Loading...
Roof Truss LayoutTruss Connector Total List Manuf Product Qty Simpson LUC26Z 1 Simpson LUS24 9 Simpson LUS26 14 GARAGE 9/12 9/12 9/12 9/12 5/12 5/12 9/12 4/12 FOLLOW ALL BRACING REQUIREMENTS AS SPECIFIED IN THE TRUSS ENGINEERING PACKET2x12RafterOPT. COVER PATIO TOTAL BLOCK COUNT =83 C01 B02 C00 B00 A0 0 A0 2 A0 5 E0 0 E0 2 D00 D01 D02 M0 1 E M0 3 M0 4 E P02 P01E LU S 2 6 LU S 2 6 LU S 2 6 LU S 2 6 LU S 2 6 LU S 2 6 LU S 2 6 LU S 2 6 LU S 2 4 LU S 2 4 LU S 2 4 LU S 2 4 LU S 2 4 LU S 2 4 LU S 2 4 LUS24 LUS24 LUC26Z LU S 2 6 LU S 2 6 LU S 2 6 LU S 2 6 LU S 2 6 LU S 2 6 E01(9) A01(6) A01(4)A04(6) A03(3) B0 1 ( 6 ) M02(9)M03A(7) D0 3 ( 2 ) 28 - 0 0 - 0 0 2- 0 0 - 0 0 30 - 0 0 - 0 0 10 - 0 0 - 0 0 13-06-00 28 - 0 0 - 0 0 14 - 0 0 - 0 0 2- 0 0 - 0 0 8- 0 8 2- 0 0 - 0 0 14 - 1 1 - 0 8 5-00-001- 0 0 - 0 0 1- 0 0 - 0 0 15-00-00 20-00-00 4- 0 0 - 0 0 4- 0 6 - 0 0 2-00-00 10 - 0 0 - 0 0 2-00-00 20-05-08 19-06-08 12 - 0 0 - 0 0 14-00-00 5- 0 8 13 - 0 0 - 0 8 ** IMPORTANT ** = INDICATES LEFT ENDAddress:30222 11th Pl S,Federal Way,WA 98023 J1182641 Date: Sales Rep: Ryan KittelsonRoof Trusses Soundbuilt NW, LLC Plan: 2603/A/Dining & Cov Pat Opt/Gar RT Job Name: - THIS IS A TRUSS PLACEMENT PLAN ONLY. All trusses are designed as individual building components built to the building designer's specifications as given to us in the plans, see individual truss design sheets for specific loading and design. - VERIFY ALL DIMENSIONS. Temporary truss bracing is the responsibility of the general contractor, permanent bracing is the responsibility of the building designer. Individual bracing of "at- compression" truss pieces is marked out on the truss seals and it is the responsibility of the contractor to verify it is installed as specified. - Do not install broken/damaged trusses or trusses that do not match the jobsite conditions, please inform your salesman if any such conditions are discovered. - All Truss-To-Structural element connections shown on this layout are a suggestion provided as a courtesy to the builder and must be specified in the construction documents as approved by the building designer per ANSI/TPI 1-2014 2.3.2.4 prior to their installation. 5/12/2025 Estimate By: Marco Fimbres Summit @ Steel Lake Drawing Type: Job Number: Finalized By: Marco FimbresLot 10 Loading TC/LL=25.0 lb/ft² TC/DL=8.0 lb/ft² BC/LL=0.0 lb/ft² BC/DL=7.0 lb/ft² WIND=110 mph EXP=SuburbanAreas Customer: