Loading...
HomeMy WebLinkAboutLightcurve Carter loop short plat design v2CAR T E R L O O P S E 1 2 3 4 5 6 15113 15117 15109 15105 15121 15125 RAI 12 FEE D 336 A C S R 336 A C S R AB C AB C 115 K V 15122 15126 15127 15123 15119 15115 15111 15107 15103 15130 15134 15131 15135 56' 56 ' FUSE @ 100T SW#T96269 'A' 'B' N Vicinity Map 46.9348, -122.6187 Owner / Developer Contact Info officeATTN: PROJECTS WEST, INC 2014 S. MERIDIAN PUYALLUP, WA 98371 PAUL EDMINSTER 253.841.5603 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. GAS PHONE CABLE TV 516353764 105108134 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Perm. Service Relocation Removal Temporary Job Order Distribution Service Stubs HP Svc/MSA 9. 8. 7. 6. 5. 4. 3. 2. 1. THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, PER THE TRENCH PROFILE, AND ALL EXCAVATIONS AT THE TRANSFORMER/HANDHOLE VAULT SITES SUCH THAT PSE FACILITIES WILL MATCH FINAL GRADE. VAULT HOLES WILL HAVE STABLE LEVEL BOTTOMS. CUSTOMER WILL PROVIDE 6" OF CRUSHED ROCK FOR VAULT BEDDING. ALL TRENCHES WILL HAVE 6" OF WASHED SAND COVER AND 4" BEDDING FOR ALL CONDUITS. THE CUSTOMER WILL PROVIDE SELECT BACKFILL, IF REQUIRED, AND COMPACTION AS NECESSARY. THE CUSTOMER IS RESPONSIBLE FOR DISPOSAL OF ALL NATIVE SPOILS NOT SUITABLE FOR USE AS BACKFILL. ALL TRENCHES MAY BE JOINT WITH GAS, TELEPHONE AND TV CABLE. ALL CABLES/CONDUITS TO BE INSTALLED IN CUSTOMER'S TRENCH AT THE DEPTH INDICATED IN TRENCH DETAIL (DEPENDENT UPON SIZE OF CONDUIT BEING INSTALLED TO MEET MIN 36" OF COVER). INSTALL CABLE ID TAGS AT EACH END OF THE PRIMARY CABLES PER THE CIRCUIT ONE-LINE DIAGRAM. UNLESS OTHERWISE SPECIFIED BY MUNICIPALITIES, INSTALL PVC (DB-120) ROAD CROSSINGS AS INDICATED ON THE CROSSINGS CONDUIT TABLE & AS SHOWN ON WORK SKETCH. CROSSINGS SHALL BE INSTALLED BY CUSTOMER/DEVELOPER PER PUGET SOUND ENERGY STANDARDS. AT SYMBOL: INSTALL UNDERGROUND PRIMARY CABLES IN CONDUIT. CABLE LENGTH AND CONDUIT SIZE AS INDICATED ON PRIMARY CABLE & CONDUIT TABLE. AT SYMBOL: INSTALL 600 VOLT UG SECONDARY CABLES IN CONDUIT. CABLE/CONDUIT SIZE AND LENGTH AS INDICATED ON SECONDARY CABLE & CONDUIT TABLE. AT SYMBOL: INSTALL MINI-PAD HANDHOLE & PADMOUNT TRANSFORMER. ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE. AT SYMBOL: INSTALL SECONDARY PEDESTAL/HANDHOLE W/ (3) MULTI-CONNECTORS. SIZE AS INDICATED ON SECONDARY HH/PEDESTAL TABLE. (EXCAVATION: 3' SQ.) AT SYMBOL: INSTALL SECONDARY CABLE & CONDUIT STUB-OUT. INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMES AND DATES. POWER GENERAL NOTES - PLAT PROJECT DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J.CALLAHAN 206.503.1520 . M.SAO 206.231.9766 08.08.25 N/A .N/A E. ORTIZ . 07.30.25 REDT # ( RW-139412 )YELM CARTER LOOP SP 1Ø PRIMARY U/G LINE EXTENSION - 6 S/F LOTS 15106 CARTER LOOP RD SE, YELM, WA 98597 PUGET SOUND ENERGY N/A N/A N/A 105108134 1"=50' 1 OF 2 THURSTON N/A N/A QSTHLE 25SE-T17N-R01E N/A N/A 1701E100 1702E116 1701E097 RAI-25 COMCAST TED AXTELL 253.878.2794 . . . RIGHT OF WAY CAROLYN BANASKY 253.476.6416 . . . E-Mail: Cell Phone: Project Manager Contact Information: Manager:JESSICA CALLAHAN 206.503.1520 jessica.callahan@pse.com x x x x ... ... ... PWIHOUSE@AOL.COM TYPICAL NOTCH-OUT FOR TRANSFORMER, NOT TO SCALE & SECONDARY PEDESTAL/HANDHOLE BACK OF EASEMENT STANDARD EASEMENT LINE ROW 10' PL 1' 4' - 5' Min. 1' 7'7' TRANSFORMER (WHEN PRESENT) 42" 45°42" 1' 45° Pr o p e r t y L i n e Road Side Top View of Mainline Trench for Single