101179926 - Approved DesignP01
EXST
559013
147276 25kVA 120/240V
'10711'
MI
L
L
R
D
S
E
REPLACE EXIST XF
W/ 50kVA 120/240V
'10648'
'10710'
'10705'
MAPS & RECORDS NOTE:
'10705' CONNECTED TO
559013-147276 IN FIELD
SITE PLAN P01
SCALE: 1:50
EXISTING OH MAP: 1702E116
SCALE: 6'' = 1 MILE
10
1
1
7
9
9
2
6
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
MAKE NO CHANGES TO THIS JOB WITHOUT PRIOR APPROVAL
Notify Customers and Service Area
48 HRS Prior To Planned Outages
ORDER#NOTIF#PROJECT PHASE
TRANSFORMER
O & M
SUPERIOR
FAILED SILICONE
REMOVAL
EXPENSE
12029394 101179926
N/A
108XXXXXX
N/A
583XXXXXX
N/A
VICINITY MAP
For contacts below dial 1-888-CALL PSE (225-5773)
Contact Information
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
N/A
N/A
N/A
POWER GENERAL NOTES
1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any
deviation from this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on
the Foremans' Copy.
2. All switching arrangements and/or outage arrangements are to be made with the Project Manager at
least three (3) working days in advance.
3. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to
commencing work to get the underground facilities located.
4. All work is to be done in accordance with local municipal and county permit requirements as
applicable.
5. Inclement weather conditions may cause delays in construction times and dates.
SITE SPECIFIC NOTES
P01 (559013-147276)
-REMOVE EXIST 25kVA 120/240V XFMR
- INST NEW 50kVA 120/240V XFMR ON EXIST POLE (6025.1000 TRFRXF)2-24X
- INST NEW LB C/O COVER (9999530)
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P01
559013-147276
25kVA 120/240V
6. TREAT ALL FIELD-DRILLED POLES WITH COPPER NAPHTHENATE WOOD PRESERVATIVE.
GENERAL OVERHEAD NOTES:
1. POLES, CONDUCTORS, DEVICES TO BE INSTALLED PER PSE
2. POLES ARE TO BE INSTALLED OR RELOCATED AS STAKED.
3. ALL NEW POLES SET SHALL BE THE CLASS INDICATED ON THE SKETCH
4. INSTALL GROUND PLATE ASSEMBLY ON ALL NEW POLES.
5. INSTALL GRID NUMBERS ON ALL NEW AND EXISTING POLES AS SHOWN ON SKETCH.
STANDARDS & SPECIFICATIONS.
OR BETTER.
Installed at site:
Grid Number:
kVA Rating:
TRANSFORMER INSTALLATION (OH)
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
Foreman to redline the following information
P01
559013-147276
JOB SITE
JOB SITE
50kVA 120/240V
6211350
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
R. KRUEGER 253-651-4419 07/30/25
A. CRAWFORD 425-559-5712 07/30/25
N/A N/A N/A
N. COX 253-569-9241 07/30/25
N/A CITY OF YELM
OTEP YEL-26 TRANSFORMER REPLACEMENT
UPGRADE (1) OH TRANSFORMER
10711 MILL RD SE, YELM, WA 98597
N/A
N/A 101179926
AS NOTED 1 OF 1
THURSTON N/A N/A QSTHLE
T17N-R01E-25S N/A N/A
1701E100 1702E116 1701E097 YEL-26
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
Potelco, Inc.DESIGNED BY
XFMR SELECTION
Existing XFMR
Proposed XFMR
Location
Nameplate
Rating
(kVA)
Residential
Peak Demand
Commercial
Peak Demand
Total
Peak Demand Peak Demand
Percent of
Nameplate (%)
Max. Allowable Peak Demand
Percent of Nameplate (%)
(Sec. 6315.0033)
kVA kVA kVA Nameplate
Rating (kVA)
Peak Demand
Percent of Nameplate (%)
P01 25 48.1 0 48.1 192.4 110 50 96.2
No
No
No
Yes
Yes
Yes
"Flagging Required"
"Outages Required"
"Locates Required"
No
No
Yes
Yes
"Joint Trench Coordination Required"
"Vegetation Management Required"
UNITS OF PROPERTY
INSTALL ONLY
LINE FIXTURES
MATERIAL QTY
DIST. ARRESTERS
DIST. CUTOUTS
DIST. INSULATORS
TRANS. ARRESTERS
TRANS. INSULATORS
UNITS OF PROPERTY
REMOVAL ONLY
MATERIAL QTY
DIST. ARRESTERS
DIST. CUTOUTS
DIST. INSULATORS
TRANS. ARRESTERS
TRANS. INSULATORS
CROSSARMS
Signature _________________________________________
Print Name _________________________________________
POTELCO DESIGN AND
QUALITY ASSURANCE
This design complies with PSE
Design/Engineering Standards.
Any/all variations have been
pre-approved/documented by the
appropriate PSE Representative.
Devin Boehlke
Devin Boehlke
X
Date _________________8/19/25
D.D. BOEHLKEBOEHLKE 253-253-549-9711549-9711 8/19/25/25