HomeMy WebLinkAboutLightcurve Carter loop short plat design v2CAR
T
E
R
L
O
O
P
S
E
1
2
3
4
5
6
15113
15117
15109
15105
15121
15125
RAI
12
FEE
D
336
A
C
S
R
336
A
C
S
R
AB
C
AB
C
115
K
V
15122
15126
15127
15123
15119
15115
15111
15107
15103
15130
15134
15131
15135
56'
56
'
FUSE @ 100T
SW#T96269 'A'
'B'
N
Vicinity Map
46.9348, -122.6187
Owner / Developer Contact Info
officeATTN:
PROJECTS WEST, INC
2014 S. MERIDIAN
PUYALLUP, WA 98371
PAUL EDMINSTER 253.841.5603
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
516353764 105108134
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm. Service
Relocation
Removal
Temporary
Job Order
Distribution
Service Stubs
HP Svc/MSA
9.
8.
7.
6.
5.
4.
3.
2.
1. THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, PER THE TRENCH
PROFILE, AND ALL EXCAVATIONS AT THE TRANSFORMER/HANDHOLE VAULT SITES
SUCH THAT PSE FACILITIES WILL MATCH FINAL GRADE. VAULT HOLES WILL HAVE
STABLE LEVEL BOTTOMS. CUSTOMER WILL PROVIDE 6" OF CRUSHED ROCK FOR
VAULT BEDDING. ALL TRENCHES WILL HAVE 6" OF WASHED SAND COVER AND 4"
BEDDING FOR ALL CONDUITS. THE CUSTOMER WILL PROVIDE SELECT BACKFILL, IF
REQUIRED, AND COMPACTION AS NECESSARY. THE CUSTOMER IS RESPONSIBLE FOR
DISPOSAL OF ALL NATIVE SPOILS NOT SUITABLE FOR USE AS BACKFILL. ALL
TRENCHES MAY BE JOINT WITH GAS, TELEPHONE AND TV CABLE.
ALL CABLES/CONDUITS TO BE INSTALLED IN CUSTOMER'S TRENCH AT THE DEPTH
INDICATED IN TRENCH DETAIL (DEPENDENT UPON SIZE OF CONDUIT BEING INSTALLED
TO MEET MIN 36" OF COVER). INSTALL CABLE ID TAGS AT EACH END OF THE PRIMARY
CABLES PER THE CIRCUIT ONE-LINE DIAGRAM.
UNLESS OTHERWISE SPECIFIED BY MUNICIPALITIES, INSTALL PVC (DB-120) ROAD
CROSSINGS AS INDICATED ON THE CROSSINGS CONDUIT TABLE & AS SHOWN ON
WORK SKETCH. CROSSINGS SHALL BE INSTALLED BY CUSTOMER/DEVELOPER PER
PUGET SOUND ENERGY STANDARDS.
AT SYMBOL: INSTALL UNDERGROUND PRIMARY CABLES IN
CONDUIT. CABLE LENGTH AND CONDUIT SIZE AS INDICATED ON PRIMARY CABLE &
CONDUIT TABLE.
AT SYMBOL: INSTALL 600 VOLT UG SECONDARY CABLES IN
CONDUIT. CABLE/CONDUIT SIZE AND LENGTH AS INDICATED ON SECONDARY CABLE &
CONDUIT TABLE.
AT SYMBOL: INSTALL MINI-PAD HANDHOLE & PADMOUNT TRANSFORMER.
ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE.
AT SYMBOL: INSTALL SECONDARY PEDESTAL/HANDHOLE W/ (3)
MULTI-CONNECTORS. SIZE AS INDICATED ON SECONDARY HH/PEDESTAL TABLE.
(EXCAVATION: 3' SQ.)
AT SYMBOL: INSTALL SECONDARY CABLE & CONDUIT STUB-OUT.
INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMES
AND DATES.
POWER GENERAL NOTES - PLAT PROJECT
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
J.CALLAHAN 206.503.1520 .
