Loading...
Calcs- Shelm Meadows- Plan 1843 HawthornLGI Homes - WA 12951 Bel Red Rd Bellevue, Washington 98005 Shelm Meadows Plan 1843 HAWTHORN INDEX TO STRUCTURAL CALCULATIONS Design Criteria SHEET 1 Vertical Analysis SHEETS 2-30 Lateral Analysis SHEETS L1-L31 OWNERSHIP OF DOCUMENTS: CALCULATIONS, DRAWINGS AND SPECIFICATIONS AS INSTRUMENTS OF SERVICE ARE, AND SHALL REMAIN THE PROPERTY OF THE ENGINEER. THEY ARE NOT TO BE USED ON OTHER PROJECTS OR EXTENSIONS OF THIS PROJECT EXCEPT BY AGREEMENT IN WRITING WITH THE APPROPRIATE COMPENSATION TO FELTEN GROUP, INC. WA-FE25-001103 130733 18325 N. ALLIED WAY, SUITE #200 * PHOENIX, AZ 85054 * PHONE: 602.867.2500 * FAX: 602.867.2503 02/07/25 2018 SHINGLE OR MEMBRANE PSF PSF 12.00 7.00 27.00 (MAX) GOVERNING CODE AND LATERAL LOAD CRITERIA: 3 SEC GUST (MPH): BUILDING CODE: MUNICIPALITY: Thurston County, WA 85/110 ROOF LOADS: ROOF FRAMING DEAD LOAD PSF 10.00NON-CONCURRENT ATTIC LL WITHOUT STORAGE (PSF) = LESS THAN 4:12 SLOPE ROOF LL (PSF) = 4:12 SLOPE AND GREATER TOTAL ROOF LL (PSF) = 16.00 20.00 15.00 ROOF FRAMING LIVE LOAD TOTAL ROOF DL (PSF) = DECK FRAMING LIVE LOAD TOTAL DECK LL (PSF) = 60.00 TOTAL FLOOR DL (PSF) = 10.00 WITH PARTITION WALLS (PSF) = +5.00 SEISMIC DESIGN CATEGORY: EXPOSURE AT MWFRS: EXPOSURE AT C & C: D2 C C TOTAL WALL DL (PSF) = INTERIOR WALL DEAD LOAD WITH TILE (PSF) = +5.00 EXTERIOR WALL DEAD LOAD WALL DEAD LOADS: FLOOR FRAMING LIVE LOAD TOTAL FLOOR LL (PSF) = 40.00 IBC/IRC TOTAL WALL DL (PSF) = TOTAL WALL DL W/ STONE VENEER (PSF) = SNOW LOAD TOTAL SNOW LOAD (PSF) = 20.00 FLOOR LOADS: FLOOR FRAMING DEAD LOAD PSF "Where quality engineering leads to lower costs." 2021 CLIENT: PROJECT: FELTENdROUP ARCHITECTURE I ENGINEERING I FORENSICS ROOF FRAMING PLAN DATE: SHEET OF BY: CLIENT: PROJECT: FELTENdROUP ARCHITECTURE I ENGINEERING I FORENSICS ROOF FRAMING PLAN DATE: SHEET OF BY: CLIENT: PROJECT: FELTENdROUP ARCHITECTURE I ENGINEERING I FORENSICS DATE: SHEET OF BY: UPPER FLOOR/LOWER ROOF FLOOR FRAMING PLAN FRAMING PLAN SHEET 5 OF BY CLIENT: PROJECT:PLAN 1843- VERTICAL LA Multi-Span Girder Key Girder Loading Point Loads Uniform Loads Id Load Type P (lb)x (ft)wstart (plf)wstop (plf)Total Length (ft) Span 3 (ft) Left Right xstart (ft)xstop (ft) Span 1 (ft) Span 2 (ft)Cantilever Data Truss Type Span 4 (ft)Girder Ply Requirements Based on Crushing Post Height Post Height Support Material Type Support Material Type Support Material Type Support Material Type Support Material Type Load Combo Max/Min Reaction R4 (lb) Load Combo Max/Min Reaction R5 (lb) Load Combo Bearing Length (in)/Hanger Bearing Length (in)/Hanger Bearing Length (in)/Hanger Bearing Length (in)/Hanger Bearing Length (in)/Hanger Max/Min Reaction R1 (lb) Load Combo Max/Min Reaction R2 (lb) Load Combo Max/Min Reaction R3 (lb) Post Height Post Height Posts / Hanger Posts / Hanger Posts / Hanger Posts / Hanger Fo u n d a t i o n S u p p o r t D e s i g n Support Condition Support Condition Support Condition Support Condition Support Condition Gi r d e r S u p p o r t De s i g n Post Height Posts / Hanger Support Location Support Location Support Location Support Location Support Location Slab Thickness (in)Slab Thickness (in)Slab Thickness (in)Slab Thickness (in)Slab Thickness (in) Bearing Pressure (psf)Bearing Pressure (psf)Bearing Pressure (psf)Bearing Pressure (psf)Bearing Pressure (psf) Support Width (in)Support Width (in)Support Width (in)Support Width (in)Support Width (in) Support Depth (in)Support Depth (in)Support Depth (in)Support Depth (in)Support Depth (in) Point Load at Support (lb)Point Load at Support (lb)Point Load at Support (lb)Point Load at Support (lb)Point Load at Support (lb) Girder Diagram Uniform Load at Support (plf)Uniform Load at Support (plf)Uniform Load at Support (plf)Uniform Load at Support (plf)Uniform Load at Support (plf) Support Size Support Size Support Size Support Size Support Size Printed by larissa.anaya on 02/06/2025 at 14:45 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\1843 HAWTHORN- Vertical Book.xlsm SHEET 6 OF BY Point Load at Support (lb)Point Load at Support (lb)Point Load at Support (lb)Point Load at Support (lb)Point Load at Support (lb) Girder Diagram Uniform Load at Support (plf)Uniform Load at Support (plf)Uniform Load at Support (plf)Uniform Load at Support (plf)Uniform Load at Support (plf) Support Size Support Size Support Size Support Size Support Size Support Width (in)Support Width (in)Support Width (in)Support Width (in)Support Width (in) Support Depth (in)Support Depth (in)Support Depth (in)Support Depth (in)Support Depth (in) Fo u n d a t i o n S u p p o r t D e s i g n Support Condition Support Condition Support Condition Support Condition Support Condition Gi r d e r S u p p o r t De s i g n Post Height Posts / Hanger Support Location Support Location Support Location Support Location Support Location Slab Thickness (in)Slab Thickness (in)Slab Thickness (in)Slab Thickness (in)Slab Thickness (in) Bearing Pressure (psf)Bearing Pressure (psf)Bearing Pressure (psf)Bearing Pressure (psf)Bearing Pressure (psf) Max/Min Reaction R7 (lb) Load Combo Max/Min Reaction R8 (lb) Post Height Post Height Posts / Hanger Posts / Hanger Posts / Hanger Posts / Hanger Support Size Support Size Support Size Support Size Support Size Post Height Post Height Support Material Type Support Material Type Support Material Type Support Material Type Support Material Type Load Combo Max/Min Reaction R9 (lb) Load Combo Max/Min Reaction R10 (lb) Load Combo Bearing Length (in)/Hanger Bearing Length (in)/Hanger Bearing Length (in)/Hanger Bearing Length (in)/Hanger Bearing Length (in)/Hanger Max/Min Reaction R6 (lb) Load Combo Point Load at Support (lb)Point Load at Support (lb)Point Load at Support (lb)Point Load at Support (lb)Point Load at Support (lb) Uniform Load at Support (plf)Uniform Load at Support (plf)Uniform Load at Support (plf)Uniform Load at Support (plf)Uniform Load at Support (plf) Support Width (in)Support Width (in)Support Width (in)Support Width (in)Support Width (in) Support Depth (in)Support Depth (in)Support Depth (in)Support Depth (in)Support Depth (in) Posts / Hanger Posts / Hanger Posts / Hanger Fo u n d a t i o n S u p p o r t D e s i g n Support Condition Support Condition Support Condition Support Condition Support Condition Support Location Support Location Support Location Support Location Support Location Slab Thickness (in)Slab Thickness (in)Slab Thickness (in)Slab Thickness (in)Slab Thickness (in) Bearing Pressure (psf)Bearing Pressure (psf)Bearing Pressure (psf)Bearing Pressure (psf)Bearing Pressure (psf) Post Height Post Height Post Height Support Material Type Support Material Type Support Material Type Support Material Type Support Material Type Load Combo Bearing Length (in)/Hanger Bearing Length (in)/Hanger Bearing Length (in)/Hanger Bearing Length (in)/Hanger Bearing Length (in)/Hanger Load Combo Max/Min Reaction R3 (lb) Load Combo Max/Min Reaction R4 (lb) Load Combo Max/Min Reaction R5 (lb) Span 8 (ft) Span 9 (ft) Gi r d e r S u p p o r t De s i g n Max/Min Reaction R1 (lb) Load Combo Max/Min Reaction R2 (lb) Post Height Post Height Posts / Hanger Posts / Hanger Id Load Type P (lb)x (ft)wstart (plf)wstop (plf)xstart (ft) Total Length, L (ft) Left Right Span 4 (ft)Girder Ply Requirements Based on Crushing xstop (ft) Span 1 (ft) Span 2 (ft) Span 3 (ft) Cantilever Data Truss Type Span 5 (ft) Span 6 (ft) Span 7 (ft) CLIENT: PROJECT:PLAN 1843- VERTICAL LA Single Multi-Span Girder Key Girder Loading Point Loads Uniform Loads Printed by larissa.anaya on 02/06/2025 at 14:45 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\1843 HAWTHORN- Vertical Book.xlsm SHEET 7 OF BY D 60 60 0.000 14.000 S 100 100 0.000 14.000 0.6W -44 -44 0.000 14.000 1120 1120 -54 -54 D 60 60 0.000 8.000 S 100 100 0.000 8.000 0.6W -44 -44 0.000 8.000 D 45 45 0.000 3.000 S 75 75 0.000 3.000 0.6W -33 -33 0.000 3.000 D 420 4.000 105 105 5.000 8.000 S 700 4.000 175 175 5.000 8.000 0.6W -306 4.000 -77 -77 5.000 8.000 1650 1950 -80 -94 To Framing Below To HangerFo u n d a t i o n S u p p o r t D e s i g n (0) 2x6 POSTS To Framing Below To Hanger 9.083 Hem-Fir Stud (2" to 4" wide)Gi r d e r S u p p o r t De s i g n D + S D + S USE PREFABRICATED GIRDER TRUSS WITH MINIMUM (1) PLY AT BEARING 0.6D + 0.6W 0.6D + 0.6W 5.5 Hanger No 2x Roof 8.000No Cantilever Data Truss Type Total Length (ft) 8.000 G2 To Hanger To Hanger Hanger Hanger Fo u n d a t i o n S u p p o r t D e s i g n To Hanger To Hanger Gi r d e r S u p p o r t De s i g n D + S D + S 0.6D + 0.6W 0.6D + 0.6W Cantilever Data Truss Type Total Length (ft) No 2x Roof 14.000No PROJECT:PLAN 1843- VERTICAL LA G1 CLIENT: 14.000 14' 116 116 8' 814 203 203 116 116 320 320 Printed by larissa.anaya on 02/06/2025 at 14:45 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\1843 HAWTHORN- Vertical Book.xlsm SHEET 8 OF BY D 15 15 0.000 30.000 S 25 25 0.000 30.000 0.6W -11 -11 0.000 30.000 D 60 60 0.000 5.000 S 100 100 0.000 5.000 0.6W -44 -44 0.000 5.000 D 731 6.000 15 15 7.000 19.000 S 1219 6.000 25 25 7.000 19.000 0.6W -533 6.000 -11 -11 7.000 19.000 D 731 20.000 60 60 21.000 30.000 S 1219 20.000 100 100 21.000 30.000 0.6W -533 20.000 -44 -44 21.000 30.000 4031 3789 -198 -187 Fo u n d a t i o n S u p p o r t D e s i g n Gi r d e r S u p p o r t De s i g n 770 770 NOT REQ'D NOT REQ'D 18 18 Fo u n d a t i o n S u p p o r t D e s i g n Conventional Conventional Edge Edge 2500 2500 14 14 (1) 2x6 POSTS (1) 2x6 POSTS Hem-Fir Stud (2" to 4" wide)Hem-Fir Stud (2" to 4" wide) 5.5 5.5 Gi r d e r S u p p o r t De s i g n D + S D + S 0.6D + 0.6W 0.6D + 0.6W 9.083 9.083 USE PREFABRICATED GIRDER TRUSS WITH MINIMUM (1) PLY AT BEARING Cantilever Data Truss Type Total Length (ft) No 2x Roof 30.000No G3 30.000 PROJECT:PLAN 1843- VERTICAL LA CLIENT: 30' 1417 1417 145 145 29 29 58 58 29 29 145 145 Printed by larissa.anaya on 02/06/2025 at 14:45 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\1843 HAWTHORN- Vertical Book.xlsm SHEET 9 OF BY Left Support Right Support Rleft (#)Rright (#) Vd Mmax fb F'b CD fv F'v CL Δactual Δmax CF/CV Cr Use: 191 191 90 0.000 4.250 165 203 5.5 5.5 398 1459 7.000 7.000 1.15 24 173 8.083 8.083 N/A N/A N/A N/A 0.995 0.047 0.170 Hem-Fir Stud (2" to 4" wide)Hem-Fir Stud (2" to 4" wide)N/A N/A N/A N/A 1.500 (1) 2x6 KS (1) 2x6 KS N/A N/A N/A N/A 1.00 Use:(1) 2x6 (1) 2x6 281 281 90 0.000 6.250 240 439 5.5 5.5 349 1256 7.000 7.000 1.15 22 173 8.083 8.083 N/A N/A N/A N/A 0.988 0.057 0.250 Hem-Fir Stud (2" to 4" wide)Hem-Fir Stud (2" to 4" wide)N/A N/A N/A N/A 1.300 (1) 2x6 KS (1) 2x6 KS N/A N/A N/A N/A 1.00 Use:(1) 2x6 (1) 2x6 1056 1056 650 0.000 3.250 758 858 5.5 5.5 681 1263 8.000 8.000 1.15 69 173 9.083 9.083 N/A N/A N/A N/A 0.994 0.030 0.130 Hem-Fir Stud (2" to 4" wide)Hem-Fir Stud (2" to 4" wide)N/A N/A N/A N/A 1.300 (1) 2x6 KS (1) 2x6 KS N/A N/A N/A N/A 1.00 Use:(1) 2x6 (1) 2x6 Select Support Select Support Use: Select Support Select Support Use: Select Support Select Support Use: PROJECT:PLAN 1843- VERTICAL LA Beam / Header Design and Loading CLIENT: Point Loads Uniform Loads Results Left Support Right Support Id Span (ft) P (#)x (ft)w (plf) Unbraced Length(ft) King Stud Height (ft)Slab Thickness (in)Bearing Pressure (psf) Trimmer and King Stud Material Standard Width (in)Standard Depth (in) start (ft)stop (ft) Bearing Length (in) / Hanger Support Condition Trimmer or Post Height (ft)Location Of Support H1 4.250 To Framing Below To Framing Below N/A N/A Material Type Member Size King Studs Uniform Load (plf)Point Load (#) Dual Spec Material Type Dual Spec Member Size Trimmers/ Hangers Size (in) H2 6.250 To Framing Below To Framing Below N/A N/A 4.250 Hem-Fir #2 Common Sizes 2-2x4 Hem-Fir #2 (2" to 4" wide)2x4 To Framing Below To Framing Below H3 3.250 To Framing Below To Framing Below N/A N/A 6.250 Hem-Fir #2 Common Sizes 2-2x6 Hem-Fir #2 (2" to 4" wide)2x6 To Framing Below To Framing Below 3.250 Hem-Fir #2 Common Sizes 2-2x6 Hem-Fir #2 (2" to 4" wide)2x8 To Framing Below To Framing Below Select Material Select Material Select Material Select Material Select Material Select Material Printed by larissa.anaya on 02/06/2025 at 14:45 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\1843 HAWTHORN- Vertical Book.xlsm SHEET 10 OF BY D 30 0.667 230 230 0.667 3.833 L 98 0.667 613 613 0.667 3.833 D 130 130 0.000 0.667 L 347 347 0.000 0.667 1499 1617 404 440 D 112 112 0.000 3.167 L 150 150 0.000 3.167 415 415 178 178 PROJECT:PLAN 1843- VERTICAL LA FG1 