x
EVAN@SOUNDBUILTHOMES.COM
TYPICAL NOTCH-OUT FOR TRANSFORMER,
NOT TO SCALE
& SECONDARY PEDESTAL/HANDHOLE
BACK OF EASEMENT
STANDARD
EASEMENT
LINE
ROW
10'
PL
1'
4' - 5'
Min.
1'
7'7'
TRANSFORMER
(WHEN PRESENT)
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
OIL-FILLED EQUIPMENT
TRANSFORMER
APPROVED
AREA
CO
M
B
U
S
T
I
B
L
E
B
U
I
L
D
I
N
G
W
A
L
L
S
&
R
O
O
F
10'
10'
10'
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
3'
MIN
3' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
3' MIN
POWER GENERAL NOTES - MULTIFAMILY PROJECT
11.
7.
6.
5.
4.
3.
2.
1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
9.
10.
CLEAR WORKING SPACE FOR VAULTS
NOT TO SCALE
FIELD SIDE (PREFERRED)
ROAD SIDE (PREFERRED)
6' MIN
3'
MIN
3'
MIN
3' MIN
J-BOX CABLE ENTRY DETAIL
NOT TO SCALE 12kV CABLE ROUTING
Cables should enter the vault so that all of
the cables will lay in the same direction.
TOP VIEW
JOINT TRENCH DETAIL
NOT TO SCALE
ROAD SIDE
MINIPAD
MINIPAD
FIELD SIDE
VAULT
6" of crushed rock
(base for vault)
P/L
Power
Secondary
Power
Primary
Communications
42" Min
21"1'
Feeder
38"
2"
4" Sand Bedding
12" Sand
Cover
36"
Cover
4" Sand Bedding
42"
6" Additional depth when
Feeder is required
PSE 10' FRONTAGE EASEMENT
1'
TRANSFORMER
Final
Backfill
Initial
Backfill
Trench Depth
42" - 48"
Phone & TV Primary Power Cable in PSE
Provided DB120 Grade Conduit
Excavated Dirt Pile
Final Grade
24" Min
48"
Max
18"
Backfill for DB 120 Conduit/Direct Buried Cable
12" Min
Separation
6" or 12" of sand, 5/8" minus
3" of sand, 5/8" minus, or clean backfill bedding
JOINT TRENCH DETAIL
36"
Min
Cover
ROADSIDE
Typical To Excavated Dirt Pile
(No Rocks over 10" Diameter)
or clean backfill shading
Primary-DB120 CONDUIT (NTS)
- A 6" layer of sand, 5/8" minus, or clean shading is allowed when excavated native material
contains rocks no larger than 8" in diameter.
Trench and backfill requirements for primary electric line extension trenches (No PSE gas)
- A 12" layer of sand, 5/8" minus, or clean shading is required when excavated native material
contains rocks up to 10" in diameter.
TOP VIEW
Excavation - 10-1/3 cubic yards
SIDE VIEW
Rock
Crushed
6"
4'-4"
2"
8'-0"
4'-8"
3'-6"
4'-8"
6"
20"
4'-8"5'-6"
44"
8'-0"
No Secondary
PSE Primary
Conduit
Customer's conduit/cables may enter on
any vault side except the front or side
where PSE's primary conduit/cable enters.
Note: Customer's conduit/cables must
match PSE's left/right vault entry
orientation and coil in the same direction
as PSE's primary conductors.
VAULT DETAIL @ V01-V03
NOT TO SCALE
MINIMUM CLEARANCES FROM OIL-FILLED EQUIP. TO BLDG. FEATURES
NOT TO SCALE
FIRE ESCAPE
SERVICE
GAS
RELIEF
DOOR, WINDOW, VENT,
OR OTHER OPENING
TANK
FUEL VENT OIL-FILLED
ELECTRICAL
EQUIPMENT
SPRINKLER VALVE,
STANDPIPE, OR
HYDRANT
20'
3'
10'
6'
10'
(TRANSFORMER)
Oil-Filled Equipment Clearances per PSE Std 0700.1500
If the oil-filled equipment is adjacent to… Clearance
Requirement
Combustible walls or roof (including stucco).10 FT
Noncombustible walls, soffits, and roofs (including brick, concrete,
steel and stone) providing the side of the transformer facing the wall
does not have doors. Materials that pass UBC Std. 2-1 or ASTM
E136-79 are considered to be noncombustible.
