HomeMy WebLinkAboutEnvelope ComCheckCOMcheck Software Version COMcheckWeb Envelope Compliance Certificate Project Title: 2021 IECC Project Type:New Construction Vertical Glazing / Wall Area:14% Location:Yelm, Washington Climate Zone:4c Construction Site: 1104 East Yelm Avenue Yelm, Washington 98597 Owner/Agent:Designer/Contractor: Lannie Cowden Heights Venture Architecture 3333 Warrenville Rd, Suite 200 Lisle, Illinois 60532 2818546125 lannie.cowden@hva.cc Project Information Energy Code: Yelm, WA D37983 - Cont. Insulation Added Credits: 10.0 Required 12.0 Proposed Energy monitoring, 3.0 credit Fault detection and diagnostics system, 1.0 credit Efficient kitchen equipment, 8.0 credit Additional Efficiency Package(s) Building Area Floor Area 1-Dining: Cafeteria/Fast Food : Nonresidential 2675 Envelope Assemblies Assembly Cavity R-Value Cont. R-Value Proposed U-Factor Budget U- Factor(a) Gross Area or Perimeter Floor - Main Building and Utility Bump-Out: Unheated Slab-On- Grade, Horizontal with vertical 2 ft., [Bldg. Use 1 - Dining: Cafeteria/Fast Food] (c) 222 ---10.0 0.700 0.520 Roof - Main Building: Insulation Entirely Above Deck, [Bldg. Use 1 - Dining: Cafeteria/Fast Food] 2633 ---30.0 0.032 0.032 Roof - Utility Bump-Out: Insulation Entirely Above Deck, [Bldg. Use 1 - Dining: Cafeteria/Fast Food] 42 ---30.0 0.032 0.032 NORTH Ext. Wall - Main Customer Entry Wall: Wood-Framed, 16in. o.c., [Bldg. Use 1 - Dining: Cafeteria/Fast Food] 652 21.0 9.4 0.037 0.051 Door - Main Customer Entry: Glass (over 50 9.56976e- 315lazing): Metal Frame, Entrance Door, Perf. Specs.: Product ID SolarBan 90 Low E Clear + Clear, SHGC 0.23, PF 0.02, [Bldg. Use 1 - Dining: Cafeteria/Fast Food] (b) 24 ------0.280 0.630 Door - Kitchen/Employee Door: Glass (over 50 9.56976e- 315lazing): Metal Frame, Entrance Door, Perf. Specs.: Product ID SolarBan 90 Low E Clear + Clear, SHGC 0.23, PF 0.08, [Bldg. Use 1 - Dining: Cafeteria/Fast Food] (b) 27 ------0.290 0.630 Window - Main Customer Entry Side Lite(s): Metal Frame with Thermal Break: Fixed, Perf. Specs.: Product ID SolarBan 90 Low E Clear + Clear, SHGC 0.23, PF 0.02, [Bldg. Use 1 - Dining: Cafeteria/Fast Food] (b) 73 ------0.290 0.360 Window - Main Customer Entry Transom: Metal Frame with Thermal Break: Fixed, Perf. Specs.: Product ID SolarBan 90 Low 10 ------0.290 0.360 Project Title: Data filename: Yelm, WA D37983 - Cont. Insulation Added 11/04/25Report date: 101 ofPage Assembly Cavity R-Value Cont. R-Value Proposed U-Factor Budget U- Factor(a) Gross Area or Perimeter E Clear + Clear, SHGC 0.23, PF 0.05, [Bldg. Use 1 - Dining: Cafeteria/Fast Food] (b) Window - Dining Room Storefront: Metal Frame with Thermal Break: Fixed, Perf. Specs.: Product ID SolarBan 90 Low E Clear + Clear, SHGC 0.23, PF 0.13, [Bldg. Use 1 - Dining: Cafeteria/Fast Food] (b) 97 ------0.290 0.360 EAST Ext. Wall - Secondary Customer Entry Wall: Wood-Framed, 16in. o.c., [Bldg. Use 1 - Dining: Cafeteria/Fast Food] 622 21.0 9.4 0.037 0.051 Door - Secondary Customer Entry: Glass (over 50 9.56976e- 315lazing): Metal Frame, Entrance Door, Perf. Specs.: Product ID SolarBan 90 Low E Clear + Clear, SHGC 0.23, PF 0.08, [Bldg. Use 1 - Dining: Cafeteria/Fast Food] (b) 24 ------0.290 0.630 Window - Secondary Customer Entry Side Lite(s): Metal Frame with Thermal Break: Fixed, Perf. Specs.: Product ID SolarBan 90 Low E Clear + Clear, SHGC 0.23, PF 0.08, [Bldg. Use 1 - Dining: Cafeteria/Fast Food] (b) 15 ------0.290 0.360 Window - Secondary CUstomer Entry Transom: Metal Frame with Thermal Break: Fixed, Perf. Specs.: Product ID SolarBan 90 Low E Clear + Clear, SHGC 0.23, PF 0.28, [Bldg. Use 1 - Dining: Cafeteria/Fast Food] (b) 11 ------0.290 0.360 Window - Dining Room Storefront: Metal Frame with Thermal Break: Fixed, Perf. Specs.: Product ID SolarBan 90 Low E Clear + Clear, SHGC 0.23, PF 0.02, [Bldg. Use 1 - Dining: Cafeteria/Fast Food] (b) 136 ------0.290 0.360 Ext. Wall - Side Utility Bump-Out: Wood-Framed, 16in. o.c., [Bldg. Use 1 - Dining: Cafeteria/Fast Food] 23 21.0 1.3 0.056 0.051 SOUTH Ext. Wall - Rear Utility Wall: Wood-Framed, 16in. o.c., [Bldg. Use 1 - Dining: Cafeteria/Fast Food] 849 21.0 9.4 0.037 0.051 Door - Employee / Kitchen