Loading...
105107100_CityOfYelmReservoir103rd Ave SE 17029 17021 TPN 64303100500 TPN 64303100400 Owner / Developer Contact Info officeATTN: City of Yelm 106 2nd St SE Yelm, WA 98597 Patrick Hughes (360) 878-2042 10 5 1 0 7 1 0 0 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. GAS PHONE CABLE TV 515963432 105107100 514071074 104353297 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Perm Svc Relocation Removal Temporary Job Order Distribution HP Main HP Svc/MSA PROJECT LOCATION Vicinity Map (Lat,Long: 46.9381,-122.5779 ) OVERHEAD CIRCUIT MAP SCALE: 6"= 1 MILE SITE PLAN SCALE: 1" = 30' JOB SITE CIRCUIT FEET ADDED: 0' Sq. Footage: N/A Panel Size: 200AMP Heat Type:ELEC Est. Demand: 6kW LRC: 65 % V. Drop:0.7% % Flicker:2.8% N PSE Locates Req'd Developer Locates Req'd Yes Yes No YesFlagging Req'd Outages Req'd SITE SPECIFIC NOTES AT P01 GRID # 559212-148133 EXIST 25kVA 120/240v OH XFMR TO REMAIN CONN 1/0 OH SECONDARY AT P02 INST 35' CL3 POLE (AS STAKED) Note: Rock & Rake Pole if Necessary 3-10 INST RIGID CLEVIS (N) CONN (1) RUN OF CUST OWNED 3/0 WIRE CUST TO INST 3" RISER PER "CONDUIT RISER DETAIL" INST GRID #559207-148128 AT M01 PERM METER P01 TO P02: INST 1/0 OH SECONDARY TPLX ±85' (TOTAL BILLABLE LGTH = ±85')3-5 AU D 25kVA 120/240v Fault Current: 6,100 R/X: 0.8 %Z: 1.7 CUSTOMER NOTE: SITE MUST BE READY 1-WEEK PRIOR TO CONSTRUCTION DATE. J.Singleton (360) 522-3156 John.Singleton@pse.com (360) 522-3156 John Singleton E-Mail: Cell Phone: Project Manager Contact Information: Manager: DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT REV#DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP 02/20/25 M.Taylor 85-5970 02/20/25 M.Taylor 85-5970 02/20/25 REQ'D N/A City of Yelm - Reservoir Cmrcl - OH Secondary Line Extension & OH to UG Svc 17021 103rd Ave SE Yelm, WA 98597 PSE 105107100 AS NOTED 01/01 THURSTON QSTHLE NE¼,Sect29,T17,R02E 1702E080 1702E116 1702E080 YEL-26 POWER GENERAL NOTES - COMMERCIAL PROJECT 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. 2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 4.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. 5.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. 6.Roads shall be paved or have a compacted , crushed rock base in place. 7.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. 8.All work is to be done in accordance with local municipal and county permit requirements as applicable. 9.Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. 10.Inclement weather conditions may cause delays in construction times and dates. 11.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. R/W R/W R/W # 4 CU 559212-148133 25kVA 120/240v AØ T89179 25T WO# 101118503 Feed R/W R/W 559200-148174 559205-148174 25 kVA (A) 559207-148128 PERM METER Pole Table (NEW) Work Location Pole Data Grid #Height Class Year Remarks / Location Ref. P02 560452-140483 35 CL3 TOP VIEW 5" Min CL LC Direction of Vehicular Traffic CONDUIT RISER PLACEMENT DETAIL (P02) SCALE: NONE Field Face Quadrant Climbing Space Road Face Quadrant Climbing Space CONDUIT RISER DETAIL - (P02) SCALE: NONE SIDE VIEW ITEMS IN SHADED AREA INSTALLED BY PSE 20' Electric Service Handbook 2017 — Cmrcl/Ind and Multifamily Projects PSE’S POWER POLE 6" SEE 10' WORK SPACE 8' MIN SEE NOTE 3 12" MIN SEE NOTE 4 24" SECONDARY 9' 5" M I N S E P A R A T I O N Comm. Neut. TH I S P O R T I O N I S I N S T A L L E D B Y P S E INSTALLATION NOTES: 1.All customer-provided material must be on-site for PSE to install. 2.The 1st customer-installed standoff bracket must be located 6 in. belowgrade on the pole. 3.The 2nd customer-installed standoff bracket must be located 8 ft abovegrade on the pole. 4.Customer-installed conduit riser sections shall extend 12 inches belowgrade. The remaining abovegrade conduit risers shall be installed 9 ft abovegrade. 5.Maintain 5-in. minimum separation between the pole and conduit risers. 6.Leave sufficient service cable (Item 9) coiled for PSE crew to install through the top 25 ft riser section and complete connection to transformer(s). TH I S P O R T I O N I S I N S T A L L E D B Y C U S T O M E R NOTE 2 INST 1/0 OH SEC TPLX ±85'