3 FT
Fire sprinkler valves, standpipes, and fire hydrants.6 FT
Doors, windows, vents, fire escapes, or other building openings.10 FT
The water's edge of a swimming pool or any body of water.15 FT
Individual domestic and irrigation wells. Clearance not required on
pole mounted transformers (pole placement still applies as stated in
6450.3000), TUT's installed in sealed vaults, 7200V single-phase
padmount transformers 50kva or less, and ones with reduced
flammability oil.
100 FT
Facilities used to dispense or store LP, hazardous liquids, or fuel.20 FT
Gas service meter relief vent.3 FT
Generators, customer-owned transformers, etc.6 FT
2"
Excavation - 19-1/2 cubic yards
SIDE VIEW
5'-4"Crushed
6"
Rock
TOP VIEW
9'
11'
7'-0"
4'-0"
1'
4'-8"
VAULT DETAIL @ J01
NOT TO SCALE
SITE 1
SITE 4
SITE 3
SITE 2
LO
N
G
M
I
R
E
S
T
S
E
W
Y
E
L
M
A
V
E
TA
H
O
M
A
BLV
D
S
E
3.10.25
C
C
D
E
F
H
G
D
E
K
H
F
G J
M
L
B
E
R
R
Y
V
A
L
L
E
Y
R
D
S
E
TA
H
O
M
A
B
L
V
D
S
E
BLDG H
7 UNITS
1000 SQFT
(3) 300KCMIL
BLDG G
12 UNITS
1000 SQFT
BLDG F
12 UNITS
900 SQFT
BLDG E
12 UNITS
900 SQFT
BLDG D
12 UNITS
900 SQFT
BLDG C
24 UNITS
900 SQFT
EX: 2-4"
EX: 2-4"
EX: 1-4"
(6) 300KCMIL
(3) 300KCMIL
(3) 300KCMIL
(3) 300KCMIL
(3) 300KCMIL
EX: 1-4"
1-4"
3-6"
1-4"
3-6"
1-4"
F
E
E
D
YEL
25
90'
DEVELOPER RESPONSIBLE
FOR CONDUIT/WIRE FROM
VAULT TO METER LOCATION
24
'
24
'
24
'
24'
A
B
A
B
C
LO
N
G
M
I
R
E
S
T
S
E
BLDG B
12 UNITS
900 SQFT
BLDG A
12 UNITS
900 SQFT
(3) 300KCMIL
(3) 300KCMIL
3-6"
3-6"
3-4"
EX: 1-3"
56
'
30'
14'
1-4"
1" = 50'
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
J. CALLAHAN 206.503.1520 .
A. DUNN . 02.10.25
N/A .N/A
S. LEWISON . 02.10.25
REDT # ( RW-134414 )YELM
TAHOMA TERRA APARTMENTS PH 2
3Ø PRIMARY U/G LINE EXTENSION - 8 M/F BLDGS, 103 UNITS
14730 TAHOMA BLVD SE (P#78640000010), YELM, WA 98597
PUGET SOUND ENERGY
N/A N/A
N/A 105104609
1" = 50' 2 OF 4
THURSTON N/A N/A QSTHLE
24SW-T17N-R01E N/A N/A
1701E095 1702E116 1701E095 YEL-25
COMCAST
TED AXTELL
253.878.2794
LUMEN
DEWAYNE RICHERT
253.221.0133
RIGHT OF WAY
LINDA OLSON
425.786.4806
.
.
.
SITE PLAN (1)
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
YEL-25
12.04.24
467 402 347
29 29 29
496 431 376
...
...
...
SCHED.SQ. FT.
MAX LRC =
CIRCUIT FEET ADDED: 1540'
17 1,000
75 AMPS
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
MATCHLINE A-A (SEE LEFT)
MATCHLINE A-A (SEE RIGHT)
Developer Note:
The following Fault Current information MUST BE conveyed
to the builder of the units:
All units may require upgraded house electrical equipment as the
fault current at the meter base may exceed 10,000 amps.
