THE SUMMIT AT THOMPSON LAKE 2025-02-10REAssoc version: 2024.3.131.0 Project Information Project: THE SUMMIT AT THOMPSON LAKE Location: THURSTON COUNTY, WA Owner: Designer: rjr Date: February 10, 2025 Facing & Geogrid Facing Unit: GravityStone Edge (CAN) Geogrid: Mirafi Geotechnical Information Zone Phi coh gamma Reinforced 32 0 120 Retained 32 0 120 Foundation 32 50 120 Leveling Pad 40 0 135 Summary There are 17 GS Edge walls one this site. The layout was done from the Civil plans dated 1/2/2025. The site soils are gravely sand material as noted in the Geotechnical report provided. The original layout was done using Civil plans from 11/28/24. After reviewing the plans, the revised set was sent dated that include many changes to wall layouts. Quantities Units Geogrid Wall count Wall Length Cap Units Edge 3XT AREA Unit Fill LvlPad Stone (cy) Rein Fill Steps 1 Tract 'E' 392 198 1359 433 1458 24 22 72 225 9 2 Lot 58 89 63 220 53 252 4 5 12 26 5 3 Lots 56-57 89 46 72 0 95 2 3 4 5 3 4 Lots 55-45 RA 665 360 5296 3067 5476 88 37 267 1686 43 5 Lots 97-98 94 55 252 76 280 5 94 14 29 8 6 Lots 91-96 RA 246 131 1109 531 1175 19 14 57 218 22 7 Lots 83-84 RA 87 45 249 107 272 5 5 13 29 6 8 Lots 83-85 RA 93 50 364 156 389 6 5 19 60 5 9 Lots 87-83 RA 282 146 2758 2270 2831 46 16 140 1240 56 10 Lots 80-81 RA 176 97 658 214 707 12 10 36 98 21 11 Lots 78-61 877 165 3171 5254 3254 52 48 365 5840 62 11A Lots 61-65 195 147 646 242 720 12 11 33 111 13 12 Lot 40 55 41 189 92 210 4 3 11 38 11 13 Lots 5-13 428 237 1095 382 1214 21 24 56 150 9 14 Lots 33-29 317 174 2425 1731 2512 40 17 124 896 48 15 Lots 15-17 110 63 135 23 167 3 6 8 12 7 16 Lots 18-19 92 50 288 97 313 5 5 15 41 12 TOTALS 4287 2068 20286 14728 21320 348 1246 10704 340 AREA 1034 20286 SF TOTALS 21320 sf 14728 348 sy The quantities shown are “neat” counts, contingency values should be added for construction estimates. The soil parameters used for this preliminary quantity estimate were assumed. Actual on-site conditions may differ from the assumed conditions and may cause the estimated quantities to change. This preliminary quantity estimates for GravityStone Edge and is meant to assist the contractor in preparation of a bid package. It does not include additional materials that may or may not be required to construct the wall(s) including but not limited to waste, filter fabric, drain tile or other materials to address drop structures and other obstructions in the reinforced zone. It is the responsibility of the contractor to verify these quantities provided through their own estimate. Race Engineering Assoc., LLC accepts no responsibility or any discrepancies between quantities provided in this estimate and quantities required by the final approved design.