PSE RELOCATE 101185105 MICHAELS LANDINGTRACT A
RELOCATE
16747
ABC
3
3
6
A
C
S
R
3
3
6
A
C
S
R
3
3
6
A
C
S
R
ABC
ABC
A
A
A
#
4
A
C
S
R
#
4
A
C
S
R
#
4
A
C
S
R
#4AC
S
R
A
C
A
N
E
L
R
D
S
E
YEL
27
F
E
E
D
50'
53'
1
1
5
k
V
1
1
5
k
V
1
1
5
k
V
4
9
'
NEW
N
Vicinity Map
46.9467, -122.5864
Owner / Developer Contact Info
officeATTN:
MOUNTAIN TERRACE BUILDERS
210 MOSMAN AVE SE
YELM, WA 98597
JODY CLIFFORD 360.878.1602
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
516005019 101185105
N/A 593xx
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
OH Modification
Relocation
Removal
Temporary
Job Order
Distribution
Service Stubs
HP Svc/MSA
10
1
1
8
5
1
0
5
N/
A
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
J. CALLAHAN 206.503.1520 .
A. DUNN .09.11.25
N/A .N/A
D. WALKER .03.05.25
REDT # ( RW-138874 )YELM
MICHAELS LANDING
RELOCATE (1) POLE
16803 CANEL RD SE, YELM, WA 98597
PUGET SOUND ENERGY
N/A N/A
N/A 101185105
AS SHOWN 1 OF 1
THURSTON N/A N/A QSTHLE
20S-T17N-R02E N/A N/A
1702E080 1702E116 1702E078 YEL-27
COMCAST
TED AXTELL
253.878.2794
LUMEN
DEWAYNE RICHERT
253.221.0133
RIGHT OF WAY
CAROLYN BANASKY
253.476.6416
.
.
.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:JESSICA CALLAHAN
206.503.1520
jessica.callahan@pse.com
x
xx x
...
...
...
JODY@MOUNTAINTERRACEBUILDERS.COM
SITE
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
1. POLES, CONDUCTORS, DEVICES TO BE INSTALLED PER PSE STANDARDS & SPECIFICATIONS.
2. POLES ARE TO BE INSTALLED OR RELOCATED AS STAKED.
3. ALL NEW POLES SET SHALL BE THE CLASS INDICATED ON THE SKETCH OR BETTER.
4. INSTALL GROUND PLATE ASSEMBLY ON ALL NEW POLES.
5. INSTALL GRID NUMBERS ON ALL NEW AND EXISTING POLES AS SHOWN ON SKETCH.
6. TREAT ALL FIELD-DRILLED POLES WITH COPPER NAPHTHENATE WOOD PRESERVATIVE.
OVERHEAD CONSTRUCTION
POLES & STRUCTURES
-POLES ARE TO BE INSTALLED OR RELOCATED AS STAKED. UNLESS OTHERWISE NOTED, ALL POLE
LOCATION MEASUREMENTS ARE FROM THE CENTER OF THE POLE.
-ALL NEW POLES SET SHALL BE THE CLASS INDICATED ON THE SKETCH, OR BETTER. DO NOT SET A
LOWER CLASS POLE THAN SPECIFIED.
-INSTALL GROUND PLATE ASSEMBLY ON ALL NEW POLES. INSTALL SWITCH GROUND ASSEMBLY PER
STANDARD SPECIFICATION 6014.1000 AT NEW GANG OPERATED SWITCH LOCATIONS.
-INSTALL GRID NUMBERS ON ALL NEW AND EXISTING POLES AS SHOWN ON SKETCH.
-STRAIGHTEN EXISTING POLES AS INDICATED OR AS NECESSARY.
-TREAT ALL FIELD-DRILLED POLES WITH COPPER NAPHTHENATE WOOD PRESERVATIVE.
-REMOVE OLD POLES AFTER COMMUNICATION COMPANIES HAVE TRANSFERRED OFF AND RETURN TO
PSE STOREROOM. FILL AND CROWN POLE HOLES AND RESTORE THE AREA SIMILAR TO ADJACENT
LANDSCAPING.
