Loading...
101179926 - Approved DesignP01 EXST 559013 147276 25kVA 120/240V '10711' MI L L R D S E REPLACE EXIST XF W/ 50kVA 120/240V '10648' '10710' '10705' MAPS & RECORDS NOTE: '10705' CONNECTED TO 559013-147276 IN FIELD SITE PLAN P01 SCALE: 1:50 EXISTING OH MAP: 1702E116 SCALE: 6'' = 1 MILE 10 1 1 7 9 9 2 6 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG MAKE NO CHANGES TO THIS JOB WITHOUT PRIOR APPROVAL Notify Customers and Service Area 48 HRS Prior To Planned Outages ORDER#NOTIF#PROJECT PHASE TRANSFORMER O & M SUPERIOR FAILED SILICONE REMOVAL EXPENSE 12029394 101179926 N/A 108XXXXXX N/A 583XXXXXX N/A VICINITY MAP For contacts below dial 1-888-CALL PSE (225-5773) Contact Information FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. N/A N/A N/A POWER GENERAL NOTES 1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy. 2. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 3. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 4. All work is to be done in accordance with local municipal and county permit requirements as applicable. 5. Inclement weather conditions may cause delays in construction times and dates. SITE SPECIFIC NOTES P01 (559013-147276) -REMOVE EXIST 25kVA 120/240V XFMR - INST NEW 50kVA 120/240V XFMR ON EXIST POLE (6025.1000 TRFRXF)2-24X - INST NEW LB C/O COVER (9999530) Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P01 559013-147276 25kVA 120/240V 6. TREAT ALL FIELD-DRILLED POLES WITH COPPER NAPHTHENATE WOOD PRESERVATIVE. GENERAL OVERHEAD NOTES: 1. POLES, CONDUCTORS, DEVICES TO BE INSTALLED PER PSE 2. POLES ARE TO BE INSTALLED OR RELOCATED AS STAKED. 3. ALL NEW POLES SET SHALL BE THE CLASS INDICATED ON THE SKETCH 4. INSTALL GROUND PLATE ASSEMBLY ON ALL NEW POLES. 5. INSTALL GRID NUMBERS ON ALL NEW AND EXISTING POLES AS SHOWN ON SKETCH. STANDARDS & SPECIFICATIONS. OR BETTER. Installed at site: Grid Number: kVA Rating: TRANSFORMER INSTALLATION (OH) Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: Foreman to redline the following information P01 559013-147276 JOB SITE JOB SITE 50kVA 120/240V 6211350 UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP R. KRUEGER 253-651-4419 07/30/25 A. CRAWFORD 425-559-5712 07/30/25 N/A N/A N/A N. COX 253-569-9241 07/30/25 N/A CITY OF YELM OTEP YEL-26 TRANSFORMER REPLACEMENT UPGRADE (1) OH TRANSFORMER 10711 MILL RD SE, YELM, WA 98597 N/A N/A 101179926 AS NOTED 1 OF 1 THURSTON N/A N/A QSTHLE T17N-R01E-25S N/A N/A 1701E100 1702E116 1701E097 YEL-26 N/A N/A N/A N/A N/A N/A N/A N/A N/A Potelco, Inc.DESIGNED BY XFMR SELECTION Existing XFMR Proposed XFMR Location Nameplate Rating (kVA) Residential Peak Demand Commercial Peak Demand Total Peak Demand Peak Demand Percent of Nameplate (%) Max. Allowable Peak Demand Percent of Nameplate (%) (Sec. 6315.0033) kVA kVA kVA Nameplate Rating (kVA) Peak Demand Percent of Nameplate (%) P01 25 48.1 0 48.1 192.4 110 50 96.2 No No No Yes Yes Yes "Flagging Required" "Outages Required" "Locates Required" No No Yes Yes "Joint Trench Coordination Required" "Vegetation Management Required" UNITS OF PROPERTY INSTALL ONLY LINE FIXTURES MATERIAL QTY DIST. ARRESTERS DIST. CUTOUTS DIST. INSULATORS TRANS. ARRESTERS TRANS. INSULATORS UNITS OF PROPERTY REMOVAL ONLY MATERIAL QTY DIST. ARRESTERS DIST. CUTOUTS DIST. INSULATORS TRANS. ARRESTERS TRANS. INSULATORS CROSSARMS Signature _________________________________________ Print Name _________________________________________ POTELCO DESIGN AND QUALITY ASSURANCE This design complies with PSE Design/Engineering Standards. Any/all variations have been pre-approved/documented by the appropriate PSE Representative. Devin Boehlke Devin Boehlke X Date _________________8/19/25 D.D. BOEHLKEBOEHLKE 253-253-549-9711549-9711 8/19/25/25