Loading...
HomeMy WebLinkAbout101193466_ElRayBurro R1FM FM FM FM FM FM BA L T I C A V E L L C 217 2 4 1 4 1 2 0 5 58' R O W 20' R O A D W A Y 513 Lon g m i r e S t S W X X X X G G G G G G G G FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM S G S SS S S NO PAR K I N G SS G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G 20' R O A D W A Y 40' R O A D W A Y ST ST ST ST ST ST ST ST ST ST ST ST ST W W W SV SV SV SV GV 604 Lon g m i r e S t S W W Y e l m A v e ( S R 5 1 0 ) Lon g m i r e S t S W G G G ST ST ST ST ST W W W LO N G M I R E S T 514 11' THREE PHASE SECONDARY CONCRETE HANDHOLE SCALE: NONE 6050.2100 fig 1 Owner / Developer Contact Info officeATTN: Gudelio Jimenez 8120 N Bicentennial Loop SE, Apt A Olympia, WA 98503 Gudelio Jimenez 360-250-0045 10 1 1 9 3 4 6 6 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. GAS PHONE CABLE TV 515931946 101193466 108171801 583082154 593267651 516718036 587037502 N/A N/A N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Misc Dist Retire OH Xfmr Const Related OH <55kV Const Related Perm Svc Job Order Distribution HP Main HP Svc/MSA PROJECT LOCATION Vicinity Map (Lat,Long: 46.9458,-122.6129 ) SITE PLAN SCALE: 1" = 20' JOB SITE CIRCUIT FEET ADDED: 0' Sq. Footage: 1445 Panel Size: 200AMP Heat Type:Elec Est. Demand: 6 kW LRC: 150 % V. Drop:0.8% % Flicker:1.8% N 559527-147277 Y2102 100T ** Switch Orientation PSE Locates Req'd Developer Locates Req'd Yes Yes Yes YesFlagging Req'd Outages Req'd SITE SPECIFIC NOTES AT P01 SET 45' CL2 POLE W/GND ±10.75' (W) OF P02 (AS STAKED)3-10 INST 9' 8PIN DOUBLE ARM & 9' 8-PIN SGL ARM FOR XFMR C/Os INST (3) #2 ACSR AUTO DE (SW) - Std 6033.1040 (DE2315) INST (1) #2 ACSR AUTO DE (NE) - Std 6031.1040 (DE2115) INST (2) 3/8" DWN GUYS (PRI & NEUT) TO 20" PLATE ANCH L=11' (NE) INST 3" SEC RISER ON S/O BRKTs (ACTUAL=____') - Std 6042.1000 (RIS3CSS) INST (3) 25kVA OH XFMR BANK 120/208v ON CLUSTER-BRKT 3-11(2) INST (3) STIRRUPS, (3) L/B C/Os & FUSE AT 10T X-FER EXIST OH SVC FEEDING (514 W YELM AVE) INST GRID # 559515-147264 AT P02 GRID # 559509-147262 45' CL2 (2006) REMV ALL DIST HARDWARE REMV 45' CL2 (2006) POLE 2-26, 2-129 AT P03 GRID # 559514-147266 45' CL2 (1980) REMV ALL DIST HARDWARE REMV 45' CL2 (1980) POLE 2-26, 2-129 AT P04 GRID # 559527-147277 ** MAPPING CORRECTION - OH LATERAL RUNNING (NE) IS FUSED AT FT1 SLIDE FLYING TAPS (Y-Connections) PER - Std 6550.5200 2-21(3) AT HH1 INST 30"x30" #12-350 4-POS STD PLT - Sta 6050.2100 (HH34350SP)3-22 CONNECT & TAG CUSTOMER RAN UG SVC LINES (1) RUN OF 250MCM QUAD AT M01 PERM METER P01 TO HH1: INST 350MCM UG QUAD SVC ±45' IN CUST PROVIDED TRENCH & 3" DB120 CONDUIT (TOTAL BILLABLE LGTH = ±10')3-6 AU D 75kVA 120/208v Fault Current: 6,200 R/X: 0.8 %Z: 1.70 CUSTOMER NOTE: SITE MUST BE READY 1-WEEK PRIOR TO CONSTRUCTION DATE. Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P03 559514-147266 25kVA J.Singleton (360) 522-3156 John.Singleton@pse.com (360) 522-3156 John Singleton E-Mail: Cell Phone: Project Manager Contact Information: Manager: DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT REV#DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP 04/22/25 M.Taylor 85-5970 04/22/25 M.Taylor 85-5970 04/22/25 REQ'D REQ'D El Ray Burro Cmrcl - Relocate Poles & Inst Sec HH 604 W Yelm Ave Yelm, WA 98597 PSE 101193466 AS NOTED 01 of 01 THURSTON QSTHLE NE¼,Sect24,T17,R01E 1701E093 1702E116 1701E093 YEL-25 POWER GENERAL NOTES - COMMERCIAL PROJECT 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. 2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 4.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. 5.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. 6.Roads shall be paved or have a compacted , crushed rock base in place. 7.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. 8.All work is to be done in accordance with local municipal and county permit requirements as applicable. 9.Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. 10.Inclement weather conditions may cause delays in construction times and dates. 