Loading...
PSE FINAL 105107600 WILLOW GLEN IVN Vicinity Map 46.9445, -122.5849 Owner / Developer Contact Info officeATTN: CENTURY COMMUNITIES OF WASHINGTON LLC 20000 NORTH CREEK PKWY. SUITE 201 BOTHELL, WA 98011 STEVE GOINS 253.514.2836 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. GAS PHONE CABLE TV 515976068 105107600 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Perm. Service Relocation Removal Temporary Job Order Distribution Service Stubs HP Svc/MSA 10. 9. 8. 7. 6. 5. 4. 3. 2. 1.THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, PER THE TRENCH PROFILE, AND ALL EXCAVATIONS AT THE TRANSFORMER/HANDHOLE VAULT SITES SUCH THAT PSE FACILITIES WILL MATCH FINAL GRADE. VAULT HOLES WILL HAVE STABLE LEVEL BOTTOMS. CUSTOMER WILL PROVIDE 6" OF CRUSHED ROCK FOR VAULT BEDDING. ALL TRENCHES WILL HAVE 6" OF WASHED SAND COVER AND 4" BEDDING FOR ALL CONDUITS. THE CUSTOMER WILL PROVIDE SELECT BACKFILL, IF REQUIRED, AND COMPACTION AS NECESSARY. THE CUSTOMER IS RESPONSIBLE FOR DISPOSAL OF ALL NATIVE SPOILS NOT SUITABLE FOR USE AS BACKFILL. ALL TRENCHES MAY BE JOINT WITH GAS, TELEPHONE AND TV CABLE. ALL CABLES/CONDUITS TO BE INSTALLED IN CUSTOMER'S TRENCH AT THE DEPTH INDICATED IN TRENCH DETAIL (DEPENDENT UPON SIZE OF CONDUIT BEING INSTALLED TO MEET MIN 36" OF COVER). INSTALL CABLE ID TAGS AT EACH END OF THE PRIMARY CABLES PER THE CIRCUIT ONE-LINE DIAGRAM. UNLESS OTHERWISE SPECIFIED BY MUNICIPALITIES, INSTALL PVC (DB-120) ROAD CROSSINGS AS INDICATED ON THE CROSSINGS CONDUIT TABLE & AS SHOWN ON WORK SKETCH. CROSSINGS SHALL BE INSTALLED BY CUSTOMER/DEVELOPER PER PUGET SOUND ENERGY STANDARDS. AT SYMBOL: INSTALL UNDERGROUND PRIMARY CABLES IN CONDUIT. CABLE LENGTH AND CONDUIT SIZE AS INDICATED ON PRIMARY CABLE & CONDUIT TABLE. AT SYMBOL: INSTALL 600 VOLT UG SECONDARY CABLES IN CONDUIT. CABLE/CONDUIT SIZE AND LENGTH AS INDICATED ON SECONDARY CABLE & CONDUIT TABLE. AT SYMBOL: INSTALL MINI-PAD HANDHOLE & PADMOUNT TRANSFORMER. ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE. AT SYMBOL: INSTALL SECONDARY PEDESTAL/HANDHOLE W/ (3) MULTI-CONNECTORS. SIZE AS INDICATED ON SECONDARY HH/PEDESTAL TABLE. (EXCAVATION: 3' SQ.) AT SYMBOL: INSTALL JUNCTION BOX HANDHOLE. ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE. AT SYMBOL: INSTALL SECONDARY CABLE & CONDUIT STUB-OUT. AT SYMBOL: INSTALL STREET LIGHTING STANDARD. SIZE AND TYPE OF STANDARD/LUMINARIE AS INDICATED ON STREET LIGHTING TABLE. (CUSTOMER TO EXCAVATE & INSTALL CORRUGATED STREET LIGHT TUBES FOR PLACEMENT OF THE STREET LIGHT STANDARDS. ) INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMES AND DATES. POWER GENERAL NOTES - PLAT PROJECT 10 5 1 0 7 6 0 0 N/ A DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. CALLAHAN 206.503.1520 . A. DUNN .05.22.25 ... A. DUNN .05.22.25 REDT # ( RW-138620 )YELM WILLOW GLENN IV 3Ø PRIMARY U/G LINE EXTENSION - 75 S/F LOTS 9819 GROVE RD SE, YELM, WA 98597 PUGET SOUND ENERGY N/A N/A N/A 105107600 N/A 1 OF 5 THURSTON N/A N/A QSTHLE 20SE-T17N-R02E N/A N/A 1702E080 1702E116 1702E079 YEL-27 COMCAST TED AXTELL 253.878.2794 LUMEN DEWAYNE RICHERT 253.221.0133 RIGHT OF WAY CAROLYN BANASKY 253.476.6416 . . . 