Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Lighting Compliance Summary
Administered by: ©2025 NEEA, All rights reserved Date: Dec 09, 2025 LIGHTING COMPLIANCE SUMMARY 2021 WSEC Compliance Forms for Commercial Buildings including Group R2, R3 & R4 over 3 stories and all R1 Project & Applicant Information Project Title Panda Express Yelm - 2021 WSEC - 2021 WSEC For Building Department Use: Project Address 1104 East Yelm Avenue Yelm, WA 98597 Applicant Name Mai-Lan Nguyen Applicant Phone Applicant Email mnguyen@jfte.com For questions about this report, contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com General Occupancy All Commercial General Building Use Type Dining, Fast Food Building Cond. Floor Area 2,721 General Project Types New Building New Building or Addition Lighting Scope Interior Lighting Exterior Lighting Alteration Lighting Scope Project Cond. Floor Area 2,721 Floors Above Grade 1 Compliance Method General Prescriptive Lighting Project Description Lighting Compliance Scope and Method Project Type Interior / Exterior (Interior includes both interior & parking) Luminaire Replacement Scope Compliance Method LPA Calculation Adjustment Compliance Verification New Building Interior Lighting Building area No Calculation Adjustments selected COMPLIES New Building Exterior Lighting Not applicable to exterior COMPLIES Additional Energy Efficiency (AEC) Measures Included Reduced lighting power density - 10% lower than LPA Load Management (LDM) Measures Included No lighting or electrical load management measures included in project Project Title Panda Express Yelm - 2021 WSEC - 2021 WSEC Date Dec 09, 2025 Lighting Power Calculation NEW BUILDING - INTERIOR LIGHTING Compliance Verification COMPLIES Compliance Method Building area LPA Calculation Adjustment LPA x 0.9 Interior Lighting Power Allowance - Building Area Building Areas Gross Interior Area (SF)LPA (Watts/SF)Total Watts Allowed (SF x LPA x 0.9) Total Proposed Watts By Building Area Compliance Status by Building Area Dining - Cafeteria/fast food 2,721 0.72 1,763 1,628 COMPLIES Proposed Lighting Power Density Fixture Type/Application Fixture ID Building Area New or Existing-to-Remain Quantity of Fixtures, CLDs or Luminaires (#F) Watts per Fixture, CLD or Luminaire (WpF) Total Linear Feet (LF) Watts per Linear Foot (WpLF) Total Watts Proposed (#F x WpF) or (LF x WpLF) Individual Fixtures Recessed downlight L21W/L21B Dining - Cafeteria/fast food New 17 5 85 Recessed downlight L19W/L19EMW/L19B Dining - Cafeteria/fast food New 43 9 387 Suspended L50R Dining - Cafeteria/fast food New 3 5 15 Suspended L49 Dining - Cafeteria/fast food New 5 60 300 Other fixture type L40 Dining - Cafeteria/fast food New 1 40 40 Other fixture type L32 Dining - Cafeteria/fast food New 17 3 51 Other fixture type L1/L1E Dining - Cafeteria/fast food New 15 50 750 Project Title Panda Express Yelm - 2021 WSEC - 2021 WSEC Date Dec 09, 2025 Proposed Fixtures Details NEW BUILDING - INTERIOR LIGHTING Fixture Type/Application Fixture ID Location in Documents Lamp Type Building Area New or Existing-to-Remain Individual Fixtures Recessed downlight L21W/L21B E-101 LED Dining - Cafeteria/fast food New Fixture Description:Are these fixtures located within a daylight zone?: Yes, controls provided Daylight zone location(s): Sidelit daylight zones (primary and/or secondary)Do these fixtures require specific application lighting controls?: None required Recessed downlight L19W/L19EMW/L19B E-101 LED Dining - Cafeteria/fast food New Fixture Description:Are these fixtures located within a daylight zone?: Yes, controls provided Daylight zone location(s): Sidelit daylight zones (primary and/or secondary)Do these fixtures require specific application lighting controls?: None required Suspended L50R E-101 Other Dining - Cafeteria/fast food New Fixture Description:Are these fixtures located within a daylight zone?: Yes, controls provided Daylight zone location(s): Sidelit daylight zones (primary and/or secondary)Do these fixtures require specific application lighting controls?: None required Suspended L49 E-101 Other Dining - Cafeteria/fast food New Fixture Description:Are these fixtures located within a daylight zone?: No Do these fixtures require specific application lighting controls?: None required Other fixture type L40 E-101 Other Dining - Cafeteria/fast food New Fixture Description:Are these fixtures located within a daylight zone?: No Do these fixtures require specific application lighting controls?: None required Other fixture type L32 E-101 LED Dining - Cafeteria/fast food New Fixture Description:Are these fixtures located within a daylight zone?: No Do these fixtures require specific application lighting controls?: None required Other fixture type L1/L1E E-101 LED Dining - Cafeteria/fast food New Fixture Description:Are these fixtures located within a daylight zone?: No Do these fixtures require specific application lighting controls?: None required Project Title Panda Express Yelm - 2021 WSEC - 2021 WSEC Date Dec 09, 2025 Lighting Power Calculation NEW BUILDING - EXTERIOR LIGHTING Compliance Verification COMPLIES Exterior Lighting Zone ZONE 2 Base Site Allowance 280 Exterior Lighting Power Allowance Exterior Surface Surface Sub-Type Surface Area (SF) LPA (Watts/SF) Linear Feet (LF) LPA (Watts/LF) Total Watts Allowed (LPA x SF) or (LPA x LF) Total Proposed Watts Compliance Status Building entrances and exits Pedestrian entrances & exits 13 9.8 127 Uncovered parking areas and drives 44,373 0.026 1,154 Base Site Allowance 280 Totals 1,561 1,528 COMPLIES Proposed Exterior Lighting Power Density Fixture Type Fixture ID Exterior Surface Type Quantity of Fixtures (#F) Watts or Wattage Limit per Fixture (WpF) Total Linear Feet (LF) Watts per Linear Foot (WpLF) Total Watts Proposed (#F x WpF) or (LF x WpLF) Individual Fixtures Flood light L97 Building entrances and exits - Pedestrian entrances & exits 4 10 40 Pole-mounted A Uncovered parking areas and drives - 6 135 810 Pole-mounted D Uncovered parking areas and drives - 2 270 540 Wall-mounted L90BL Building entrances and exits - Pedestrian entrances & exits 4 25 100 Wall-mounted L85 Building entrances and exits - Pedestrian entrances & exits 1 30 30 Other fixture type L86 Building entrances and exits - Pedestrian entrances & exits 4 2 8 Proposed Total LPD 1,528