CONDUCTORS & EQUIPMENT
-TRANSFER ALL OVERHEAD AND UNDERGROUND PRIMARY, SECONDARY AND SERVICE CONDUCTORS
AND GUYS TO NEW POLES SET, UNLESS OTHERWISE INDICATED ON THIS SKETCH.
-TRANSFER EXISTING TRANSFORMERS TO NEW POLES UNLESS OTHERWISE INDICATED ON THIS
SKETCH.
-USE STIRRUPS TO CONNECT ALL OVERHEAD AND UNDERGROUND PRIMARY TAPS, AND
TRANSFORMERS ABOVE 25 KVA. INSTALL AT ALL SITES BEING WORKED WITHIN THE SCOPE OF THE
PROJECT WHERE THEY ARE CURRENTLY MISSING.
-FOR 12VK CONSTRUCTION, INSTALL AVIAN PROTECTION WITH #4 CU-COVERED JUMPERS
(MID#9998076) AND #4 SD ALUMINUM COVERED TIE-WIRE (MID#8309760). FOR 34VK CONSTRUCTION
USE BARE WIRE PRIMARY JUMPERS WITH PRE-FORMED HELICAL-GRIP TIES AND AVIAN PROTECTION
DEVICES WHEN REQUIRED PER STD. 6015.2000. JUMPERS FOR POLES THAT ARE DOUBLE DEAD
ENDED WITH TREE WIRE CAN BE EITHER THE SAME SIZE TREE WIRE CONDUCTOR OR COVERED CU.
-APPLY GRIT INHIBITOR ON ALL AMPACT, STIRRUP, AND DEAD-END CONNECTIONS.
-CONNECT PRIMARY TAPS AND TRANSFORMERS TO SAME PHASE AS EXISTING UNLESS OTHERWISE
SHOWN ON THE DRAWING.
-ALL NEUTRAL CONNECTIONS TO BE MADE WITH SOLID COMPRESSION CONNECTORS. CONNECT ALL
POLE GROUNDS TO COMMON NEUTRAL.
-USE LOAD-INTERRUPTER CUTOUTS (WITH ARC SHIELDS) ON ALL PRIMARY OVERHEADS AND
UNDERGROUND TAPS WITH FUSED PROTECTION ABOVE 40T.
-INSTALL WILDLIFE PROTECTORS ON ALL TRANSFORMERS.
GENERAL OVERHEAD NOTES:
PSE GENERAL SPECIFICATIONS
GENERAL
-ALL WORK IS TO BE COMPLETED PER PSE STANDARDS & PRACTICES. COPIES OF ALL PSE
STANDARDS ARE AVAILABLE UPON REQUEST.
-WORK SITES SHALL BE KEPT CLEAR OF DEBRIS AND ALL CONSTRUCTION MATERIALS; EQUIPMENT
AND PACKING SHALL BE REMOVED DAILY.
-RETURN ALL UNUSED AND REMOVED POLES, TRANSFORMERS AND HARDWARE TO PSE,
STOREROOM. ALL COPPER SHALL BE COILED AND RETURNED THE DAY IT IS REMOVED FROM THE
POLES. REMOVE ALL UNUSED PINS AND INSULATORS.
-RETURN ALL STREETLIGHTS, AREA LIGHTS AND FLOODLIGHTS TO SUMNER YARD.
PRE-CONSTRUCTION
-NOTIFY APPROPRIATE CITY, COUNTY OR DOT AUTHORITIES 48 TO 72 HOURS, OR AS REQUIRED BY
PERMITTING AGENCY, IN ADVANCE OF STARTING WORK IN RIGHT-OF-WAY INVOLVING A PERMIT.
-ALL SYSTEM SWITCHING SHALL BE APPROVED BY SYSTEM OPERATIONS (425-882-4652) A MINIMUM OF
48 HOURS IN ADVANCE.
-NOTIFY CUSTOMERS OF ALL OUTAGES 48 HOURS IN ADVANCE.
WORK DRAWINGS & DOCUMENTS
-PSE PROJECT MANAGER OR ENGINEER SHALL APPROVE FIELD DESIGN CHANGES.
-MARK ALL FIELD CHANGES, EQUIPMENT ID NUMBERS AND UNDERGROUND CABLE INFORMATION IN
RED ON FOREMAN'S COPY OF WORK SKETCH.