11. E-Mail: Cell Phone: Project Manager Contact Information: Manager:JESSICA CALLAHAN 206.503.1520 JESSICA.CALLAHAN@PSE.COM x x x Standoff Bracket 15" Min Length Conduit Clamp Conduit Field Face Quadrant Climbing SpaceRoad Face Quadrant Climbing Space 5" Min CL LC Direction of Vehicular Traffic CONDUIT RISER PLACEMENT DETAIL TOP VIEW NOT TO SCALE ... ... ... x STEVE.GOINS@CENTURYCOMMUNITIES.COM TYPICAL NOTCH-OUT FOR TRANSFORMER, NOT TO SCALE & SECONDARY PEDESTAL/HANDHOLE BACK OF EASEMENT STANDARD EASEMENT LINE ROW 10' PL 1' 4' - 5' Min. 1' 7'7' TRANSFORMER (WHEN PRESENT) 42" 45°42" 1' 45° Pr o p e r t y L i n e Road Side Top View of Mainline Trench for Single Stubout Location 4' Pr o p e r t y L i n e Road Side Top View of Mainline Trench for Pedestal or Double Stubout Location 42"45° 4' 45° STUBOUT EXCAVATION DIMENSIONS NOT TO SCALE MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE OIL-FILLED EQUIPMENT TRANSFORMER APPROVED AREA CO M B U S T I B L E B U I L D I N G W A L L S & R O O F 10' 10' 10' COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 3' MIN 3' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA 3' MIN @H1A, H2A, H2B, H3A, H3B, H4A, H6A, H9A & H10A SHALL BE STAGGERED CONNECTOR BARS IN THE FRONT NEUTRALS SHALL BE 18" 16" 13" 12"10" 2" 10" Pedestal will accept up to six 3" conduits SEALED WITH FOAM CONDUIT SHALL BE 120 PVC CONDUIT ELBOWS TYPICAL 24" RADIUS DB SIDE VIEW WITH CONDUIT 10" 18" 16" 13" 10" 2" 36" FRONT VIEW WITH CONDUIT SECONDARY PEDESTAL DETAIL NOT TO SCALE JOINT TRENCH DETAIL NOT TO SCALE ROAD SIDE MINIPAD MINIPAD FIELD SIDE VAULT 6" of crushed rock (base for vault) P/L Power Secondary Power Primary Communications 42" Min 21"1' Feeder 38" 2" 4" Sand Bedding 12" Sand Cover 36" Cover 4" Sand Bedding 42" 6" Additional depth when Feeder is required PSE 10' FRONTAGE EASEMENT 1' TRANSFORMER Final Backfill Initial Backfill Trench Depth 42" - 48" ROAD SIDE NATIVE SECONDARY POWER PEDESTAL MATERIAL P/L Power Secondary Power Primary Conduit Tel. & TV Sand 6" or 12" 4" Sand Bedding 1' 36" Cover 42" 12" 18" Lower 2" 10" Pedestal PSE 10' FRONTAGE EASEMENT 1' Cover JOINT TRENCH DETAIL NOTES: 1. If the final backfill contains rocks greater than 8 inches in diameter , install 12 inches compacted sand shading across the full width of the trench. * If the final backfill contains rocks 8 inches in diameter or smaller , install 6 inches compacted sand shading across the full width of the trench. * 2. Rocks greater than 10 inches diameter are not permitted in the final backfill. 3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the side of the trench nearest to where the gas main/service is installed to a minimum OF 5 inches on the opposite side of the gas line. 4. Utilities shall not be stacked over the gas line in the trench. 5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements. 