CLIENT: 3.833 Cantilever Data Truss Type Total Length (ft) No 4x Floor 3.833No Gi r d e r S u p p o r t De s i g n D + L D + L D D Hanger Hanger Fo u n d a t i o n S u p p o r t D e s i g n To Hanger To Hanger To Hanger To Hanger 3.167 FG2 No 4x Floor 3.167No Cantilever Data Truss Type Total Length (ft) Gi r d e r S u p p o r t De s i g n D + L D + L D D Hanger Hanger To Hanger To Hanger To Hanger To HangerFo u n d a t i o n S u p p o r t D e s i g n 3.167' 262 262 3.833' 128 477477 843 843 Printed by larissa.anaya on 02/06/2025 at 14:45 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\1843 HAWTHORN- Vertical Book.xlsm SHEET 11 OF BY D 178 7.500 30 30 0.000 7.500 L 238 7.500 80 80 0.000 7.500 D 15 15 7.500 18.958 L 40 40 7.500 18.958 483 1259 128 141 404 30 D 95 95 0.000 2.500 L 40 40 0.000 2.500 D 45 45 0.000 2.500 S 75 75 0.000 2.500 354 212 219 131 PROJECT:PLAN 1843- VERTICAL LA FG3 CLIENT: 9.625 9.333 Cantilever Data Truss Type Total Length (ft) No 4x Floor 18.958No Gi r d e r S u p p o r t De s i g n D + L D + L D + L USE PREFABRICATED 4x2 FLOOR GIRDER TRUSS Hem-Fir Stud (2" to 4" wide)Hem-Fir Stud (2" to 4" wide) D D D 3.125 3.5 5.5 Fo u n d a t i o n S u p p o r t D e s i g n To Framing Below Conventional To Framing Below 9.083 9.083 Edge To Framing Below (0) 2x4 POSTS (0) 2x6 POSTS 14 2500 18 200 To Framing Below NO FTG REQ'D To Framing Below 0.500 FG4 Yes 4x Floor 2.500No 2.000 Cantilever Data Truss Type Total Length (ft) Gi r d e r S u p p o r t De s i g n D + 0.75(L + S)D + 0.75(L + S) USE PREFABRICATED 4x2 FLOOR GIRDER TRUSS D D 3.125 3.125 To Framing Below To Framing Below To Framing Below To Framing Below To Framing Below To Framing BelowFo u n d a t i o n S u p p o r t D e s i g n 9.625'9.333' 415 110 110 55 55 0.5'2' 255 255 Printed by larissa.anaya on 02/06/2025 at 14:45 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\1843 HAWTHORN- Vertical Book.xlsm SHEET 12 OF BY D 30 30 0.000 2.667 L 80 80 0.000 2.667 D 228 0.000 S 113 0.000 532 60 329 -48 D 404 0.500 30 30 0.000 17.625 L 1094 0.500 80 80 0.000 17.625 2425 1012 657 276 PROJECT:PLAN 1843- VERTICAL LA FG5 CLIENT: 0.500 2.167 Cantilever Data Truss Type Total Length (ft) Yes 4x Floor 2.667No Gi r d e r S u p p o r t De s i g n D + 0.75(L + S)D + L USE PREFABRICATED 4x2 FLOOR GIRDER TRUSS D D + S 3.125 3.125 Fo u n d a t i o n S u p p o r t D e s i g n To Framing Below To Framing Below To Framing Below To Framing Below To Framing Below To Framing Below 17.625 FG6 No 4x Floor 17.625No Cantilever Data Truss Type Total Length (ft) Gi r d e r S u p p o r t De s i g n D + L D + L USE PREFABRICATED 4x2 FLOOR GIRDER TRUSS D D 3.5 3.5 9.083 9.083 Hem-Fir Stud (2" to 4" wide)Hem-Fir Stud (2" to 4" wide) (2) 2x4 POSTS (0) 2x4 POSTS To Framing Below To Framing Below To Framing Below To Framing BelowFo u n d a t i o n S u p p o r t D e s i g n 0.5'2.167' 340 110 110 17.625' 1499 110 110 Printed by larissa.anaya on 02/06/2025 at 14:45 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\1843 HAWTHORN- Vertical Book.xlsm SHEET 13 OF BY D 95 95 0.000 2.500 L 40 40 0.000 2.500 D 75 75 0.000 2.500 S 125 125 0.000 2.500 461 277 266 159 D 30 30 0.000 2.667 L 80 80 0.000 2.667 D 280 0.000 S 200 0.000 677 48 394 -80 PROJECT:PLAN 1843- VERTICAL LA FG7 CLIENT: 0.500 2.000 Cantilever Data Truss Type Total Length (ft) Yes 4x Floor 2.500No Gi r d e r S u p p o r t De s i g n D + S D + S USE PREFABRICATED 4x2 FLOOR GIRDER TRUSS D D 3.125 3.125 Fo u n d a t i o n S u p p o r t D e s i g n To Framing Below To Framing Below To Framing Below To Framing Below To Framing Below To Framing Below 0.500 FG8 Yes 4x Floor 2.667No 2.167 Cantilever Data Truss Type Total Length (ft) Gi r d e r S u p p o r t De s i g n D + 0.75(L + S)D + L USE PREFABRICATED 4x2 FLOOR GIRDER TRUSS D D + S 3.125 3.125 To Framing Below To Framing Below To Framing Below To Framing Below To Framing Below To Framing BelowFo u n d a t i o n S u p p o r t D e s i g n 0.5'2' 335 335 0.5'2.167' 480 110 110 Printed by larissa.anaya on 02/06/2025 at 14:45 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\1843 HAWTHORN- Vertical Book.xlsm SHEET 14 OF BY Lub,top (ft)TL (L/x) Lub,bot (ft)LL (L/x) Cr Ci CM CT Dmax (in) CLtop Dcant (in) CLbot Left dn (in)Dmax (in) CF/Cvtop Right dn (in)Dcant (in) CF/Cvbot Support Size Support Size Support Size Support Size Support Size Beam/Header Diagram Point Load at Support (lb)Point Load at Support (lb)Point Load at Support (lb)Point Load at Support (lb)Point Load at Support (lb) Uniform Load at Support (plf)Uniform Load at Support (plf)Uniform Load at Support (plf)Uniform Load at Support (plf)Uniform Load at Support (plf) Fo u n d a t i o n S u p p o r t D e s i g n Support Width (in)Support Width (in)Support Width (in)Support Width (in)Support Width (in) Support Depth (in)Support Depth (in)Support Depth (in)Support Depth (in)Support Depth (in) Slab Thickness (in)Slab Thickness (in)Slab Thickness (in)Slab Thickness (in)Slab Thickness (in) Bearing Pressure (psf)Bearing Pressure (psf)Bearing Pressure (psf)Bearing Pressure (psf)Bearing Pressure (psf) Support Material Type Support Material Type Trimmers / Hanger Trimmers / Hanger Trimmers / Hanger Trimmers / Hanger Trimmers / Hanger Support Condition Support Location Support Location Support Location Support Location Support Location King Studs King Studs King Studs King Studs King Studs Support Condition Support Condition Support Condition Support Condition Trimmer or Post Height Trimmer or Post Height King Stud Height King Stud Height King Stud Height King Stud Height King Stud Height Load Combo Max/Min Reaction R4 (lb) Load Combo Max/Min Reaction R5 (lb) Load Combo Bearing Length (in)/Hanger Bearing Length (in)/Hanger Bearing Length (in)/Hanger Bearing Length (in)/Hanger Bearing Length (in)/Hanger He a d e r / B e a m S u p p o r t De s i g n Max/Min Reaction R1 (lb) Load Combo Max/Min Reaction R2 (lb) Load Combo Max/Min Reaction R3 (lb) Trimmer or Post Height Trimmer or Post Height Trimmer or Post Height Support Material Type Support Material Type Support Material Type Member Size Dual Spec Material Type Dual Spec Member Size Span 2 (ft) Right DLL Limit Deflections DTL Span 3 (ft) Scarf Cut Data DTL DLL Span 1 (ft) NDS Factors Cantilever Data M+max (lb-ft)M+fb+ (psi)F'b+ (psi) Left DTL Limit xstop (ft) DL Creep Factor Vmax (lb)V fv (psi)F'v (psi) M-max (lb-ft)M-fb- (psi)F'b- (psi) Total Length, L (ft)DLL Span 4 (ft) Material Type Id Load Type P (lb)x (ft)wstart (plf)wstop (plf)xstart (ft) Header/Beam Loading Unbraced Lengths CLIENT: PROJECT:PLAN 1843- VERTICAL LA Multi-Span Header / Beam Key Allowable StressPoint Loads Uniform Loads Deflection Data Results Load Combo Actual Stress Printed by larissa.anaya on 02/06/2025 at 14:45 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\1843 HAWTHORN- Vertical Book.xlsm SHEET 15 OF BY D 155 155 0.000 3.250 240 S 125 125 0.000 3.250 360 Factors D 162 162 0.000 3.250 No L 367 367 0.000 3.250 1.000 D 15 15 0.000 3.250 No S 25 25 0.000 3.250 MC<=19% T<=100 -0.034 0.996 0.000 1.000 No -0.018 1.000 No 0.000 1.000 1175 1175 544 544 D 49 49 0.000 6.000 240 S 81 81 0.000 6.000 360 Factors No 1.000 No MC<=19% T<=100 -0.072 0.992 0.000 1.000 No -0.044 1.000 No 0.000 1.000 399 399 156 156 699 6" DIA. x 8" DEEP NO REBAR NOT REQ'D 18 Fo u n d a t i o n S u p p o r t D e s i g n Isolated Footing Conventional Edge 2500 2500 14 Doug-Fir #2 (2" to 4" wide)Hem-Fir Stud (2" to 4" wide) 4x4 POSTS (1) 2x6 POSTS 9 3.5 5.5 He a d e r / B e a m S u p p o r t De s i g n D + S D + S D D Hem-Fir #2 Common Sizes 2-2x6 Hem-Fir #2 (2" to 4" wide)2x8 9 Scarf Cut Data S 6.000 D + S 173 1260 No Deflections No 0 D 0 994 B2 6.000 Cantilever Data 599 D + S 475 1.000 338 D + S 31 699 699 NOT REQ'D NOT REQ'D 18 18 Fo u n d a t i o n S u p p o r t D e s i g n Conventional Conventional Edge Edge 2500 2500 14 14 (1) 2x6 KS (1) 2x6 KS Hem-Fir Stud (2" to 4" wide)Hem-Fir Stud (2" to 4" wide) (1) 2x6 TRIMMERS (1) 2x6 TRIMMERS Hem-Fir #2 Common Sizes 2-2x6 Select Material 8 8 He a d e r / B e a m S u p p o r t De s i g n D + 0.75(L + S)D + 0.75(L + S) D D 9.083 9.083 D + 0.75(L + S) 5.5 5.5 927 D + L 735 No Deflections 3.250 Scarf Cut Data 0.75(L + S)3.250 B1 1.000 819 D + L 74 150 1100 No 0 D 0 994 Cantilever Data PROJECT:PLAN 1843- VERTICAL LA CLIENT: 6' 130 130 3.25' 849 849 Printed by larissa.anaya on 02/06/2025 at 14:45 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\1843 HAWTHORN- Vertical Book.xlsm SHEET 16 OF BY D 110 110 0.000 5.250 240 S 50 50 0.000 5.250 360 Factors D 160 160 0.000 5.250 No L 360 360 0.000 5.250 1.000 No MC<=19% T<=100 -0.042 0.987 0.000 1.000 No -0.024 1.000 No 0.000 1.000 1667 1667 722 722 D 110 110 0.000 6.250 240 S 50 50 0.000 6.250 360 Factors D 160 160 0.000 6.250 No L 360 360 0.000 6.250 1.000 No MC<=19% T<=100 -0.085 0.985 0.000 1.000 No -0.048 1.000 No 0.000 1.000 1985 1985 860 860 658 658 NOT REQ'D NOT REQ'D 18 18 Fo u n d a t i o n S u p p o r t D e s i g n Conventional Conventional Edge Edge 2500 2500 14 14 (1) 2x6 KS (1) 2x6 KS Hem-Fir Stud (2" to 4" wide)Hem-Fir Stud (2" to 4" wide) (1) 2x6 TRIMMERS (1) 2x6 TRIMMERS 8 9.083 9.083 5.5 5.5 He a d e r / B e a m S u p p o r t De s i g n D + L D + L D D Hem-Fir #2 Common Sizes 2-2x10 Select Material 8 Scarf Cut Data L 6.250 D + L 150 921 No Deflections No 0 D 0 842 B4 6.250 Cantilever Data 3101 D + L 870 1.000 1509 D + L 82 658 658 NOT REQ'D NOT REQ'D 18 18 Fo u n d a t i o n S u p p o r t D e s i g n Conventional Conventional Edge Edge 2500 2500 14 14 (1) 2x6 KS (1) 2x6 KS Hem-Fir Stud (2" to 4" wide)Hem-Fir Stud (2" to 4" wide) (1) 2x6 TRIMMERS (1) 2x6 TRIMMERS Hem-Fir #2 Common Sizes 2-2x10 Select Material 8 8 He a d e r / B e a m S u p p o r t De s i g n D + L D + L D D 9.083 9.083 D + L 5.5 5.5 2188 D + L 614 No Deflections 5.250 Scarf Cut Data L 5.250 B3 1.000 1191 D + L 64 150 923 No 0 D 0 842 Cantilever Data PROJECT:PLAN 1843- VERTICAL LA CLIENT: 5.25' 680 680 6.25' 680 680 Printed by larissa.anaya on 02/06/2025 at 14:45 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\1843 HAWTHORN- Vertical Book.xlsm SHEET 17 OF BY D 338 338 0.000 2.917 240 L 900 900 0.000 2.917 360 Factors No 1.000 No MC<=19% T<=100 -0.016 0.994 0.000 1.000 No -0.012 1.000 No 0.000 1.000 1812 1812 499 499 D 110 110 0.000 6.000 1.000 240 S 50 50 0.000 6.000 360 Factors D 139 139 0.000 20.000 No L 370 370 0.000 20.000 1.000 D 15 15 0.000 5.000 No S 25 25 0.000 5.000 MC<=19% D 131 6.000 -22 -22 7.000 20.000 T<=100 -0.839 L 38 6.000 82 82 7.000 20.000 1.000 0.000 S 70 6.000 -26 -26 7.000 20.000 1.000 No -0.600 0.983 No 0.000 D 690 20.000 1.000 L 434 20.000 S 394 20.000 6255 7066 2182 2201 770 658 NOT REQ'D NOT REQ'D 18 18 Fo u n d a t i o n S u p p o r t D e s i g n Conventional Conventional Edge Edge 2500 2500 14 14 Hem-Fir Stud (2" to 4" wide)Hem-Fir Stud (2" to 4" wide) (2) 2x6 POSTS (2) 2x6 POSTS 10 5.5 5.5 He a d e r / B e a m S u p p o r t De s i g n D + L D + L D D Glu-Lam (24F-1.8E)5 1/8 x 15 GLB Select Material 10 Scarf Cut Data L 20.000 D + L 265 2359 No Deflections No 0 D 0 1665 B6 20.000 Cantilever Data 30129 D + L 1881 1.000 5444 D + L 106 1301 1301 NOT REQ'D NOT REQ'D 18 18 Fo u n d a t i o n S u p p o r t D e s i g n Conventional Conventional Edge Edge 2500 2500 14 14 (1) 2x6 KS (1) 2x6 KS Hem-Fir Stud (2" to 4" wide)Hem-Fir Stud (2" to 4" wide) (1) 2x6 TRIMMERS (1) 2x6 TRIMMERS Hem-Fir #2 Common Sizes 2-2x8 Hem-Fir #2 (2" to 4" wide)2x10 8 8 He a d e r / B e a m S u p p o r t De s i g n D + L D + L D D 9.083 9.083 D + L 5.5 5.5 1321 D + L 603 No Deflections 2.917 Scarf Cut Data L 2.917 B5 1.000 1087 D + L 75 150 1014 No 0 D 0 918 Cantilever Data PROJECT:PLAN 1843- VERTICAL LA CLIENT: 2.917' 1238 1238 20' 239 1518 709 709 669669 509509 543 543 Printed by larissa.anaya on 02/06/2025 at 14:45 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\1843 HAWTHORN- Vertical Book.xlsm SHEET 18 OF BY D 155 155 0.000 6.000 1.000 240 S 125 125 0.000 6.000 360 Factors D 139 139 0.000 20.000 No L 370 370 0.000 20.000 1.000 D 15 15 0.000 5.000 No S 25 25 0.000 5.000 MC<=19% D 159 6.000 -34 -34 7.000 20.000 T<=100 -0.842 L 38 6.000 82 82 7.000 20.000 1.000 0.000 S 117 6.000 -46 -46 7.000 20.000 1.000 No -0.600 0.983 No 0.000 D 690 20.000 1.000 L 434 20.000 S 394 20.000 6453 7010 2380 2145 D 30 30 0.000 3.125 1.000 240 S 50 50 0.000 3.125 360 Factors D 266 4.125 394 394 5.125 16.250 No L 63 4.125 131 131 5.125 16.250 1.000 S 195 4.125 246 246 5.125 16.250 No MC<=19% D 20 20 0.000 