Stubout Location 4' Pr o p e r t y L i n e Road Side Top View of Mainline Trench for Pedestal or Double Stubout Location 42"45° 4' 45° STUBOUT EXCAVATION DIMENSIONS NOT TO SCALE JOINT TRENCH DETAIL NOT TO SCALE ROAD SIDE NATIVE SECONDARY POWER PEDESTAL MATERIAL P/L Power Secondary Power Primary Conduit Tel. & TV 12" Min 12" Sand Cover when gas line is in trench Sand 6" or 12" 4" Sand Bedding 1' 36" Cover 42" Gas 12" 18" Lower 2" 10" Pedestal PSE 10' FRONTAGE EASEMENT 1' Cover ROAD SIDE MINIPAD MINIPAD FIELD SIDE VAULT 6" of crushed rock (base for vault) P/L Power Secondary Power Primary Gas 12" Min Horizontal Separation Communications 42" Min 21"1' Feeder 38" 2" 4" Sand Bedding 12" Sand Cover 36" Cover 4" Sand Bedding 42" 6" Additional depth when Feeder is required PSE 10' FRONTAGE EASEMENT 1' TRANSFORMER Final Backfill Initial Backfill Trench Depth 42" - 48" SHALL BE STAGGERED CONNECTOR BARS IN THE FRONT NEUTRALS SHALL BE 18" 16" 13" 12"10" 2" 10" Pedestal will accept up to six 3" conduits SEALED WITH FOAM CONDUIT SHALL BE 120 PVC CONDUIT ELBOWS TYPICAL 24" RADIUS DB SIDE VIEW WITH CONDUIT 10" 18" 16" 13" 10" 2" 36" FRONT VIEW WITH CONDUIT SECONDARY PEDESTAL DETAIL NOT TO SCALE VAULT DETAIL @ V01 NOT TO SCALE EXCAVATION: _____ CUBIC YARDS 3'-6" SIDE VIEW 2" 6" CRUSHED ROCK TOP VIEW 7' 7' 6 1/3 SITE TRANSFORMERS HAVE BEEN SIZED FOR EXTRA 7KW DEMAND PER UNIT FOR EV DEVELOPER TO COORDINATE WITH PSE PROJECT MANGER & SERVICE PROVIDER PRIOR TO EXCAVATING WITHIN 3' OF LOCATE MARKS OF PSE ENERGIZED FACILITIES SITE PLAN SCALE: 1"=50' SCHED.SQ. FT. MAX LRC = CIRCUIT FEET ADDED: 80 17 2,370 80 AMPS CROSSING CONDUIT TABLE X-ING # LOCATION POWER XING LENGTH ASBUILT LOCATION TYPE OF CROSSING (Feeder, Primary, Secondary, etc.)FROM TO SIZE (IN)TYPE QTY X01 'A' 'B' 2 DB120 1 105 ( )'ECL PRIMARY 2" DB120 GREY PVC = 105 FT 2" PVC PLUG /CAPS = 2 SITE SPECIFIC NOTES At P01 (559116-147082) 1967 CLASS 3 - 40' -INSTALL (1) 2" PRIMARY RISER ON EXISTING STANDOFF BRACKETS -STIRRUP (2254100) -ALUM "H" CONNECTOR (2168000) (RIS2CSS) 6042.1000 -FUSE @ 100T (3412700), TAP 'B' PHASE -INSTALL SWITCH# T96269 (100T) -INSTALL 1Ø TERM ON FIBERGLASS ARM W/ LOAD INTERRUPTER CUTOUT & SURGE ARRESTOR (TSU1L1) 6043.1000, TAP BØ DEDICATED FACILITIES (105108134) for Dedicated Stub Location SITE SPAN ADDITIONAL REMARKS LABOR UNITS # FROM TO FOOTAGE - H1B LOT 5 25 DED. CONDUIT & WIRE 2-36, 2-54A TOTAL FT=25 @ H1A & H1B 10 5 1 0 8 1 3 4 425-417-8620 9/22/25 1 2 3 4 5 6 'A' 'B' NEW 1/O AL EKJ132-BØ 336 A C S R 336 A C S R AB C 115 K V FUSE @ 100T SW#T96269 RAI 12 FEE D 'A' 'B' DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J.CALLAHAN 206.503.1520 . M.SAO 206.231.9766 08.08.25 N/A .N/A E. ORTIZ . 07.30.25 REDT # ( RW-139412 )YELM CARTER LOOP SP 1Ø PRIMARY U/G LINE EXTENSION - 6 S/F LOTS 15106 CARTER LOOP RD SE, YELM, WA 98597 PUGET SOUND ENERGY N/A N/A N/A 105108134 N/A 2 OF 2 THURSTON N/A N/A QSTHLE 25SE-T17N-R01E N/A N/A 1701E100 1702E116 1701E097 RAI-25 COMCAST TED AXTELL 253.878.2794 . . . RIGHT OF WAY CAROLYN BANASKY 253.476.6416 . . . ... ... ... EX UNDERGROUND CIRCUIT MAP 1701E097 NOT TO SCALE THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) SITE SECONDARY CABLE & CONDUIT TABLE LOCATION CABLE CONDUIT VOLTAGE ASBUILT INFORMATION SIZE LENGTH ASSUMED SIZE LENGTH BENDS DROP FLICKER Foreman - Complete FROM TO (1/O,4/O,350)Design (ft)Lot Corner to Meter (ft)(in) Design (ft)90° 45°22° 11°(Percent) (Percent)Actual Amount Installed