6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies. * Alternatives to full-width trench shading require PSE approval. Primary & Secondary & Communications (NTS) Primary Dirt Pile Final Grade 24" Min 36" Min Cover Over Power 48" Max Depth Final Backfill 4" Sand Bedding Property Line intercept (depth varies). SidewalkCurb Location of roof drain 48" Typical Width may vary per Number of Utilities and Conduits R/W or Excavated 12" Typical Power Secondary Power TV & TEL 12" Min 4,5 1,2 3 6 6" or 12" Min Sand Shading Over Power after Compaction1 GREENLEAF AVE SE GR O V E R D S E VAULT DETAIL @ V01-V10 NOT TO SCALE EXCAVATION: _____ CUBIC YARDS 3'-6" SIDE VIEW 2" 6" CRUSHED ROCK TOP VIEW 7' 7' 6 1/3 CLEAR WORKING SPACE FOR VAULTS NOT TO SCALE FIELD SIDE (PREFERRED) ROAD SIDE (PREFERRED) 6' MIN 3' MIN 3' MIN 3' MIN SITE LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 9 LOT 10 LOT 11 LOT 12 LOT 13 LOT 14 LOT 15 LOT 16 LOT 17 LOT 18 LOT 19 LOT 20 LOT 21 LOT 22 LOT 23 LOT 24 LOT 25 LOT 26 LOT 27 LOT 28 LOT 29LOT 30LOT 31LOT 32 LOT 33LOT 34LOT 35LOT 36 LOT 37LOT 38 LOT 39LOT 40 LOT 41LOT 42LOT 43LOT 44 LOT 45LOT 46 LOT 47LOT 48LOT 49 LOT 50 LOT 51 LOT 52 LOT 53 LOT 54 LOT 55 LOT 56 LOT 57 LOT 58 LOT 59 LOT 60 LOT 61 LOT 62 LOT 63LOT 64LOT 65LOT 66LOT 67LOT 68LOT 69LOT 70LOT 71LOT 72LOT 73LOT 74LOT 75 #4 ACSR 39 7 . 5 A A C 39 7 . 5 A A C 39 7 . 5 A A C YEL 27 FE E D FUSE @ 100T SW#T95640 ROAD A ROAD B RO A D C EX: 1-2" FUT: 1-2" IRR (1) 1/0 GR O V E R D S E GR E E N L E A F L O O P S E CBA CBA C CBA DEVELOPER RESPONSIBLE FOR CONDUIT/WIRE FROM VAULT TO METER LOCATION (TYPICAL) 56' 56' 56 ' 56' 58' RO A D B RO A D B BO U R B O N S T S E 'A' 'B' ST.LTS (1) 10GA 1" = 50' DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. CALLAHAN 206.503.1520 . A. DUNN .05.22.25 ... A. DUNN .05.22.25 REDT # ( RW-138620 )YELM WILLOW GLENN IV 3Ø PRIMARY U/G LINE EXTENSION - 75 S/F LOTS 9819 GROVE RD SE, YELM, WA 98597 PUGET SOUND ENERGY N/A N/A N/A 105107600 1" = 50'2 OF 5 THURSTON N/A N/A QSTHLE 20SE-T17N-R02E N/A N/A 1702E080 1702E116 1702E079 YEL-27 COMCAST TED AXTELL 253.878.2794 LUMEN DEWAYNE RICHERT 253.221.0133 RIGHT OF WAY CAROLYN BANASKY 253.476.6416 . . . SITE PLAN CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE YEL-27 12.04.24 377 332 299 38 48 43 415 380 342 ... ... ... SCHED.SQ. FT. MAX LRC = CIRCUIT FEET ADDED: 3720' 17 2448 80 AMPS THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) J-BOX CABLE ENTRY DETAIL NOT TO SCALE 12kV CABLE ROUTING Cables should enter the vault so that all of the cables will lay in the same direction. TOP VIEW Oil-Filled Equipment Clearances per PSE Std 0700.1500 If the oil-filled equipment is adjacent to… Clearance Requirement Combustible walls or roof (including stucco).10 FT Noncombustible walls, soffits, and roofs (including brick, concrete, steel and stone) providing the side of the transformer facing the wall does not have doors. Materials that pass UBC Std. 2-1 or ASTM E136-79 are considered to be noncombustible. 