DESIGN FOR PERMITC
C
C
C
C
C
C
C
C
C
C
EV
EV
EV
E
V
E
V
EV
14820
14708
14732
14814
14802
14808
14805
14811
14828
148221481014816
14804
14726
14720
14714
14710
14702
9905
9911
9918
9924
14819
14807 14813
14818
14812
14824
9930
9936
9942
9917
9923
9929
9935
9941
9947
9953
9955
9955
TAHOM
A
B
L
V
D
S
E
B
e
r
r
y
V
a
l
l
e
y
R
d
S
E
DR
A
G
T
S
T
S
E
TA
H
O
M
A
B
L
V
D
S
E
Owner / Developer Contact Info
officeATTN:
Tahoma Terra Holdings LLC
P.O. Box 73790
Puyallup, WA, 98371
n Mann 253-820-7835
10
5
1
0
7
8
0
1
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
FOREMAN (CHECK BOX WHEN COMPLETED)
Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
nt Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
516216716 105107801
516259687 104369495
516216891 104370876
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF# ORDER#
Superior
Perm. Svc Bldg. A
Perm. Svc Bldg. B
Removal
Temporary
Job Order
Distribution
HP Main
HP Svc/MSA
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
r Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
PING
INCIDENT
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
REV#DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
6/20/25
P.Courtney 253-888-0002 6/23/24
P.Courtney 253-888-0002 6/23/24
REQ'd City of Yelm
Tahoma Valley Retail
Cmrcl - 3Ø Line Extension
14820 Berry Valley Rd SE Yelm, WA 98597
105107801
AS NOTED 01 of 02
Thurston QSTHLE
SW¼,Sect24,T17,R01E
1701E095 1702E116 1701E095 -25
Vicinity Map
OVERHEAD CIRCUIT MAP
SCALE: 6"= 1 MILE
SITE PLAN
SCALE: 1" = 50'
BLDG A: M01
Sq. Footage: 4,240
Panel Size: 3x400 1x100AMP
Heat Type: ELECTRIC
Est. Demand: 75.6kW
LRC: 102
% V. Drop: 4.5%
% Flicker: 1.2%
559487-146915
150kVA 120/208v 3Ø
F
e
e
d
BLD
G
A
Locates Req'd
Developer Locates Req'd Yes
No
Yes
YesFlagging Req'd
Outages Req'd
AU
D
150kVA 120/208v
Fault Current: 26,900
R/X: 0.3 %Z: 1.55
POWER GENERAL NOTES - COMMERCIAL PROJECT
1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
2. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
3. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
4. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
5. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
6. Roads shall be paved or have a compacted , crushed rock base in place.
7. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
8. All work is to be done in accordance with local municipal and county permit requirements as applicable.
9. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point.
10. Inclement weather conditions may cause delays in construction times and dates.
11. ION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's
primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will
provide any and all shoring or they will side slope the trench to 1:1.
CUSTOMER NOTE:
SITE MUST BE READY 1-WEEK PRIOR TO CONSTRUCTION DATE.
il:
Cell Phone:
Project Manager Contact Information:
Manager:
C.Vanwagenen 360-570-6841
Christine.Vanwagenen@pse.com
206-639-4606
Christine Vanwagenen
MAPS & RECORDS
NOTE: Corrected Facility Locations Shown.
C:\Users\pcourt\appdata\local\temp\AcPublish_18728\105107801_TahomaValley.dwg08
/
2
8
/
2
5
_
1
:
2
9
p
m
P
l
o
t
t
e
d
B
y
:
p
c
o
u
r
t
C
:
\
U
s
e
r
s
\
p
c
o
u
r
t
\
a
p
p
d
a
t
a
\
l
o
c
a
l
\
t
e
m
p
\
A
c
P
u
b
l
i
s
h
_
1
8
7
2
8
\
1
0
5
1
0
7
8
0
1
_
T
a
h
o
m
a
V
a
l
l
e
y
.
d
w
g
Erosion & Sediment Control Requirements
Erosion & Sediment Control Shall Be Per PSE Std. Practice
0150.3200 Techniques For Temporary Erosion & Sediment
Control & Any Additional Local Jurisdiction Requirements.
(Local Jurisdictions May Have Additional Requirements
Including Notes Detailing Where Erosion Or Sediment
Control Structures Are To Be Installed, Cross Section
Details Of The Typical Erosion Structures, & Special
Requirements For Work In Sensitive Areas.)
Circuit:-25 Customer 3Ø Load: 297
Of:2020 Power Factor: .85
Phase to Phase Voltage:12500
A Phase B Phase C Phase
Existing Peak Load:303.0 306.0 278.0
imated New Load: 16.2 16.2 16.2
Total: 319.2 322.2 294.2
BLD
G
B
559477-146894
559496-146889
150kVA 120/208v 3Ø
559505-146888 559505-146894 559504-146906
25kVA 120/240v CØ 559504-146919
Y883 25T
559473-146906
Fe
e
d
559453-146901
559456-146902
559453-146901
25kVA 120/240v AØ
559465-146966
25kVA 120/240v AØ
INST (3) 1/0 AL
15KV UG CABLES
IN EXIST 4" SPARE
BLDG B: M02
Sq. Footage: 3,081
Panel Size: 3x400 1x100AMP
Heat Type: ELECTRIC
Est. Demand: 63kW
LRC: 102
% V. Drop: 1.9%
% Flicker: 1.2%
CIRCUIT FEET ADDED: 152'
PERM METER
PERM METER
SITE SPECIFIC NOTES
AT E01
INTERCEPT EXIST 4" CONDUIT & EXTEND ±152' INTO V01
AT J01 GRID # 559477-146894
INST (3) L/B ELBOWS
AT V01
INST 4’-8” SQ VAULT W/ 4’-8” x 5’-6” COVER 3-19b
SET 150kVA 3PH PM XFMR, 120/208V, FACING SOUTHHWEST
INST (3) L/B ELBOWS
INST (4) 4POS SECONDARY CONNECTOR BARS
INST GRID# 559487-146915
CONNECT & TAG CUST INSTALLED UG SVC CONDUCTORS
(7 RUNS OF 250KCM) TO BUILDING B
AT HH1
INST 2'8”x3'8” CONCRETE SEC HH STD PLT 3-22
W/ #12-500 (8) POS CONN BARS
INST GROUND TO STEEL LID
CONNECT & TAG CUST INSTALLED UG SVC CONDUCTORS
(7 RUNS OF 250KCM) TO BUILDING A
AT M01
PERM METER
AT M02
PERM METER
J01 TO V01:
INST (3) 1/0 PRI CABLES ±172' IN EXIST SPARE 4" DB120 CONDUIT (E01-V01 = ±105)
CABLE #'S PER ONE-LINE (TOTAL BILLABLE LGTH = ±152')
V01 TO HH1:
INST 350 UG QUAD ±35' IN CUST PROVIDED TRENCH & 3-6
PSE PROVIDED 3" DB120 CONDUIT (TOTAL BILLABLE LGTH = ±15')
SITE PLAN
SCALE: 1" = 40'
Neutral Bars Hot Legs
3Ø secondary service and steel lid
ground wire connections with:
• 2 PSE runs
• 6 customer runs
• 1 steel vault cover ground wire
Detail B Typical Connections with 8 3Ø Runs
Ground
Wire Neutrals
s Sec
Conductors
Detail B - Typical Connections with 8 3Ø Runs
SCALE: NONE Std 6050.2120
BLD
G
B
559487-146915
150kVA 120/208v 3Ø
INST 350MCM
UG SEC QUAD
B. Jolliff 253-293-0532 9/8/25