16.250 T<=100 -0.589 0.995 0.000 1.000 No -0.234 1.000 No 0.000 1.000 3355 5333 2029 3204 PROJECT:PLAN 1843- VERTICAL LA CLIENT: B6.1 1.000 5589 D + L 109 265 2359 No 0 D 0 1665 Cantilever Data 30164 D + L 1883 No Deflections 20.000 Scarf Cut Data L 20.000 D + L 5.5 5.5 He a d e r / B e a m S u p p o r t De s i g n D + L D + L D D Glu-Lam (24F-1.8E)5 1/8 x 15 GLB Select Material 10 10 Hem-Fir Stud (2" to 4" wide)Hem-Fir Stud (2" to 4" wide) (2) 2x6 POSTS (2) 2x6 POSTS Fo u n d a t i o n S u p p o r t D e s i g n Conventional Conventional Edge Edge 2500 2500 14 14 18 18 770 658 NOT REQ'D NOT REQ'D B7.1 16.250 Cantilever Data 20120 D + 0.75(L + S)2060 1.000 4479 D + 0.75(L + S)143 305 2746 No Deflections No 0 D 0 1665 Scarf Cut Data 0.75(L + S)16.250 D + 0.75(L + S) 5.5 5.5 He a d e r / B e a m S u p p o r t De s i g n D + 0.75(L + S)D + 0.75(L + S) D D Glu-Lam (24F-1.8E)3 1/8 x 15 GLB Select Material 10 10 Hem-Fir Stud (2" to 4" wide)Hem-Fir Stud (2" to 4" wide) (1) 2x6 POSTS (2) 2x6 POSTS Fo u n d a t i o n S u p p o r t D e s i g n Conventional Conventional Edge Edge 2500 2500 14 14 9 9 200 699 NOT REQ'D NOT REQ'D 20' 314 1518 829 829 789789 509509 511 511 16.25' 523 100 100 20 20 791 791 Printed by larissa.anaya on 02/06/2025 at 14:45 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\1843 HAWTHORN- Vertical Book.xlsm SHEET 19 OF BY D 30 30 0.000 3.125 1.000 240 S 50 50 0.000 3.125 360 Factors D 219 4.125 329 329 5.125 16.250 No L 63 4.125 131 131 5.125 16.250 1.000 S 117 4.125 138 138 5.125 16.250 No MC<=19% D 20 20 0.000 16.250 T<=100 -0.469 0.995 0.000 1.000 No -0.168 1.000 No 0.000 1.000 2720 4238 1746 2717 D 155 155 0.000 5.250 240 S 125 125 0.000 5.250 360 Factors D 141 3.166 56 56 0.000 2.166 No L 342 3.166 150 150 0.000 2.166 1.000 D 135 135 4.166 5.250 No L 360 360 4.166 5.250 MC<=19% D 40 40 0.000 5.250 T<=100 -0.073 S 25 25 0.000 5.250 0.991 0.000 1.000 No -0.035 1.000 No 0.000 1.000 1311 1527 690 764 699 To Framing Below NOT REQ'D 18 Fo u n d a t i o n S u p p o r t D e s i g n To Framing Below Conventional Edge 2500 14 Hem-Fir Stud (2" to 4" wide)Hem-Fir Stud (2" to 4" wide) (1) 2x6 POSTS (1) 2x6 POSTS 9 5.5 5.5 He a d e r / B e a m S u p p o r t De s i g n D + 0.75(L + S)D + 0.75(L + S) D D Hem-Fir #2 Common Sizes 2-2x8 Select Material 9 Scarf Cut Data 0.75(L + S)5.250 D + 0.75(L + S) 173 1011 No Deflections No 0 D 0 918 B8 5.250 Cantilever Data 1631 D + L 745 1.000 1012 D + 0.75(L + S)70 200 699 NOT REQ'D NOT REQ'D 9 9 Fo u n d a t i o n S u p p o r t D e s i g n Conventional Conventional Edge Edge 2500 2500 14 14 Hem-Fir Stud (2" to 4" wide)Hem-Fir Stud (2" to 4" wide) (1) 2x6 POSTS (1) 2x6 POSTS Glu-Lam (24F-1.8E)3 1/8 x 15 GLB Select Material 10 10 He a d e r / B e a m S u p p o r t De s i g n D + 0.75(L + S)D + 0.75(L + S) D D D + 0.75(L + S) 5.5 5.5 16013 D + 0.75(L + S)1640 No Deflections 16.250 Scarf Cut Data 0.75(L + S)16.250 B7 1.000 3099 D + L 99 265 2746 No 0 D 0 1665 Cantilever Data PROJECT:PLAN 1843- VERTICAL LA CLIENT: 16.25' 398 100 100 20 20 619 619 5.25' 483 551 551 345 345 840840 Printed by larissa.anaya on 02/06/2025 at 14:45 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\1843 HAWTHORN- Vertical Book.xlsm SHEET 20 OF BY D 320 320 0.000 2.250 240 S 400 400 0.000 2.250 360 Factors D 40 40 0.000 2.250 No L 40 40 0.000 2.250 1.000 No MC<=19% T<=100 -0.032 0.998 0.000 1.000 No -0.017 1.000 No 0.000 1.000 857 857 407 407 D 338 338 0.000 5.250 240 L 900 900 0.000 5.250 360 Factors No 1.000 No MC<=19% T<=100 -0.058 0.993 0.000 1.000 No -0.042 1.000 No 0.000 1.000 3268 3268 905 905 To Framing Below To Framing BelowFo u n d a t i o n S u p p o r t D e s i g n To Framing Below To Framing Below Hem-Fir Stud (2" to 4" wide)Hem-Fir Stud (2" to 4" wide) (1) 2x6 POSTS (1) 2x6 POSTS 9 5.5 5.5 He a d e r / B e a m S u p p o r t De s i g n D + L D + L D D Doug-Fir #2 (2" to 4" wide)4x10 Select Material 9 Scarf Cut Data L 5.250 D + L 180 1072 No Deflections No 0 D 0 972 B10 5.250 Cantilever Data 4289 D + L 1031 1.000 2334 D + L 108 770 770 NOT REQ'D NOT REQ'D 18 18 Fo u n d a t i o n S u p p o r t D e s i g n Conventional Conventional Edge Edge 2500 2500 14 14 (1) 2x6 KS (1) 2x6 KS Hem-Fir Stud (2" to 4" wide)Hem-Fir Stud (2" to 4" wide) (1) 2x6 TRIMMERS (1) 2x6 TRIMMERS Hem-Fir #2 Common Sizes 2-2x4 Hem-Fir #2 (2" to 4" wide)2x6 8 8 He a d e r / B e a m S u p p o r t De s i g n D + S D + S D D 9.083 9.083 D + S 5.5 5.5 482 D + S 945 No Deflections 2.250 Scarf Cut Data S 2.250 B9 1.000 635 D + S 91 173 1463 No 0 D 0 1148 Cantilever Data PROJECT:PLAN 1843- VERTICAL LA CLIENT: 2.25' 800 800 5.25' 1238 1238 Printed by larissa.anaya on 02/06/2025 at 14:45 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\1843 HAWTHORN- Vertical Book.xlsm SHEET 21 OF BY D 24 24 0.000 29.750 1.000 240 L 64 64 0.000 29.750 360 Factors Yes 1.150 No MC<=19% T<=100 -0.079 0.991 0.000 0.907 No -0.056 1.000 No 0.000 1.000 357 991 991 357 105 291 291 105 D 404 6.250 24 24 0.000 10.250 1.000 240 L 855 6.250 64 64 0.000 10.250 360 Factors No 1.150 No MC<=19% T<=100 -0.180 0.999 0.000 1.000 No -0.122 1.000 No 0.000 1.000 982 1258 320 409 PROJECT:PLAN 1843- VERTICAL LA CLIENT: J1 1.000 465 D + L 50 150 1065 No -894 D + L 501 976 Cantilever Data 703 D + L 394 10.000 No Deflections 9.875 9.875 Scarf Cut Data L 29.750 D + L D 5.125 3.125 3.125 5.125 Hem-Fir #2 (2" to 4" wide)2x10 Select Material He a d e r / B e a m S u p p o r t De s i g n D + L D + L D + L D + L D D D To Framing Below To Framing Below To Framing Below To Framing Below Fo u n d a t i o n S u p p o r t D e s i g n To Framing Below To Framing Below To Framing Below To Framing Below To Framing Below To Framing Below To Framing Below To Framing Below J2 10.250 Cantilever Data 4268 D + L 798 1.000 1185 D + L 43 150 1074 No Deflections No 0 D 0 968 Scarf Cut Data L 10.250 D + L 5.125 5.125 He a d e r / B e a m S u p p o r t De s i g n D + L D + L D D Hem-Fir #2 (2" to 4" wide)3-2x10 Select Material To Framing Below To Framing Below Fo u n d a t i o n S u p p o r t D e s i g n To Framing Below To Framing Below To Framing Below To Framing Below 9.875'10'9.875' 88 88 10.25' 1259 88 88 Printed by larissa.anaya on 02/06/2025 at 14:45 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\1843 HAWTHORN- Vertical Book.xlsm SHEET 22 OF BY D 56 56 0.000 2.833 240 L 150 150 0.000 2.833 360 Factors No 1.000 No MC<=19% T<=100 -0.002 0.963 0.000 1.000 No -0.002 1.000 No 0.000 1.000 295 295 83 83 D 11 11 0.000 2.833 1.000 240 L 30 30 0.000 2.833 360 Factors No 1.000 No MC<=19% T<=100 0.000 0.991 0.000 1.000 No 0.000 1.000 No 0.000 1.000 62 62 19 19 PROJECT:PLAN 1843- VERTICAL LA CLIENT: J3 1.000 135 D + L 15 150 901 No 0 D 0 842 Cantilever Data 209 D + L 117 No Deflections 2.833 Scarf Cut Data L 2.833 D + L Hanger Hanger Hem-Fir #2 (2" to 4" wide)2x10 Select Material He a d e r / B e a m S u p p o r t De s i g n D + L D + L D D Fo u n d a t i o n S u p p o r t D e s i g n To Hanger To Hanger To Hanger To Hanger J4 2.833 Cantilever Data 44 D + L 25 1.000 28 D + L 3 150 926 No Deflections No 0 D 0 842 Scarf Cut Data L 2.833 D + L Hanger Hanger He a d e r / B e a m S u p p o r t De s i g n D + L D + L D D Hem-Fir #2 (2" to 4" wide)2x10 Select Material Fo u n d a t i o n S u p p o r t D e s i g n To Hanger To Hanger To Hanger To Hanger 2.833' 206 206 2.833' 41 41 Printed by larissa.anaya on 02/06/2025 at 14:45 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\1843 HAWTHORN- Vertical Book.xlsm SHEET 23 OF BY D 19 1.250 1.000 240 L 42 1.250 360 D 83 2.750 Factors L 212 2.750 No D 905 4.333 1.150 L 2363 4.333 No D 905 9.500 MC<=19% L 2363 9.500 T<=100 -0.028 0.999 0.000 D 24 24 0.000 10.499 0.995 No -0.020 L 64 64 0.000 10.499 1.000 No 0.000 1.000 34 5057 2805 18 1438 790 D 19 1.250 1.000 240 L 42 1.250 360 D 83 2.750 Factors L 212 2.750 Yes 1.150 D 24 24 0.000 10.250 No L 64 64 0.000 10.250 MC<=19% T<=100 -0.247 0.991 0.000 1.000 No -0.175 1.000 No 0.000 1.000 734 551 214 161 PROJECT:PLAN 1843- VERTICAL LA CLIENT: J5 1.000 2737 D + L 99 150 1074 No -1408 D + L 263 1070 Cantilever Data 2754 D + L 515 6.166 No Deflections 4.333 Scarf Cut Data L 10.499 D + L 5.125 3.5 5.125 Hem-Fir #2 (2" to 4" wide)3-2x10 Select Material 4 He a d e r / B e a m S u p p o r t De s i g n D + L D + L D + L D D D To Framing Below To Framing Below Doug-Fir #2 (2" to 4" wide) 4x4 POSTS Fo u n d a t i o n S u p p o r t D e s i g n To Framing Below Isolated Footing To Framing Below 2500 To Framing Below 20" DIA. x 9" DEEP NO REBAR To Framing Below J6 10.250 Cantilever Data 1675 D + L 940 1.000 664 D + L 72 150 1065 No Deflections No 0 D 0 968 Scarf Cut Data L 10.250 D + L 5.125 5.125 He a d e r / B e a m S u p p o r t De s i g n D + L D + L D D Hem-Fir #2 (2" to 4" wide)2x10 Select Material To Framing Below To Framing Below Fo u n d a t i o n S u p p o r t D e s i g n To Framing Below To Framing Below To Framing Below To Framing Below 4.333'6.166' 62 295 3268 3268 88 88 10.25' 62 295 88 88 Printed by larissa.anaya on 02/06/2025 at 14:45 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\1843 HAWTHORN- Vertical Book.xlsm SHEET 24 OF BY Lub,top (ft)TL (L/x) Lub,bot (ft)LL (L/x) Cr Ci CM CT Dmax (in) CLtop Dcant (in) CLbot Left dn (in)Dmax (in) CF/Cvtop Right dn (in)Dcant (in) CF/Cvbot Support Size Support Size Support Size Support Size Support Size Beam/Header Diagram Point Load at Support (lb)Point Load at Support (lb)Point Load at Support (lb)Point Load at Support (lb)Point Load at Support (lb) Uniform Load at Support (plf)Uniform Load at Support (plf)Uniform Load at Support (plf)Uniform Load at Support (plf)Uniform Load at Support (plf) Fo u n d a t i o n S u p p o r t D e s i g n Support Width (in)Support Width (in)Support Width (in)Support Width (in)Support Width (in) Support Depth (in)Support Depth (in)Support Depth (in)Support Depth (in)Support Depth (in) Slab Thickness (in)Slab Thickness (in)Slab Thickness (in)Slab Thickness (in)Slab Thickness (in) Bearing Pressure (psf)Bearing Pressure (psf)Bearing Pressure (psf)Bearing Pressure (psf)Bearing Pressure (psf) Support Material Type Support Material Type Trimmers / Hanger Trimmers / Hanger Trimmers / Hanger Trimmers / Hanger Trimmers / Hanger Support Condition Support Location Support Location Support Location Support Location Support Location King Studs King Studs King Studs King Studs King Studs Support Condition Support Condition Support Condition Support Condition Trimmer or Post Height Trimmer or Post Height King Stud Height King Stud Height King Stud Height King Stud Height King Stud Height Load Combo Max/Min Reaction R9 (lb) Load Combo Max/Min Reaction R10 (lb) Load Combo Bearing Length (in)/Hanger Bearing Length (in)/Hanger Bearing Length (in)/Hanger Bearing Length (in)/Hanger Bearing Length (in)/Hanger He a d e r / B e a m S u p p o r t De s i g n Max/Min Reaction R6 (lb) Load Combo Max/Min Reaction R7 (lb) Load Combo Max/Min Reaction R8 (lb) Trimmer or Post Height Trimmer or Post Height Trimmer or Post Height Support Material Type Support Material Type Support Material Type Uniform Load at Support (plf)Uniform Load at Support (plf)Uniform Load at Support (plf)Uniform Load at Support (plf)Uniform Load at Support (plf) Support Size Support Size Support Size Support Size Support Size Support Width (in)Support Width (in) Support Depth (in)Support Depth (in)Support Depth (in)Support Depth (in)Support Depth (in) Point Load at Support (lb)Point Load at Support (lb)Point Load at Support (lb)Point Load at Support (lb)Point Load at Support (lb) Support Location Slab Thickness (in)Slab Thickness (in)Slab Thickness (in)Slab Thickness (in)Slab Thickness (in) Fo u n d a t i o n S u p p o r t D e s i g n Support Condition Support Condition Support Condition Support Condition Support Condition Support Location Support Location Support Location Support Location Bearing Pressure (psf)Bearing Pressure (psf)Bearing Pressure (psf)Bearing Pressure (psf)Bearing Pressure (psf) Support Width (in)Support Width (in)Support Width (in) Trimmers / Hanger Trimmers / Hanger Trimmers / Hanger Trimmers / Hanger Trimmers / Hanger King Studs King Studs King Studs King Studs King Studs Support Material Type Support Material Type Support Material Type Support Material Type Support Material Type Bearing Length (in)/Hanger Bearing Length (in)/Hanger Bearing Length (in)/Hanger Trimmer or Post Height Trimmer or Post Height Trimmer or Post Height Trimmer or Post Height Trimmer or Post Height Span 5 (ft) Span 