Loading...
Floor Truss LayoutTruss Connector Total List Manuf Product Qty Simpson HHUS26-2 1 Simpson LUS46 4 GARAGE 5.5x13.5 GLB (DN)5.5x9 GLB (DN) 5.5X15 GLB (UP) FAU IB 350# DRAG LOAD FOLLOW ALL BRACING REQUIREMENTS AS SPECIFIED IN THE TRUSS ENGINEERING SEALS PACKET STOVE VENT LV L B E A M ( U P ) 5.5X15 GLB (UP) 3.5x10.5 GLB (DN) OPT. COVERED PATIO B02 B02 B02 B06 B04 B01 B01 B01 B01 B05 B01 B01 B01 B06 B04 B01 B01 B01 B01 B05 B01 B01 B01 B01 B01 B03 F05G F0 8 G F0 1 E F0 3 F0 4 F0 6 F0 6 F0 9 F0 9 F0 9 F0 9 F0 9 F0 9 F0 9 F0 9 F0 9 F1 0 E F1 1 E F1 3 F0 4 F07G F0 9 F1 4 G LU S 4 6 LU S 4 6 HHUS26-2 LU S 4 6 LU S 4 6 1 3 4 5 6 F02(2)F02A(3) F12(10) 4- 0 0 - 0 0 10 - 0 0 - 0 0 30 - 0 0 - 0 0 54 - 0 0 - 0 0 42 - 0 0 - 0 0 56 - 0 0 - 0 0 40-00-00 8-00-00 12 - 0 2 - 0 8 4-10-00 2-00-00 3- 0 2 - 0 0 1- 0 8 - 0 8 2- 0 0 - 0 0 2- 0 0 - 0 0 2- 0 0 - 0 0 2- 0 0 - 0 0 1- 0 8 - 0 0 11 - 1 1 1- 0 4 - 0 5 2- 0 0 - 0 0 2- 0 0 - 0 0 2- 0 0 - 0 8 1- 1 1 - 0 7 2- 0 0 - 0 0 2- 0 0 - 0 1 1- 0 2 - 0 4 1- 0 9 - 0 0 1- 0 0 - 1 3 2- 0 0 - 0 0 2- 0 0 - 0 0 2- 0 0 - 0 0 2- 0 0 - 0 0 2- 0 0 - 0 0 10 - 0 0 - 0 4 10 - 0 0 - 0 0 19-11-10 14-05-08 5-06-08 12 - 0 0 - 0 0 3-06-00 8-00-00 3-06-00 5-00-00 20-00-00 40-00-00 ** IMPORTANT ** = INDICATES LEFT ENDAddress:30222 11th Pl S,Federal Way,WA 98023 J1182641F2 Plan: 2603/A/Dining & Cov Pat Opt/Gar RT Job Name: - THIS IS A TRUSS PLACEMENT PLAN ONLY. All trusses are designed as individual building components built to the building designer's specifications as given to us in the plans, see individual truss design sheets for specific loading and design. - VERIFY ALL DIMENSIONS. Temporary truss bracing is the responsibility of the general contractor, permanent bracing is the responsibility of the building designer. Individual bracing of "at- compression" truss pieces is marked out on the truss seals and it is the responsibility of the contractor to verify it is installed as specified. - Do not install broken/damaged trusses or trusses that do not match the jobsite conditions, please inform your salesman if any such conditions are discovered. - All Truss-To-Structural element connections shown on this layout are a suggestion provided as a courtesy to the builder and must be specified in the construction documents as approved by the building designer per ANSI/TPI 1-2014 2.3.2.4 prior to their installation. 5/9/2025 Estimate By: Marco Fimbres Summit @ Steel Lake Ryan Kittelson Job Number: Soundbuilt NW, LLC Finalized By: Marco Fimbres Loading TC/LL=40.0 lb/ft² TC/DL=10.0 lb/ft² BC/LL=0.0 lb/ft² BC/DL=5.0 lb/ft² IBC 2021 Drawing Type: Customer:Sales Rep: Date: Lot 10 Floor Trusses