11.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. OVERHEAD CIRCUIT MAP SCALE: 6"= 1 Mile Re v D a t e : 0 1 / 2 3 / 2 6 J:\Electric_Southwest\THURSTON\John Singleton\3_COMMERCIAL\101193466_ELRAY BURRITO_515931946_604 W YELM AVE\5_CAD\101193466_ElRayBurro.dwg01 / 2 3 / 2 6 _ 3 : 3 1 p m P l o t t e d B y : m t a y l o r J: \ E l e c t r i c _ S o u t h w e s t \ T H U R S T O N \ J o h n S i n g l e t o n \ 3 _ C O M M E R C I A L \ 1 0 1 1 9 3 4 6 6 _ E L R A Y B U R R I T O _ 5 1 5 9 3 1 9 4 6 _ 6 0 4 W Y E L M A V E \ 5 _ C A D \ 1 0 1 1 9 3 4 6 6 _ E l R a y B u r r o . d w g 559514-147266 (3) 25kVA 120/208v 3Ø 559509-147262 559516-147245 25kVA 120/240v AØ SLAN0478 559508-147254 SLAR7445 559497-147251 X 94392 SLAR0132 559492-147273 50kVA 120/240v AØ A #2 A C S R ABC ABC 397 . 5 A A C Fee d Fee d Fee d #2 A C S R A B C Fee d 559515-147264 (3) 25kVA 120/208v 3Ø 20" Plate Anch, L=11' #2 A C S R Enlrg Detail (P01) SCALE: 1" = 10' Enlrg Detail (P04) SCALE: 1" = 10' Exist Svc & Meter Previously Removed Swing Swing Swing ** X 94392 ** Y 2102 100T 559527-147277 Y2102 100T ** Switch Orientation CUSTOMER-SUPPLIED SERVICE TRENCH (P01-HH1) SCALE: NONE TV & TEL Electric Service Cable in Conduit 3" Schedule 40 Grey PVC Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover Separation 12" Min 20" Min To Excavated Dirt Pile 36" MINIMUM COVER IN RIGHT OF WAY Backfill for Conduit Free of rocks larger than 8" in diameter) Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. 3Ø B 6' to 8' 6" to 12" Backfill and Compact Cut slot to lay rod in Not To Scale ANCHOR PLATE DETAIL Not To Scale FLYING TAP DETAIL Not To Scale Facing Northwest GUYING DETAIL (P01) Units of Property - INSTALL Only CROSSARMS Material Quantity DIST. WOOD DIST. FIBERGLASS DIST. STEEL DIST. OTHERS TRANS. WOOD TRANS. FIBERGLASS TRANS. STEEL TRANS. OTHER Units of Property - REMOVAL Only Material Quantity DIST. ARRESTERS DIST. CUTOUTS DIST. INSULATORS TRANS. ARRESTERS TRANS. INSULATORS CROSSARMS Units of Property - INSTALL Only LINE FIXTURES Material Quantity DIST. ARRESTERS DIST. CUTOUTS DIST. INSULATORS TRANS. ARRESTERS TRANS. INSULATORS Pole Retirement Table Work Loc Pole Data Pole TEMP TRANSFERS ST. LIGHT TRANSFERS Grid #Length Class Year TOPPED RMVD TEL TV FIBER TRAN REMV'D ID NUMBER P02 559509-147262 45 CL2 2006 P03 559514-147266 45 CL2 1980 Pole Table (NEW) Work Location Pole Data Grid #Height Class Year Remarks / Location Ref. P01 559515-147264 45 CL2 PERM METER 397.5 AAC C/N C/N #2 AC S R A B C A B C MAPS & RECORDS NOTE: Corrected Facility Locations, Based on Field Survey. Installed at site: Grid Number: kVA Rating: TRANSFORMER INSTALLATION (OH) Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: Foreman to redline the following information 25kVA 120/208v 6209150 P01 559515-147264 Installed at site: Grid Number: kVA Rating: TRANSFORMER INSTALLATION (OH) Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: Foreman to redline the following information 25kVA 120/208v 6209150 P01 559515-147264 Installed at site: Grid Number: kVA Rating: TRANSFORMER INSTALLATION (OH) Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: Foreman to redline the following information 25kVA 120/208v 6209150 P01 559515-147264 INST 350MCM UG QUAD Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P03 559514-147266 25kVA Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P03 559514-147266 25kVA 2'-6" Install PVC bell ends and grout into wall 2'-6" Handhole 730 lbs Conduits and conductors shall enter from ends of handhole through knockouts provided Typical customer run service conductors in duct Steel Door Seal conduit with foam TOP VIEW SIDE VIEW 2'-4" EXCAVATION: 3.1 CUBIC YARDS 6" Crushed rock 2" Customer-installed grounding wires ( the "4th" wire on the single-phase systems and the "5th" wire on the three-phase systems) shall not be connected to PSE's ground or neutral bus. They shall be removed by customer or cut off at the vault wall. 6'-0" 6'-0" 01/23/26S.Tincknell 253-303-1638