6 (ft) Span 7 (ft) Span 8 (ft) Max/Min Reaction R3 (lb) Load Combo Max/Min Reaction R4 (lb) Load Combo Max/Min Reaction R5 (lb) Load Combo Span 9 (ft) He a d e r / B e a m S u p p o r t De s i g n Max/Min Reaction R1 (lb) Load Combo Max/Min Reaction R2 (lb) Load Combo Bearing Length (in)/Hanger Bearing Length (in)/Hanger King Stud Height King Stud Height King Stud Height King Stud Height King Stud Height Scarf Cut Data DTL DLL DLL Span 4 (ft)Material Type Member Size Total Length, L (ft) Allowable StressPoint Loads Uniform Loads Id Load Type P (lb)x (ft)wstart (plf)wstop (plf)xstart (ft) Header/Beam Loading Unbraced Lengths Deflection Data Results Load Combo Actual Stress Span 1 (ft) NDS Factors Cantilever Data M+max (lb-ft)M+fb+ (psi) Left Span 3 (ft) CLIENT: PROJECT:PLAN 1843- VERTICAL LA Single Multi-Span Header / Beam Key F'v (psi) F'b+ (psi) fb- (psi)F'b- (psi) DTL Limit M-max (lb-ft)M- xstop (ft) DL Creep Factor Vmax (lb)V fv (psi) Span 2 (ft) Right DLL Limit Deflections DTL Printed by larissa.anaya on 02/06/2025 at 14:45 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\1843 HAWTHORN- Vertical Book.xlsm SHEET 25 OF BY D 188 188 0.000 16.666 1.000 240 L 500 500 0.000 16.666 360 Factors No 1.000 No MC<=19% T<=100 -0.023 0.999 0.013 0.996 No -0.017 1.000 No 0.010 1.000 3237 5107 3237 908 1432 908 Fo u n d a t i o n S u p p o r t D e s i g n He a d e r / B e a m S u p p o r t De s i g n Fo u n d a t i o n S u p p o r t D e s i g n 16" DIA. x 8" DEEP NO REBAR 20" DIA. x 9" DEEP NO REBAR 16" DIA. x 8" DEEP NO REBAR 0 0 0 2500 2500 2500 Isolated Footing Isolated Footing Isolated Footing Doug-Fir #2 (2" to 4" wide)Doug-Fir #2 (2" to 4" wide)Doug-Fir #2 (2" to 4" wide) 3.5 3.5 3.5 4 4 4 He a d e r / B e a m S u p p o r t De s i g n D + L D + L D + L D D D 4x4 POSTS 4x4 POSTS 4x4 POSTS Scarf Cut Data D + L L 16.666L 1.833 Doug-Fir #2 (2" to 4" wide)4x10 Select Material 742 1076 6.500 Yes 180 Deflections D + L 6.500 1.833 Cantilever Data 1606 D + L 386 1079 Yes 120 -3086 D + L C1 1.000 1989 D + L 92 180 PROJECT:PLAN 1843- VERTICAL LA CLIENT: 1.833'6.5'6.5'1.833' 688 688 Printed by larissa.anaya on 02/06/2025 at 14:45 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\1843 HAWTHORN- Vertical Book.xlsm SHEET 26 OF BY Total Conn A35 Total ASCE LOAD COMBINATIONS CD Load (plf)Cap (plf)Cap (plf)Cap (plf) D 41 D 0.90 41 232 0 232 L D + L 1.00 41 258 0 258 Lr D + Lr 1.25 41 323 0 323 S 69 D + S 1.15 110 297 0 297 R D + R 1.25 41 323 0 323 0.6W D + 0.75L + 0.75Lr 1.25 41 323 0 323 E D + 0.75L + 0.75S 1.15 93 297 0 297 D + 0.75L + 0.75R 1.25 41 323 0 323 2x8 D + 0.6W 1.60 41 413 0 413 SPF/HF D + 0.7E 1.60 41 413 0 413 3 D + 0.75(0.6W) + 0.75L + 0.75Lr 1.60 41 413 0 413 .131 x 3"D + 0.75(0.6W) + 0.75L + 0.75S 1.60 93 413 0 413 Normal D + 0.75(0.6W) + 0.75L + 0.75R 1.60 41 413 0 413 2 D + 0.75(0.7E) + 0.75L + 0.75Lr 1.60 41 413 0 413 24 in.D + 0.75(0.7E) + 0.75L + 0.75S 1.60 93 413 0 413 D + 0.75(0.7E) + 0.75L + 0.75R 1.60 41 413 0 413 in. Total Conn A35 Total ASCE LOAD COMBINATIONS CD Load (plf)Cap (plf)Cap (plf)Cap (plf) D D 0.90 0 0 0 0 L D + L 1.00 0 0 0 0 Lr D + Lr 1.25 0 0 0 0 S D + S 1.15 0 0 0 0 R D + R 1.25 0 0 0 0 0.6W D + 0.75L + 0.75Lr 1.25 0 0 0 0 E D + 0.75L + 0.75S 1.15 0 0 0 0 D + 0.75L + 0.75R 1.25 0 0 0 0 D + 0.6W 1.60 0 0 0 0 D + 0.7E 1.60 0 0 0 0 D + 0.75(0.6W) + 0.75L + 0.75Lr 1.60 0 0 0 0 D + 0.75(0.6W) + 0.75L + 0.75S 1.60 0 0 0 0 D + 0.75(0.6W) + 0.75L + 0.75R 1.60 0 0 0 0 D + 0.75(0.7E) + 0.75L + 0.75Lr 1.60 0 0 0 0 in.D + 0.75(0.7E) + 0.75L + 0.75S 1.60 0 0 0 0 D + 0.75(0.7E) + 0.75L + 0.75R 1.60 0 0 0 0 in. Total Conn A35 Total ASCE LOAD COMBINATIONS CD Load (plf)Cap (plf)Cap (plf)Cap (plf) D D 0.90 0 0 0 0 L D + L 1.00 0 0 0 0 Lr D + Lr 1.25 0 0 0 0 S D + S 1.15 0 0 0 0 R D + R 1.25 0 0 0 0 0.6W D + 0.75L + 0.75Lr 1.25 0 0 0 0 E D + 0.75L + 0.75S 1.15 0 0 0 0 D + 0.75L + 0.75R 1.25 0 0 0 0 D + 0.6W 1.60 0 0 0 0 D + 0.7E 1.60 0 0 0 0 D + 0.75(0.6W) + 0.75L + 0.75Lr 1.60 0 0 0 0 D + 0.75(0.6W) + 0.75L + 0.75S 1.60 0 0 0 0 D + 0.75(0.6W) + 0.75L + 0.75R 1.60 0 0 0 0 D + 0.75(0.7E) + 0.75L + 0.75Lr 1.60 0 0 0 0 in.D + 0.75(0.7E) + 0.75L + 0.75S 1.60 0 0 0 0 D + 0.75(0.7E) + 0.75L + 0.75R 1.60 0 0 0 0 in. Conn Placement: No. of cols/Conn Spacing of Connector: No. of A35: Spacing of A35: w (plf) Ledger Size: Ledger Material: No. of Connectors: Type of Connector: No. of cols/Conn Spacing of Connector: No. of A35: Spacing of A35: Load Type Conn Placement: No. of cols/Conn Spacing of Connector: No. of A35: Spacing of A35: Load Type w (plf) Ledger Size: Ledger Material: No. of Connectors: Type of Connector: CLIENT: PROJECT:PLAN 1843- VERTICAL LA L1 Load Type w (plf) Conn Placement: Ledger Size: Ledger Material: No. of Connectors: Type of Connector: Printed by larissa.anaya on 02/06/2025 at 14:45 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\1843 HAWTHORN- Vertical Book.xlsm SHEET 27 OF BY S1 2 3.00 180 YES 1.50 0.7 NO ROOF TYPE:15.00 8.08 2.00 12.00 1.00 25.00 2.00 10.91 FLOOR TYPE:15.00 9.08 18.00 40.00 12.00 TARGET WALL 9.00 17.42 9.08 SPECIES TITLE 8.98 12.00 SCANT CFB b (IN) 5.00 FB (PSI)CFC d (IN) 8.71 FC (PSI)CR A (IN2) 5.50 0.00 EMIN (PSI)c Sx (IN3) Ex (PSI) CD 0.90 196.82 " o.c. 1.00 99.40 " o.c. 1.25 245.82 " o.c. 1.15 201.60 " o.c. 1.25 245.82 " o.c. 1.25 132.64 " o.c. 1.15 118.40 " o.c. 1.25 132.64 " o.c. 1.60 84.24 " o.c. 1.60 117.12 " o.c. 1.60 75.00 " o.c. 1.60 72.36 " o.c. 1.60 75.00 " o.c. 1.60 92.28 " o.c. 1.60 88.44 " o.c. 1.60 92.28 " o.c. 1.60 59.77 " o.c.GOVERNS 1.00 " o.c. 24 " o.c. 1 Per Table IBC 1604.3 footnote f, for ASD the wind load for deflection shall be taken as 0.42 times the C&C loading. The 0.42 factor is a conversion from Ultimate loads to service loads (0.6W) and then further multiplied by 0.7 to adjust for the 10 year mean return interval. Therefore, 0.6 * 0.7 = 0.42 D + 0.75(0.6W) + 0.75L + 0.75LR D + 0.75(0.6W) + 0.75L + 0.75S D + 0.75(0.6W) + 0.75L + 0.75R D + 0.75(0.7E) + 0.75L + 0.75LR D + 0.75(0.7E) + 0.75L + 0.75S D + 0.75(0.7E) + 0.75L + 0.75R D + R D + 0.75L + 0.75LR D + 0.75L + 0.75S D + 0.75L + 0.75R D + 0.6W D + 0.7E 1200000 20.797 ASCE7 LOAD COMBINATIONS C & C LOADING BENDING (NDS Section 3.3) Le = 9.08ft - (3.00in + 1.50in)(1ft/12in) = 8.71ft M = 330.01#-ft F'b = Fb(Cd)(Cr)(Cfb) = 675(1.60)(1.15)(1.00) = 1242.00psi fb = (12in/1ft)(330.01#-ft)/7.56in^3 = 523.65psi DEFLECTION (NDS Section 3.5.1) DELTA = 0.10in BENDING AND DEFLECTION CAPACITY CHECK 523.65psi/1242.00psi = 0.422 < 1.000 O.K. 0.10in < 0.58in O.K. THEREFORE, USE 2x6 HEM-FIR STUD GRADE STUDS AT 24in O.C. D D + L D + LR D + S 0.6C&C1 D + L (NON-CONCURRENT) DESIRED SPACING FOR CALCULATIONS: STOP (FT)800 1.15 8.250 WALL WIDTH (IN)START (FT)440000 0.80 7.563 0.6*W (PSF)WEIGHT (PSF)NO 1.00 1.50 0.7*E (PSF)PARTIAL LOADING (WIND)675 1.00 5.50 TARGET WALL STUD MATERIAL 0.6*C&C (PSF)HEIGHT (FT)Hem-Fir Stud (2" to 4" wide)2x6 HEM-FIR STUD GRADE STUDS SIMPLE MAIN SPAN L WEIGHT (PSF) TOTAL TRIB. FLOOR SPAN (FT)FLOOR LOADS (PSF)SUPPORTING WALL SIMPLE D HEIGHT (FT) SIMPLE 0.6*WUPLIFT MAIN SPAN LR WEIGHT (PSF) OVERHANG S TOTAL TRIB.R ROOF SPAN (FT)ROOF LOADS (PSF)SUPPORTING WALL SIMPLE D HEIGHT (FT) TOP PLATE THICKNESS (IN)WALL HAS CONTINUOUS SHEATHING ON ONE SIDE YES ROOF ASSEMBLY TYPE C&CWIND DEFLECTION, L/GYP COMP. SOLE PLATE THICKNESS (IN)PRE-FAB TRUSSES C&CWIND FACTOR = GYP + WOOD COMP. CLIENT: PROJECT:PLAN 1843- VERTICAL LA WALL NUMBER:STUD LOCATION:(1 = ROOF, 2 = FIRST FLOOR BELOW ROOF, 3 = SECOND FLOOR BELOW ROOF) Printed by larissa.anaya on 02/06/2025 at 14:45 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\1843 HAWTHORN- Vertical Book.xlsm SHEET 28 OF BY S2 2 3.00 180 YES 1.50 0.7 NO ROOF TYPE:15.00 8.08 30.00 12.00 1.00 25.00 16.00 9.79 FLOOR TYPE:15.00 9.08 2.00 40.00 12.00 TARGET WALL 1.00 17.42 9.08 SPECIES TITLE 10.93 12.00 SCANT CFB b (IN) 5.00 FB (PSI)CFC d (IN) 8.71 FC (PSI)CR A (IN2) 5.50 0.00 EMIN (PSI)c Sx (IN3) Ex (PSI) CD 0.90 153.24 " o.c. 1.00 150.61 " o.c. 1.25 191.38 " o.c. 1.15 91.61 " o.c. 1.25 191.38 " o.c. 1.25 178.23 " o.c. 1.15 100.31 " o.c. 1.25 178.23 " o.c. 1.60 76.20 " o.c. 1.60 103.20 " o.c. 1.60 87.24 " o.c. 1.60 65.52 " o.c. 1.60 87.24 " o.c. 1.60 111.72 " o.c. 1.60 78.72 " o.c. 1.60 111.72 " o.c. 1.60 59.77 " o.c.GOVERNS 1.00 " o.c. 24 " o.c. 1 Per Table IBC 1604.3 footnote f, for ASD the wind load for deflection shall be taken as 0.42 times the C&C loading. The 0.42 factor is a conversion from Ultimate loads to service loads (0.6W) and then further multiplied by 0.7 to adjust for the 10 year mean return interval. Therefore, 0.6 * 0.7 = 0.42 D + 0.75(0.6W) + 0.75L + 0.75LR D + 0.75(0.6W) + 0.75L + 0.75S D + 0.75(0.6W) + 0.75L + 0.75R D + 0.75(0.7E) + 0.75L + 0.75LR D + 0.75(0.7E) + 0.75L + 0.75S D + 0.75(0.7E) + 0.75L + 0.75R D + R D + 0.75L + 0.75LR D + 0.75L + 0.75S D + 0.75L + 0.75R D + 0.6W D + 0.7E 1200000 20.797 ASCE7 LOAD COMBINATIONS C & C LOADING BENDING (NDS Section 3.3) Le = 9.08ft - (3.00in + 1.50in)(1ft/12in) = 8.71ft M = 330.01#-ft F'b = Fb(Cd)(Cr)(Cfb) = 675(1.60)(1.15)(1.00) = 1242.00psi fb = (12in/1ft)(330.01#-ft)/7.56in^3 = 523.65psi DEFLECTION (NDS Section 3.5.1) DELTA = 0.10in BENDING AND DEFLECTION CAPACITY CHECK 523.65psi/1242.00psi = 0.422 < 1.000 O.K. 0.10in < 0.58in O.K. THEREFORE, USE 2x6 HEM-FIR STUD GRADE STUDS AT 24in O.C. D D + L D + LR D + S 0.6C&C1 D + L (NON-CONCURRENT) DESIRED SPACING FOR CALCULATIONS: STOP (FT)800 1.15 8.250 WALL WIDTH (IN)START (FT)440000 0.80 7.563 0.6*W (PSF)WEIGHT (PSF)NO 1.00 1.50 0.7*E (PSF)PARTIAL LOADING (WIND)675 1.00 5.50 TARGET WALL STUD MATERIAL 0.6*C&C (PSF)HEIGHT (FT)Hem-Fir Stud (2" to 4" wide)2x6 HEM-FIR STUD GRADE STUDS SIMPLE MAIN SPAN L WEIGHT (PSF) TOTAL TRIB. FLOOR SPAN (FT)FLOOR LOADS (PSF)SUPPORTING WALL SIMPLE D HEIGHT (FT) SIMPLE 0.6*WUPLIFT MAIN SPAN LR WEIGHT (PSF) OVERHANG S TOTAL TRIB.R ROOF SPAN (FT)ROOF LOADS (PSF)SUPPORTING WALL SIMPLE D HEIGHT (FT) TOP PLATE THICKNESS (IN)WALL HAS CONTINUOUS SHEATHING ON ONE SIDE YES ROOF ASSEMBLY TYPE C&CWIND DEFLECTION, L/GYP COMP. SOLE PLATE THICKNESS (IN)PRE-FAB TRUSSES C&CWIND FACTOR = GYP + WOOD COMP. CLIENT: PROJECT:PLAN 1843- VERTICAL LA WALL NUMBER:STUD LOCATION:(1 = ROOF, 2 = FIRST FLOOR BELOW ROOF, 3 = SECOND FLOOR BELOW ROOF) Printed by larissa.anaya on 02/06/2025 at 14:45 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\1843 HAWTHORN- Vertical Book.xlsm SHEET 29 OF BY S3 2 3.00 180 YES 1.50 0.7 NO ROOF TYPE:15.00 8.08 30.00 12.00 1.00 25.00 16.00 9.79 FLOOR TYPE:15.00 12.00 2.00 40.00 12.00 TARGET WALL 1.00 17.42 12.00 SPECIES TITLE 10.93 12.00 SCANT CFB b (IN) 5.00 FB (PSI)CFC d (IN) 11.63 FC (PSI)CR A (IN2) 5.50 0.00 EMIN (PSI)c Sx (IN3) Ex (PSI) CD 0.90 117.41 " o.c. 1.00 112.27 " o.c. 1.25 132.72 " o.c. 1.15 66.54 " o.c. 1.25 132.72 " o.c. 1.25 123.95 " o.c. 1.15 72.71 " o.c. 1.25 123.95 " o.c. 1.60 42.72 " o.c. 1.60 59.28 " o.c. 1.60 49.32 " o.c. 1.60 37.92 " o.c. 1.60 49.32 " o.c. 1.60 64.92 " o.c. 1.60 46.80 " o.c. 1.60 64.92 " o.c. 1.60 33.51 " o.c.GOVERNS 1.00 " o.c. 24 " o.c. 1 Per Table IBC 1604.3 footnote f, for ASD the wind load for deflection shall be taken as 0.42 times the C&C loading. The 0.42 factor is a conversion from Ultimate loads to service loads (0.6W) and then further multiplied by 0.7 to adjust for the 10 year mean return interval. Therefore, 0.6 * 0.7 = 0.42 D + 0.75(0.6W) + 0.75L + 0.75LR D + 0.75(0.6W) + 0.75L + 0.75S D + 0.75(0.6W) + 0.75L + 0.75R D + 0.75(0.7E) + 0.75L + 0.75LR D + 0.75(0.7E) + 0.75L + 0.75S D + 0.75(0.7E) + 0.75L + 0.75R D + R D + 0.75L + 0.75LR D + 0.75L + 0.75S D + 0.75L + 0.75R D + 0.6W D + 0.7E 1200000 20.797 ASCE7 LOAD COMBINATIONS C & C LOADING BENDING (NDS Section 3.3) Le = 12.00ft - (3.00in + 1.50in)(1ft/12in) = 11.63ft M = 588.54#-ft F'b = Fb(Cd)(Cr)(Cfb) = 675(1.60)(1.15)(1.00) = 1242.00psi fb = (12in/1ft)(588.54#-ft)/7.56in^3 = 933.88psi DEFLECTION (NDS Section 3.5.1) DELTA = 0.31in BENDING AND DEFLECTION CAPACITY CHECK 933.88psi/1242.00psi = 0.752 < 1.000 O.K. 0.31in < 0.78in O.K. THEREFORE, USE 2x6 HEM-FIR STUD GRADE STUDS AT 24in O.C. D D + L D + LR D + S 0.6C&C1 D + L (NON-CONCURRENT) DESIRED SPACING FOR CALCULATIONS: STOP (FT)800 1.15 8.250 WALL WIDTH (IN)START (FT)440000 0.80 7.563 0.6*W (PSF)WEIGHT (PSF)NO 1.00 1.50 0.7*E (PSF)PARTIAL LOADING (WIND)675 1.00 5.50 TARGET WALL STUD MATERIAL 0.6*C&C (PSF)HEIGHT (FT)Hem-Fir Stud (2" to 4" wide)2x6 HEM-FIR STUD GRADE STUDS SIMPLE MAIN SPAN L WEIGHT (PSF) TOTAL TRIB. FLOOR SPAN (FT)FLOOR LOADS (PSF)SUPPORTING WALL SIMPLE D HEIGHT (FT) SIMPLE 