Loading...
Needs 594 Approved QSTHLE 101163375 - PM XFMRV01 558979 147716 25kVA 120/240V BIRKLAND ST SE '16319' '16321''16325' '16323' '16333' '16331' '16322' '16329' '16327' REPLACE EXST XFMR W/ 50kVA 120/240V 107TH CT SE V01 558979 147716 25kVA 120/240V REPLACE EXST XFMR W/ 50kVA 120/240V Potelco, Inc.DESIGNED BY THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG No No No Yes Yes Yes "Flagging Required" "Outages Required" "Locates Required" MAKE NO CHANGES TO THIS JOB WITHOUT PRIOR APPROVAL Notify Customers and Service Area 48 HRS Prior To Planned Outages ORDER#NOTIF#PROJECT PHASE MAINTENENCE O & M SUPERIOR FAILED SILICONE REMOVAL EXPENSE 11942628 101163375 N/A N/A 594XXXXX 584050661 N/A For contacts below dial 1-888-CALL PSE (225-5773) Contact Information FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. N/A N/A N/A GENERAL UNDERGROUND NOTES: CONSTRUCTION OF ELECTRICAL SYSTEM MUST COMPLY TO PUGET SOUND ENERGY STANDARDS. OWNER/DEVELOPER RESPONSIBILITIES: PROVIDE ALL TRENCHING, BACKFILL (SELECT BACKFILL AND COMPACTION TO 95% OF ORIGINAL DENSITY IN CROSSINGS) AND RESTORATION WITHIN THIS PROJECT. LOCATE: THE ONE CALL CENTER (1-800-424-5555) MUST BE NOTIFIED 48 HOURS IN ADVANCE OF CONSTRUCTION SO ALL UTILITIES CAN BE LOCATED PRIOR TO ANY DIGGING. INSTALLED BY PSE MUST BE 18 INCHES MINIMUM IN WIDTH & SHALL HAVE A MINIMUM OF 36 INCHES COVER OVER THE TOP OF THE CONDUCTOR OR FROM THE TOP OF THE CONDUIT TO THE POINT OF FINAL GRADE. PROVIDE3 INCHES OF SAND BEDDING BELOW & 6 INCHES OF SAND BACKFILL. THE REMAINING BACKFILL MAY CONSIST OF NATIVE MATERIALS IF SUITABLE (I.E.; FREE FROM ROCKS, SHARP OBJECTS OR CORROSIVE MATERIALS THAT MAY DAMAGE CABLES OR CONDUITS). IF NATIVE MATERIALS ARE UNSUITABLE,AS DETERMINED BY PSE OR ITS INSPECTOR, SELECT BACKFILL SHALL BE SUPPLIED BY THE CUSTOMER. BACKFILL THE EXCAVATION TO FINISHED GRADE AT 2 INCHES BELOW THE VAULT TOP AS SOON AS PRACTICAL AFTER FACILITIES ARE PLACED AND INSPECTED.THE SPOILS PILE MUST BELOCATED A MINIMUM OF 24 INCHES FROM THE OPEN TRENCH.THE TRENCH SHALL PROVIDE ADDITIONAL WIDTH AS NEEDED TO MAINTAIN A 12 INCH MINIMUM HORIZONTAL SEPARATION BETWEEN POWER CONDUITS OR CABLE & ADJACENT UTILITY SERVICES. TRENCHING-SERVICE: THE CUSTOMER'S SERVICE TRENCH MUST MEET STATE & LOCAL REGULATORY REQUIREMENTS. SECONDARY TRENCHES SHALL HAVE A MINIMUM OF 24 INCHES COVER. PROVIDE 3 INCHES OF SAND BEDDING BELOW & 6 INCHES OF SAND BACKFILL. A 48 SQUARE INCH WORK PIT MUST BE PROVIDEDAT THE METER BASE. THE TRENCH SHALL PROVIDE ADDITIONAL WIDTH AS NEEDED TO MAINTAIN A 12 INCH MINIMUM HORIZONTAL SEPARATION BETWEEN CONDUITS OR CABLE & ADGACENT UTILITY SERVICES. THE SPOILS PILE MUST BE LOCATED A MINIMUM OF 24 INCHES FROM THE OPEN TRENCH. VAULT EXCAVATION: SIX INCHES (6") OF CRUSHED ROCK IS TO BE USED AS THE VAULT BASE. BACKFILL AROUND VAULTS SHOULD CONSIST OF GOOD COMPACTIBLE MATERIAL SUCH AS CLEAN EARTH FILL, CRUSHED ROCK, OR SAND. NO VOIDS SHOULD REMAIN BETWEEN THE VAULT