Loading...
Lot 78-TESC26 . 1 6 GARAGE STORM CLEANOUT ROOF LINE EX. SEWER RECLAIMED WATER PROPOSED CONTOUR EXISTING CONTOUR PROPOSED TREE GF: 346.3 FF: 346.8 28 . 3 4 28 . 1 6 28 . 3 4 30' 32' 35 ' 5' BSBL 25 ' BS B L HAY ST SE 10 ' P. U . E . PATIO SEWER STUB EX. STORM 5' 10 ' S. D . E . N37°31'21"W 40.00 N5 2 ° 2 8 ' 3 9 " E 9 1 . 5 0 N37°31'21"W 40.00 N5 2 ° 2 8 ' 3 9 " E 9 1 . 5 0 WATER METER 5'5' 5' PORCH 5' BSBL LOT 78 3,660± SF TEMPORARY CONSTRUCTION ENTRANCE 346 3 4 6 346 346 346 77 79 EX. WATER 5/19/2025 10:51 AM CFEMLING J:\2025\25103\PLOT PLANS\TESC\LOT 78.DWG 78 25103 DESIGN 12100 NE 195th St, Suite 300 Bothell, Washington 98011 425.885.7877 CIVIL ENGINEERING LANDSCAPE ARCHITECTURE PLANNING SURVEYING LOT 78 1623 CYPRESS (A) 5/19/25 9750 HAY ST SE LEGEND P.U.E.PUBLIC UTILITY EASEMENT S.D.E.PRIVATE STORM DRAIN EASEMENT TESC PLAN CONTRACTOR SHALL INSTALL SILT FENCE USING BEST MANAGEMENT PRACTICESALL OPEN AREAS SHALL BE COVERED WITH MULCH, THICK STRAW, OR PLASTIC SHEETING