FAULT CURRENT TABLE
3Ø PM TRANSFORMERS (208Y/120V)
120V WINDINGS 208V WINDINGS
LOCATION SIZE R/X
MIN.
%Z
FAULT
CURRENT
MIN.
%Z
FAULT
CURRENT
V01 & V03 150kVA 0.2 --2.15 29,000 AMPS
V02 225kVA 0.3 --2.10 39,700 AMPS
DEVELOPER TO COORDINATE WITH PSE
PROJECT MANGER & SERVICE PROVIDER
PRIOR TO EXCAVATING WITHIN 3' OF LOCATE
MARKS OF PSE ENERGIZED FACILITIES
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #G
12 + HP
1,000
800A
ELEC
51KW + 18KW
75A
4.8 @ V03
0.9 @ V03
CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLE
BLDG.# OF
METERS SOURCE # OF RUNS WIRE SIZE REMARKS
A 13 V01 3 300KCMIL -
B 13 V01 3 300KCMIL -
C 25 V02 6 300KCMIL -
D 13 V02 3 300KCMIL -
E 13 V02 3 300KCMIL -
F 13 V03 3 300KCMIL -
G 13 V03 3 300KCMIL -
H 8 V03 3 300KCMIL -
ALL CUSTOMER-OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLE
COMM. DEMAND:
(EV CHARGER, LIGHTS)
COMM. DEMAND:
(EV CHARGER, LIGHTS)
COMM. DEMAND:
(EV CHARGER, LIGHTS)
COMM. DEMAND:
(EV CHARGER, LIGHTS)
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #F
12 + HP
900
800A
ELEC
51KW + 18KW
75A
4.8 @ V03
0.9 @ V03
COMM. DEMAND:
(EV CHARGER, LIGHTS)
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #H
7 + HP
1,000
800A
ELEC
35KW + 19KW
75A
4.8 @ V03
0.8 @ V03
COMM. DEMAND:
(EV CHARGER, LIGHTS,
OFFICE, RECREATION)
COMM. DEMAND:
(EV CHARGER, LIGHTS)
COMM. DEMAND:
(EV CHARGER, LIGHTS)
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #A
12 + HP
900
800A
ELEC
51KW + 18KW
75A
4.0 @ V01
0.9 @ V01
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #B
12 + HP
900
800A
ELEC
51KW + 18KW
75A
4.0 @ V01
0.9 @ V01
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #C
24 + HP
900
2x800A
ELEC
94KW + 29KW
75A
4.7@ V02
0.6 @ V02
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #D
12 + HP
900
800A
ELEC
51KW + 18KW
75A
4.7 @ V02
0.6 @ V02
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #E
12 + HP
900
800A
ELEC
51KW + 18KW
75A
4.7 @ V02
0.6 @ V02
3.10.25
LO
N
G
M
I
R
E
S
T
Y
E
L
M
A
V
E
W
#2A
C
S
R
C
B
A
#2A
C
S
R
C
B
A
3
9
7
A
C
S
R
3
9
7
A
C
S
R
AB
C
AB
C
601
W
A
S
H
I
N
G
T
O
N
C
T
S
W
#
2
A
C
S
R
A
90'
85'
5
5
'
80'
60'
5
0
'
5
6
'
NEW RECLOSER
SW#X94392
SOLID BLADE
#6CU
CB
A
#6CU
#2
A
C
S
R
C
C
#6
C
U
C
TE
R
R
A
G
L
E
N
S
T
S
E
LONGMIRE ST
50
'
50
'
6
0
'
40'
45'
SW#T94394
DU
R
A
N
T
S
T
S
#2ACSR CB
A
LONGMIRE ST
#6C
U
C
B
A
#2A
C
S
R
RE-FUSE @ 100T
15425
SW#X94393
D
E
-
E
N
E
R
G
I
Z
E
D
1
0
0
T
H
A
V
E
S
E
50
'
55'
N.O.
