105107100_CityOfYelmReservoir103rd Ave SE
17029
17021
TPN 64303100500
TPN 64303100400
Owner / Developer Contact Info
officeATTN:
City of Yelm
106 2nd St SE
Yelm, WA 98597
Patrick Hughes (360) 878-2042
10
5
1
0
7
1
0
0
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
515963432 105107100
514071074 104353297
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm Svc
Relocation
Removal
Temporary
Job Order
Distribution
HP Main
HP Svc/MSA
PROJECT
LOCATION
Vicinity Map (Lat,Long: 46.9381,-122.5779 )
OVERHEAD CIRCUIT MAP
SCALE: 6"= 1 MILE
SITE PLAN
SCALE: 1" = 30'
JOB SITE
CIRCUIT FEET ADDED: 0'
Sq. Footage: N/A
Panel Size: 200AMP
Heat Type:ELEC
Est. Demand: 6kW
LRC: 65
% V. Drop:0.7%
% Flicker:2.8%
N
PSE Locates Req'd
Developer Locates Req'd Yes
Yes
No
YesFlagging Req'd
Outages Req'd
SITE SPECIFIC NOTES
AT P01 GRID # 559212-148133
EXIST 25kVA 120/240v OH XFMR TO REMAIN
CONN 1/0 OH SECONDARY
AT P02
INST 35' CL3 POLE (AS STAKED) Note: Rock & Rake Pole if Necessary 3-10
INST RIGID CLEVIS (N)
CONN (1) RUN OF CUST OWNED 3/0 WIRE
CUST TO INST 3" RISER PER "CONDUIT RISER DETAIL"
INST GRID #559207-148128
AT M01
PERM METER
P01 TO P02:
INST 1/0 OH SECONDARY TPLX ±85' (TOTAL BILLABLE LGTH = ±85')3-5
AU
D
25kVA 120/240v
Fault Current: 6,100
R/X: 0.8 %Z: 1.7
CUSTOMER NOTE:
SITE MUST BE READY 1-WEEK PRIOR TO CONSTRUCTION DATE.
J.Singleton (360) 522-3156
John.Singleton@pse.com
(360) 522-3156
John Singleton
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
REV#DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
02/20/25
M.Taylor 85-5970 02/20/25
M.Taylor 85-5970 02/20/25
REQ'D N/A
City of Yelm - Reservoir
Cmrcl - OH Secondary Line Extension & OH to UG Svc
17021 103rd Ave SE Yelm, WA 98597
PSE
105107100
AS NOTED 01/01
THURSTON QSTHLE
NE¼,Sect29,T17,R02E
1702E080 1702E116 1702E080 YEL-26
POWER GENERAL NOTES - COMMERCIAL PROJECT
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
4.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
5.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
6.Roads shall be paved or have a compacted , crushed rock base in place.
7.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
8.All work is to be done in accordance with local municipal and county permit requirements as applicable.
9.Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point.
10.Inclement weather conditions may cause delays in construction times and dates.
11.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's
primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will
provide any and all shoring or they will side slope the trench to 1:1.
R/W
R/W
R/W
# 4 CU
559212-148133
25kVA 120/240v AØ
T89179 25T
WO# 101118503
Feed
R/W
R/W
559200-148174
559205-148174
25 kVA (A)
559207-148128
PERM METER
Pole Table (NEW)
Work
Location
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P02 560452-140483 35 CL3
TOP VIEW
5" Min
CL
LC
Direction of Vehicular Traffic
CONDUIT RISER PLACEMENT DETAIL (P02)
SCALE: NONE
Field Face
Quadrant
Climbing
Space
Road Face
Quadrant
Climbing
Space
CONDUIT RISER DETAIL - (P02)
SCALE: NONE
SIDE VIEW
ITEMS IN SHADED AREA INSTALLED BY PSE
20'
Electric Service Handbook 2017 — Cmrcl/Ind and Multifamily Projects
PSE’S POWER POLE
6"
SEE
10'
WORK
SPACE
8' MIN
SEE NOTE 3
12" MIN
SEE NOTE 4
24"
SECONDARY
9'
5"
M
I
N
S
E
P
A
R
A
T
I
O
N
Comm. Neut.
TH
I
S
P
O
R
T
I
O
N
I
S
I
N
S
T
A
L
L
E
D
B
Y
P
S
E
INSTALLATION NOTES:
1.All customer-provided material must be on-site for PSE to install.
2.The 1st customer-installed standoff bracket must be located 6 in.
belowgrade on the pole.
3.The 2nd customer-installed standoff bracket must be located 8 ft
abovegrade on the pole.
4.Customer-installed conduit riser sections shall extend 12 inches
belowgrade. The remaining abovegrade conduit risers shall be
installed 9 ft abovegrade.
5.Maintain 5-in. minimum separation between the pole and conduit
risers.
6.Leave sufficient service cable (Item 9) coiled for PSE crew to install
through the top 25 ft riser section and complete connection to
transformer(s).
TH
I
S
P
O
R
T
I
O
N
I
S
I
N
S
T
A
L
L
E
D
B
Y
C
U
S
T
O
M
E
R
NOTE 2
INST 1/0 OH SEC TPLX ±85'