design for permit (2)701
411
407
10236
W
E
S
T
R
D
E
PRAIR
I
E
P
A
R
K
S
T
S
E
E
V
C
H
A
R
G
I
N
G
O
N
L
Y
EV CHARGING
O
N
L
Y
E
V
C
H
A
R
G
I
N
G
ONLY
E
V
C
H
A
R
G
I
N
G
ONLY
E
V
C
H
A
R
G
I
N
G
ONLY
E
V
C
H
A
R
G
I
N
G
ONLY
E
V
C
H
A
R
G
I
N
G
ONLY
E
V
C
H
A
R
G
I
N
G
O
N
L
Y
E
V
C
H
A
R
G
I
N
G
ONLY 6'-0
"
502
10110
W
E
S
T
R
D
E
Owner / Developer Contact Info
officeATTN:
EVCS
11800 Clark St.
Arcadia, CA, 91006
Alex Naasz 626-272-7683
10
5
1
0
7
9
8
5
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
516229159 105107985
516317962 104370099
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm. Service
Relocation
Removal
Temporary
Job Order
Distribution
HP Main
HP Svc/MSA
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
REV#DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
8/7/25
P.Courtney 253-888-0002 8/7/25
P.Courtney 253-888-0002 8/7/25
N/A City of Yelm
Yelm Cinemas EV
Cmrcl - 3Ø Line Extension
201 Prairie Park St SE Yelm, WA 98597
PSE
105107985
AS NOTED 01 of 01
Thurston QSTHLE
SE¼,Sect19,T17,R02E
1702E076 1702E116 1702E076 YEL-26
PROJECT
LOCATION
Vicinity Map
OVERHEAD CIRCUIT MAP
SCALE: 6"= 1 MILE
PRIMARY CONDUIT & CABLE ONE-LINE DIAGRAM
SCALE: NONE
CUSTOMER-SUPPLIED TRENCH FOR PRIMARY CABLE (P01-V01)
SCALE: NONE
SITE PLAN
SCALE: 1" = 50'
JOB SITE
CIRCUIT FEET ADDED: 60'
Sq. Footage: N/A
Panel Size: 1600AMP
Heat Type: ELECTRIC
Est. Demand: 642kW
LRC: 0
% V. Drop: 3.7%
% Flicker: 0.0%
N
FOREMAN MUST FILL IN
Compound:
CABLE #:
Manufacturer:
Year Manufactured:
EJA048
559308-147619
750kVA 277/480v 3Ø
INST (3) 1/0 AL
15KV UG CABLES
PSE Locates Req'd
Developer Locates Req'd No
No
Yes
YesFlagging Req'd
Outages Req'd
AU
D
Phone & TV
Excavated Dirt Pile
Final Grade
24" Min
48"
Max
18"
Backfill for DB 120 Conduit/Direct Buried Cable
12" Min
Separation
6" or 12" of sand, 5/8" minus
3" of sand, 5/8" minus, or clean backfill bedding
36"
Min
Cover
ROADSIDE
Typical To Excavated Dirt Pile
(No Rocks over 10" Diameter)
or clean backfill shading
- A 6" layer of sand, 5/8" minus, or clean shading is allowed when excavated native material
contains rocks no larger than 8" in diameter.
Trench and backfill requirements for primary electric line extension trenches (No PSE gas)
- A 12" layer of sand, 5/8" minus, or clean shading is required when excavated native material
contains rocks up to 10" in diameter.
CIRCUIT LOADING TABLE
Circuit: YEL-26 Customer 3Ø Load:803
As Of:2020 Power Factor: .85
Phase to Phase Voltage:12500
A Phase B Phase C Phase
Existing Peak Load:255.0 243.0 272.0
Estimated New Load: 43.7 43.7 43.7
Total: 298.7 286.7 315.7
750kVA 277/480v
Fault Current: 17,000
R/X: 0.1 %Z: 5.30
FOREMAN MUST FILL IN
Compound:
CABLE #:
Manufacturer:
Year Manufactured:
EJA047
FOREMAN MUST FILL IN
Compound:
CABLE #:
Manufacturer:
Year Manufactured:
EJA046
Primary Power Cables
in PSE provided
4" DB120 Grade Conduit
VAULT DETAIL (V01)
SCALE: NONE
2"
Excavation - 20 cubic yards
8'-0"
7'-0"
8'-0"8"
4'-2"
SIDE VIEW
4'-6"
Crushed
6"
Rock
3'-6"
7'-0"
11'
11'
TOP VIEW
N
o
S
e
c
o
n
d
a
r
y
POWER GENERAL NOTES - COMMERCIAL PROJECT
1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
2. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
3. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
4. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
5. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
6. Roads shall be paved or have a compacted , crushed rock base in place.
7. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
8. All work is to be done in accordance with local municipal and county permit requirements as applicable.
9. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point.
10. Inclement weather conditions may cause delays in construction times and dates.
11. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's
primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will
provide any and all shoring or they will side slope the trench to 1:1.
CUSTOMER NOTE:
SITE MUST BE READY 1-WEEK PRIOR TO CONSTRUCTION DATE.