3 FT Fire sprinkler valves, standpipes, and fire hydrants.6 FT Doors, windows, vents, fire escapes, or other building openings.10 FT The water's edge of a swimming pool or any body of water.15 FT Individual domestic and irrigation wells. Clearance not required on pole mounted transformers (pole placement still applies as stated in 6450.3000), TUT's installed in sealed vaults, 7200V single-phase padmount transformers 50kva or less, and ones with reduced flammability oil. 100 FT Facilities used to dispense or store LP, hazardous liquids, or fuel.20 FT Gas service meter relief vent.3 FT Generators, customer-owned transformers, etc.6 FT 10' CLEARANCE REQUIRED TO TRANSFORMER OR NON-FLAMMABLE BUILDING MATERIALS REQUIRED TRANSFORMERS HAVE BEEN SIZED FOR EXTRA 7KW DEMAND PER LOT FOR EV Developer Note: The following Fault Current information MUST BE conveyed to the builder of the units: All units may require upgraded house electrical equipment as the fault current at the meter base may exceed 10,000 amps. FAULT CURRENT TABLE 1Ø PM TRANSFORMERS (240/120V) 120V WINDINGS 240V WINDINGS LOCATION SIZE R/X MIN. %Z FAULT CURRENT MIN. %Z FAULT CURRENT V01-V04, V06,V09-V10 100kVA 0.5 2.43 57,300 AMPS 1.90 36,600 AMPS V05,V07-V08 75kVA 0.5 2.30 36,200 AMPS 1.80 23,100 AMPS LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: Units: BUILDING #STREET LIGHTS N/A N/A 100A N/A 1KW 80A 3.4 @ H2B 1.1 @ H2B LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: Units: BUILDING #IRRIGATION N/A N/A 100A N/A 1KW 80A 3.1 @ H6A 1.6 @ H6A CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLE BLDG.# OF METERS SOURCE # OF RUNS WIRE SIZE REMARKS -1 V02 100 (1) 1/0 STREET LIGHTS -1 V06 100 (1) 10GA IRRIGATION ALL CUSTOMER-OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLE CROSSING CONDUIT TABLE X-ING # LOCATION POWER XING LENGTH ASBUILT LOCATION TYPE OF CROSSING (Feeder, Primary, Secondary, etc.)FROM TO SIZE (IN)TYPE QTY X01 'A'LOT 29 4 DB120 1 170 ( )' ECL PRIMARY X02 LOT 33 LOT 62 3 DB120 1 65 ( )' WCL SECONDARY X03 LOT 35 LOT 60 3 DB120 2 65 ( )' ECL SECONDARY X04 'B'LOT 57 3 DB120 2 65 ( )' ECL SECONDARY X05 LOT 37 LOT 56 3 DB120 2 65 ( )' WCL SECONDARY X06 LOT 39 LOT 54 3 DB120 1 65 ( )' WCL SECONDARY X07 LOT 41 LOT 51 3 DB120 1 65 ( )' WCL SECONDARY X08 LOT 43 LOT 50 3 DB120 1 65 ( )' ECL SECONDARY X09 LOT 48 LOT 1 4 DB120 1 65 ( )' WCL PRIMARY 2 DB120 1 65 ( )' WCL PRIMARY X10 LOT 11 LOT 74 3 DB120 1 65 ( )' WCL SECONDARY X11 LOT 11 LOT 12 2 DB120 1 65 ( )' NCL PRIMARY X12 LOT 12 LOT 73 3 DB120 2 65 ( )' ECL SECONDARY X13 LOT 14 LOT 70 3 DB120 2 65 ( )' ECL SECONDARY X14 LOT 16 LOT 69 3 DB120 2 65 ( )' WCL SECONDARY X15 LOT 18 LOT 67 3 DB120 2 65 ( )' WCL SECONDARY X16 LOT 20 LOT 64 3 DB120 2 65 ( )' WCL SECONDARY X17 LOT 21 LOT 63 3 DB120 1 65 ( )' WCL SECONDARY X18 LOT 36 LOT 37 4 DB120 1 65 ( )' SCL PRIMARY 2 DB120 2 65 ( )' SCL PRIMARY 3 DB120 1 65 ( )' SCL SECONDARY 2" DB120 GREY PVC = 260 FT 2" PVC PLUG /CAPS = 8 3" DB120 GREY PVC = 1495 FT 