0.6*WUPLIFT MAIN SPAN LR WEIGHT (PSF) OVERHANG S TOTAL TRIB.R ROOF SPAN (FT)ROOF LOADS (PSF)SUPPORTING WALL SIMPLE D HEIGHT (FT) TOP PLATE THICKNESS (IN)WALL HAS CONTINUOUS SHEATHING ON ONE SIDE YES ROOF ASSEMBLY TYPE C&CWIND DEFLECTION, L/GYP COMP. SOLE PLATE THICKNESS (IN)PRE-FAB TRUSSES C&CWIND FACTOR = GYP + WOOD COMP. CLIENT: PROJECT:PLAN 1843- VERTICAL LA WALL NUMBER:STUD LOCATION:(1 = ROOF, 2 = FIRST FLOOR BELOW ROOF, 3 = SECOND FLOOR BELOW ROOF) Printed by larissa.anaya on 02/06/2025 at 14:45 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\1843 HAWTHORN- Vertical Book.xlsm SHEET 30 OF BY S4 2 3.00 180 YES 1.50 0.7 NO ROOF TYPE: FLOOR TYPE:15.00 9.08 18.50 40.00 7.00 18.00 TARGET WALL 22.82 9.08 SPECIES TITLE 7.00 SCANT CFB b (IN) 5.00 FB (PSI)CFC d (IN) 8.71 FC (PSI)CR A (IN2) 5.50 0.00 EMIN (PSI)c Sx (IN3) Ex (PSI) CD 0.90 166.52 " o.c. 1.00 52.26 " o.c.GOVERNS 1.25 207.97 " o.c. 1.15 197.52 " o.c. 1.25 207.97 " o.c. 1.25 73.49 " o.c. 1.15 69.79 " o.c. 1.25 73.49 " o.c. 1.60 237.01 " o.c. 1.60 107.76 " o.c. 1.60 83.75 " o.c. 1.60 83.75 " o.c. 1.60 83.75 " o.c. 1.60 60.00 " o.c. 1.60 60.00 " o.c. 1.60 60.00 " o.c. 1.60 1200.00 " o.c. 1.00 " o.c. 24 " o.c. 1 Per Table IBC 1604.3 footnote f, for ASD the wind load for deflection shall be taken as 0.42 times the C&C loading. The 0.42 factor is a conversion from Ultimate loads to service loads (0.6W) and then further multiplied by 0.7 to adjust for the 10 year mean return interval. Therefore, 0.6 * 0.7 = 0.42 D + 0.75(0.6W) + 0.75L + 0.75LR D + 0.75(0.6W) + 0.75L + 0.75S D + 0.75(0.6W) + 0.75L + 0.75R D + 0.75(0.7E) + 0.75L + 0.75LR D + 0.75(0.7E) + 0.75L + 0.75S D + 0.75(0.7E) + 0.75L + 0.75R D + R D + 0.75L + 0.75LR D + 0.75L + 0.75S D + 0.75L + 0.75R D + 0.6W D + 0.7E 1200000 20.797 ASCE7 LOAD COMBINATIONS AXIAL (NDS Section 3.7) Emin = 440000 Le/d = 17.41 <= 50 c = 0.80 Fce = 0.822Emin'/(Le/d)^2 = 0.822(440000psi)/17.41^2 = 1193.24psi F*c = Fc(Cd)(Cfc) = 800(1.00)(1.00) = 800.00psi Fce/F*c = 1193.24psi/800.00psi = 1.49 A1 = (1 + Fce/F*c)/2c = 2.49/1.60 = 1.56 A2 = (Fce/F*c)/c = 1.49/0.80 = 1.86 Cp = A1-[A1^2-A2]^0.5 = 1.56-[2.42-1.86]^0.5 = 0.81 F'c = F*c(Cp) = 800.00psi(0.81) = 646.85psi P = 1286.66plf*2.00ft = 2573.31# fc = P/A = 2573.31#/8.25in^2 = 311.92psi COMPRESSION CAPACITY CHECK 311.92psi < 646.85psi O.K. THEREFORE, USE 2x6 HEM-FIR STUD GRADE STUDS AT 24in O.C. D D + L D + LR D + S 0.6C&C1 D + L (NON-CONCURRENT) DESIRED SPACING FOR CALCULATIONS: STOP (FT)800 1.15 8.250 WALL WIDTH (IN)START (FT)440000 0.80 7.563 0.6*W (PSF)WEIGHT (PSF)NO 1.00 1.50 0.7*E (PSF)PARTIAL LOADING (WIND)675 1.00 5.50 TARGET WALL STUD MATERIAL 0.6*C&C (PSF)HEIGHT (FT)Hem-Fir Stud (2" to 4" wide)2x6 HEM-FIR STUD GRADE STUDS CONTINUOUS LONG SPAN L WEIGHT (PSF) SHORT SPAN TOTAL TRIB. FLOOR SPAN (FT)FLOOR LOADS (PSF)SUPPORTING WALL CONTINUOUS D HEIGHT (FT) 0.6*WUPLIFT LR WEIGHT (PSF) S TOTAL TRIB.R ROOF SPAN (FT)ROOF LOADS (PSF)SUPPORTING WALL D HEIGHT (FT) TOP PLATE THICKNESS (IN)WALL HAS CONTINUOUS SHEATHING ON ONE SIDE YES ROOF ASSEMBLY TYPE C&CWIND DEFLECTION, L/GYP COMP. SOLE PLATE THICKNESS (IN)PRE-FAB TRUSSES C&CWIND FACTOR = GYP + WOOD COMP. CLIENT: PROJECT:PLAN 1843- VERTICAL LA WALL NUMBER:STUD LOCATION:(1 = ROOF, 2 = FIRST FLOOR BELOW ROOF, 3 = SECOND FLOOR BELOW ROOF) Printed by larissa.anaya on 02/06/2025 at 14:45 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\1843 HAWTHORN- Vertical Book.xlsm CLIENT: PROJECT: BRACED/SHEAR WALL PLAN FELTENGROUP ARCHITECTURE I ENGINEERING I FORENSICS DATE: SHEET OF BY: UPPER FLOOR BRACED/SHEAR WALL PLAN CLIENT:SHEET L3 OF PROJECT:BY 110 mph C (Section 26.7) II (Table 1.5-1) 0.85 (Table 26.6-1) 1.00 (Section 26.8.2) 100 (Section 26.9)Ke = 1.00 (Table 26.9-1) 0.6 (Section 2.4.1) Roof Truss Heel Height:0.333 ft Upper Plate Height:8.083 ft Floor Truss Depth:1.583 ft Lower Plate Height:9.083 ft Length (Dim. Perp. to Truss Span):36.000 ft Width (Dim. Parallel to Truss Span):30.000 ft Roof Pitch:5.00 in/12 in Roof Angle:22.620 deg Mean Roof Height:22.207 ft Ridge Height:25.332 ft Design Edge Strip (a):3.000 ft Design End Zone (2a):6.000 ft Velocity Pressure Coefficient (Kz):0.918 (Table 26.10-1) 0.6*qz (Velocity Pressure):14.44 psf (Equation 26.10-1) 0.6*Pcc,wall (Maximum Volume Wall):15.79 psf (Equation 30.3-1) 0.6*Pcc,wall (Maximum Story Wall):17.42 psf (Equation 30.3-1) 0.6*Pez (End Zone Stud Design Pressure):13.74 psf Load Case A 0.6*Piz (Int. Zone Stud Design Pressure):10.37 psf Load Case A 0.6*Pp (Parapet Pressure 1.5WW and -1.0LW):21.67 psf Windward and -14.44 psf Leeward Topographic Factor (Kzt): Ground Elevation Factor (ft) (Ke): ASD Load Combination Factor for W: TWO STORY DIAPHRAGM WIND LOADS FOR ASD LOAD COMBINATIONS Exposure: Risk Category: Wind Directionality (Kd): Design Code:ASCE 7-16 Design Method:Low-Rise Building (Section 28.3.1) LGI HOMES PLAN 1843- WIND LA Elevation Label: Basic Wind Speed (3 sec gust): Printed by larissa.anaya on 02/06/2025 at 14:31 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\PLAN 1843- ASCE7-16 Wind Lateral Book 2021 IRC1.xlsm CLIENT:SHEET L4 OF PROJECT:BY p = 0.6 * qz * [GCpf - GCpi](Equation 28.3-1) GCpf interpolated from Figure 28.3-1 GCpi 0.18 enclosed buildings Table 26.13-1 (GCpi acts either inward or outward at any one time) GCpf GCpi Zone 1:0.54 -0.18 Zone 2:-0.45 0.18 Zone 3:-0.47 0.18 Zone 4:-0.41 -0.18 Zone 1E:0.77 -0.18 Zone 2E:-0.72 0.18 Zone 3E:-0.65 0.18 Zone 4E:-0.60 -0.18 GCpf GCpi Zone 1:-0.45 -0.18 Zone 2:-0.69 0.18 Zone 3:-0.37 0.18 Zone 4:-0.45 -0.18 Zone 5:0.40 -0.18 Zone 6:-0.29 -0.18 Zone 1E:-0.48 -0.18 Zone 2E:-1.07 0.18 Zone 3E:-0.53 0.18 Zone 4E:-0.48 -0.18 Zone 5E:0.61 -0.18 Zone 6E:-0.43 -0.18 Note: Plus and minus signs signify pressures acting toward and away from the surfaces, respectively. -6.21 -2.60 -3.61 -6.93 -2.60 -4.33 8.81 -2.60 11.41 -15.46 2.60 -18.06 -7.66 2.60 -10.26 -4.19 -2.60 -1.59 -6.93 -2.60 -4.33 -6.50 -2.60 -3.90 5.78 -2.60 8.38 -9.97 2.60 -12.57 -5.34 2.60 -7.94 Load Case B Pressures 0.6*qz*GCpf (psf)0.6*qz*GCpi (psf)Pressure (psf) -6.50 -2.60 -3.90 -9.36 2.60 -11.96 -8.64 -2.60 -6.04 11.14 -2.60 13.74 -10.38 2.60 -12.98 -6.74 2.60 -9.34 -5.98 -2.60 -3.38 7.77 -2.60 10.37 -6.56 2.60 -9.16 Hip End Loading Load Case A Load Case B Load Case A Pressures 0.6*qz*GCpf (psf)0.6*qz*GCpi (psf)Pressure (psf) PLAN 1843- WIND LA Gable End Loading Load Case A Load Case B LGI HOMES Printed by larissa.anaya on 02/06/2025 at 14:31 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\PLAN 1843- ASCE7-16 Wind Lateral Book 2021 IRC1.xlsm CLIENT:SHEET L5 OF PROJECT:BY Case A 7.20 psf 7.18 psf Case B 10.88 psf 5.73 psf GCpf GCpf 6.38 psf 4.61 psf GCpf GCpf 8.33 psf 6.43 psf GCpi GCpi 2.60 psf 2.60 psf 14.76 psf 10.98 psf 0.00 psf 9.79 psf 10.91 psf 7725 #5821 # 5088 # Case A 7.20 psf 7.18 psf Case B 8.96 psf 7.66 psf GCpf GCpf GCpf GCpf 8.33 psf 6.43 psf 5.93 psf 4.29 psf GCpi GCpi 2.60 psf 2.60 psf 14.76 psf 10.22 psf 0.00 psf 0.00 psf 9.79 psf 10.91 psf 7725 #4841 # ∴Use 10.93 psf at Wall for Windward Only Case (0.6*W)∴Use 8.53 psf at Wall for Windward Only Case (0.6*W) 4998 # ∴Use 14.76|0.00 psf Wall|Roof Horizontal Pressure at Case A ∴Use 9.60|4.80 psf Wall|Roof Horizontal Pressure at Case B Total Base Shear Due to Wind Loads =Total Base Shear Due to Wind Loads = Total Base Shear Due to 0.6*16psf at Wall and 0.6*8psf at Roof =5655 #Total Base Shear Due to 0.6*16psf at Wall and 0.6*8psf at Roof = Total Horizontal Pressure at Wall =Total Horizontal Pressure at Wall = Total Horizontal Pressure at Roof =Total Horizontal Pressure at Roof = Total Uplift Pressure at Roof =Total Uplift Pressure at Roof = TWO STORY DIAPHRAGM HIP END WIND LOADS FOR ASD LOAD COMBINATIONS Load Case A Load Case B GCpf Windward GCpf Leeward GCpf Windward GCpf Leeward ∴Use 14.76|0.00 psf Wall|Roof Horizontal Pressure at Case A ∴Use 10.98 psf Horizontal Pressure at Case B ∴Use 10.93 psf at Wall for Windward Only Case (0.6*W)∴Use 8.98 psf at Wall for Windward Only Case (0.6*W) Total Horizontal Pressure at Roof = Total Uplift Pressure at Roof =Total Uplift Pressure at Roof = Total Base Shear Due to Wind Loads =Total Base Shear Due to Wind Loads = Total Base Shear Due to 0.6*16psf at Wall and 0.6*8psf at Roof =6105 #Total Base Shear Due to 0.6*16psf = Total Horizontal Pressure at Wall =Total Horizontal Pressure at Wall = CASE A CASE B GCpf Windward GCpf Leeward Load Cases A & B total pressures are determined by using a weighted average of end zone total plus interior zone total. This number is then compared to the code required 16psf minimum for the horizontal direction. Roof uplift for the left and right sides of the roof are determined using a weighted average of end zone plus interior zone and then the total roof uplift is the average of the left and right sides. GCpi assumed to act inward for wall design, outward for roof uplift design. TWO STORY DIAPHRAGM GABLE END WIND LOADS FOR ASD LOAD COMBINATIONS LGI HOMES PLAN 1843- WIND LA Printed by larissa.anaya on 02/06/2025 at 14:31 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\PLAN 1843- ASCE7-16 Wind Lateral Book 2021 IRC1.xlsm SHEET L6 OF BY WALL ROOF PARAPET TRIB. WALL HEEL TRIB. RIDGE PARAPET SHEAR DISTANCE PRESSURE PRESSURE PRESSURE HEIGHT HEIGHT TO HEEL HEIGHT UNIFORM START STOP #FT PSF PSF PSF FT FT FT FT PLF FT FT 10.98 10.98 4.042 0.333 3.125 2ND FLOOR 10.98 10.166 1236 0.000 1236 30.000 1ST FLOOR 1ST FLOOR 1ST FLOOR 0.00%0 STORY CALC DESCRIPTION 0 0 0 0 0 0 0 0 STORY CALC DESCRIPTION 0 0 0 0.00%0 0 0 0 0 0 0 0 0 STORY CALC DESCRIPTION 0 0 0 B 0.00% 36.000 #B ABOVE 0 0 2910 0 2910 349 0 2910 0 STORY CALC DESCRIPTION A 30.000 # ABOVE 112 0.000 30.000 2910 2910 B 0.00% 36.000 0 30.000 A 30.000 1236 0 1236 0 1236 1236 257 0 0 82 0.000 1236 SHEAR (#) CHORD (#) WINDWARD INFORMATION LEEWARD INFORMATION NEXT LINE FROM NEXT CHORD DIST. FT SOURCE LINE NEXT LINE # TARGET LINE TO TARGET LINE SPACING FT POINT SHEAR FROM OTHER LINES UNIFORM LOADS BETWEEN TARGET LINE AND NEXT LINE TARGET LINE # PROJECT:PLAN 1843- WIND LA LINE CALLOUT % CANT.WIND DESIGN SHEAR DIAPHRAGM CLIENT:LGI HOMES Printed by larissa.anaya on 02/06/2025 at 14:31 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\PLAN 1843- ASCE7-16 Wind Lateral Book 2021 IRC1.xlsm SHEET L7 OF BY WALL ROOF PARAPET TRIB. WALL HEEL TRIB. RIDGE PARAPET SHEAR DISTANCE PRESSURE PRESSURE PRESSURE HEIGHT HEIGHT TO HEEL HEIGHT UNIFORM START STOP #FT PSF PSF PSF FT FT FT FT PLF FT FT 14.76 0.00 4.042 0.333 6.250 2ND FLOOR 14.76 10.166 1243 0.000 1ST FLOOR 14.76 10.166 1350 0.000 14.76 0.00 4.542 0.333 2.188 1243 20.000 1ST FLOOR 1ST FLOOR 0.00%0 STORY CALC DESCRIPTION 0 0 0 0 0 0 0 0 STORY CALC DESCRIPTION 0 0 0 3 0.00% 30.000 #3 ABOVE 0 0 2550 0 3332 436 72 20.000 24.000 2550 0 STORY CALC DESCRIPTION 2 24.000 #2*150 0.000 20.000 3332 3332 2* 0.00% 30.000 0 0 1350 0 2593 203 0 1350 0 STORY CALC DESCRIPTION 1 18.000 #1 ABOVE 150 0.000 18.000 2593 2593 3 0.00% 30.000 0 38.500 1 38.500 1243 0 1243 0 1243 1243 399 0 0 65 0.000 1243 SHEAR (#) CHORD (#) WINDWARD INFORMATION LEEWARD INFORMATION NEXT LINE FROM NEXT CHORD DIST. FT SOURCE LINE NEXT LINE # TARGET LINE TO TARGET LINE SPACING FT POINT SHEAR FROM OTHER LINES UNIFORM LOADS BETWEEN TARGET LINE AND NEXT LINE TARGET LINE # PROJECT:PLAN 1843- WIND LA LINE CALLOUT % CANT.WIND DESIGN SHEAR DIAPHRAGM CLIENT:LGI HOMES Printed by larissa.anaya on 02/06/2025 at 14:31 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\PLAN 1843- ASCE7-16 Wind Lateral Book 2021 IRC1.xlsm SHEET L8 OF BY WIND DESIGN: WALL BRACING ANALYSES 110 22.21 2 1 C 6.25 8 2 NO YES NO NO 0.00 0.00 30.00 0.00 1.30 0.85 0.90 1.00 1.00 1.00 1.00 1.00 1.00 5.00 0.00 WALL #1 2 3 4 5 6 7 8 9 10 11 12 13 14 METHOD WSP WSP L (ft)16.67 16.33 ADJ. H (ft) LCONT. (ft)16.67 16.33 33.00 110 22.83 2 1 C 7.50 8 2 NO YES NO NO 0.00 0.00 30.00 0.00 1.300 0.850 0.900 1.000 1.000 1.000 1.000 1.000 1.000 5.000 0.000 WALL #1 2 3 4 5 6 7 8 9 10 11 12 13 14 METHOD WSP WSP L (ft)19.33 13.66 ADJ. H (ft) LCONT. (ft)19.33 13.66 32.99 WALL #1 2 3 4 5 6 7 8 9 10 11 12 13 14 METHOD L (ft) ADJ. H (ft) LCONT. (ft)0.00 EAVE TO RIDGE H (ft) STORY HEIGHT (ft) NUMBER OF LINES PARAPET HEEL H (ft) PARAPET H (ft) LINE SPACING 1 (ft) LINE SPACING 2 (ft) REQUIRED LENGTH (ft) LENGTH OF BRACING PROVIDED, ADJACENT HEIGHT & CONTRIBUTING LENGTH FOR EACH METHOD (ft) NOT PERMITTEDTOTAL (ft) BRACED WALL INPUTS AND FACTORS WIND SPEED (mph) MEAN ROOF H (ft) NUMBER OF STORIES STORY LOCATION EXPOSURE MIN. 800# HOLD- DOWN GB ON INSIDE FACE GB 