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
J. CALLAHAN 206.503.1520 .
A. DUNN .02.10.25
N/A .N/A
S. LEWISON .02.10.25
REDT # ( RW-134414 )YELM
TAHOMA TERRA APARTMENTS PH 2
3Ø PRIMARY U/G LINE EXTENSION - 8 M/F BLDGS, 103 UNITS
14730 TAHOMA BLVD SE (P#78640000010), YELM, WA 98597
PUGET SOUND ENERGY
N/A N/A
N/A 105104609
AS SHOWN 3 OF 4
THURSTON N/A N/A QSTHLE
24SW-T17N-R01E N/A N/A
1701E095 1702E116 1701E095 YEL-25
COMCAST
TED AXTELL
253.878.2794
LUMEN
DEWAYNE RICHERT
253.221.0133
RIGHT OF WAY
LINDA OLSON
425.786.4806
.
.
.
...
...
...
EX OVERHEAD CIRCUIT MAP 1702E116
SCALE: 6" = 1 MILE
EX UNDERGROUND CIRCUIT MAP 1701E095
NOT TO SCALE
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
1" = 50'
SITE PLAN (2)
1" = 50'
SITE PLAN (4)
1" = 50'
SITE PLAN (3)
Site:
Grid #:
Recloser Company ID#:
Controller Company ID#:
RECLOSER
Action:Installed Removed
Recloser Material ID#:
Controller Material ID#:
Recloser Type:
Foreman to redline the following information
G&W Viper 15.5kV w/ VS
9999668
9999667
X
559497-147251
P1A
SITE 1
SITE
SITE SPECIFIC NOTES
AT P01 (559497-147251) 45' CLASS 1, 2005
-POLE TO BE REPLACED
-REMOVE POLE AND ALL PSE EQUIPMENT
AT NEW P1A
-POLE TO BE SET 5' N OF EX P01
-INSTALL NEW 45' CLASS 1 POLE (PD451) 6010.1000
-INSTALL 11' DOUBLE WOOD DISTRIBUTION ARMS (ARD2S11) 6011.1010
-INSTALL 12kV 600A G&W VOLTAGE SENSOR INLINE RECLOSER W/CPT (REC15VGWTS) 6023.1021
-INSTALL SW#X94392
-INSTALL EX. GRID #559497-147251
AT P02 (559361-147132) 45' CLASS 1, 2005
POLE TO REMAIN
-RE-FUSE @ 100T (3412700); TAP 3Ø
-INSTALL SW#X94393
AT P03 (559368-147022) 45' CLASS 2, 2005
POLE TO REMAIN
-REMOVE (3) 100T FUSES
-INSTALL (3) SOLID BLADES (9995608)
-INSTALL SW#T94394
SITE 2
SITE 3SITE 4
NEW @ P1A:
%V DROP: 4.8
% FLICKER: 5.6
EXISTING @ P01:
% V. DROP: 4.9
% FLICKER: 5.6
Other sites not
shown due to
OH nature of work.