3" PVC PLUG /CAPS = 46 4" DB120 GREY PVC = 300 FT 4" PVC PLUG /CAPS = 6 DEDICATED FACILITIES (105107600) for Dedicated Stub Locations SITE SPAN ADDITIONAL REMARKS LABOR UNITS #FROM TO FOOTAGE -V05 LOT 2 35 DED. CONDUIT & WIRE 2-36, 2-54A -V05 LOT 4 30 DED. CONDUIT & WIRE 2-36, 2-54A -V08 LOT 15 50 DED. CONDUIT & WIRE 2-36, 2-54A -V10 LOT 25 30 DED. CONDUIT & WIRE 2-36, 2-54A -V02 LOT 30 35 DED. CONDUIT & WIRE 2-36, 2-54A -V02 LOT 32 45 DED. CONDUIT & WIRE 2-36, 2-54A -V03 LOT 39 35 DED. CONDUIT & WIRE 2-36, 2-54A -V03 LOT 40 35 DED. CONDUIT & WIRE 2-36, 2-54A -H4A LOT 43 35 DED. CONDUIT & WIRE 2-36, 2-54A -V04 LOT 45 35 DED. CONDUIT & WIRE 2-36, 2-54A -V04 LOT 46 30 DED. CONDUIT & WIRE 2-36, 2-54A -H4B LOT 48 40 DED. CONDUIT & WIRE 2-36, 2-54A -V01 LOT 58 55 DED. CONDUIT & WIRE 2-36, 2-54A -V01 LOT 59 40 DED. CONDUIT & WIRE 2-36, 2-54A -V09 LOT 65 45 DED. CONDUIT & WIRE 2-36, 2-54A -V09 LOT 66 40 DED. CONDUIT & WIRE 2-36, 2-54A -V08 LOT 68 30 DED. CONDUIT & WIRE 2-36, 2-54A -V07 LOT 71 80 DED. CONDUIT & WIRE 2-36, 2-54A TOTAL FT=725 SITE SPECIFIC NOTES AT P01 (559450-147961) 2013 CLASS 2 - 45' -INSTALL 3Ø TERM ON NEW FIBERGLASS ARM W/ LOAD INTERRUPTER C/O & SURGE ARRESTOR (TSU3L1F) 6043.1000 -(3) STIRRUPS (2254100) -ALUM "H" CONNECTOR (2167700) -(3) FUSE @ 100T (3412700); TAP 3Ø -INSTALL SWITCH# T95640 -INSTALL 4" PRIMARY RISER ON NEW STANDOFF BRACKETS (RIS4CSS) 6042.1000 POLE 559433-147945 AND ALL RELATED FACILITIES TO BE REMOVED ON WILLOW GLEN IV WRECKOUT, WO#105107600 #4 ACSR 39 7 A A C 39 7 A A C YEL 27 FE E D FUSE @ 100T SW#T95640 CBA C CBA 39 7 A A C CBA NEW 3Ø 1/O AL EKG206-AØ EKG207-BØ EKG208-CØ NEW 1/O AL EKG204-CØ NEW 3Ø 1/O AL EKG200-AØ EKG201-BØ EKG202-CØ EKG203-CØ NEW 1/O AL EKG205-CØ NEW 1/O ALEKG209-AØ NEW 1/O AL EKG210-AØ NEW 1/O AL NEW 3Ø 1/O AL EKG211AØ EKG212-BØ EKG213-CØ EKG214-AØ NEW 1/O AL EKG215-BØ NEW 1/O AL EKG216-BØ NEW 1/O AL EKG217-BØ NEW 1/O AL EKG218-BØ NEW 1/O AL DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. CALLAHAN 206.503.1520 . A. DUNN .05.22.25 ... A. DUNN .05.22.25 REDT # ( RW-138620 )YELM WILLOW GLENN IV 3Ø PRIMARY U/G LINE EXTENSION - 75 S/F LOTS 9819 GROVE RD SE, YELM, WA 98597 PUGET SOUND ENERGY N/A N/A N/A 105107600 AS SHOWN 3 OF 5 THURSTON N/A N/A QSTHLE 20SE-T17N-R02E N/A N/A 1702E080 1702E116 1702E079 YEL-27 COMCAST TED AXTELL 253.878.2794 LUMEN DEWAYNE RICHERT 253.221.0133 RIGHT OF WAY CAROLYN BANASKY 253.476.6416 . . . THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) ... ... ... NOT TO SCALE NEW PRIMARY UNDERGROUND CIRCUIT ONE-LINE DIAGRAM EX UNDERGROUND CIRCUIT MAP 1702E079 NOT TO SCALE SITE EX OVERHEAD CIRCUIT MAP 1702E116 SCALE: 6" = 1 MILE SITE IRR ST.LTS DEVELOPER RESPONSIBLE FOR CONDUIT/WIRE FROM VAULT TO METER LOCATION (TYPICAL) LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 9 LOT 10 LOT 11 LOT 12 LOT 13 LOT 14 LOT 15 LOT 16 LOT 17 LOT 18 LOT 19 LOT 20 LOT 21 LOT 22 LOT 23 LOT 24 LOT 25 LOT 26 LOT 27 LOT 28 LOT 29LOT 30LOT 31LOT 32LOT 33LOT 34LOT 35LOT 36LOT 37LOT 