4"O.C. PANEL PLYWOOD BLOCKING OMITTED 4.97 LENGTH OF BRACING PROVIDED, ADJACENT HEIGHT & CONTRIBUTING LENGTH FOR EACH METHOD (ft) 32.99>=4.97 O.K.TOTAL (ft) PLYWOOD BLOCKING OMITTED PARAPET HEEL H (ft) PARAPET H (ft) LINE SPACING 1 (ft) LINE SPACING 2 (ft) REQUIRED LENGTH (ft) EAVE TO RIDGE H (ft) STORY HEIGHT (ft) NUMBER OF LINES BRACED WALL INPUTS AND FACTORS WIND SPEED (mph) MEAN ROOF H (ft) NUMBER OF STORIES STORY LOCATION EXPOSURE MIN. 800# HOLD- DOWN GB ON INSIDE FACE GB 4"O.C. PANEL EAVE TO RIDGE H (ft) STORY HEIGHT (ft) NUMBER OF LINES B PARAPET HEEL H (ft) PARAPET H (ft) LINE SPACING 1 (ft) LINE SPACING 2 (ft) REQUIRED LENGTH (ft) 4.97 LENGTH OF BRACING PROVIDED, ADJACENT HEIGHT & CONTRIBUTING LENGTH FOR EACH METHOD (ft) 33.00>=4.97 O.K.TOTAL (ft) BRACED WALL INPUTS AND FACTORS WIND SPEED (mph) MEAN ROOF H (ft) NUMBER OF STORIES STORY LOCATION EXPOSURE MIN. 800# HOLD- DOWN GB ON INSIDE FACE GB 4"O.C. PANEL A PLYWOOD BLOCKING OMITTED CLIENT:LGI HOMES PROJECT:PLAN 1843- WIND LA METHOD CS-WSP (INCLUDES CS-G & CS-PF) FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR METHOD WSP (INCLUDES ABW, PFH & PFG)METHOD GB (2 SIDED)METHOD GB (1 SIDED) METHOD CS-WSP (INCLUDES CS-G & CS-PF)METHOD WSP (INCLUDES ABW, PFH & PFG)METHOD GB (2 SIDED)METHOD GB (1 SIDED) 3rd FLOOR 3rd FLOOR BASEMENT BASEMENT METHOD CS-WSP (INCLUDES CS-G & CS-PF) FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR METHOD WSP (INCLUDES ABW, PFH & PFG)METHOD GB (2 SIDED)METHOD GB (1 SIDED) 3rd FLOORBASEMENT Printed by larissa.anaya on 02/06/2025 at 14:31 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\PLAN 1843- ASCE7-16 Wind Lateral Book 2021 IRC1.xlsm SHEET L9 OF BY WIND DESIGN: WALL BRACING ANALYSES 110 22.83 2 2 C 7.50 9 2 NO YES NO NO 0.00 0.00 30.00 0.00 1.30 0.93 0.95 1.00 1.00 1.00 1.00 1.00 1.00 9.50 0.00 WALL #1 2 3 4 5 6 7 8 9 10 11 12 13 14 METHOD WSP WSP WSP L (ft)6.00 8.00 20.75 ADJ. H (ft) LCONT. (ft)6.00 8.00 20.75 34.75 110 22.83 2 2 C 7.50 9 2 NO YES NO NO 0.00 0.00 30.00 0.00 1.300 0.925 0.950 1.000 1.000 1.000 1.000 1.000 1.000 9.500 0.000 WALL #1 2 3 4 5 6 7 8 9 10 11 12 13 14 METHOD WSP L (ft)38.00 ADJ. H (ft) LCONT. (ft)38.00 38.00 WALL #1 2 3 4 5 6 7 8 9 10 11 12 13 14 METHOD L (ft) ADJ. H (ft) LCONT. (ft)0.00 EAVE TO RIDGE H (ft) STORY HEIGHT (ft) NUMBER OF LINES PARAPET HEEL H (ft) PARAPET H (ft) LINE SPACING 1 (ft) LINE SPACING 2 (ft) REQUIRED LENGTH (ft) LENGTH OF BRACING PROVIDED, ADJACENT HEIGHT & CONTRIBUTING LENGTH FOR EACH METHOD (ft) NOT PERMITTEDTOTAL (ft) BRACED WALL INPUTS AND FACTORS WIND SPEED (mph) MEAN ROOF H (ft) NUMBER OF STORIES STORY LOCATION EXPOSURE MIN. 800# HOLD- DOWN GB ON INSIDE FACE GB 4"O.C. PANEL PLYWOOD BLOCKING OMITTED 10.85 LENGTH OF BRACING PROVIDED, ADJACENT HEIGHT & CONTRIBUTING LENGTH FOR EACH METHOD (ft) 38.00>=10.85 O.K.TOTAL (ft) PLYWOOD BLOCKING OMITTED PARAPET HEEL H (ft) PARAPET H (ft) LINE SPACING 1 (ft) LINE SPACING 2 (ft) REQUIRED LENGTH (ft) EAVE TO RIDGE H (ft) STORY HEIGHT (ft) NUMBER OF LINES BRACED WALL INPUTS AND FACTORS WIND SPEED (mph) MEAN ROOF H (ft) NUMBER OF STORIES STORY LOCATION EXPOSURE MIN. 800# HOLD- DOWN GB ON INSIDE FACE GB 4"O.C. PANEL EAVE TO RIDGE H (ft) STORY HEIGHT (ft) NUMBER OF LINES B PARAPET HEEL H (ft) PARAPET H (ft) LINE SPACING 1 (ft) LINE SPACING 2 (ft) REQUIRED LENGTH (ft) 10.85 LENGTH OF BRACING PROVIDED, ADJACENT HEIGHT & CONTRIBUTING LENGTH FOR EACH METHOD (ft) 34.75>=10.85 O.K.TOTAL (ft) BRACED WALL INPUTS AND FACTORS WIND SPEED (mph) MEAN ROOF H (ft) NUMBER OF STORIES STORY LOCATION EXPOSURE MIN. 800# HOLD- DOWN GB ON INSIDE FACE GB 4"O.C. PANEL A PLYWOOD BLOCKING OMITTED CLIENT:LGI HOMES PROJECT:PLAN 1843- WIND LA METHOD CS-WSP (INCLUDES CS-G & CS-PF) FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR METHOD WSP (INCLUDES ABW, PFH & PFG)METHOD GB (2 SIDED)METHOD GB (1 SIDED) METHOD CS-WSP (INCLUDES CS-G & CS-PF)METHOD WSP (INCLUDES ABW, PFH & PFG)METHOD GB (2 SIDED)METHOD GB (1 SIDED) 3rd FLOOR 3rd FLOOR BASEMENT BASEMENT METHOD CS-WSP (INCLUDES CS-G & CS-PF) FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR METHOD WSP (INCLUDES ABW, PFH & PFG)METHOD GB (2 SIDED)METHOD GB (1 SIDED) 3rd FLOORBASEMENT Printed by larissa.anaya on 02/06/2025 at 14:31 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\PLAN 1843- ASCE7-16 Wind Lateral Book 2021 IRC1.xlsm SHEET L10 OF BY WIND DESIGN: WALL BRACING ANALYSES 110 22.83 2 1 C 7.50 9 2 NO YES NO NO 0.00 0.00 38.50 0.00 1.30 0.85 0.95 1.00 1.00 1.00 1.00 1.00 1.00 6.28 0.00 WALL #1 2 3 4 5 6 7 8 9 10 11 12 13 14 METHOD WSP WSP L (ft)13.50 3.50 ADJ. H (ft) LCONT. (ft)13.50 3.00 16.50 110 22.83 2 1 C 7.50 9 2 NO YES NO NO 0.00 0.00 38.50 0.00 1.300 0.850 0.950 1.000 1.000 1.000 1.000 1.000 1.000 6.275 0.000 WALL #1 2 3 4 5 6 7 8 9 10 11 12 13 14 METHOD WSP WSP WSP L (ft)5.04 4.50 4.50 ADJ. H (ft) LCONT. (ft)5.04 4.50 4.50 14.04 WALL #1 2 3 4 5 6 7 8 9 10 11 12 13 14 METHOD L (ft) ADJ. H (ft) LCONT. (ft)0.00 EAVE TO RIDGE H (ft) STORY HEIGHT (ft) NUMBER OF LINES PARAPET HEEL H (ft) PARAPET H (ft) LINE SPACING 1 (ft) LINE SPACING 2 (ft) REQUIRED LENGTH (ft) LENGTH OF BRACING PROVIDED, ADJACENT HEIGHT & CONTRIBUTING LENGTH FOR EACH METHOD (ft) NOT PERMITTEDTOTAL (ft) BRACED WALL INPUTS AND FACTORS WIND SPEED (mph) MEAN ROOF H (ft) NUMBER OF STORIES STORY LOCATION EXPOSURE MIN. 800# HOLD- DOWN GB ON INSIDE FACE GB 4"O.C. PANEL PLYWOOD BLOCKING OMITTED 6.59 LENGTH OF BRACING PROVIDED, ADJACENT HEIGHT & CONTRIBUTING LENGTH FOR EACH METHOD (ft) 14.04>=6.59 O.K.TOTAL (ft) PLYWOOD BLOCKING OMITTED PARAPET HEEL H (ft) PARAPET H (ft) LINE SPACING 1 (ft) LINE SPACING 2 (ft) REQUIRED LENGTH (ft) EAVE TO RIDGE H (ft) STORY HEIGHT (ft) NUMBER OF LINES BRACED WALL INPUTS AND FACTORS WIND SPEED (mph) MEAN ROOF H (ft) NUMBER OF STORIES STORY LOCATION EXPOSURE MIN. 800# HOLD- DOWN GB ON INSIDE FACE GB 4"O.C. PANEL EAVE TO RIDGE H (ft) STORY HEIGHT (ft) NUMBER OF LINES 3 PARAPET HEEL H (ft) PARAPET H (ft) LINE SPACING 1 (ft) LINE SPACING 2 (ft) REQUIRED LENGTH (ft) 6.59 LENGTH OF BRACING PROVIDED, ADJACENT HEIGHT & CONTRIBUTING LENGTH FOR EACH METHOD (ft) 16.50>=6.59 O.K.TOTAL (ft) BRACED WALL INPUTS AND FACTORS WIND SPEED (mph) MEAN ROOF H (ft) NUMBER OF STORIES STORY LOCATION EXPOSURE MIN. 800# HOLD- DOWN GB ON INSIDE FACE GB 4"O.C. PANEL 1 PLYWOOD BLOCKING OMITTED CLIENT:LGI HOMES PROJECT:PLAN 1843- WIND LA METHOD CS-WSP (INCLUDES CS-G & CS-PF) FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR METHOD WSP (INCLUDES ABW, PFH & PFG)METHOD GB (2 SIDED)METHOD GB (1 SIDED) METHOD CS-WSP (INCLUDES CS-G & CS-PF)METHOD WSP (INCLUDES ABW, PFH & PFG)METHOD GB (2 SIDED)METHOD GB (1 SIDED) 3rd FLOOR 3rd FLOOR BASEMENT BASEMENT METHOD CS-WSP (INCLUDES CS-G & CS-PF) FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR METHOD WSP (INCLUDES ABW, PFH & PFG)METHOD GB (2 SIDED)METHOD GB (1 SIDED) 3rd FLOORBASEMENT Printed by larissa.anaya on 02/06/2025 at 14:31 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\PLAN 1843- ASCE7-16 Wind Lateral Book 2021 IRC1.xlsm SHEET L11 OF BY WIND DESIGN: WALL BRACING ANALYSES 110 22.83 2 2 C 7.50 9 2 NO YES NO NO 0.00 0.00 18.00 0.00 1.30 0.93 0.95 1.00 1.00 1.00 1.00 1.00 1.00 5.90 0.00 WALL #1 2 3 4 5 6 7 8 9 10 11 12 13 14 METHOD WSP WSP WSP L (ft)4.91 9.00 5.04 ADJ. H (ft) LCONT. (ft)4.91 9.00 5.04 18.95 WALL #1 2 3 4 5 6 7 8 9 10 11 12 13 14 METHOD L (ft) ADJ. H (ft) LCONT. (ft)0.00 WALL #1 2 3 4 5 6 7 8 9 10 11 12 13 14 METHOD L (ft) ADJ. H (ft) LCONT. (ft)0.00 EAVE TO RIDGE H (ft) STORY HEIGHT (ft) NUMBER OF LINES PARAPET HEEL H (ft) PARAPET H (ft) LINE SPACING 1 (ft) LINE SPACING 2 (ft) REQUIRED LENGTH (ft) LENGTH OF BRACING PROVIDED, ADJACENT HEIGHT & CONTRIBUTING LENGTH FOR EACH METHOD (ft) NOT PERMITTEDTOTAL (ft) BRACED WALL INPUTS AND FACTORS WIND SPEED (mph) MEAN ROOF H (ft) NUMBER OF STORIES STORY LOCATION EXPOSURE MIN. 800# HOLD- DOWN GB ON INSIDE FACE GB 4"O.C. PANEL PLYWOOD BLOCKING OMITTED LENGTH OF BRACING PROVIDED, ADJACENT HEIGHT & CONTRIBUTING LENGTH FOR EACH METHOD (ft) NOT PERMITTEDTOTAL (ft) PLYWOOD BLOCKING OMITTED PARAPET HEEL H (ft) PARAPET H (ft) LINE SPACING 1 (ft) LINE SPACING 2 (ft) REQUIRED LENGTH (ft) EAVE TO RIDGE H (ft) STORY HEIGHT (ft) NUMBER OF LINES BRACED WALL INPUTS AND FACTORS WIND SPEED (mph) MEAN ROOF H (ft) NUMBER OF STORIES STORY LOCATION EXPOSURE MIN. 800# HOLD- DOWN GB ON INSIDE FACE GB 4"O.C. PANEL EAVE TO RIDGE H (ft) STORY HEIGHT (ft) NUMBER OF LINES PARAPET HEEL H (ft) PARAPET H (ft) LINE SPACING 1 (ft) LINE SPACING 2 (ft) REQUIRED LENGTH (ft) 6.74 LENGTH OF BRACING PROVIDED, ADJACENT HEIGHT & CONTRIBUTING LENGTH FOR EACH METHOD (ft) 18.95>=6.74 O.K.TOTAL (ft) BRACED WALL INPUTS AND FACTORS WIND SPEED (mph) MEAN ROOF H (ft) NUMBER OF STORIES STORY LOCATION EXPOSURE MIN. 800# HOLD- DOWN GB ON INSIDE FACE GB 4"O.C. PANEL 1 PLYWOOD BLOCKING OMITTED CLIENT:LGI HOMES PROJECT:PLAN 1843- WIND LA METHOD CS-WSP (INCLUDES CS-G & CS-PF) FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR METHOD WSP (INCLUDES ABW, PFH & PFG)METHOD GB (2 SIDED)METHOD GB (1 SIDED) METHOD CS-WSP (INCLUDES CS-G & CS-PF)METHOD WSP (INCLUDES ABW, PFH & PFG)METHOD GB (2 SIDED)METHOD GB (1 SIDED) 3rd FLOOR 3rd FLOOR BASEMENT BASEMENT METHOD CS-WSP (INCLUDES CS-G & CS-PF) FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR METHOD WSP (INCLUDES ABW, PFH & PFG)METHOD GB (2 SIDED)METHOD GB (1 SIDED) 3rd FLOORBASEMENT Printed by larissa.anaya on 02/06/2025 at 14:31 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\PLAN 1843- ASCE7-16 Wind Lateral Book 2021 IRC1.xlsm SHEET L12 OF BY LATERAL LOAD ANALYSIS: SEGMENTED SHEAR WALLS SDPWS 4.3.5.1 V ==3332 # WALL n Wall Type Studs (in o.c.) 2 SIDED Ln (ft) hn (ft) Wall Width Chord En (psi) D (in) Vdesign (#)CWSP vdesign (plf) vallow (plf) ATRIB. (ft) WWALL (psf) DL (psf) 0.6WUPLIFT (psf) ∑MOT (#-ft) ∑MR (#-ft) 1 3 24 15.83 9.08 2x6 1.4E+06 3341 1.000 211 324 22.50 7.00 15.00 0.00 30336 50270 2 3 4 5 6 3341 1 11 11 2 3 4 5 6 V ==# WALL n Wall Type Studs (in o.c.) 2 SIDED Ln (ft) hn (ft) Wall Width Chord En (psi) D (in) Vdesign (#)CWSP vdesign (plf) vallow (plf) ATRIB. (ft) WWALL (psf) DL (psf) 0.6WUPLIFT (psf) ∑MOT (#-ft) ∑MR (#-ft) 1 2 3 4 5 6 1 2 3 4 5 6 TDESIGN (#)HOLDOWNT2nd FLOOR (#)CONCRETE WINT.WALL (#) T2nd FLOOR (#) TDESIGN (#)HOLDOWN WOOD/ CONC LOCATION OR NAME POSITION STEM CONCRETE WINT.WALL (#) LEFT END RIGHT END WALL n WOOD/ CONC LOCATION OR NAME POSITION STEM VTOTAL (#) = TDESIGN (#)HOLDOWNLOCATION OR NAME POSITION STEM CONCRETE WINT.WALL (#) T2nd FLOOR (#)CONCRETE WINT.WALL (#) T2nd FLOOR (#) TDESIGN (#)HOLDOWN WOOD/ CONC 0.181 WALL n WOOD/ CONC LOCATION OR NAME POSITION STEM LEFT END RIGHT END LA 2 VTOTAL (#) = CLIENT:LGI HOMES PROJECT:PLAN 1843- WIND FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR 3rd FLOOR 3rd FLOOR BASEMENT BASEMENT Printed by larissa.anaya on 02/06/2025 at 14:31 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\PLAN 1843- ASCE7-16 Wind Lateral Book 2021 IRC1.xlsm SHEET L13 OF BY LATERAL LOAD ANALYSIS: FORCE TRANSFER AROUND OPENINGS (FTAO) SDPWS 4.3.5.2 V ==110 # 580 # 2.00 15.00 9.79 580 # 1.083 →→ ←← 2.000 →→ ←← 6.000 →→→ ←←← 2.000 2.000 2.000 D =0.111 in WOOD 324 Left Uplift from Above (#) Right Uplift from Above (#) 0 0 Type of Shear (Wall/Value (plf)) 3 Left Restraint (#) Right Restraint (#)Left Pier (ft) =Window (ft) =Right Pier (ft) = 800 800 250 250 251 145 0 0.000 0.000 0 145 251 Left Holdown Strap Force (#) Max. Shear Panel Force (plf) Right Holdown Strap Force (#)Bottom Pier (ft) = Concrete Concrete CRKD CRKD Name / Value (#) / D Name / Value (#) / D Stem Stem 124 124 6 6 124 124 Position Position Left Sill Strap Force (#) Right Sill Strap Force (#)CORNER CORNER EXT EXT Window (ft) = Location Location 10 Material Material Wall Weight (psf)CONC CONC 324 324 124 124 Left Holdown Right Holdown Left Header Strap Force (#) Stud Spacing (inches o.c.) Right Header Strap Force (#)NO STRAP ATRIB. (ft) =Roof DL (psf) =WUPLIFT (psf) =← VALLOW = NO STRAP Top Pier (ft) = 124 24 124 Left Strap (Name/Value (#)) Right Strap (Name/Value (#)) → VALLOW = CLIENT:LGI HOMES PROJECT:PLAN 1843- WIND LA 3 FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR 3rd FLOORBASEMENT Printed by larissa.anaya on 02/06/2025 at 14:31 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\PLAN 1843- ASCE7-16 Wind Lateral Book 2021 IRC1.xlsm SHEET L14 OF BY LATERAL LOAD ANALYSIS: APA PORTAL FRAME PER TT-100H V ==976 # 977 # 1.000 9.000 10.000 D =0.457 in Door Height (ft) = Pier Height (ft) = Left Pier (ft) 1.500 APA