Cable Conduit V01 H1A 350 70 3 70 2 2.5 0.9 V01 H1B 350 70 3 70 2 2.7 0.9 H1A LOT 1 4/0 45 3 3.0 1.7 H1A LOT 2 4/0 45 3 3.0 1.7 H1B LOT 3 4/0 45 3 3.2 1.7 H1B LOT 4 4/0 45 3 3.2 1.7 H1B LOT 5 4/0 90 45 3 90 1 1 3.5 2.2 LABEL YELLOW TAG "MUST BE 4/0 TO MTR" H1B LOT 6 4/0 95 45 3 95 1 1 3.6 2.3 LABEL YELLOW TAG "MUST BE 4/0 TO MTR" 4/O UG Triplex (ft) =185 3" PVC & BENDS (ft)=325 6 0 2 0 0.9 350 UG Triplex (ft) =140 TOTAL QTS OF GLUE 0.9 SECONDARY HH/PEDESTAL TABLE Site Pedestal or Handhole Number of Positions Required Remarks H1A PEDESTAL 3 - SEPS3 6050.1000 H2A PEDESTAL 6 - SEPL6 6050.1000 NOT TO SCALE NEW CONDUIT DIAGRAM SECONDARY 3" PRIMARY 2" CONDUIT LEGEND SITE NEW PRIMARY UNDERGROUND CIRCUIT ONE-LINE DIAGRAM NOT TO SCALE PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE FROM TO SIZE (IN)QTY. DESIGN LENGTH (FT) BENDS PULL (LBS) PULL REV (LBS) CABLE SIZE DESIGN LENGTH (FT) PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED LUBRICANT (Gal.) 90° 45°22° 11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE EST. ACTUAL P01 V01 2 1 110 - 1 - -43 118 1/0 AL JKT 150 -EKJ132 --0.6 2" PVC (FT) & BENDS =110 0 1 0 0 1/0 AL JKT TOTAL (FT) =150 TTL (Gal.)0.6 VAULT & EQUIPMENT TABLE SITE # GRID # VAULT SIZE & COVER TYPE & SIZE EQUIPMENT IN VAULT PRIMARY BUSHINGS TRANSFORMER ID NUMBERS (COMPANY ID) AS-BUILT INFORMATION LB DC FOREMAN: INCLUDE PHASE TAPPED V01 559111 147091 54"x54"x38" Unistrut HH Matid: 7663002 75KVA MP TRF 120/240 Matid: 6247150 1 1 MINU1LR 6045.1010 BØ EX OVERHEAD CIRCUIT MAP 1702E116 SCALE: 6" = 1 MILE CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE RAI-12 07.14.25 179 140 243 0 12 0 179 152 243 Oil-Filled Equipment Clearances per PSE Std 0700.1500 If the oil-filled equipment is adjacent to… Clearance Requirement Combustible walls or roof (including stucco).10 FT Noncombustible walls, soffits, and roofs (including brick, concrete, steel and stone) providing the side of the transformer facing the wall does not have doors. Materials that pass UBC Std. 2-1 or ASTM E136-79 are considered to be noncombustible. 3 FT Fire sprinkler valves, standpipes, and fire hydrants.6 FT Doors, windows, vents, fire escapes, or other building openings.10 FT The water's edge of a swimming pool or any body of water.15 FT Individual domestic and irrigation wells. Clearance not required on pole mounted transformers (pole placement still applies as stated in 6450.3000), TUT's installed in sealed vaults, 7200V single-phase padmount transformers 50kva or less, and ones with reduced flammability oil. 100 FT Facilities used to dispense or store LP, hazardous liquids, or fuel.20 FT Gas service meter relief vent.3 FT Generators, customer-owned transformers, etc.6 FT Developer Note: The following Fault Current information MUST BE conveyed to the builder of the units: All units may require upgraded house electrical equipment as the fault current at the meter base may exceed 10,000 amps. FAULT CURRENT TABLE 1Ø PM TRANSFORMERS (240/120V) 120V WINDINGS 240V WINDINGS LOCATION SIZE R/X MIN. %Z FAULT CURRENT MIN. %Z FAULT CURRENT V01 75kVA 0.5 2.30 36,200 AMPS 1.80 23,100 AMPS MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE OIL-FILLED EQUIPMENT TRANSFORMER APPROVED AREA CO M B U S T I B L E B U I L D I N G W A L L S & R O O F 10' 10' 10' COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 3' MIN 3' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA 3' MIN 10 5 1 0 8 1 3 4 9/22/25425-417-8620