38LOT 39LOT 40LOT 41LOT 42LOT 43LOT 44LOT 45LOT 46LOT 47LOT 48LOT 49 LOT 50 LOT 51 LOT 52 LOT 53 LOT 54 LOT 55 LOT 56 LOT 57 LOT 58 LOT 59 LOT 60 LOT 61 LOT 62 LOT 63LOT 64LOT 65LOT 66LOT 67LOT 68LOT 69LOT 70LOT 71LOT 72LOT 73LOT 74LOT 75 FUT: 1-2" EX: 1-2" 1 (1/0) (1) 10 GA DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. CALLAHAN 206.503.1520 . A. DUNN .05.22.25 ... A. DUNN .05.22.25 REDT # ( RW-138620 )YELM WILLOW GLENN IV 3Ø PRIMARY U/G LINE EXTENSION - 75 S/F LOTS 9819 GROVE RD SE, YELM, WA 98597 PUGET SOUND ENERGY N/A N/A N/A 105107600 N/A 4 OF 5 THURSTON N/A N/A QSTHLE 20SE-T17N-R02E N/A N/A 1702E080 1702E116 1702E079 YEL-27 COMCAST TED AXTELL 253.878.2794 LUMEN DEWAYNE RICHERT 253.221.0133 RIGHT OF WAY CAROLYN BANASKY 253.476.6416 . . . ... ... ... NOT TO SCALE NEW CONDUIT DIAGRAM SECONDARY HH/PEDESTAL TABLE Site Pedestal or Handhole Number of Positions Required Remarks H1A PEDESTAL 4 - SEPS4 6050.1000 H2A PEDESTAL 4 - SEPS4 6050.1000 H2B PEDESTAL 4 - SEPS4 6050.1000 H3A PEDESTAL 3 - SEPS3 6050.1000 H3B PEDESTAL 3 - SEPS3 6050.1000 H4A PEDESTAL 4 - SEPS4 6050.1000 H4B PEDESTAL 3 - SEPS3 6050.1000 H6A PEDESTAL 4 - SEPS4 6050.1000 H9A PEDESTAL 4 - SEPS4 6050.1000 H10A PEDESTAL 3 - SEPS3 6050.1000 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) CUST. OWNED PRIMARY 4" PRIMARY 2" CONDUIT LEGEND PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE FROM TO SIZE (IN)QTY. DESIGN LENGTH (FT) BENDS PULL (LBS) PULL REV (LBS) CABLE SIZE DESIGN LENGTH (FT) PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED LUBRICANT (Gal.) 90°45°22°11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE EST.ACTUAL P01 J01 4 1 430 1 ---387 940 3Ø 1/0 AL JKT 705 EKG200 EKG201 EKG202 4.9 J01 V01 2 1 55 ----70 59 1/0 AL JKT 130 --EKG203 0.5 V01 V02 2 1 100 ----78 78 1/0 AL JKT 110 --EKG204 0.4 J01 V03 2 1 170 ----79 65 1/0 AL JKT 180 --EKG205 0.7 J01 E01 2 1 85 ----CONDUIT ONLY ---- J01 J02 4 1 690 ----426 426 3Ø 1/0 AL JKT 700 EKG206 EKG207 EKG208 4.9 J02 V04 2 1 210 ----86 71 1/0 AL JKT 220 EKG209 --0.9 J02 V05 2 1 210 1 ---131 111 1/0 AL JKT 285 EKG210 --1.1 J02 J03 4 1 555 1 -4 -629 701 3Ø 1/0 AL JKT 630 EKG211 EKG212 EKG213 4.4 J03 V06 2 1 100 ----64 55 1/0 AL JKT 110 EKG214 --0.4 J03 V07 2 1 55 ----67 57 1/0 AL JKT 130 -EKG215 -0.5 V07 V08 2 1 215 ----105 105 1/0 AL JKT 225 -EKG216 -0.9 V08 V09 2 1 110 ----84 84 1/0 AL JKT 120 -EKG217 -0.5 V09 V10 2 1 325 --3 -314 282 1/0 AL JKT 335 -EKG218 -1.3 J03 E02 2 1 85 ----CONDUIT ONLY ---- 2" PVC (FT) & BENDS =1720 1 0 3 0 1/0 AL JKT TOTAL (FT) =1845 TTL (Gal.)21.4 4" PVC (FT) & BENDS =1675 2 0 4 0 3Ø1/0 AL JKT TOTAL (FT) =2035 VAULT & EQUIPMENT TABLE SITE #GRID # VAULT SIZE & COVER TYPE & SIZE EQUIPMENT IN VAULT PRIMARY BUSHINGS TRANSFORMER ID NUMBERS (COMPANY ID) AS-BUILT INFORMATION LB DC FOREMAN: INCLUDE PHASE TAPPED V01 559444 147923 54"x54"x38" Unistrut HH Matid: 7663002 100KVA MP TRF 120/240 Matid: 6247200 2 - MINU1LL 6045.1010 CØ V02 559444 147933 54"x54"x38" Unistrut HH Matid: 7663002 100KVA