M.SAO 206.231.9766 08.08.25
N/A .N/A
E. ORTIZ . 07.30.25
REDT # ( RW-139412 )YELM
CARTER LOOP SP
1Ø PRIMARY U/G LINE EXTENSION - 6 S/F LOTS
15106 CARTER LOOP RD SE, YELM, WA 98597
PUGET SOUND ENERGY
N/A N/A
N/A 105108134
1"=50' 1 OF 2
THURSTON N/A N/A QSTHLE
25SE-T17N-R01E N/A N/A
1701E100 1702E116 1701E097 RAI-25
COMCAST
TED AXTELL
253.878.2794
.
.
.
RIGHT OF WAY
CAROLYN BANASKY
253.476.6416
.
.
.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:JESSICA CALLAHAN
206.503.1520
jessica.callahan@pse.com
x
x
x
x
...
...
...
PWIHOUSE@AOL.COM
TYPICAL NOTCH-OUT FOR TRANSFORMER,
NOT TO SCALE
& SECONDARY PEDESTAL/HANDHOLE
BACK OF EASEMENT
STANDARD
EASEMENT
LINE
ROW
10'
PL
1'
4' - 5'
Min.
1'
7'7'
TRANSFORMER
(WHEN PRESENT)
42"
45°42"
1'
45°
Pr
o
p
e
r
t
y
L
i
n
e
Road Side
Top View of Mainline Trench for
Single Stubout Location
4'
Pr
o
p
e
r
t
y
L
i
n
e
Road Side
Top View of Mainline Trench for Pedestal
or Double Stubout Location
42"45°
4'
45°
STUBOUT EXCAVATION DIMENSIONS
NOT TO SCALE
JOINT TRENCH DETAIL
NOT TO SCALE
ROAD SIDE
NATIVE
SECONDARY POWER
PEDESTAL
MATERIAL
P/L
Power
Secondary
Power
Primary
Conduit
Tel. & TV
12" Min
12" Sand
Cover when
gas line is in
trench
Sand
6" or 12"
4" Sand Bedding
1'
36"
Cover
42"
Gas
12"
18"
Lower 2"
10"
Pedestal
PSE 10' FRONTAGE
EASEMENT
1'
Cover
ROAD SIDE
MINIPAD
MINIPAD
FIELD SIDE
VAULT
6" of crushed rock
(base for vault)
P/L
Power
Secondary
Power
Primary
Gas
12" Min Horizontal Separation
Communications
42" Min
21"1'
Feeder
38"
2"
4" Sand Bedding
12" Sand
Cover
36"
Cover
4" Sand Bedding
42"
6" Additional depth when
Feeder is required
PSE 10' FRONTAGE EASEMENT
1'
TRANSFORMER
Final
Backfill
Initial
Backfill
Trench Depth
42" - 48"
SHALL BE STAGGERED
CONNECTOR BARS
IN THE FRONT
NEUTRALS SHALL BE 18"
16"
13"
12"10"
2"
10"
Pedestal will accept up to six 3" conduits
SEALED WITH FOAM
CONDUIT SHALL BE
120 PVC CONDUIT ELBOWS
TYPICAL 24" RADIUS DB
SIDE VIEW WITH CONDUIT
10"
18"
16"
13"
10"
2"
36"
FRONT VIEW WITH CONDUIT
SECONDARY PEDESTAL DETAIL
NOT TO SCALE
VAULT DETAIL @ V01
NOT TO SCALE
EXCAVATION: _____ CUBIC YARDS
3'-6"
SIDE VIEW
2"
6"
CRUSHED
ROCK
TOP VIEW
7'
7'
6 1/3
SITE
TRANSFORMERS HAVE BEEN SIZED FOR
EXTRA 7KW DEMAND PER UNIT FOR EV
DEVELOPER TO COORDINATE WITH PSE
PROJECT MANGER & SERVICE PROVIDER
PRIOR TO EXCAVATING WITHIN 3' OF LOCATE
MARKS OF PSE ENERGIZED FACILITIES
SITE PLAN
SCALE: 1"=50'
SCHED.SQ. FT.