3.10.25
F
E
E
D
YEL
25
NEW 1/O AL
EKB109-AØ
EKB110-BØ
EKB111-CØ
AØAEN979
BØAEN980
CØAEN981
AØAEN000
BØAEN001
CØAEN002
AØAFA000
BØAFA001
CØAFA002
NEW 1/O AL
EKB100-AØ
EKB101-BØ
EKB102-CØ
NEW 1/O AL
EKB106-AØ
EKB107-BØ
EKB108-CØ
NEW 1/O AL
EKB103-AØ
EKB104-BØ
EKB105-CØ
AØAEN991
AØAEN985
BØAEN986
CØAEN987
AØAEN982
BØAEN983
CØAEN984
AØAEN988
BØAEN989
CØAEN990
BØAEN997
BØEJL548
(3) 300KCMIL
(3) 300KCMIL
(3) 300KCMIL
(6) 300KCMIL
(3) 300KCMIL
(3) 300KCMIL
(3) 300KCMIL
(3) 300KCMIL
DEVELOPER RESPONSIBLE
FOR CONDUIT/WIRE FROM
VAULT TO METER LOCATION
BLDG H
7 UNITS
1000 SQFT
BLDG G
12 UNITS
1000 SQFT
BLDG F
12 UNITS
900 SQFT
BLDG E
12 UNITS
900 SQFT
BLDG D
12 UNITS
900 SQFT
BLDG C
24 UNITS
900 SQFT
BLDG B
12 UNITS
900 SQFT
BLDG A
12 UNITS
900 SQFT
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
J. CALLAHAN 206.503.1520 .
A. DUNN . 02.10.25
N/A .N/A
S. LEWISON . 02.10.25
REDT # ( RW-134414 )YELM
TAHOMA TERRA APARTMENTS PH 2
3Ø PRIMARY U/G LINE EXTENSION - 8 M/F BLDGS, 103 UNITS
14730 TAHOMA BLVD SE (P#78640000010), YELM, WA 98597
PUGET SOUND ENERGY
N/A N/A
N/A 105104609
N/A 4 OF 4
THURSTON N/A N/A QSTHLE
24SW-T17N-R01E N/A N/A
1701E095 1702E116 1701E095 YEL-25
COMCAST
TED AXTELL
253.878.2794
LUMEN
DEWAYNE RICHERT
253.221.0133
RIGHT OF WAY
LINDA OLSON
425.786.4806
.
.
.
...
...
...
NEW PRIMARY UNDERGROUND CIRCUIT ONE-LINE DIAGRAM
NOT TO SCALE
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
VAULT & EQUIPMENT TABLE
SITE # GRID #
VAULT SIZE &
COVER
TYPE & SIZE
EQUIPMENT IN
VAULT
PRIMARY
BUSHINGS TRANSFORMER ID NUMBERS
(COMPANY ID)
AS-BUILT INFORMATION
LB DC FOREMAN: INCLUDE PHASE TAPPED
V01 559398
146893
4'8"x4'8"x4'
w/20"x44" Hole
Matid: 7663900
Cover: 7655200
150KVA PM TRF
120/208
Matid: 6258100
3 -
PM3P15S 6045.5000 3Ø
CONNECTOR (7651002)
MOUNTING KIT (7651008)X3
V02 559440
146897
4'8"x4'8"x4'
w/20"x44" Hole
Matid: 7663900
Cover: 7655200
225KVA PM TRF
120/208
Matid: 6258150
3 -
PM3P15S 6045.5000 3Ø
CONNECTORS (7651002),
(7651000) X2
MOUNTING (7651008)x5
V03 559496
146889
4'8"x4'8"x4'
w/20"x44" Hole
Matid: 7663900
Cover: 7655200
150KVA PM TRF
120/208
Matid: 6258100
3 -
PM3P15S 6045.5000 3Ø
CONNECTORS (7651002),
(7651000)
MOUNTING (7651008)x4
J01 559473
146906
4'8"x7'x5'
w/2-3' Sq Doors
Matid: 7663200
J-Box Below Grade
w/4-Pos J-Bus x3
Matid: 7625900
12 -JBOX15L 6055.1030 3Ø
ELB10J 6041.1000
Existing
J02
559477
146894
4'8"x7'x5'
w/2-3' Sq Doors
Matid: Existing
J-Box Below Grade
w/4-Pos J-Bus x3
Matid: Existing
3 -
ELB10J 6041.1000 TAP 3Ø
PRIMARY CABLE & CONDUIT TABLE
LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE
FROM TO
SIZE
(IN)QTY.
DESIGN
LENGTH
(FT)
BENDS PULL
(LBS)
PULL
REV
(LBS)
CABLE SIZE
DESIGN
LENGTH
(FT)
PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED LUBRICANT (Gal.)
90° 45°22° 11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE EST. ACTUAL
J02 J01 4 1 90 - 1 - -176 174 3Ø 1/0 AL JKT 100 EKB100 EKB101 EKB102 -0.7
J01 V01 4 1 785 - - - -466 466 3Ø 1/0 AL JKT 795 EKB103 EKB104 EKB105 -5.5
J01 V02 4 1 345 - - - -265 265 3Ø 1/0 AL JKT 355 EKB106 EKB107 EKB108 -2.5
J01 V03 4 1 325 1 3 - -475 466 3Ø 1/0 AL JKT 335 EKB109 EKB110 EKB111 -2.3
4" PVC (FT) & BENDS =1545 1 4 0 0
3Ø 1/0 AL JKT TOTAL (FT) =1585 TTL (Gal.)11.0
NOT TO SCALE
NEW CONDUIT DIAGRAM
CUST. OWNED
PRIMARY 4"
CONDUIT LEGEND
3.10.25