MP TRF 120/240 Matid: 6247200 1 1 MINU1LR 6045.1010 CØ V03 559445 147895 54"x54"x38" Unistrut HH Matid: 7663002 100KVA MP TRF 120/240 Matid: 6247200 1 1 MINU1LR 6045.1010 CØ V04 559445 147864 54"x54"x38" Unistrut HH Matid: 7663002 100KVA MP TRF 120/240 Matid: 6247200 1 1 MINU1LR 6045.1010 AØ V05 559463 147853 54"x54"x38" Unistrut HH Matid: 7663002 75KVA MP TRF 120/240 Matid: 6247150 1 1 MINU1LR 6045.1010 AØ V06 559475 147871 54"x54"x38" Unistrut HH Matid: 7663002 100KVA MP TRF 120/240 Matid: 6247200 1 1 MINU1LR 6045.1010 AØ V07 559474 147893 54"x54"x38" Unistrut HH Matid: 7663002 75KVA MP TRF 120/240 Matid: 6247150 2 - MINU1LL 6045.1010 BØ V08 559474 147914 54"x54"x38" Unistrut HH Matid: 7663002 75KVA MP TRF 120/240 Matid: 6247150 2 - MINU1LL 6045.1010 BØ V09 559474 147925 54"x54"x38" Unistrut HH Matid: 7663002 100KVA MP TRF 120/240 Matid: 6247200 2 - MINU1LL 6045.1010 BØ V10 559460 147950 54"x54"x38" Unistrut HH Matid: 7663002 100KVA MP TRF 120/240 Matid: 6247200 1 1 MINU1LR 6045.1010 BØ J01 556444 147912 4'8"x7'x5' w/2-3' Sq Doors Matid: 7663200 J-Box Below Grade w/4-Pos J-Bus x3 Matid: 7625900 8 4 JBOX15L 6055.1030 3Ø CAP (7630600) ELB10J 6041.1000 TAP 3Ø J02 559446 147843 4'8"x7'x5' w/2-3' Sq Doors Matid: 7663200 J-Box Below Grade w/4-Pos J-Bus x3 Matid: 7625900 8 4 JBOX15L 6055.1030 3Ø CAP (7630600) ELB10J 6041.1000 TAP 3Ø J03 559475 147881 4'8"x7'x5' w/2-3' Sq Doors Matid: 7663200 J-Box Below Grade w/4-Pos J-Bus x3 Matid: 7625900 5 7 JBOX15L 6055.1030 3Ø CAP (7630600) ELB10J 6041.1000 TAP 3Ø SECONDARY 3" DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. CALLAHAN 206.503.1520 . A. DUNN .05.22.25 ... A. DUNN .05.22.25 REDT # ( RW-138620 )YELM WILLOW GLENN IV 3Ø PRIMARY U/G LINE EXTENSION - 75 S/F LOTS 9819 GROVE RD SE, YELM, WA 98597 PUGET SOUND ENERGY N/A N/A N/A 105107600 N/A 5 OF 5 THURSTON N/A N/A QSTHLE 20SE-T17N-R02E N/A N/A 1702E080 1702E116 1702E079 YEL-27 COMCAST TED AXTELL 253.878.2794 LUMEN DEWAYNE RICHERT 253.221.0133 RIGHT OF WAY CAROLYN BANASKY 253.476.6416 . . . ... ... ... THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) SECONDARY CABLE & CONDUIT TABLE LOCATION CABLE CONDUIT VOLTAGE ASBUILT INFORMATION SIZE LENGTH ASSUMED SIZE LENGTH BENDS DROP FLICKER Foreman - Complete FROM TO (1/O,4/O,350)Design (ft)Lot Corner to Meter (ft)(in)Design (ft)90°45°22°11°(Percent)(Percent)Actual Amount Installed Cable Conduit V01 H1A 350 185 3 120 2 3.6 1.5 - V01 LOT 35 4/O 10 60 3 10 1 3.0 1.5 - V01 LOT 36 4/O 10 60 3 10 1 3.0 1.5 - V01 LOT 57 350 145 60 3 80 2 3.5 2.4 - V01 LOT 58 4/O 150 60 3 85 3 3.9 3.0 - V01 LOT 59 4/O 130 60 3 65 3 3.8 2.8 - V01 LOT 60 4/O 125 60 3 60 2 3.8 2.7 - H1A LOT 37 4/O 60 3 4.3 2.7 - H1A LOT 55 4/O 100 60 3 35 3 4.6 3.2 LABEL YELLOW TAG "MUST BE 4/0 TO MTR" H1A LOT 56 4/O 95 60 3 30 2 4.6 3.2 LABEL YELLOW TAG "MUST BE 4/0 TO MTR" V02 H2A 350 210 3 210 2 3.6 1.7 - V02 H2B 350 120 3 55 3 3.4 1.1 - V02 LOT 32 4/O 105 60 3 105 1 3.4 2.5 - V02 LOT 33 4/O 10 60 3 10 1 2.8 1.5 - V02 LOT 34 4/O 10 60 3 10 1 