Use: Insulated Metal, Swinging, [Bldg. Use 1 - Dining: Cafeteria/Fast Food] 27 ------0.700 0.370 Ext. Wall - Utility Bump-Out: Wood-Framed, 16in. o.c., [Bldg. Use 1 - Dining: Cafeteria/Fast Food] 106 21.0 1.3 0.056 0.051 Door - Single Utility Door: Insulated Metal, Swinging, [Bldg. Use 1 - Dining: Cafeteria/Fast Food] 24 ------0.700 0.370 Door - Double Utility Door: Insulated Metal, Swinging, [Bldg. Use 1 - Dining: Cafeteria/Fast Food] 45 ------0.700 0.370 WEST Ext. Wall - Drive-Thru Side Wall: Steel-Framed, 16in. o.c., [Bldg. Use 1 - Dining: Cafeteria/Fast Food] 644 22.0 7.3 0.058 0.055 Window: Metal Frame with Thermal Break: Operable, Perf. Specs.: Product ID SolarBan 90 Low E Clear + Clear, SHGC 0.23, PF 0.57, [Bldg. Use 1 - Dining: Cafeteria/Fast Food] (b) 4 ------0.290 0.450 Window: Metal Frame with Thermal Break: Fixed, Perf. Specs.: Product ID SolarBan 90 Low E Clear + Clear, SHGC 0.23, PF 0.57, [Bldg. Use 1 - Dining: Cafeteria/Fast Food] (b) 16 ------0.290 0.360 Ext. Wall - Side Utility Bump-Out: Wood-Framed, 16in. o.c., [Bldg. Use 1 - Dining: Cafeteria/Fast Food] 30 21.0 1.3 0.056 0.051 Ext. Wall - Drive-Thru Side Wall: Wood-Framed, 16in. o.c., [Bldg. Use 1 - Dining: Cafeteria/Fast Food] 143 21.0 7.3 0.041 0.051 (a)Budget U-factors are used for software baseline calculations ONLY, and are not code requirements. (b)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. (c)Slab-On-Grade proposed and budget U-factors shown in table are F-factors. Project Notes Project Title: Data filename: Yelm, WA D37983 - Cont. Insulation Added 11/04/25Report date: 102 ofPage - Roof = R-30 min. Rigid insulation. - Drive-thru wall (west) = R-22 min. batt at 6" metal stud cavity (R-21 min. at 6" wood stud wall) w/ spec'd RMAX continuous insulation (R-6 min.) + FRT sheathing and finishes per plan (R-1.3 min.). - Other walls, excluding bump-out (north / south / east) = R-21 min. batt at 6" wood stud cavity w/ 1/2 sheathing (R-.62 min.) & 1-1/2" rigid insulation (R-7.5 min.) + FRT sheathing and finishes per plan (R-1.3 min.). Refer to plans for assembly sequence. Envelope Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 2021 IECC requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Envelope PASSES: Design 1% better than code Project Title: Data filename: Yelm, WA D37983 - Cont. Insulation Added 11/04/25Report date: 103 ofPage Lannie Cowden - Project Manager 12/01/2025 Inspection Checklist Requirements: 0.0% were addressed directly in the COMcheck software COMcheck Software Version COMcheckWeb Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 2021 IECC Section # & Req.ID Plan Review Complies?Comments/Assumptions C103.2 [PR1]1 Plans and/or specifications provide all information with which compliance can be determined for the building envelope and document where exceptions to the standard are claimed. Complies Does Not Not Observable Not Applicable C402.4.1 [PR10]1 The vertical fenestration area <= 30 percent of the gross above-grade wall area. Complies Does Not Not Observable Not Applicable C402.4.1 [PR11]1 The skylight area <= 3 percent of the gross roof area. Complies Does Not Not Observable Not Applicable C402.4.2 [PR14]1 In enclosed spaces > 2,500 ft2 directly under a roof with ceiling heights >15 ft. and used as an office, lobby, atrium, concourse, corridor, storage, gymnasium/exercise center, convention center, automotive service, manufacturing, non- refrigerated warehouse, retail store, distribution/sorting area, transportation, or workshop, the following requirements apply: (a) the daylight zone under skylights is >= half the floor area; (b) the skylight area to daylight zone is >= 3 percent with a skylight VT >= 0.40; or a minimum skylight effective aperture >= 1 percent. Complies Does Not Not Observable Not Applicable C406 [PR9]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the additional energy efficiency package options. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Yelm, WA D37983 - Cont. Insulation Added 11/04/25Report date: 104 ofPage Section # & Req.ID Footing / Foundation Inspection Complies?Comments/Assumptions C303.2 [FO4]2 Slab edge insulation installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable C303.2.1 [FO6]1 Exterior insulation protected against damage, sunlight, moisture, wind, landscaping and equipment maintenance activities. Complies Does Not Not Observable Not Applicable C105 [FO3]2 Installed slab-on-grade insulation type and R-value consistent with insulation specifications reported in plans and COMcheck reports. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.2.4 [FO7]2 Slab edge insulation depth/length. Slab insulation extending away from building is covered by pavement or >= 10 inches of soil. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Yelm, WA D37983 - Cont. Insulation Added 11/04/25Report date: 105 ofPage Section # & Req.ID Framing / Rough-In Inspection Complies?Comments/Assumptions C303.1.3 [FR12]2 Fenestration products rated in accordance with NFRC certified and as to performance labels or certificates provided. Complies Does Not Not Observable Not Applicable C402.4.3 [FR10]1 Vertical fenestration SHGC value.Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.4.3, C402.4.3. 4 [FR8]1 Installed vertical fenestration U-factor and SHGC consistent with label specifications and as reported in plans and COMcheck reports. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.4.5 [FR14]2 U-factor of opaque swinging and nonswinging doors associated with the building thermal envelope meets requirements. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.5.1. 3 [FR19]1 The building envelope contains a continuous air barrier that is sealed in an approved manner and material permeability <= 0.004 dfm/ft2. Air barrier penetrations are sealed in an approved manner. Complies Does Not Not Observable Not Applicable C402.5.4 [FR18]3 Factory-built fenestration and doors are labeled as meeting air leakage requirements. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Yelm, WA D37983 - Cont. Insulation Added 11/04/25Report date: 106 ofPage Section # & Req.ID Mechanical Rough-In Inspection Complies?Comments/Assumptions C403.7.7 [ME58]3 Outdoor air and exhaust systems have motorized dampers that automatically shut when not in use and meet maximum leakage rates. Check gravity dampers where allowed. Reference section language for operational details. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Yelm, WA D37983 - Cont. Insulation Added 11/04/25Report date: 107 ofPage Section # & Req.ID Rough-In Electrical Inspection Complies?Comments/Assumptions C405.7 [EL26]2 Low-voltage dry-type distribution electric transformers meet the minimum efficiency requirements of Table C405.6. Complies Does Not Not Observable Not Applicable C405.8 [EL27]2 Electric motors meet the minimum efficiency requirements of Tables C405.7(1) through C405.7(4). Efficiency verified through certification under an approved certification program or the equipment efficiency ratings shall be provided by motor manufacturer (where certification programs do not exist). Complies Does Not Not Observable Not Applicable C405.9.1, C405.9.2 [EL28]2 Escalators and moving walks comply with ASME A17.1/CSA B44 and have automatic controls configured to reduce speed to the minimum permitted speed in accordance with ASME A17.1/CSA B44 or applicable local code when not conveying passengers. Complies Does Not Not Observable Not Applicable C405.10 [EL29]2 Total voltage drop across the combination of feeders and branch circuits <= 5%. Complies Does Not Not Observable Not Applicable C405.1.1 [EL30]2 At least 90% of dwelling unit permanently installed lighting shall have lamp efficacy >= 65 lm/W or luminaires with efficacy >= 45 lm/W or comply with C405.2.4 or C405.3. Complies Does Not Not Observable Not Applicable C405.11, C405.11.1 [EL31]2 50% of 15/20 amp receptacles installed in enclosed offices, conference rooms, copy rooms, break rooms, classrooms and workstations and > 25% of branch circuit feeders for modular furniture will have automatic receptacle control in accordance with C405.11.1. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Yelm, WA D37983 - Cont. Insulation Added 11/04/25Report date: 108 ofPage Section # & Req.ID Insulation Inspection Complies?Comments/Assumptions C303.1 [IN3]1 Roof insulation installed per manufacturer’s instructions and is labeled with R-value or insulation certificate providing R-value and other relevant data. Blown or poured loose- fill insulation is installed only where the roof slope is <=3 in 12. Complies Does Not Not Observable Not Applicable C402.2.1 [IN20]1 Roof assembly meets minimal thermal resistance installed between roof framing or in a continuous fashion on the roof assembly as stipulated in Table C402.1.3. Requirements for above deck insulation, minimum thickness, suspended ceilings, staggered joints and skylight curbs will be met. Complies Does Not Not Observable Not Applicable C303.2 [IN7]1 Above-grade wall insulation installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable C105 [IN6]1 Installed above-grade wall insulation type and R-value consistent with insulation specifications reported in plans and COMcheck reports. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.2.3 [IN8]2 Installed floor insulation type and R- value consistent with insulation specifications reported in plans and COMcheck reports. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.2.6 [IN18]3 Radiant panels and associated components, designed for heat transfer from the panel surfaces to the occupants or indoor space are insulated with a minimum of R-3.5. Complies Does Not Not Observable Not Applicable C105 [IN2]1 Installed roof insulation type and R- value consistent with insulation specifications reported in plans and COMcheck reports. For some ceiling systems, verification may need to occur during Framing Inspection. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.5.1. 1 [IN1]1 All sources of air leakage in the building thermal envelope are sealed, caulked, gasketed, weather stripped or wrapped with moisture vapor- permeable wrapping material to minimize air leakage. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Yelm, WA D37983 - Cont. Insulation Added 11/04/25Report date: 109 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions C401.3 [FI58]1 A thermal envelope certificate will be supplied and completed by an approved third party. Complies Does Not Not Observable Not Applicable C402.5.10 [FI26]3 Recessed luminaires in thermal envelope to limit infiltration and be IC rated and labeled. Seal between interior finish and luminaire housing. Complies Does Not Not Observable Not Applicable C402.5.11 [FI59]1 Operable openings > 40 ft2 will be interlocked with heating and cooling systems to setback setpoint temperatures within 10 minutes of opening. Complies Does Not Not Observable Not Applicable C402.5.8 [FI37]1 Weatherseals installed on all loading dock cargo door openings and provide direct contact along the top and sides of vehicles parked in the doorway. Complies Does Not Not Observable Not Applicable C406.10 [FI63]1 Energy Monitoring - the building is equipped with an energy management system to monitor, record, and report energy consumption for electrical energy, by end-use category, contain meters, a data acquisition system and employ graphical reports. Complies Does Not Not Observable Not Applicable C408.1.1 [FI57]1 Building operations and maintenance documents will be provided to the owner. Documents will cover manufacturers' information, specifications, programming procedures and means of illustrating to owner how building, equipment and systems are intended to be installed, maintained, and operated. Complies Does Not Not Observable Not Applicable C406.11 [FI64]1 Fault Detection and Diagnostics - a fault detection and diagnostics system installed to monitor the HVAC operation and performance. Includes monitoring sensors and devices, sampling every 15 minutes, automatically report faults and provide recommendations for repair, and transmit recommendations to local authorized personnel. Complies Does Not Not Observable Not Applicable C406.12 [FI65]1 Efficient Kitchen Equipment - the commercial kitchen has at least one fryer with all fryers, dishwashers, steam cookers and ovens complying with performance requirements of Tables C406.12(1) through C406.12(4). Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Yelm, WA D37983 - Cont. Insulation Added 11/04/25Report date: 1010 ofPage