HomeMy WebLinkAbout101193466_ElRayBurro R1FM
FM
FM
FM
FM
FM
BA
L
T
I
C
A
V
E
L
L
C
217
2
4
1
4
1
2
0
5
58'
R
O
W
20'
R
O
A
D
W
A
Y
513
Lon
g
m
i
r
e
S
t
S
W
X
X
X
X
G
G
G
G
G
G
G
G
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
S
G
S
SS
S
S
NO PAR
K
I
N
G
SS
G
G
G
G G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
20'
R
O
A
D
W
A
Y
40'
R
O
A
D
W
A
Y
ST
ST
ST ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
W
W
W
SV
SV
SV
SV
GV
604
Lon
g
m
i
r
e
S
t
S
W
W Y
e
l
m
A
v
e
(
S
R
5
1
0
)
Lon
g
m
i
r
e
S
t
S
W
G
G
G
ST
ST
ST
ST
ST
W
W
W
LO
N
G
M
I
R
E
S
T
514
11'
THREE PHASE SECONDARY CONCRETE HANDHOLE
SCALE: NONE 6050.2100 fig 1
Owner / Developer Contact Info
officeATTN:
Gudelio Jimenez
8120 N Bicentennial Loop SE, Apt A
Olympia, WA 98503
Gudelio Jimenez 360-250-0045
10
1
1
9
3
4
6
6
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
515931946 101193466
108171801
583082154
593267651
516718036 587037502
N/A N/A
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Misc Dist Retire
OH Xfmr Const Related
OH <55kV Const Related
Perm Svc
Job Order
Distribution
HP Main
HP Svc/MSA
PROJECT
LOCATION
Vicinity Map (Lat,Long: 46.9458,-122.6129 )
SITE PLAN
SCALE: 1" = 20'
JOB SITE
CIRCUIT FEET ADDED: 0'
Sq. Footage: 1445
Panel Size: 200AMP
Heat Type:Elec
Est. Demand: 6 kW
LRC: 150
% V. Drop:0.8%
% Flicker:1.8%
N
559527-147277
Y2102 100T
** Switch Orientation
PSE Locates Req'd
Developer Locates Req'd Yes
Yes
Yes
YesFlagging Req'd
Outages Req'd
SITE SPECIFIC NOTES
AT P01
SET 45' CL2 POLE W/GND ±10.75' (W) OF P02 (AS STAKED)3-10
INST 9' 8PIN DOUBLE ARM & 9' 8-PIN SGL ARM FOR XFMR C/Os
INST (3) #2 ACSR AUTO DE (SW) - Std 6033.1040 (DE2315)
INST (1) #2 ACSR AUTO DE (NE) - Std 6031.1040 (DE2115)
INST (2) 3/8" DWN GUYS (PRI & NEUT) TO 20" PLATE ANCH L=11' (NE)
INST 3" SEC RISER ON S/O BRKTs (ACTUAL=____') - Std 6042.1000 (RIS3CSS)
INST (3) 25kVA OH XFMR BANK 120/208v ON CLUSTER-BRKT 3-11(2)
INST (3) STIRRUPS, (3) L/B C/Os & FUSE AT 10T
X-FER EXIST OH SVC FEEDING (514 W YELM AVE)
INST GRID # 559515-147264
AT P02 GRID # 559509-147262 45' CL2 (2006)
REMV ALL DIST HARDWARE
REMV 45' CL2 (2006) POLE 2-26, 2-129
AT P03 GRID # 559514-147266 45' CL2 (1980)
REMV ALL DIST HARDWARE
REMV 45' CL2 (1980) POLE 2-26, 2-129
AT P04 GRID # 559527-147277
** MAPPING CORRECTION - OH LATERAL RUNNING (NE) IS FUSED
AT FT1
SLIDE FLYING TAPS (Y-Connections) PER - Std 6550.5200 2-21(3)
AT HH1
INST 30"x30" #12-350 4-POS STD PLT - Sta 6050.2100 (HH34350SP)3-22
CONNECT & TAG CUSTOMER RAN UG SVC LINES (1) RUN OF 250MCM QUAD
AT M01
PERM METER
P01 TO HH1:
INST 350MCM UG QUAD SVC ±45' IN CUST PROVIDED TRENCH & 3" DB120
CONDUIT (TOTAL BILLABLE LGTH = ±10')3-6
AU
D
75kVA 120/208v
Fault Current: 6,200
R/X: 0.8 %Z: 1.70
CUSTOMER NOTE:
SITE MUST BE READY 1-WEEK PRIOR TO CONSTRUCTION DATE.
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P03
559514-147266
25kVA
J.Singleton (360) 522-3156
John.Singleton@pse.com
(360) 522-3156
John Singleton
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
REV#DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
04/22/25
M.Taylor 85-5970 04/22/25
M.Taylor 85-5970 04/22/25
REQ'D REQ'D
El Ray Burro
Cmrcl - Relocate Poles & Inst Sec HH
604 W Yelm Ave Yelm, WA 98597
PSE
101193466
AS NOTED 01 of 01
THURSTON QSTHLE
NE¼,Sect24,T17,R01E
1701E093 1702E116 1701E093 YEL-25
POWER GENERAL NOTES - COMMERCIAL PROJECT
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
4.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
5.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
6.Roads shall be paved or have a compacted , crushed rock base in place.
7.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
8.All work is to be done in accordance with local municipal and county permit requirements as applicable.
9.Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point.
10.Inclement weather conditions may cause delays in construction times and dates.
11.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's
primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will
provide any and all shoring or they will side slope the trench to 1:1.