2.8 1.5 - H2A LOT 29 4/O 60 3 4.3 2.9 - H2A LOT 30 4/O 40 60 3 40 1 4.6 3.3 - H2A LOT 31 4/O 70 60 3 70 1 4.8 3.6 - H2B LOT 61 4/O 60 3 3.5 2.3 - H2B LOT 62 4/O 60 3 3.5 2.3 - V03 H3A 350 160 3 160 3 2.9 1.4 - V03 H3B 350 105 3 105 3 2.6 1.0 - V03 LOT 38 4/O 70 60 3 70 1 3.2 2.2 - V03 LOT 39 4/O 45 60 3 45 1 3.0 1.9 - V03 LOT 40 4/O 45 60 3 45 1 3.0 1.9 - V03 LOT 41 4/O 70 60 3 70 1 3.2 2.2 - H3A LOT 51 4/O 60 3 3.7 2.6 - H3A LOT 52 4/O 60 3 3.7 2.6 - H3B LOT 53 4/O 60 3 3.4 2.2 - H3B LOT 54 4/O 60 3 3.4 2.2 - V04 H4A 350 115 3 115 2 3.0 1.0 - V04 H4B 350 115 3 115 2 2.8 1.0 - V04 LOT 44 4/O 70 60 3 70 1 3.4 2.2 - V04 LOT 45 4/O 45 60 3 45 1 3.2 1.9 - V04 LOT 46 4/O 40 60 3 40 1 3.2 1.9 - V04 LOT 47 4/O 75 60 3 75 1 3.4 2.2 - H4A LOT 42 4/O 70 60 3 70 1 4.3 3.0 - H4A LOT 43 4/O 50 60 3 45 1 4.1 28 - H4A LOT 50 4/O 115 60 3 50 2 4.5 3.4 - H4B LOT 48 4/O 45 60 3 45 1 3.9 2.7 - H4B LOT 49 4/O 70 60 3 70 1 4.1 3.0 - V05 LOT 1 4/O 70 60 3 70 1 3.3 2.3 - V05 LOT 2 4/O 45 60 3 45 1 3.1 2.0 - V05 LOT 3 4/O 10 60 3 10 1 2.9 1.6 - V05 LOT 4 4/O 70 110 3 70 1 1 3.9 3.3 - V05 LOT 5 4/O 75 110 3 75 1 2 4.0 3.3 - V05 LOT 6 4/O 105 110 3 105 1 4.1 3.6 - V06 H6A 4/O 180 3 115 3 3.1 1.6 - V06 LOT 7 4/O 90 60 3 90 1 3.1 2.4 - V06 LOT 8 4/O 65 60 3 65 1 3.0 2.1 - V06 LOT 9 4/O 10 60 3 10 1 2.6 1.5 - V06 LOT 10 4/O 10 60 3 10 1 2.6 1.5 - V06 LOT 11 4/O 65 60 3 65 1 3.0 2.1 - H6A LOT 74 4/O 60 3 4.3 3.3 - H6A LOT 75 4/O 60 3 4.3 3.3 - V07 LOT 12 4/O 10 60 3 10 1 2.9 1.6 - V07 LOT 13 4/O 10 60 3 10 1 2.9 1.6 - V07 LOT 70 4/O 165 60 3 100 2 3.9 3.3 - V07 LOT 71 4/O 170 60 3 105 3 3.9 3.3 - V07 LOT 72 4/O 105 60 3 40 3 3.5 2.6 - V07 LOT 73 4/O 100 60 3 35 2 3.5 2.6 - V08 LOT 14 4/O 115 60 3 115 1 3.6 2.7 - V08 LOT 15 4/O 110 60 3 110 1 3.5 2.7 - V08 LOT 16 4/O 10 60 3 10 1 2.9 1.6 - V08 LOT 17 4/O 10 60 3 10 1 2.9 1.6 - V08 LOT 68 4/O 120 60 3 55 3 3.6 2.8 - V08 LOT 69 4/O 115 60 3 50 2 3.6 2.7 - SECONDARY CABLE & CONDUIT TABLE (Cont.) LOCATION CABLE CONDUIT VOLTAGE ASBUILT INFORMATION SIZE LENGTH ASSUMED SIZE LENGTH BENDS DROP FLICKER Foreman - Complete FROM TO (1/O,4/O,350)Design (ft)Lot Corner to Meter (ft)(in)Design (ft)90°45°22°11°(Percent)(Percent)Actual Amount Installed Cable Conduit V09 H9A 350 120 3 120 2 3.1 1.1 - V09 LOT 18 4/O 10 60 3 10 1 3.0 1.5 - V09 LOT 19 4/O 10 60 3 10 1 3.0 1.5 - V09 LOT 64 4/O 140 60 3 75 2 3.8 2.9 - V09 LOT 65 4/O 145 60 3 80 3 3.9 3.0 - V09 LOT 66 4/O 130 60 3 65 3 3.8 2.8 - V09 LOT 67 4/O 125 60 3 60 2 3.8 2.7 - H9A LOT 20 4/O 60 3 3.8 2.3 - H9A LOT 21 4/O 60 3 3.8 2.3 - H9A LOT 63 4/O 90 60 3 25 2 4.4 3.2 - V10 H10A 350 140 3 140 2 3 2.6 1.2 - V10 LOT 24 4/O 80 110 3 80 1 2 3.7 3.3 - V10 LOT 25 4/O 75 60 3 75 1 2 3.0 2.2 - V10 LOT 26 4/O 10 60 3 10 1 2.6 1.5 - V10 LOT 27 4/O 10 110 3 10 1 3.2 2.5 - V10 LOT 28 4/O 60 110 3 60 1 3.6 3.1 - H10A LOT 22 4/O 60 3 3.3 2.4 - H10A LOT 23 4/O 60 3 3.3 2.4 - 4/O UG Triplex (ft) =4200 3" PVC & BENDS (ft)=4430 111 0 10 0 12.8 350 UG Triplex (ft) =1595 TOTAL QTS OF GLUE 12.8 CONTINUED AT RIGHT