Loading...
DESIGN FOR PERMITC C C C C C C C C C C EV EV EV E V E V EV 14820 14708 14732 14814 14802 14808 14805 14811 14828 148221481014816 14804 14726 14720 14714 14710 14702 9905 9911 9918 9924 14819 14807 14813 14818 14812 14824 9930 9936 9942 9917 9923 9929 9935 9941 9947 9953 9955 9955 TAHOM A B L V D S E B e r r y V a l l e y R d S E DR A G T S T S E TA H O M A B L V D S E Owner / Developer Contact Info officeATTN: Tahoma Terra Holdings LLC P.O. Box 73790 Puyallup, WA, 98371 n Mann 253-820-7835 10 5 1 0 7 8 0 1 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) FOREMAN (CHECK BOX WHEN COMPLETED) Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ nt Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. GAS PHONE CABLE TV 516216716 105107801 516259687 104369495 516216891 104370876 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF# ORDER# Superior Perm. Svc Bldg. A Perm. Svc Bldg. B Removal Temporary Job Order Distribution HP Main HP Svc/MSA DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP r Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 PING INCIDENT Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT REV#DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP 6/20/25 P.Courtney 253-888-0002 6/23/24 P.Courtney 253-888-0002 6/23/24 REQ'd City of Yelm Tahoma Valley Retail Cmrcl - 3Ø Line Extension 14820 Berry Valley Rd SE Yelm, WA 98597 105107801 AS NOTED 01 of 02 Thurston QSTHLE SW¼,Sect24,T17,R01E 1701E095 1702E116 1701E095 -25 Vicinity Map OVERHEAD CIRCUIT MAP SCALE: 6"= 1 MILE SITE PLAN SCALE: 1" = 50' BLDG A: M01 Sq. Footage: 4,240 Panel Size: 3x400 1x100AMP Heat Type: ELECTRIC Est. Demand: 75.6kW LRC: 102 % V. Drop: 4.5% % Flicker: 1.2% 559487-146915 150kVA 120/208v 3Ø F e e d BLD G A Locates Req'd Developer Locates Req'd Yes No Yes YesFlagging Req'd Outages Req'd AU D 150kVA 120/208v Fault Current: 26,900 R/X: 0.3 %Z: 1.55 POWER GENERAL NOTES - COMMERCIAL PROJECT 1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. 2. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 3. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 4. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. 5. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. 6. Roads shall be paved or have a compacted , crushed rock base in place. 7. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. 8. All work is to be done in accordance with local municipal and county permit requirements as applicable. 9. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. 10. Inclement weather conditions may cause delays in construction times and dates. 11. ION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. CUSTOMER NOTE: SITE MUST BE READY 1-WEEK PRIOR TO CONSTRUCTION DATE. il: Cell Phone: Project Manager Contact Information: Manager: C.Vanwagenen 360-570-6841 Christine.Vanwagenen@pse.com 206-639-4606 Christine Vanwagenen MAPS & RECORDS NOTE: Corrected Facility Locations Shown. C:\Users\pcourt\appdata\local\temp\AcPublish_18728\105107801_TahomaValley.dwg08 / 2 8 / 2 5 _ 1 : 2 9 p m P l o t t e d B y : p c o u r t C : \ U s e r s \ p c o u r t \ a p p d a t a \ l o c a l \ t e m p \ A c P u b l i s h _ 1 8 7 2 8 \ 1 0 5 1 0 7 8 0 1 _ T a h o m a V a l l e y . d w g Erosion & Sediment Control Requirements Erosion & Sediment Control Shall Be Per PSE Std. Practice 0150.3200 Techniques For Temporary Erosion & Sediment Control & Any Additional Local Jurisdiction Requirements. (Local Jurisdictions May Have Additional Requirements Including Notes Detailing Where Erosion Or Sediment Control Structures Are To Be Installed, Cross Section Details Of The Typical Erosion Structures, & Special Requirements For Work In Sensitive Areas.) Circuit:-25 Customer 3Ø Load: 297 Of:2020 Power Factor: .85 Phase to Phase Voltage:12500 A Phase B Phase C Phase Existing Peak Load:303.0 306.0 278.0 imated New Load: 16.2 16.2 16.2 Total: 319.2 322.2 294.2 BLD G B 559477-146894 559496-146889 150kVA 120/208v 3Ø 559505-146888 559505-146894 559504-146906 25kVA 120/240v CØ 559504-146919 Y883 25T 559473-146906 Fe e d 559453-146901 559456-146902 559453-146901 25kVA 120/240v AØ 559465-146966 25kVA 120/240v AØ INST (3) 1/0 AL 15KV UG CABLES IN EXIST 4" SPARE BLDG B: M02 Sq. Footage: 3,081 Panel Size: 3x400 1x100AMP Heat Type: ELECTRIC Est. Demand: 63kW LRC: 102 % V. Drop: 1.9% % Flicker: 1.2% CIRCUIT FEET ADDED: 152' PERM METER PERM METER SITE SPECIFIC NOTES AT E01 INTERCEPT EXIST 4" CONDUIT & EXTEND ±152' INTO V01 AT J01 GRID # 559477-146894 INST (3) L/B ELBOWS AT V01 INST 4’-8” SQ VAULT W/ 4’-8” x 5’-6” COVER 3-19b SET 150kVA 3PH PM XFMR, 120/208V, FACING SOUTHHWEST INST (3) L/B ELBOWS INST (4) 4POS SECONDARY CONNECTOR BARS INST GRID# 559487-146915 CONNECT & TAG CUST INSTALLED UG SVC CONDUCTORS (7 RUNS OF 250KCM) TO BUILDING B AT HH1 INST 2'8”x3'8” CONCRETE SEC HH STD PLT 3-22 W/ #12-500 (8) POS CONN BARS INST GROUND TO STEEL LID CONNECT & TAG CUST INSTALLED UG SVC CONDUCTORS (7 RUNS OF 250KCM) TO BUILDING A AT M01 PERM METER AT M02 PERM METER J01 TO V01: INST (3) 1/0 PRI CABLES ±172' IN EXIST SPARE 4" DB120 CONDUIT (E01-V01 = ±105) CABLE #'S PER ONE-LINE (TOTAL BILLABLE LGTH = ±152') V01 TO HH1: INST 350 UG QUAD ±35' IN CUST PROVIDED TRENCH & 3-6 PSE PROVIDED 3" DB120 CONDUIT (TOTAL BILLABLE LGTH = ±15') SITE PLAN SCALE: 1" = 40' Neutral Bars Hot Legs 3Ø secondary service and steel lid ground wire connections with: • 2 PSE runs • 6 customer runs • 1 steel vault cover ground wire Detail B Typical Connections with 8 3Ø Runs Ground Wire Neutrals s Sec Conductors Detail B - Typical Connections with 8 3Ø Runs SCALE: NONE Std 6050.2120 BLD G B 559487-146915 150kVA 120/208v 3Ø INST 350MCM UG SEC QUAD B. Jolliff 253-293-0532 9/8/25