-RETURN ONE FOREMAN'S COPY OF WORK SKETCH TO PROJECT MANGER AT COMPLETION OF JOB.
-WHEN PERMITS ARE REQUIRED, A COPY OF THE PERMITS SHALL BE AVAILABLE ON WORK SITE AT
ALL TIMES.
SAFETY
-EFER TO PSE STANDARDS 6275.3000 FOR REQUIREMENTS ON SYSTEM GROUNDING
-REFER TO PSE STANDARDS 6275.9210, 6275.9230 AND 6275.9250 FOR PERSONAL PROTECTIVE
GROUNDING REQUIREMENTS.
-REFER TO PSE STANDARDS 6275.9150 FOR VEHICLE GROUNDING AND BARRICADING REQUIREMENTS.
-PROPER LINE CLEARANCES SHALL BE TAKEN AT THE BEGINNING, AND RELEASED AT THE END, OF
EACH WORKDAY, OR AS OTHERWISE INSTRUCTED BY THE SYSTEM OPERATOR.
-PROVIDE SIGNS, BARRICADES, AND TRAFFIC CONTROL IN CONFORMANCE WITH PERMIT
REGULATIONS.
-UTILIZE FLAGGING AND OTHER VEHICLE TRAFFIC CONTROL AS NECESSARY AND IN CONFORMANCE
WITH LOCAL TRAFFIC REGULATIONS.
-MAINTAIN TRAFFIC FLOW AS REQUIRED BY PERMITTING AGENCY.
JOINT FACILITIES
-COORDINATE WITH COMMUNICATION COMPANIES FOR TRANSFERS.
CIRCUIT FEET REMOVED: 100'
CIRCUIT FEET ADDED: 0'
SITE SPECIFIC NOTES
AT P01 (559515-147937) 40' CLASS 1, 1973
POLE TO BE RELOCATED
-TRANSFER EXISTING #4ACSR OH PRI & NEUT WIRES (NW) TO P1A
-SPLICE & SHORTEN AS NECESSARY
-REMOVE EXISTING 15kVA XFMR
-REMOVE POLE & ALL PSE FACILITIES
AT P1A
-INSTALL NEW 45' CL 3 POLE (PD453) 6010.1000
-SET POLE IN ROW: APPROX 76' NORTH, 60' WEST OF P01
-INSTALL 1Ø DE #4ACSR (DE2115) 6031.1040
-INSTALL SINGLE HELIX ANCHOR (ANDH1) 6012.1000 (L = 10' SE)
-INSTALL 3/8" PRI DG (GYD3SA) TO NEW ANCHOR 6013.0100
-INSTALL 3/8" NEUT DG (GYD3SAN) TO NEW ANCHOR 6013.0100
-INSTALL GRID# 559537-147925
UTILITY POLE EROSION CONTROL DETAIL
NOT TO SCALE Drainage ditches or Dry vegetated sites
TOP VIEW
DRY DRAINAGE DITCH or DRY VEGETATED SITE
SLOPE
Place gravel bags for
Sediment Trap
Place straw mulch
on disturbed areaExcavated or
Augered Hole
Pole
SLOPE
POLE TABLE (NEW)
Site
#
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P1A 559537-147925 45 3 2025 PSE Equip #
RETIREMENT POLE TABLE
SITE
#
POLE DATA POLE TRANSFERS REMARKS
GRID #HEIGHT CLASS YEAR XFMR CO.
ID#TOPPED RMVD TEL TV FIBER ST. LIGHT (ADDITIONAL INFORMATION)
P01 559515-147937 40'1 1973 COMCAST
EX OVERHEAD CIRCUIT MAP 1702E116
SCALE: 6" = 1 MILE
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P01
559515-147937
15kVA
NOT TO SCALE
ANCHOR DETAIL - SINGLE HELIX
6" to 12"
Under Normal
Conditions
40" Min for Single Helix
65" Min for Triple Helix
1" = 50'
SITE PLAN
SITE
WIRE REMOVAL TABLE
Location
Pri Sec Wire Size & Type Quantity
Length
(ft per
conductor)RemarksFromTo
P01 P1A X #4ACSR PRI & NEUT 2 100
Total Feet (#4ACSR PRI) Removed 100
Total Feet (#4ACSR NEUT) Removed 100