28188-Yelm High School Boilers-HVAC-PS1-signedDRAWING INDEX
VICINITY MAP
SITE MAP
MECHANICAL GENERAL NOTESMECHANICAL ABBREVIATIONS MECHANICAL LEGEND
”
LEGAL DESCRIPTION
APN NUMBER
Design Team
FOR CITY USE
www.hermanson.com
Fax:
Tel:
YELM HIGH SCHOOL
BOILERS
ISSUE FOR PERMIT
Revisions
Key Plan
M0.00
CONSTRUCTION
STANDARDS
- HVAC
June 10, 2025
CONDENSING GAS BOILER DETAIL
NOT TO SCALE
1
M0.01
NOTES:
1. INSTALL STRAINER AT UNIT IF NOT INSTALLED AT DISTRIBUTION PUMP.
2. PUMP MAY BE PROVIDED INTEGRAL WITH BOILER - REFER TO EQUIPMENT SCHEDULE.
REFER TO VIBRATION
ISOLATION SCHEDULE
FOR ISOLATION
REQUIREMENTSUNION (TYP)
GAS REGULATOR
GAS SHUTOFF VALVE
MAX.OF 4X'S MAIN PIPE Ø
HYDRONIC MAIN
CHECK VALVE
PRESSURE
GAUGE (TYP)
STRAINER
ISOLATION VALVES ON
COIL/UNIT PIPING PER
MECH CODE CHAPTER 12
(TYP)
THERMOMETER (TYP)FLUE TO OUTSIDE
OF BUILDING
RELIEF VALVE
PIPED FULL SIZE
TO DRAIN
P&T TAP (TYP)GAS BOILER
HOUSEKEEPING
PAD (BY GC)
SENSOR WELL FOR CONTROLS
AND FLOW SWITCH (BY GC)
DRAIN TO FLOOR DRAIN (NOT
STORM/ROOF DRAIN) THRU
CONDENSATE NEUTRALIZER KIT
SENSOR WELL FOR CONTROLS
(FLOW SWITCH)
SENSOR WELLS FOR
CONTROLS (TYP)
Design Team
FOR CITY USE
www.hermanson.com
Fax:
Tel:
YELM HIGH SCHOOL
BOILERS
ISSUE FOR PERMIT
Revisions
Key Plan
M0.01
SCHEDULES
SHEET
- HVAC
June 10, 2025
Design Team
FOR CITY USE
www.hermanson.com
Fax:
Tel:
YELM HIGH SCHOOL
BOILERS
ISSUE FOR PERMIT
Revisions
Key Plan
M0.02
CONSTRUCTION
STANDARDS
- HVAC
June 10, 2025
Design Team
FOR CITY USE
www.hermanson.com
Fax:
Tel:
YELM HIGH SCHOOL
BOILERS
ISSUE FOR PERMIT
Revisions
Key Plan
M0.03
CONSTRUCTION
STANDARDS
- HVAC
June 10, 2025
M2.01D
PARTIAL 1ST FLOOR
DEMO PLAN
- HVAC
Design Team
FOR CITY USE
www.hermanson.com
Fax:
Tel:
YELM HIGH SCHOOL
BOILERS
ISSUE FOR PERMIT
Revisions
Key Plan
PARTIAL 1ST FLOOR DEMO PLAN - HVAC
June 10, 2025
M2.02D
PARTIAL 2ND FLOOR
DEMO PLAN
- HVAC
Design Team
FOR CITY USE
www.hermanson.com
Fax:
Tel:
YELM HIGH SCHOOL
BOILERS
ISSUE FOR PERMIT
Revisions
Key Plan
PARTIAL 2ND FLOOR DEMO PLAN - HVAC
June 10, 2025
MP2.01D
PARTIAL 1ST FLOOR
PIPING DEMO PLAN
- HVAC
Design Team
FOR CITY USE
www.hermanson.com
Fax:
Tel:
YELM HIGH SCHOOL
BOILERS
ISSUE FOR PERMIT
Revisions
Key Plan
PARTIAL 1ST FLOOR PIPING DEMO PLAN - HVAC
June 10, 2025
M2.01
PARTIAL 1ST
FLOOR PLAN
- HVAC
Design Team
FOR CITY USE
www.hermanson.com
Fax:
Tel:
YELM HIGH SCHOOL
BOILERS
ISSUE FOR PERMIT
Revisions
Key Plan
PARTIAL 1ST FLOOR PLAN - HVAC
June 10, 2025
M2.02
PARTIAL 2ND
FLOOR PLAN
- HVAC
Design Team
FOR CITY USE
www.hermanson.com
Fax:
Tel:
YELM HIGH SCHOOL
BOILERS
ISSUE FOR PERMIT
Revisions
Key Plan
PARTIAL 2ND FLOOR PLAN - HVAC
June 10, 2025
MP2.01
PARTIAL 1ST FLOOR
PIPING PLAN
- HVAC
Design Team
FOR CITY USE
www.hermanson.com
Fax:
Tel:
YELM HIGH SCHOOL
BOILERS
ISSUE FOR PERMIT
Revisions
Key Plan
PARTIAL 1ST FLOOR PIPING PLAN - HVAC
June 10, 2025