PORTAL FRAME PER TT-100H 0.430 0.93 Beam Height (ft) = Number of Piers 1 VALLOW = Specific Gravity SG Reduction CLIENT:LGI HOMES PROJECT:PLAN 1843- WIND LA 3 FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR 3rd FLOORBASEMENT Printed by larissa.anaya on 02/06/2025 at 14:31 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\PLAN 1843- ASCE7-16 Wind Lateral Book 2021 IRC1.xlsm SHEET L15 OF BY LATERAL LOAD ANALYSIS: APA PORTAL FRAME PER TT-100H V ==1464 # 1465 # 1.000 9.000 10.000 D =0.510 in Door Height (ft) = Pier Height (ft) = Left Pier (ft) 2.000 APA PORTAL FRAME PER TT-100H 0.430 0.93 Beam Height (ft) = Number of Piers 1 VALLOW = Specific Gravity SG Reduction CLIENT:LGI HOMES PROJECT:PLAN 1843- WIND LA 3 FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR 3rd FLOORBASEMENT Printed by larissa.anaya on 02/06/2025 at 14:31 \\vmwashington\washington\LGI Homes\Seattle\Eldorado Plat\Plan 1843\00 - Engineering\Structural Calculations\PLAN 1843- ASCE7-16 Wind Lateral Book 2021 IRC1.xlsm CLIENT:SHEET L16 OF PROJECT:BY SEISMIC LOAD CALCULATIONS PER ASCE 7-16 *USING BASIC LOAD COMBINATIONS PER SECTION 2.4* ALL LOAD COMBINATIONS USE: 0.7*E E = Eh + Ev (EQN 12.4-1 and EQN 12.4-3) Eh = ρQE (EQN 12.4-3) ρ = 1.30 (SECTION 12.3.4.2.a) QE = V (SECTION 12.4.2.1) Ev = 0.2SDSD (EV = 0 IF SDS <= 0.125)(EQN 12.4-4a) II (TABLE 1.5-1) D (PER PROJECT SOILS REPORT OR TABLE 20.3-1)DEFAULT 22.832 (MEAN ROOF HEIGHT OF STRUCTURE) 1.288 (MAPPED MCE SPECTRAL RESPONSE ACCELERATION AT SHORT PERIODS) 0.465 (MAPPED MCE SPECTRAL RESPONSE ACCELERATION AT A PERIOD OF 1 s) Fa =1.200 (TABLE 11.4-1) Fv =1.835 (TABLE 11.4-2) SMS = FaSs =1.546 (EQN 11.4-1) SM1 = FvS1 =0.853 (EQN 11.4-2) SDS = 2/3SMS =1.030 (EQN 11.4-3) SD1 = 2/3SM1 =0.569 (EQN 11.4-4) 1.000 (TABLE 1.5-2) 0.552 (SECTION 11.4.6) SDC BASED ON SDS =D (TABLE 11.6-1)**EXCEPTION IN SECTION 11.6 CAN BE CHECKED S1<0.75 AND Ta<0.8Ts SDC BASED ON SD1 =N/A (TABLE 11.6-2) DESIGN SDC =D (SECTION 11.6) R FRONT/BACK =6.500 R SIDE/SIDE =6.500 (TABLE 12.2-1 (A.15)) 0.020 (TABLE 12.8-2) x =0.750 (TABLE 12.8-2) 0.209 (EQN 12.8-7) TL =6.000 (TABLE 22-14) V = CSW (EQN 12.8-1) CS = SEISMIC RESPONSE COEFFICIENT (SECTION 12.8.1.1) W = EFFECTIVE SEISMIC WEIGHT (SECTION 12.7.2) FRONT/BACK SIDE/SIDE CS =SDS/(R/IE) =0.159 CS =SDS/(R/IE) =0.159 GOVERNS Csmax = SD1/(T(R/IE)) =0.419 GOVERNS Csmax = SD1/(T(R/IE)) =0.419 Csmax = SD1TL/(T2(R/IE)) =12.033 Csmax = SD1TL/(T2(R/IE)) =12.033 GOVERNS Csmin = 0.044*SDS*IE>=0.01 0.045 GOVERNS Csmin = 0.044*SDS*IE>=0.01 0.045 Csmin = 0.5S1/(R/IE) =0.036 Csmin = 0.5S1/(R/IE) =0.036 EQN 12.8-2 GOVERNS AND QE = V = 0.159 *W EQN 12.8-2 GOVERNS AND QE = V = 0.159 *W SDS SDS EV =0.206 *D 0.7*EV =0.144 *D EV =0.206 *D 0.7*EV =0.144 *D LGI HOMES PLAN 1843- SEISMIC LA Elevation Label: RISK CATEGORY = SITE CLASS = hn (ft) = Ss = S1 = IE= Ts= **USE TABLE 11.6-1 ALONE IF RIGID DIAPHRAGM AND T<Ts OR WHEN USING BRACING TABLES FOR IRC DESIGN Ct= Ta = Cthn x = }0.419 }0.419 }0.045 }0.045 > 0.125, THEREFORE > 0.125, THEREFORE Printed by larissa.anaya on 02/07/2025 at 10:48 \\vmwashington\washington\LGI Homes\Seattle\Shelm Meadows\30 Wide Series\Plan 1843\00 - Engineering\Structural Calculations\PLAN 1843- ASCE7-16 Seismic Lateral Book 2021 IRC1.xlsm CLIENT:SHEET L17 OF PROJECT: Mass Calculations Area (ft2) Load (psf) Weight (lb) Total Length (ft) Load (psf) Weight (lb) Total Length (ft) Load (psf) Weight (lb) Roof 8.083 1256 15 18840 137 10 5537 186 7 5262 29639 Floor 1 9.083 1.5 1222 10 12220 154.5 10 12553 85 7 7964 32738 0 0 0 0 31060 18090 13226 62377 Base Shear ASD Eh (lb) Eh * 0.7 (lb)Level wx (lb) hx (ft) wxhx (lb-ft) wxhx k ∑wihi k (%) Fx (lb) Fx Ax (psf) 12855 8998 Roof 29639 18.7 553239 0.615 5533 4.41 Floor 1 32738 10.6 346463 0.385 3465 2.84 0 0.0 0 0.000 0 0.00 62377 899703 8998 Base Shear ASD Eh (lb) Eh * 0.7 (lb)Level wx (lb) hx (ft) wxhx (lb-ft) wxhx k ∑wihi k (%) Fx (lb) Fx Ax (psf) 12855 8998 Roof 29639 18.7 553239 0.615 5533 4.41 Floor 1 32738 10.6 346463 0.385 3465 2.84 0 0.0 0 0.000 0 0.00 62377 899703 8998 LGI HOMES PLAN 1843- SEISMIC Total Mass Total Weight (lb) Redundancy Front/Back Vertical Distribution of Seismic Forces (12.8.3) [Ta <= 0.5s k=1] ρ 1.30 Level Plate Height (ft) Floor Depth (ft) Diaphragm Exterior Walls Redundancy Side/Side Vertical Distribution of Seismic Forces (12.8.3) [Ta <= 0.5s k=1] ρ 1.30 Interior Walls Printed by larissa.anaya on 02/07/2025 at 10:48 \\vmwashington\washington\LGI Homes\Seattle\Shelm Meadows\30 Wide Series\Plan 1843\00 - Engineering\Structural Calculations\PLAN 1843- ASCE7-16 Seismic Lateral Book 2021 IRC1.xlsm SHEET L18 OF BY SHEAR DISTANCE UNIFORM START STOP #FT PLF FT FT 1ST FLOOR 2446 0.000 2466 30.000 1ST FLOOR 1ST FLOOR 1ST FLOOR PROJECT:PLAN 1843- SEISMIC LA LINE CALLOUT % CANT.SEISMIC DESIGN SHEAR DIAPHRAGM CLIENT:LGI HOMES NEXT LINE FROM NEXT CHORD DIST. FT SOURCE LINE NEXT LINE # SEISMIC LOAD SEISMIC DEPTH PARALLEL TO DIRECTION PSF TARGET LINE TO TARGET LINE SPACING FT POINT SHEAR FROM OTHER LINES UNIFORM LOADS BETWEEN TARGET LINE AND NEXT LINE TARGET LINE # A 30.000 4.41 36.000 4.41 38.500 10.000 2446 2466 520 170 10.000 24.000 30.000 FT SHEAR (#) CHORD (#) 2446 4.41 36.000 159 24.000 159 0.000 0 STORY CALC DESCRIPTION 0 24660B 0.00% 36.000 2466 4160 4160 323 108 10.500 30.000 0 A 30.000 #A ABOVE 2.84 42.000 2.84 38.000 4160 0 119 0.000 10.500 0 STORY CALC DESCRIPTION 41030B 0.00% 38.500 #B ABOVE 4103 0 0 0 0 0 0 0 0 0 STORY CALC DESCRIPTION 00 0.00% 0 0 0 0 0 0 0 0 STORY CALC DESCRIPTION 00 0.00% 0 0 0 Printed by larissa.anaya on 02/07/2025 at 10:48 \\vmwashington\washington\LGI Homes\Seattle\Shelm Meadows\30 Wide Series\Plan 1843\00 - Engineering\Structural Calculations\PLAN 1843- ASCE7-16 Seismic Lateral Book 2021 IRC1.xlsm SHEET L19 OF BY SHEAR DISTANCE UNIFORM START STOP #FT PLF FT FT 1ST FLOOR 2538 0.000 1ST FLOOR 766 0.000 2374 20.000 1ST FLOOR 1ST FLOOR PROJECT:PLAN 1843- SEISMIC LA LINE CALLOUT % CANT.SEISMIC DESIGN SHEAR DIAPHRAGM CLIENT:LGI HOMES NEXT LINE FROM NEXT CHORD DIST. FT SOURCE LINE NEXT LINE # SEISMIC LOAD SEISMIC DEPTH PARALLEL TO DIRECTION PSF TARGET LINE TO TARGET LINE SPACING FT POINT SHEAR FROM OTHER LINES UNIFORM LOADS BETWEEN TARGET LINE AND NEXT LINE TARGET LINE # 1 38.500 4.41 30.000 4.41 14.000 36.000 2538 2538 813 62 36.000 38.500 FT SHEAR (#) CHORD (#) 2538 0 132 0.000 0 STORY CALC DESCRIPTION 0 237403 0.00% 30.000 2374 3304 3304 115 0 0 1 18.000 #1 ABOVE 2.84 30.000 3304 0 85 0.000 18.000 0 STORY CALC DESCRIPTION 76602* 0.00% 30.000 766 2891 2891 579 30 20.000 24.000 0 0 85 0.000 20.000 0 2 26.00% 24.000 #2 2.84 30.000 2.84 10.500 2891 STORY CALC DESCRIPTION 206903 26.00% 30.000 #3 ABOVE 2069 0 0 0 0 0 0 0 STORY CALC DESCRIPTION 00 0.00% 0 0 0 Printed by larissa.anaya on 02/07/2025 at 10:48 \\vmwashington\washington\LGI Homes\Seattle\Shelm Meadows\30 Wide Series\Plan 1843\00 - Engineering\Structural Calculations\PLAN 1843- ASCE7-16 Seismic Lateral Book 2021 IRC1.xlsm SHEET L20 OF BY LATERAL LOAD ANALYSIS: SEGMENTED SHEAR WALLS SDPWS 4.3.5.1 V ==2446 # WALL n Wall Type Studs (in o.c.) 2 SIDED Ln (ft) hn (ft) Wall Width Chord En (psi) D (in) Vdesign (#)CWSP vdesign (plf) vallow (plf) ATRIB. (ft) WWALL (psf) DL (psf) 0.7* 0.2*SDS ∑MOT (#-ft) ∑MR (#-ft) 1 3 24 16.67 8.00 2x6 1.4E+06 1250 1.000 75 232 2.00 10.00 15.00 0.14 12204 15277 2 3 24 16.33 8.00 2x6 1.4E+06 1225 1.000 75 232 2.00 10.00 15.00 0.14 11917 14672 3 4 5 6 2475 1 800 0 800 0 2 800 0 800 0 3 4 5 6 V ==2466 # WALL n Wall Type Studs (in o.c.) 2 SIDED Ln (ft) hn (ft) Wall Width Chord En (psi) D (in) Vdesign (#)CWSP vdesign (plf) vallow (plf) ATRIB. (ft) WWALL (psf) DL (psf) 0.7* 0.2*SDS ∑MOT (#-ft) ∑MR (#-ft) 1 3 24 19.33 8.08 2x6 1.4E+06 1469 1.000 76 232 2.00 10.00 15.00 0.14 14857 20707 2 3 24 13.67 8.08 2x6 1.4E+06 1025 1.000 75 232 2.00 10.00 15.00 0.14 9775 10346 3 4 5 6 2494 1 400 0 400 0 2 400 21 400 21 3 4 5 6 LA A VTOTAL (#) = CLIENT:LGI HOMES PROJECT:PLAN 1843- SEISMIC 0.056 WALL n WOOD/ CONC LOCATION OR NAME POSITION STEM LEFT END RIGHT END WINT.WALL (#) T2nd FLOOR (#) TDESIGN (#)HOLDOWN WOOD/ CONC B TDESIGN (#)HOLDOWNLOCATION OR NAME POSITION STEM CONCRETE WINT.WALL (#) T2nd FLOOR (#)CONCRETE VTOTAL (#) = 0.057 WALL n WOOD/ CONC LOCATION OR NAME POSITION STEM WOOD/ CONC LEFT END RIGHT END CONCRETE WINT.WALL (#) T2nd FLOOR (#) TDESIGN (#)HOLDOWN LOCATION OR NAME POSITION STEM CONCRETE WINT.WALL (#) T2nd FLOOR (#) TDESIGN (#)HOLDOWN FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR 3rd FLOOR 3rd FLOOR BASEMENT BASEMENT Printed by larissa.anaya on 02/07/2025 at 10:48 \\vmwashington\washington\LGI Homes\Seattle\Shelm Meadows\30 Wide Series\Plan 1843\00 - Engineering\Structural Calculations\PLAN 1843- ASCE7-16 Seismic Lateral Book 2021 IRC1.xlsm SHEET L21 OF BY LATERAL LOAD ANALYSIS: PERFORATED SHEAR WALLS (PSW) SDPWS 4.3.2.3 V ==4160 # 1.00 10.00 15.00 0.14 37787 68578 800 800 1 3.250 0 0 2 8.000 3 20.750 4 SDPWS Equation (4.3-6) C0 = Awall / (3SA0+SAfhs) 5 SDPWS Equation (4.3-5) VALLOW = vMAXC0Sbi 6 7 8 9 1.000 3 232 7210 >=4160 OK ∑Afhs =290.656 ∑AO =∑bi =31.076 V ==# 1 2 3 4 SDPWS Equation (4.3-6) C0 = Awall / (3SA0+SAfhs) 5 SDPWS Equation (4.3-5) VALLOW = vMAXC0Sbi 6 7 8 9 0 ∑Afhs =∑AO =∑bi = ∑MOT = Vh ∑MR = [DLATRIB.+WWALLh][LTOT]2/2 Wall Length, LTOT (ft)Wall Height, h (ft)Stud Spacing (in)TDESIGN = [∑MOT-(0.6-0.7*0.2*SDS)∑MR]/[CO∑bi]-(0.6-0.7*0.2*SDS)WINT.WALL+T2nd FLOOR {EQN 4.3-8} CLIENT:LGI HOMES PROJECT:PLAN 1843- SEISMIC LA A ATRIB. (ft) WWALL (psf) DL (psf) 0.7*0.2* SDS ∑MOT (#-ft) ∑MR (#-ft)LOCATION POSITION 36.000 9.083 24 LEFT END RIGHT END Full Height Wall Segment, Li (ft) Openings Adjusted Segment, bi (ft) WOOD/ CONC TDESIGN (#)HOLDOWN STEM CONCRETE WINT.WALL (#)STEM CONCRETE WINT.WALL (#) T2nd FLOOR (#)LOCATION POSITION TDESIGN (#)HOLDOWN Height (ft)Width (ft)Area, AO (ft2) T2nd FLOOR (#) 2.000 2.000 6.055 2.326 2.000 2.000 6.055 8.000 WOOD/ CONC 20.750 V (#) DESIGN CHECK PERFORATED SHEAR WALL RESULTS CO WALL TYPE vMAX (plf) VALLOW (#) ∑MOT = Vh ∑MR = [DLATRIB.+WWALLh][LTOT]2/2 Wall Length, LTOT (ft)Wall Height, h (ft)Stud Spacing (in)TDESIGN = [∑MOT-(0.6-0.7*0.2*SDS)∑MR]/[CO∑bi]-(0.6-0.7*0.2*SDS)WINT.WALL+T2nd FLOOR {EQN 4.3-8} 12.111 ATRIB. (ft) WWALL (psf) DL (psf) 0.7*0.2* SDS ∑MOT (#-ft) ∑MR (#-ft)LOCATION POSITION 24 LEFT END RIGHT END Full Height Wall Segment, Li (ft) Openings Adjusted Segment, bi (ft) WOOD/ CONC TDESIGN (#)HOLDOWN STEM CONCRETE WINT.WALL (#)STEM CONCRETE WINT.WALL (#) T2nd FLOOR (#)LOCATION POSITION TDESIGN (#)HOLDOWN Height (ft)Width (ft)Area, AO (ft2) T2nd FLOOR (#) WOOD/ CONC PERFORATED SHEAR WALL RESULTS CO WALL TYPE vMAX (plf) VALLOW (#) V (#) DESIGN CHECK FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR 3rd FLOOR 3rd FLOOR BASEMENT BASEMENT Printed by larissa.anaya on 02/07/2025 at 10:48 \\vmwashington\washington\LGI Homes\Seattle\Shelm Meadows\30 Wide Series\Plan 1843\00 - Engineering\Structural Calculations\PLAN 1843- ASCE7-16 Seismic Lateral Book 2021 IRC1.xlsm SHEET L22 OF BY LATERAL LOAD ANALYSIS: SEGMENTED SHEAR WALLS SDPWS 4.3.5.1 V ==4103 # WALL n Wall Type Studs (in o.c.) 2 SIDED Ln (ft) hn (ft) Wall Width Chord En (psi) D (in) Vdesign (#)CWSP vdesign (plf) vallow (plf) ATRIB. (ft) WWALL (psf) DL (psf) 0.7* 0.2*SDS ∑MOT (#-ft) ∑MR (#-ft) 1 3 24 38.00 9.08 2x6 1.4E+06 4104 1.000 108 232 1.00 10.00 15.00 0.14 48299 76409 2 3 4 5 6 4104 1 800 0 800 0 2 3 4 5 6 V ==# WALL n Wall Type Studs (in o.c.) 2 SIDED Ln (ft) hn (ft) Wall Width Chord En (psi) D (in) Vdesign (#)CWSP vdesign (plf) vallow (plf) ATRIB. (ft) WWALL (psf) DL (psf) 0.7* 0.2*SDS ∑MOT (#-ft) ∑MR (#-ft) 1 2 3 4 5 6 1 2 3 4 5 6 LA B VTOTAL (#) = CLIENT:LGI HOMES PROJECT:PLAN 1843- SEISMIC 0.091 WALL n WOOD/ CONC LOCATION OR NAME POSITION STEM LEFT END RIGHT END WINT.WALL (#) T2nd FLOOR (#) TDESIGN (#)HOLDOWN WOOD/ CONC TDESIGN (#)HOLDOWNLOCATION OR NAME POSITION STEM CONCRETE WINT.WALL (#) T2nd FLOOR (#)CONCRETE VTOTAL (#) = WALL n WOOD/ CONC LOCATION OR NAME POSITION STEM WOOD/ CONC LEFT END RIGHT END CONCRETE WINT.WALL (#) T2nd FLOOR (#) TDESIGN (#)HOLDOWN LOCATION OR NAME POSITION STEM CONCRETE WINT.WALL (#) T2nd FLOOR (#) TDESIGN (#)HOLDOWN FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR 3rd FLOOR 3rd FLOOR BASEMENT BASEMENT Printed by larissa.anaya on 02/07/2025 at 10:48 \\vmwashington\washington\LGI Homes\Seattle\Shelm Meadows\30 Wide Series\Plan 1843\00 - Engineering\Structural Calculations\PLAN 1843- ASCE7-16 Seismic Lateral Book 2021 IRC1.xlsm LATERAL LOAD ANALYSIS: FORCE TRANSFER AROUND OPENINGS (FTAO) SDPWS 4.3.5.2 V ==2538 # 2578 # 2.00 15.00 0.14 2578 # →→→→ ←←←← Left Right Window Window →→→→ ←←←← →→→ ←←← D =0.082 in PR O J E C T : CL I E N T : PL A N 1 8 4 3 - S E I S M I C LG I H O M E S 1 → VALLOW = ATRIB. (ft) =Roof DL (psf) =0.7*0.2*SDS =← VALLOW = 1.083 232 895 922 205 1.083 232 1082 232 895 Left Window Left Strap (Name/Value (#)) Right Strap (Name/Value (#))Left Header Strap Force (#) Right Header Strap Force (#) Left Header Strap Force (#) Right Header Strap Force (#)NO STRAP CS20 Top Pier (ft)Top Pier (ft) 922 CS20 NO STRAP 10 205 Right Window Left Strap (Name/Value (#)) Right Strap (Name/Value (#))Wall Weight (psf) 1082 232 Left Holdown Right Holdown Window (ft) Window (ft) Material Material 5.000 Left Sill Strap Force (#) Right Sill Strap Force (#) Left Sill Strap Force (#) 205 Right Sill Strap Force (#) 5.000 Location Location 232 895 922 205 Position Position Left Holdown Strap Force (#) Shear Panel Force (plf) 232 895 922 Right Holdown Strap Force (#)Stem Stem Bottom Pier (ft)Bottom Pier (ft) 2.000 51 225 Name / Value (#) / D Name / Value (#) / D 0 2.000 Concrete Concrete 0 225 51 Right Window (ft)Right Pier (ft) 3.500 5.000 13.500 5.000 3.000 250 250 0.000 0.000 Left Restraint (#) Right Restraint (#) 0 0 Left Uplift from Above (#) Right Uplift from Above (#) 0 0 Left Pier (ft)Left Window (ft)Middle Pier (ft) OF BY : SH E E T : Type of Shear (Wall/Value (plf)) Stud Spacing (inches o.c.) 3 24 LA L2 3WOOD 232 FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR 3rd FLOORBASEMENT Printed by larissa.anaya on 02/07/2025 at 10:48 \\vmwashington\washington\LGI Homes\Seattle\Shelm Meadows\30 Wide Series\Plan 1843\00 - Engineering\Structural Calculations\PLAN 1843- ASCE7-16 Seismic Lateral Book 2021 IRC1.xlsm SHEET L24 OF BY LATERAL LOAD ANALYSIS: FORCE TRANSFER AROUND OPENINGS (FTAO) SDPWS 4.3.5.2 V ==593 # 600 # 2.00 15.00 0.14 600 # 1.083 →→ ←← 2.000 →→ ←← 5.000 →→→ ←←← 2.333 2.000 2.000 D =0.090 in CLIENT:LGI HOMES PROJECT:PLAN 1843- SEISMIC LA 3 WINDOW AT WALK IN CLOSET → VALLOW = Left Header Strap Force (#) Stud Spacing (inches o.c.) Right Header Strap Force (#)NO STRAP ATRIB. (ft) =Roof DL (psf) =0.7*0.2*SDS =← VALLOW = NO STRAP Top Pier (ft) = 136 24 116 Left Strap (Name/Value (#)) Right Strap (Name/Value (#)) Material Material Wall Weight (psf) 252 252 136 116 Left Holdown Right Holdown Window (ft) = Location Location 10 Stem Stem 136 116 136 116 Position Position Left Sill Strap Force (#) Right Sill Strap Force (#) Left Holdown Strap Force (#) Max. Shear Panel Force (plf) Right Holdown Strap Force (#)Bottom Pier (ft) = Concrete Concrete Name / Value (#) / D Name / Value (#) / D Left Restraint (#) Right Restraint (#)Left Pier (ft) =Window (ft) =Right Pier (ft) = 800 800 250 250 250 138 0 0.000 0.000 0 138 250 WOOD 252 Left Uplift from Above (#) Right Uplift from Above (#) 0 0 Type of Shear (Wall/Value (plf)) 3 FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR 3rd FLOORBASEMENT Printed by larissa.anaya on 02/07/2025 at 10:48 \\vmwashington\washington\LGI Homes\Seattle\Shelm Meadows\30 Wide Series\Plan 1843\00 - Engineering\Structural Calculations\PLAN 1843- ASCE7-16 Seismic Lateral Book 2021 IRC1.xlsm SHEET L25 OF BY LATERAL LOAD ANALYSIS: FORCE TRANSFER AROUND OPENINGS (FTAO) SDPWS 4.3.5.2 V ==736 # 1345 # 2.00 15.00 0.14 1345 # 1.083 →→ ←← 5.000 →→ ←← 2.000 →→→ ←←← 4.500 5.000 4.500 D =0.110 in CLIENT:LGI HOMES PROJECT:PLAN 1843- SEISMIC LA 3 WINDOW AT MASTER BEDROOM → VALLOW = Left Header Strap Force (#) Stud Spacing (inches o.c.) Right Header Strap Force (#)CS20 ATRIB. (ft) =Roof DL (psf) =0.7*0.2*SDS =← VALLOW = CS20 Top Pier (ft) = 630 24 630 Left Strap (Name/Value (#)) Right Strap (Name/Value (#)) Material Material Wall Weight (psf) 1082 1082 630 630 Left Holdown Right Holdown Window (ft) = Location Location 10 Stem Stem 630 630 630 630 Position Position Left Sill Strap Force (#) Right Sill Strap Force (#) Left Holdown Strap Force (#) Max. Shear Panel Force (plf) Right Holdown Strap Force (#)Bottom Pier (ft) = Concrete Concrete Name / Value (#) / D Name / Value (#) / D Left Restraint (#) Right Restraint (#)Left Pier (ft) =Window (ft) =Right Pier (ft) = 800 800 250 250 115 252 0 0.000 0.000 0 252 115 WOOD 252 Left Uplift from Above (#) Right Uplift from Above (#) 0 0 Type of Shear (Wall/Value (plf)) 3 FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR 3rd FLOORBASEMENT Printed by larissa.anaya on 02/07/2025 at 10:48 \\vmwashington\washington\LGI Homes\Seattle\Shelm Meadows\30 Wide Series\Plan 1843\00 - Engineering\Structural Calculations\PLAN 1843- ASCE7-16 Seismic Lateral Book 2021 IRC1.xlsm SHEET L26 OF BY LATERAL LOAD ANALYSIS: FORCE TRANSFER AROUND OPENINGS (FTAO) SDPWS 4.3.5.2 V ==1044 # 1062 # 2.00 15.00 0.14 1062 # 1.083 →→ ←← 2.000 →→ ←← 5.000 →→→ ←←← 5.083 2.000 2.916 D =0.078 in CLIENT:LGI HOMES PROJECT:PLAN 1843- SEISMIC LA 3 WINDOW AT MASTER BATH → VALLOW = Left Header Strap Force (#) Stud Spacing (inches o.c.) Right Header Strap Force (#)NO STRAP ATRIB. (ft) =Roof DL (psf) =0.7*0.2*SDS =← VALLOW = NO STRAP Top Pier (ft) = 179 24 103 Left Strap (Name/Value (#)) Right Strap (Name/Value (#)) Material Material Wall Weight (psf) 252 252 179 103 Left Holdown Right Holdown Window (ft) = Location Location 10 Stem Stem 179 103 179 103 Position Position Left Sill Strap Force (#) Right Sill Strap Force (#) Left Holdown Strap Force (#) Max. Shear Panel Force (plf) Right Holdown Strap Force (#)Bottom Pier (ft) = Concrete Concrete Name / Value (#) / D Name / Value (#) / D Left Restraint (#) Right Restraint (#)Left Pier (ft) =Window (ft) =Right Pier (ft) = 800 800 250 250 250 141 0 0.000 0.000 0 141 250 WOOD 252 Left Uplift from Above (#) Right Uplift from Above (#) 0 0 Type of Shear (Wall/Value (plf)) 3 FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR 3rd FLOORBASEMENT Printed by larissa.anaya on 02/07/2025 at 10:48 \\vmwashington\washington\LGI Homes\Seattle\Shelm Meadows\30 Wide Series\Plan 1843\00 - Engineering\Structural Calculations\PLAN 1843- ASCE7-16 Seismic Lateral Book 2021 IRC1.xlsm SHEET L27 OF BY LATERAL LOAD ANALYSIS: PERFORATED SHEAR WALLS (PSW) SDPWS 4.3.2.3 V ==3304 # 9.00 10.00 15.00 0.14 30000 101610 1 5.083 0 0 2 9.000 3 4.916 4 SDPWS Equation (4.3-6) C0 = Awall / (3SA0+SAfhs) 5 SDPWS Equation (4.3-5) VALLOW = vMAXC0Sbi 6 7 8 9 0.696 4 338 4468 >=3304 OK ∑Afhs =172.511 ∑AO =∑bi =18.999 V ==# 1 2 3 4 SDPWS Equation (4.3-6) C0 = Awall / (3SA0+SAfhs) 5 SDPWS Equation (4.3-5) VALLOW = vMAXC0Sbi 6 7 8 9 0 ∑Afhs =∑AO =∑bi = ∑MOT = Vh ∑MR = [DLATRIB.+WWALLh][LTOT]2/2 Wall Length, LTOT (ft)Wall Height, h (ft)Stud Spacing (in)TDESIGN = [∑MOT-(0.6-0.7*0.2*SDS)∑MR]/[CO∑bi]-(0.6-0.7*0.2*SDS)WINT.WALL+T2nd FLOOR {EQN 4.3-8} CLIENT:LGI HOMES PROJECT:PLAN 1843- SEISMIC LA 1 ATRIB. (ft) WWALL (psf) DL (psf) 0.7*0.2* SDS ∑MOT (#-ft) ∑MR (#-ft)LOCATION POSITION 30.000 9.080 24 LEFT END RIGHT END Full Height Wall Segment, Li (ft) Openings Adjusted Segment, bi (ft) WOOD/ CONC TDESIGN (#)HOLDOWN STEM CONCRETE WINT.WALL (#)STEM CONCRETE WINT.WALL (#) T2nd FLOOR (#)LOCATION POSITION TDESIGN (#)HOLDOWN Height (ft)Width (ft)Area, AO (ft2) T2nd FLOOR (#) 8.000 6.000 48.000 5.083 5.000 5.000 25.000 9.000 WOOD/ CONC 4.916 V (#) DESIGN CHECK PERFORATED SHEAR WALL RESULTS CO WALL TYPE vMAX (plf) VALLOW (#) ∑MOT = Vh ∑MR = [DLATRIB.+WWALLh][LTOT]2/2 Wall Length, LTOT (ft)Wall Height, h (ft)Stud Spacing (in)TDESIGN = [∑MOT-(0.6-0.7*0.2*SDS)∑MR]/[CO∑bi]-(0.6-0.7*0.2*SDS)WINT.WALL+T2nd FLOOR {EQN 4.3-8} 73.000 ATRIB. (ft) WWALL (psf) DL (psf) 0.7*0.2* SDS ∑MOT (#-ft) ∑MR (#-ft)LOCATION POSITION 24 LEFT END RIGHT END Full Height Wall Segment, Li (ft) Openings Adjusted Segment, bi (ft) WOOD/ CONC TDESIGN (#)HOLDOWN STEM CONCRETE WINT.WALL (#)STEM CONCRETE WINT.WALL (#) T2nd FLOOR (#)LOCATION POSITION TDESIGN (#)HOLDOWN Height (ft)Width (ft)Area, AO (ft2) T2nd FLOOR (#) WOOD/ CONC PERFORATED SHEAR WALL RESULTS CO WALL TYPE vMAX (plf) VALLOW (#) V (#) DESIGN CHECK FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR 3rd FLOOR 3rd FLOOR BASEMENT BASEMENT Printed by larissa.anaya on 02/07/2025 at 10:48 \\vmwashington\washington\LGI Homes\Seattle\Shelm Meadows\30 Wide Series\Plan 1843\00 - Engineering\Structural Calculations\PLAN 1843- ASCE7-16 Seismic Lateral Book 2021 IRC1.xlsm SHEET L28 OF BY LATERAL LOAD ANALYSIS: SEGMENTED SHEAR WALLS SDPWS 4.3.5.1 V ==2891 # WALL n Wall Type Studs (in o.c.) 2 SIDED Ln (ft) hn (ft) Wall Width Chord En (psi) D (in) Vdesign (#)CWSP vdesign (plf) vallow (plf) ATRIB. (ft) WWALL (psf) DL (psf) 0.7* 0.2*SDS ∑MOT (#-ft) ∑MR (#-ft) 1 3 24 15.83 9.08 2x6 1.4E+06 2897 1.000 183 232 22.50 7.00 15.00 0.14 33554 50251 2 3 4 5 6 2897 1 800 0 800 0 2 3 4 5 6 V ==# WALL n Wall Type Studs (in o.c.) 2 SIDED Ln (ft) hn (ft) Wall Width Chord En (psi) D (in) Vdesign (#)CWSP vdesign (plf) vallow (plf) ATRIB. (ft) WWALL (psf) DL (psf) 0.7* 0.2*SDS ∑MOT (#-ft) ∑MR (#-ft) 1 2 3 4 5 6 1 2 3 4 5 6 LA 2 VTOTAL (#) = CLIENT:LGI HOMES PROJECT:PLAN 1843- SEISMIC 0.157 WALL n WOOD/ CONC LOCATION OR NAME POSITION STEM LEFT END RIGHT END WINT.WALL (#) T2nd FLOOR (#) TDESIGN (#)HOLDOWN WOOD/ CONC TDESIGN (#)HOLDOWNLOCATION OR NAME POSITION STEM CONCRETE WINT.WALL (#) T2nd FLOOR (#)CONCRETE VTOTAL (#) = WALL n WOOD/ CONC LOCATION OR NAME POSITION STEM WOOD/ CONC LEFT END RIGHT END CONCRETE WINT.WALL (#) T2nd FLOOR (#) TDESIGN (#)HOLDOWN LOCATION OR NAME POSITION STEM CONCRETE WINT.WALL (#) T2nd FLOOR (#) TDESIGN (#)HOLDOWN FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR 3rd FLOOR 3rd FLOOR BASEMENT BASEMENT Printed by larissa.anaya on 02/07/2025 at 10:48 \\vmwashington\washington\LGI Homes\Seattle\Shelm Meadows\30 Wide Series\Plan 1843\00 - Engineering\Structural Calculations\PLAN 1843- ASCE7-16 Seismic Lateral Book 2021 IRC1.xlsm SHEET L29 OF BY LATERAL LOAD ANALYSIS: FORCE TRANSFER AROUND OPENINGS (FTAO) SDPWS 4.3.5.2 V ==327 # 510 # 2.00 15.00 0.14 510 # 1.083 →→ ←← 2.000 →→ ←← 6.000 →→→ ←←← 2.000 2.000 2.000 D =0.098 in CLIENT:LGI HOMES PROJECT:PLAN 1843- SEISMIC LA 3 → VALLOW = Left Header Strap Force (#) Stud Spacing (inches o.c.) Right Header Strap Force (#)NO STRAP ATRIB. (ft) =Roof DL (psf) =0.7*0.2*SDS =← VALLOW = NO STRAP Top Pier (ft) = 109 24 109 Left Strap (Name/Value (#)) Right Strap (Name/Value (#)) Material Material Wall Weight (psf)CONC CONC 232 232 109 109 Left Holdown Right Holdown EXT EXT Window (ft) = Location Location 10 Stem Stem 109 109 6 6 109 109 Position Position Left Sill Strap Force (#) Right Sill Strap Force (#)CORNER CORNER Left Holdown Strap Force (#) Max. Shear Panel Force (plf) Right Holdown Strap Force (#)Bottom Pier (ft) = Concrete Concrete CRKD CRKD Name / Value (#) / D Name / Value (#) / D Left Restraint (#) Right Restraint (#)Left Pier (ft) =Window (ft) =Right Pier (ft) = 800 800 250 250 251 128 0 0.000 0.000 0 128 251 WOOD 232 Left Uplift from Above (#) Right Uplift from Above (#) 0 0 Type of Shear (Wall/Value (plf)) 3 FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR 3rd FLOORBASEMENT Printed by larissa.anaya on 02/07/2025 at 10:48 \\vmwashington\washington\LGI Homes\Seattle\Shelm Meadows\30 Wide Series\Plan 1843\00 - Engineering\Structural Calculations\PLAN 1843- ASCE7-16 Seismic Lateral Book 2021 IRC1.xlsm SHEET L30 OF BY LATERAL LOAD ANALYSIS: APA PORTAL FRAME PER TT-100H V ==697 # 698 # 1.000 9.000 10.000 D =0.457 in CLIENT:LGI HOMES PROJECT:PLAN 1843- SEISMIC LA 3 1 VALLOW = Specific Gravity SG Reduction 0.430 0.93 Beam Height (ft) = Number of Piers Door Height (ft) = Pier Height (ft) = Left Pier (ft) 1.500 APA PORTAL FRAME PER TT-100H FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR 3rd FLOORBASEMENT Printed by larissa.anaya on 02/07/2025 at 10:48 \\vmwashington\washington\LGI Homes\Seattle\Shelm Meadows\30 Wide Series\Plan 1843\00 - Engineering\Structural Calculations\PLAN 1843- ASCE7-16 Seismic Lateral Book 2021 IRC1.xlsm SHEET L31 OF BY LATERAL LOAD ANALYSIS: APA PORTAL FRAME PER TT-100H V ==1045 # 1046 # 1.000 9.000 10.000 D =0.510 in CLIENT:LGI HOMES PROJECT:PLAN 1843- SEISMIC LA 3 1 VALLOW = Specific Gravity SG Reduction 0.430 0.93 Beam Height (ft) = Number of Piers Door Height (ft) = Pier Height (ft) = Left Pier (ft) 2.000 APA PORTAL FRAME PER TT-100H FRONT-BACK SIDE-SIDE 1st FLOOR 2nd FLOOR 3rd FLOORBASEMENT Printed by larissa.anaya on 02/07/2025 at 10:48 \\vmwashington\washington\LGI Homes\Seattle\Shelm Meadows\30 Wide Series\Plan 1843\00 - Engineering\Structural Calculations\PLAN 1843- ASCE7-16 Seismic Lateral Book 2021 IRC1.xlsm