MAX LRC =
CIRCUIT FEET ADDED: 80
17 2,370
80 AMPS
CROSSING CONDUIT TABLE
X-ING
#
LOCATION POWER
XING
LENGTH
ASBUILT
LOCATION
TYPE OF CROSSING
(Feeder, Primary, Secondary, etc.)FROM TO
SIZE
(IN)TYPE QTY
X01 'A' 'B' 2 DB120 1 105 ( )'ECL PRIMARY
2" DB120 GREY PVC = 105 FT 2" PVC PLUG /CAPS = 2
SITE SPECIFIC NOTES
At P01 (559116-147082) 1967 CLASS 3 - 40'
-INSTALL (1) 2" PRIMARY RISER ON EXISTING STANDOFF BRACKETS
-STIRRUP (2254100)
-ALUM "H" CONNECTOR (2168000)
(RIS2CSS) 6042.1000
-FUSE @ 100T (3412700), TAP 'B' PHASE
-INSTALL SWITCH# T96269 (100T)
-INSTALL 1Ø TERM ON FIBERGLASS ARM W/ LOAD INTERRUPTER CUTOUT
& SURGE ARRESTOR (TSU1L1) 6043.1000, TAP BØ
DEDICATED FACILITIES (105108134) for Dedicated Stub Location
SITE SPAN ADDITIONAL REMARKS LABOR UNITS
# FROM TO FOOTAGE
- H1B LOT 5 25 DED. CONDUIT & WIRE 2-36, 2-54A
TOTAL FT=25
@ H1A & H1B
10
5
1
0
8
1
3
4
425-417-8620 9/22/25
1
2
3
4
5
6
'A'
'B'
NEW 1/O AL
EKJ132-BØ
336
A
C
S
R
336
A
C
S
R
AB
C
115
K
V
FUSE @ 100T
SW#T96269
RAI
12
FEE
D
'A'
'B'
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
J.CALLAHAN 206.503.1520 .
M.SAO 206.231.9766 08.08.25
N/A .N/A
E. ORTIZ . 07.30.25
REDT # ( RW-139412 )YELM
CARTER LOOP SP
1Ø PRIMARY U/G LINE EXTENSION - 6 S/F LOTS
15106 CARTER LOOP RD SE, YELM, WA 98597
PUGET SOUND ENERGY
N/A N/A
N/A 105108134
N/A 2 OF 2
THURSTON N/A N/A QSTHLE
25SE-T17N-R01E N/A N/A
1701E100 1702E116 1701E097 RAI-25
COMCAST
TED AXTELL
253.878.2794
.
.
.
RIGHT OF WAY
CAROLYN BANASKY
253.476.6416
.
.
.
...
...
...
EX UNDERGROUND CIRCUIT MAP 1701E097
NOT TO SCALE
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
SITE
SECONDARY CABLE & CONDUIT TABLE
LOCATION
CABLE CONDUIT VOLTAGE ASBUILT INFORMATION
SIZE LENGTH ASSUMED SIZE LENGTH BENDS DROP FLICKER Foreman - Complete
FROM TO (1/O,4/O,350)Design (ft)Lot Corner to
Meter (ft)(in) Design (ft)90° 45°22° 11°(Percent) (Percent)Actual Amount Installed Cable Conduit
V01 H1A 350 70 3 70 2 2.5 0.9
V01 H1B 350 70 3 70 2 2.7 0.9
H1A LOT 1 4/0 45 3 3.0 1.7
H1A LOT 2 4/0 45 3 3.0 1.7
H1B LOT 3 4/0 45 3 3.2 1.7
H1B LOT 4 4/0 45 3 3.2 1.7
H1B LOT 5 4/0 90 45 3 90 1 1 3.5 2.2 LABEL YELLOW TAG "MUST BE 4/0 TO MTR"
H1B LOT 6 4/0 95 45 3 95 1 1 3.6 2.3 LABEL YELLOW TAG "MUST BE 4/0 TO MTR"
4/O UG Triplex (ft) =185 3" PVC & BENDS (ft)=325 6 0 2 0 0.9
350 UG Triplex (ft) =140 TOTAL QTS OF GLUE 0.9
SECONDARY HH/PEDESTAL TABLE
Site
Pedestal
or
Handhole
Number of
Positions
Required
Remarks
H1A PEDESTAL 3 - SEPS3 6050.1000
H2A PEDESTAL 6 - SEPL6 6050.1000
NOT TO SCALE
NEW CONDUIT DIAGRAM
SECONDARY 3"
PRIMARY 2"
CONDUIT LEGEND
SITE
NEW PRIMARY UNDERGROUND
CIRCUIT ONE-LINE DIAGRAM
NOT TO SCALE
PRIMARY CABLE & CONDUIT TABLE
LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE
FROM TO SIZE
(IN)QTY.