OVERHEAD CIRCUIT MAP
SCALE: 6"= 1 Mile
Re
v
D
a
t
e
:
0
1
/
2
3
/
2
6
J:\Electric_Southwest\THURSTON\John Singleton\3_COMMERCIAL\101193466_ELRAY BURRITO_515931946_604 W YELM AVE\5_CAD\101193466_ElRayBurro.dwg01
/
2
3
/
2
6
_
3
:
3
1
p
m
P
l
o
t
t
e
d
B
y
:
m
t
a
y
l
o
r
J:
\
E
l
e
c
t
r
i
c
_
S
o
u
t
h
w
e
s
t
\
T
H
U
R
S
T
O
N
\
J
o
h
n
S
i
n
g
l
e
t
o
n
\
3
_
C
O
M
M
E
R
C
I
A
L
\
1
0
1
1
9
3
4
6
6
_
E
L
R
A
Y
B
U
R
R
I
T
O
_
5
1
5
9
3
1
9
4
6
_
6
0
4
W
Y
E
L
M
A
V
E
\
5
_
C
A
D
\
1
0
1
1
9
3
4
6
6
_
E
l
R
a
y
B
u
r
r
o
.
d
w
g
559514-147266
(3) 25kVA 120/208v 3Ø
559509-147262
559516-147245
25kVA 120/240v AØ
SLAN0478
559508-147254
SLAR7445
559497-147251
X 94392
SLAR0132
559492-147273
50kVA 120/240v AØ
A
#2
A
C
S
R
ABC
ABC
397
.
5
A
A
C
Fee
d
Fee
d
Fee
d
#2
A
C
S
R
A
B
C
Fee
d
559515-147264
(3) 25kVA 120/208v 3Ø
20" Plate Anch, L=11'
#2
A
C
S
R
Enlrg Detail (P01)
SCALE: 1" = 10'
Enlrg Detail (P04)
SCALE: 1" = 10'
Exist Svc & Meter
Previously Removed
Swing
Swing
Swing
** X 94392
** Y 2102 100T
559527-147277
Y2102 100T
** Switch Orientation
CUSTOMER-SUPPLIED SERVICE TRENCH (P01-HH1)
SCALE: NONE
TV & TEL Electric Service Cable in Conduit
3" Schedule 40 Grey PVC
Excavated Dirt Pile
Final Grade
24" Min
24" Min
to
36" Max
Cover Separation
12" Min
20" Min
To Excavated Dirt Pile
36" MINIMUM COVER
IN RIGHT OF WAY
Backfill for Conduit
Free of rocks
larger than 8"
in diameter)
Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.
3Ø
B
6' to 8'
6" to 12"
Backfill and
Compact
Cut slot
to lay rod in
Not To Scale
ANCHOR PLATE DETAIL
Not To Scale
FLYING TAP DETAIL
Not To Scale Facing Northwest
GUYING DETAIL (P01)
Units of Property -
INSTALL Only
CROSSARMS
Material Quantity
DIST. WOOD
DIST. FIBERGLASS
DIST. STEEL
DIST. OTHERS
TRANS. WOOD
TRANS. FIBERGLASS
TRANS. STEEL
TRANS. OTHER
Units of Property -
REMOVAL Only
Material Quantity
DIST. ARRESTERS
DIST. CUTOUTS
DIST. INSULATORS
TRANS. ARRESTERS
TRANS. INSULATORS
CROSSARMS
Units of Property -
INSTALL Only
LINE FIXTURES
Material Quantity
DIST. ARRESTERS
DIST. CUTOUTS
DIST. INSULATORS
TRANS. ARRESTERS
TRANS. INSULATORS
Pole Retirement Table
Work
Loc
Pole Data Pole TEMP TRANSFERS ST. LIGHT TRANSFERS
Grid #Length Class Year TOPPED RMVD TEL TV FIBER TRAN REMV'D ID NUMBER
P02 559509-147262 45 CL2 2006
P03 559514-147266 45 CL2 1980
Pole Table (NEW)
Work
Location
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P01 559515-147264 45 CL2
PERM METER
397.5 AAC
C/N
C/N
#2 AC
S
R
A B C
A B C
MAPS & RECORDS
NOTE: Corrected Facility Locations, Based
on Field Survey.
Installed at site:
Grid Number:
kVA Rating:
TRANSFORMER INSTALLATION (OH)
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
Foreman to redline the following information
25kVA 120/208v
6209150
P01
559515-147264
Installed at site:
Grid Number:
kVA Rating:
TRANSFORMER INSTALLATION (OH)
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
Foreman to redline the following information
25kVA 120/208v
6209150
P01
559515-147264
Installed at site:
Grid Number:
kVA Rating:
TRANSFORMER INSTALLATION (OH)
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
Foreman to redline the following information
25kVA 120/208v
6209150
P01
559515-147264
INST 350MCM UG QUAD
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P03
559514-147266
25kVA
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P03
559514-147266
25kVA
2'-6"
Install PVC bell ends
and grout into wall
2'-6"
Handhole
730 lbs
Conduits and conductors shall enter from
ends of handhole through knockouts provided
Typical customer run
service conductors in duct
Steel Door
Seal conduit
with foam
TOP VIEW
SIDE VIEW
2'-4"
EXCAVATION: 3.1 CUBIC YARDS
6" Crushed rock
2"
Customer-installed grounding wires ( the "4th" wire on the single-phase systems and the "5th" wire on
the three-phase systems) shall not be connected to PSE's ground or neutral bus. They shall be
removed by customer or cut off at the vault wall.
6'-0"
6'-0"
01/23/26S.Tincknell 253-303-1638