Loading...
HomeMy WebLinkAbout105108817_YelmPlazaTHIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) 10 5 1 0 8 8 1 7 Owner / Developer Contact Info officeATTN: Yelm Plaza LLC 18230 E Valley HWY Ste #195 Kent, WA, 98032 Caleb Lee 206-499-5086 FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. PROJECT LOCATION Vicinity Map (Lat,Long: ) OVERHEAD CIRCUIT MAP SCALE: 6"= 1 MILE SITE PLAN SCALE: 1" = 40' JOB SITE CIRCUIT FEET ADDED: 0' Sq. Footage: N/A Panel Size: (5) 200AMP Heat Type:ELEC Est. Demand: 18.73 kW LRC: 65 % V. Drop:4.9% % Flicker:3.6% N PERM METER PSE Locates Req'd Developer Locates Req'd Yes No Yes YesFlagging Req'd Outages Req'd AU D 50kVA 120/240v Fault Current: 12,300 R/X: 0.6 %Z: 1.7 DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT REV#DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP 10/22/25 M.Taylor 85-5970 10/22/25 M.Taylor 85-5970 10/22/25 REQ'D City of Yelm Yelm Plaza LLC Cmrcl - Upgrade OH Xfmr & Secondary Line Extension 904 Yelm Ave E Yelm, WA 98597 PSE 105108817 AS NOTED 01 of 01 THURSTON QSTHLE ??¼,Sect??,T??,R?? 1702W060 1702W056 1702W058 YEL-26 J:\Electric_Southwest\THURSTON\John Singleton\3_COMMERCIAL\105108817_Yelm Plaza_904 E YELM AVE_514709338\5_CAD\105108817_YelmPlaza.dwg10 / 2 4 / 2 5 _ 1 1 : 3 1 a m P l o t t e d B y : p c o u r t J: \ e l e c t r i c _ s o u t h w e s t \ t h u r s t o n \ j o h n s i n g l e t o n \ 3 _ c o m m e r c i a l \ 1 0 5 1 0 8 8 1 7 _ y e l m p l a z a _ 9 0 4 e y e l m a v e _ 5 1 4 7 0 9 3 3 8 \ 5 _ c a d \ 1 0 5 1 0 8 8 1 7 _ y e l m p l a z a . d w g HP Svc/MSA HP Main Distribution Job Order Temporary Removal Perm Svc OH Xfmr Repl. Superior ORDER#NOTIF# PWR PROJECT PHASE N/AN/A N/AN/A N/AN/A N/AN/A N/AN/A N/AN/A 104372853516657554 583081973 105108817514709338 CABLE TV PHONE GAS CUSTOMER NOTE: SITE MUST BE READY 1-WEEK PRIOR TO CONSTRUCTION DATE SITE SPECIFIC NOTES AT P01 GRID # 559222-147676 45' CL2 (1973) REPL EXIST 37.5kVA OH XFMR W/ 50kVA OH XFMR 120/240v - Std 6025.1000 (TRFRXF) 3-11 REPL EXIST FUSE W/ 15T AT P02 GRID # 559212-147681 30' CL2 (1991) ** NOT MAPPED INST 3" SEC RISER ON S/O BRKTs (ACTUAL=____') - Std 6042.1000 (RIS3CSS) AT HH1 INST 17”x 30” SEC HH W/#10-350 (6) POS CONN BARS - Std 6050.2000 (HH16350) 3-22 CONNECT & TAG CUSTOMER RAN UG SVC LINES (5) RUNS OF 1/0 AT M01-M05 PERM METERS P02 TO HH1: INST 350MCM UG TPLX SVC ±50' IN CUST PROVIDED TRENCH & 3" SCH40 CONDUIT (TOTAL BILLABLE LGTH ±10') POWER GENERAL NOTES - COMMERCIAL PROJECT 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. 2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 4.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. 5.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. 6.Roads shall be paved or have a compacted , crushed rock base in place. 7.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. 8.All work is to be done in accordance with local municipal and county permit requirements as applicable. 9.Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. 10.Inclement weather conditions may cause delays in construction times and dates. 11.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. J.Singleton (360) 522-3156 John.Singleton@pse.com (360) 522-3156 John Singleton E-Mail: Cell Phone: Project Manager Contact Information: Manager: 559212-147681 ** Not Mapped ** Service Previously Removed 559222-147676 37.5kVA AØ 50kVA 120/240v AØ ±27" 2" 18" Captive L-Bolt Lock Cover, 10 lbs ±40" ±30" ±17" SINGLE PHASE SECONDARY HANDHOLE Not to scale 6050.2000 SIDE VIEW TOP VIEW 5'-6" 4'-5" Cust service conductors Conductors enter from beneath and shall be folded back with handhole Captive L-Bolt Lock Cover Set handhole flush to final grade 20" TOP VIEW 5" Min CL LC Direction of Vehicular Traffic CONDUIT RISER PLACEMENT DETAIL (P02) SCALE: NONE Field Face Quadrant Climbing Space Road Face Quadrant Climbing Space