DESIGN
LENGTH
(FT)
BENDS PULL
(LBS)
PULL
REV
(LBS)
CABLE
SIZE
DESIGN
LENGTH
(FT)
PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED LUBRICANT (Gal.)
90° 45°22° 11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE EST. ACTUAL
P01 V01 2 1 110 - 1 - -43 118 1/0 AL JKT 150 -EKJ132 --0.6
2" PVC (FT) & BENDS =110 0 1 0 0 1/0 AL JKT TOTAL (FT) =150 TTL (Gal.)0.6
VAULT & EQUIPMENT TABLE
SITE # GRID #
VAULT SIZE &
COVER
TYPE & SIZE
EQUIPMENT IN
VAULT
PRIMARY
BUSHINGS TRANSFORMER ID NUMBERS
(COMPANY ID)
AS-BUILT INFORMATION
LB DC FOREMAN: INCLUDE PHASE TAPPED
V01 559111
147091
54"x54"x38"
Unistrut HH
Matid: 7663002
75KVA MP TRF
120/240
Matid: 6247150
1 1
MINU1LR 6045.1010 BØ
EX OVERHEAD CIRCUIT MAP 1702E116
SCALE: 6" = 1 MILE
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
RAI-12
07.14.25
179 140 243
0 12 0
179 152 243
Oil-Filled Equipment Clearances per PSE Std 0700.1500
If the oil-filled equipment is adjacent to… Clearance
Requirement
Combustible walls or roof (including stucco).10 FT
Noncombustible walls, soffits, and roofs (including brick, concrete,
steel and stone) providing the side of the transformer facing the wall
does not have doors. Materials that pass UBC Std. 2-1 or ASTM
E136-79 are considered to be noncombustible.
3 FT
Fire sprinkler valves, standpipes, and fire hydrants.6 FT
Doors, windows, vents, fire escapes, or other building openings.10 FT
The water's edge of a swimming pool or any body of water.15 FT
Individual domestic and irrigation wells. Clearance not required on
pole mounted transformers (pole placement still applies as stated in
6450.3000), TUT's installed in sealed vaults, 7200V single-phase
padmount transformers 50kva or less, and ones with reduced
flammability oil.
100 FT
Facilities used to dispense or store LP, hazardous liquids, or fuel.20 FT
Gas service meter relief vent.3 FT
Generators, customer-owned transformers, etc.6 FT
Developer Note:
The following Fault Current information MUST BE conveyed
to the builder of the units:
All units may require upgraded house electrical equipment as the
fault current at the meter base may exceed 10,000 amps.
FAULT CURRENT TABLE
1Ø PM TRANSFORMERS (240/120V)
120V WINDINGS 240V WINDINGS
LOCATION SIZE R/X MIN.
%Z
FAULT
CURRENT
MIN.
%Z
FAULT
CURRENT
V01 75kVA 0.5 2.30 36,200 AMPS 1.80 23,100 AMPS
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
OIL-FILLED EQUIPMENT
TRANSFORMER
APPROVED
AREA
CO
M
B
U
S
T
I
B
L
E
B
U
I
L
D
I
N
G
W
A
L
L
S
&
R
O
O
F
10'
10'
10'
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
3'
MIN
3' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
3' MIN
10
5
1
0
8
1
3
4
9/22/25425-417-8620