J.Silverson 360-353-6005
Jamie Silverson
360-353-6005
Jamie.Silverson@PSE.comE-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:
MAPS & RECORDS
NOTE: Corrected Facility Locations Shown.
J:\Electric_Southwest\THURSTON\Jamie Silverson\Non Residential\105107985_YelmCinemasEV\4_CAD\105107985_YelmCinemasEv.dwg09
/
0
8
/
2
5
_
8
:
0
3
a
m
P
l
o
t
t
e
d
B
y
:
p
c
o
u
r
t
J
:
\
E
l
e
c
t
r
i
c
_
S
o
u
t
h
w
e
s
t
\
T
H
U
R
S
T
O
N
\
J
a
m
i
e
S
i
l
v
e
r
s
o
n
\
N
o
n
R
e
s
i
d
e
n
t
i
a
l
\
1
0
5
1
0
7
9
8
5
_
Y
e
l
m
C
i
n
e
m
a
s
E
V
\
4
_
C
A
D
\
1
0
5
1
0
7
9
8
5
_
Y
e
l
m
C
i
n
e
m
a
s
E
v
.
d
w
g
Erosion & Sediment Control Requirements
Erosion & Sediment Control Shall Be Per PSE Std. Practice
0150.3200 Techniques For Temporary Erosion & Sediment
Control & Any Additional Local Jurisdiction Requirements.
(Local Jurisdictions May Have Additional Requirements
Including Notes Detailing Where Erosion Or Sediment
Control Structures Are To Be Installed, Cross Section
Details Of The Typical Erosion Structures, & Special
Requirements For Work In Sensitive Areas.)
Installed at site:
Grid Number:
kVA Rating:
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
Foreman to redline the following information
750kVA 277/480v
6259300
TRANSFORMER INSTALLATION (PM)
V01
559308-147619
SITE SPECIFIC NOTES
AT P01 GRID # 559310-147611
INST 1/0 AL 3PH PRI TERM ON FG TRI-UNIT ARM
INST (3) L/I C/O’S & SURGE ARRESTERS, FUSE @ 100T
INST SW# T96323
INST (3) STIRRUPS
INST 4” PRI RISER ON S/O BRKTS (ACTUAL=____')
AT V01
INST 7’ x 7’ VAULT W/ 8’ X 8’ COVER 3-19b
SET 750kVA 3PH PM XFMR, 277/480V, FACING SOUTHWEST
INST (3) L/B ELBOWS
INST (4) 4POS SECONDARY CONNECTOR BARS
INST GRID# 559308-147619
CONNECT & TAG CUST INSTALLED UG SVC CONDUCTORS
(5 RUNS OF 400KCM)
AT M01
PERM METER
P01 TO V01:
INST (3) 1/0 PRI CABLES ±100' IN CUST PROVIDED TRENCH & PSE PROVIDED 4" DB120
CONDUIT, CABLE # PER WIRING DIAG (TOTAL BILLABLE LGTH = ±60')
559310-147611
25kVA 120/240v 3Ø
T96323 100T
Field Face
Quadrant
Road Face
Quadrant
Climbing
Space5" Min
CL
D
i
r
e
c
t
i
o
n
o
f
V
e
h
i
c
u
l
a
r
T
r
a
f
f
i
c
CL
TOP VIEW
CONDUIT RISER PLACEMENT DETAIL (P01)
SCALE: NONE
559310-147611
25kVA 120/240v 3Ø
T96323 100T
AØ-EJA046 1/0 AL
BØ-EJA047 1/0 AL
CØ-EJA048 1/0 AL559308-147619
750kVA 277/480v 3Ø
559320-147602
559328-147592
50kVA 120/240v BØ
559290-147631
Y233
559287-147642
559305-147654
25kVA 120/240v CØ
F
e
e
d
6"6"
MIN
GUARD POST INSTALLATION
MIN
CONCRETE 2'-6"
PAINTED
YELLOW
3'-6"
6'-0"
The following styles of guard posts are approved for Puget Sound Energy transformers:
- 6 ft x 4 in. diameter Schedule 40 or better galvanized steel pipe filled with concrete.
The concrete shall have a minimum compressive strength of 3000 psi after 28 days.
The exposed portion of the post shall be painted traffic yellow.
- 6 ft x 9 in. diameter precast steel-reinforced concrete post.
Available from Utility Vault Company, Auburn, WA; or Hanson Inc., Tacoma, WA.
The exposed portion of the post shall be painted traffic yellow.
LENGTH
GUARD POST INSTALLATION (V01)
Not to scale 0700.1600-03
18"
PAD &
GUARD POST LOCATIONS
XFMR
FRONT
GUARD
POSTS
3'
MIN
MIN
5'
MAX
5'
MAX
TYPICAL
3' MIN 5'
MAX
5'
MAX
5'
MAX
18"
MIN
5'
MAX
5'
MAX
5'
MAX
5'
MAX
5'
MAX
CVW 9/16/25
31'
Customer will directional boar from PSE pole grid 559310-147611 31f