Loading...
design for permit (2)701 411 407 10236 W E S T R D E PRAIR I E P A R K S T S E E V C H A R G I N G O N L Y EV CHARGING O N L Y E V C H A R G I N G ONLY E V C H A R G I N G ONLY E V C H A R G I N G ONLY E V C H A R G I N G ONLY E V C H A R G I N G ONLY E V C H A R G I N G O N L Y E V C H A R G I N G ONLY 6'-0 " 502 10110 W E S T R D E Owner / Developer Contact Info officeATTN: EVCS 11800 Clark St. Arcadia, CA, 91006 Alex Naasz 626-272-7683 10 5 1 0 7 9 8 5 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. GAS PHONE CABLE TV 516229159 105107985 516317962 104370099 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Perm. Service Relocation Removal Temporary Job Order Distribution HP Main HP Svc/MSA DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT REV#DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP 8/7/25 P.Courtney 253-888-0002 8/7/25 P.Courtney 253-888-0002 8/7/25 N/A City of Yelm Yelm Cinemas EV Cmrcl - 3Ø Line Extension 201 Prairie Park St SE Yelm, WA 98597 PSE 105107985 AS NOTED 01 of 01 Thurston QSTHLE SE¼,Sect19,T17,R02E 1702E076 1702E116 1702E076 YEL-26 PROJECT LOCATION Vicinity Map OVERHEAD CIRCUIT MAP SCALE: 6"= 1 MILE PRIMARY CONDUIT & CABLE ONE-LINE DIAGRAM SCALE: NONE CUSTOMER-SUPPLIED TRENCH FOR PRIMARY CABLE (P01-V01) SCALE: NONE SITE PLAN SCALE: 1" = 50' JOB SITE CIRCUIT FEET ADDED: 60' Sq. Footage: N/A Panel Size: 1600AMP Heat Type: ELECTRIC Est. Demand: 642kW LRC: 0 % V. Drop: 3.7% % Flicker: 0.0% N FOREMAN MUST FILL IN Compound: CABLE #: Manufacturer: Year Manufactured: EJA048 559308-147619 750kVA 277/480v 3Ø INST (3) 1/0 AL 15KV UG CABLES PSE Locates Req'd Developer Locates Req'd No No Yes YesFlagging Req'd Outages Req'd AU D Phone & TV Excavated Dirt Pile Final Grade 24" Min 48" Max 18" Backfill for DB 120 Conduit/Direct Buried Cable 12" Min Separation 6" or 12" of sand, 5/8" minus 3" of sand, 5/8" minus, or clean backfill bedding 36" Min Cover ROADSIDE Typical To Excavated Dirt Pile (No Rocks over 10" Diameter) or clean backfill shading - A 6" layer of sand, 5/8" minus, or clean shading is allowed when excavated native material contains rocks no larger than 8" in diameter. Trench and backfill requirements for primary electric line extension trenches (No PSE gas) - A 12" layer of sand, 5/8" minus, or clean shading is required when excavated native material contains rocks up to 10" in diameter. CIRCUIT LOADING TABLE Circuit: YEL-26 Customer 3Ø Load:803 As Of:2020 Power Factor: .85 Phase to Phase Voltage:12500 A Phase B Phase C Phase Existing Peak Load:255.0 243.0 272.0 Estimated New Load: 43.7 43.7 43.7 Total: 298.7 286.7 315.7 750kVA 277/480v Fault Current: 17,000 R/X: 0.1 %Z: 5.30 FOREMAN MUST FILL IN Compound: CABLE #: Manufacturer: Year Manufactured: EJA047 FOREMAN MUST FILL IN Compound: CABLE #: Manufacturer: Year Manufactured: EJA046 Primary Power Cables in PSE provided 4" DB120 Grade Conduit VAULT DETAIL (V01) SCALE: NONE 2" Excavation - 20 cubic yards 8'-0" 7'-0" 8'-0"8" 4'-2" SIDE VIEW 4'-6" Crushed 6" Rock 3'-6" 7'-0" 11' 11' TOP VIEW N o S e c o n d a r y POWER GENERAL NOTES - COMMERCIAL PROJECT 1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. 2. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 3. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 4. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. 5. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. 6. Roads shall be paved or have a compacted , crushed rock base in place. 7. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. 8. All work is to be done in accordance with local municipal and county permit requirements as applicable. 9. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. 10. Inclement weather conditions may cause delays in construction times and dates. 11. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. CUSTOMER NOTE: SITE MUST BE READY 1-WEEK PRIOR TO CONSTRUCTION DATE. J.Silverson 360-353-6005 Jamie Silverson 360-353-6005 Jamie.Silverson@PSE.comE-Mail: Cell Phone: Project Manager Contact Information: Manager: MAPS & RECORDS NOTE: Corrected Facility Locations Shown. J:\Electric_Southwest\THURSTON\Jamie Silverson\Non Residential\105107985_YelmCinemasEV\4_CAD\105107985_YelmCinemasEv.dwg09 / 0 8 / 2 5 _ 8 : 0 3 a m P l o t t e d B y : p c o u r t J : \ E l e c t r i c _ S o u t h w e s t \ T H U R S T O N \ J a m i e S i l v e r s o n \ N o n R e s i d e n t i a l \ 1 0 5 1 0 7 9 8 5 _ Y e l m C i n e m a s E V \ 4 _ C A D \ 1 0 5 1 0 7 9 8 5 _ Y e l m C i n e m a s E v . d w g Erosion & Sediment Control Requirements Erosion & Sediment Control Shall Be Per PSE Std. Practice 0150.3200 Techniques For Temporary Erosion & Sediment Control & Any Additional Local Jurisdiction Requirements. (Local Jurisdictions May Have Additional Requirements Including Notes Detailing Where Erosion Or Sediment Control Structures Are To Be Installed, Cross Section Details Of The Typical Erosion Structures, & Special Requirements For Work In Sensitive Areas.) Installed at site: Grid Number: kVA Rating: Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: Foreman to redline the following information 750kVA 277/480v 6259300 TRANSFORMER INSTALLATION (PM) V01 559308-147619 SITE SPECIFIC NOTES AT P01 GRID # 559310-147611 INST 1/0 AL 3PH PRI TERM ON FG TRI-UNIT ARM INST (3) L/I C/O’S & SURGE ARRESTERS, FUSE @ 100T INST SW# T96323 INST (3) STIRRUPS INST 4” PRI RISER ON S/O BRKTS (ACTUAL=____') AT V01 INST 7’ x 7’ VAULT W/ 8’ X 8’ COVER 3-19b SET 750kVA 3PH PM XFMR, 277/480V, FACING SOUTHWEST INST (3) L/B ELBOWS INST (4) 4POS SECONDARY CONNECTOR BARS INST GRID# 559308-147619 CONNECT & TAG CUST INSTALLED UG SVC CONDUCTORS (5 RUNS OF 400KCM) AT M01 PERM METER P01 TO V01: INST (3) 1/0 PRI CABLES ±100' IN CUST PROVIDED TRENCH & PSE PROVIDED 4" DB120 CONDUIT, CABLE # PER WIRING DIAG (TOTAL BILLABLE LGTH = ±60') 559310-147611 25kVA 120/240v 3Ø T96323 100T Field Face Quadrant Road Face Quadrant Climbing Space5" Min CL D i r e c t i o n o f V e h i c u l a r T r a f f i c CL TOP VIEW CONDUIT RISER PLACEMENT DETAIL (P01) SCALE: NONE 559310-147611 25kVA 120/240v 3Ø T96323 100T AØ-EJA046 1/0 AL BØ-EJA047 1/0 AL CØ-EJA048 1/0 AL559308-147619 750kVA 277/480v 3Ø 559320-147602 559328-147592 50kVA 120/240v BØ 559290-147631 Y233 559287-147642 559305-147654 25kVA 120/240v CØ F e e d 6"6" MIN GUARD POST INSTALLATION MIN CONCRETE 2'-6" PAINTED YELLOW 3'-6" 6'-0" The following styles of guard posts are approved for Puget Sound Energy transformers: - 6 ft x 4 in. diameter Schedule 40 or better galvanized steel pipe filled with concrete. The concrete shall have a minimum compressive strength of 3000 psi after 28 days. The exposed portion of the post shall be painted traffic yellow. - 6 ft x 9 in. diameter precast steel-reinforced concrete post. Available from Utility Vault Company, Auburn, WA; or Hanson Inc., Tacoma, WA. The exposed portion of the post shall be painted traffic yellow. LENGTH GUARD POST INSTALLATION (V01) Not to scale 0700.1600-03 18" PAD & GUARD POST LOCATIONS XFMR FRONT GUARD POSTS 3' MIN MIN 5' MAX 5' MAX TYPICAL 3' MIN 5' MAX 5' MAX 5' MAX 18" MIN 5' MAX 5' MAX 5' MAX 5' MAX 5' MAX CVW 9/16/25 31' Customer will directional boar from PSE pole grid 559310-147611 31f crossing West Rd E. Will need to dig work pit at pole. 4x4x4.