WALLS & THE SIDES OFTHE EXCAVATION. STAKING: PRIOR TO CONSTRUCTION, LOT LINE AND GRADE STAKES WILL BE PROVIDED BY THE CUSTOMER/DEVELOPER. SITE PREPARATION: PRIOR TO CONSTRUCTION, THE WORK AREA WILL BE AT OR NEAR FINISHED GRADE AND CLEAR OF ANY SPOILS OR CONSTRUCTION MATERIALS WHICH WOULD RESTRICT CONSTRUCTION ACCESS. TRENCHING-PRIMARY: TRENCHES SUPPLIED FOR PRIMARY SYSTEMS OWNED & EQUIPMENT ACCESS: ADEQUATE SPACE IS TO BE MAINTAINED AROUND PSE'SFACILITIES, UNIMPEDED BY FENCES, ROCKERIES, WALLS, STRUCTURES, ETC. SITE PLAN SCALE: 1:50 Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage V01558979-14771625kVA Installed at site: Grid Number: kVA Rating: TRANSFORMER INSTALLATION (PM) Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: Foreman to redline the following information V01558979-14771650kVA 120/240v6247100 EXISTING UG MAP: 1702E117 SCALE: 1:100 10 1 1 6 3 3 7 5 VICINITY MAP UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP M. VALDIVIA 253-410-0659 3/25/24 A. CRAWFORD 425-559-5712 3/25/24 N/A N/A N/A A. OLAH 253-293-3721 3/25/24 N/A CITY OF YELM OTEP YEL-26 TRANSFORMER REPLACEMENT UPGRADE (1) PM TRANSFORMER 16323 BIRKLAND ST SE, YELM, WA 98597 N/A N/A 101163375 AS NOTED 1 OF 1 THURSTON N/A N/A QSTHLE T17N-R02E-30S N/A N/A 1702E120 1702E116 1702E117 YEL-26 N/A N/A N/A N/A N/A N/A N/A N/A N/A K. STOKES 253-308-7359 4/11/25 JOB SITE POWER GENERAL NOTES 1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy. 2. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 3. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 4. All work is to be done in accordance with local municipal and county permit requirements as applicable. 5. Inclement weather conditions may cause delays in construction times and dates. TRANSFORMER Vault & Equipment Table Site Grid Number Vault Size & Cover Type & Size Equipment In Vault Primary Bushings Electric Construction Notes LB DC V01 558979 147716 EXST 36X42X38 Unistrut HH Matid: 7663001 NEW PM XFMR 50kVA, 120/240V Matid: 6247100 2 - SITE SPECIFIC NOTES V01 (558979-147716) - REMOVE EXISTING 25kVA 120/240v TRANSFORMER.2-45X - INST NEW 3642 4" SPLIT RISER ON EXISTING VAULT (MID: 7807900) 2-60 - INST NEW 50kVA 120/240v TRANSFORMER IN EXISTING VAULT. - INST 2 NEW 1/0 PRI ELBOWS (6041.1000 ELB10J)2-57 (2) - RECONNECT EXIST SEC SVCS XFMR SELECTION Existing XFMR Proposed XFMR Location Nameplate Rating (kVA) Residential Peak Demand Peak Demand Percent of Nameplate (%) Max. Allowable Peak Demand Percent of Nameplate (%) (Sec. 6315.0032) kW kVA Nameplate Rating (kVA) Peak Demand Percent of Nameplate (%) V01 25 42 44.2 176.8 100 50 88.4 JOB SITE POTELCO DESIGN AND QUALITY ASSURANCE This design complies with PSE Design/Engineering Standards. Any/all variations have been pre-approved/documented by the appropriate PSE Representative. X Signature _________________________________________ KATHERINE STOKESPrint Name _________________________________________ Date _________________4/11/25