HomeMy WebLinkAbout101194344 SITE DESIGN 4DE
S
I
G
N
E
D
B
Y
P
o
t
e
l
c
o
,
I
n
c
.
COVER SHEET
SHEET NUMBER
1.0
PROJECT INFORMATION
WO #
DATE:
DRAWN BY:
CHECKED BY:
PROJECT
EV CHARGING
SHEET TITLE
PS
E
Y
E
L
M
,
W
A
75
0
M
I
L
L
R
D
S
E
YE
L
M
,
W
A
9
8
5
9
7
AG
R
E
E
S
T
O
I
N
D
E
M
N
I
F
Y
A
N
D
H
O
L
D
T
O
AN
Y
O
T
H
E
R
P
R
O
J
E
C
T
S
,
B
Y
O
W
N
E
R
T
H
E
EX
P
R
E
S
S
E
D
W
R
I
T
T
E
N
C
O
N
S
E
N
T
O
F
TH
A
T
S
P
E
C
I
F
I
C
A
L
L
Y
I
N
T
E
N
D
E
D
,
U
S
E
R
ST
A
T
E
S
G
R
O
U
P
,
I
N
C
L
U
D
I
N
G
T
H
I
S
SP
E
C
I
F
I
C
U
S
E
F
O
R
W
H
I
C
H
T
H
E
Y
W
E
R
E
PS
E
/
P
O
T
E
L
C
O
I
S
D
O
N
E
P
S
E
/
P
O
T
E
L
C
O
HA
R
M
L
E
S
S
O
R
B
Y
A
N
Y
O
T
H
E
R
P
A
R
T
Y
,
WI
T
H
O
U
T
D
O
C
U
M
E
N
T
S
P
R
E
P
A
R
E
D
B
Y
CO
R
E
D
O
C
U
M
E
N
T
,
A
R
E
T
O
B
E
U
S
E
D
ON
L
Y
I
N
T
E
N
D
E
D
.
A
N
Y
E
X
T
E
N
S
I
O
N
O
F
US
E
U
N
L
A
W
F
U
L
L
Y
A
N
D
A
T
T
H
E
U
S
E
R
S
OW
N
R
I
S
K
.
I
F
U
S
E
D
I
N
A
W
A
Y
O
T
H
E
R
TH
A
N
F
O
R
T
H
E
S
P
E
C
I
F
I
C
P
R
O
J
E
C
T
A
N
D
FR
O
M
A
L
L
C
L
A
I
M
S
A
N
D
L
O
S
S
E
S
.
101194344
H. GUZMAN
C. ROATE
101194344- YELM, WA
POTELCO DESIGN AND
Signature _________________________________________
Print Name _________________________________________
This design complies with PSE
Any/all variations have been
Design/Engineering Standards.
QUALITY ASSURANCE
pre-approved/documented by the
appropriate PSE Representative.
Date _________________
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
PSE ELECTRICAL VEHICLE CHARGING SYSTEM - 1 STATION
750 MILL RD SE, YELM, WA 98597
ABBREVIATIONS
A= AMPERES
A.F.S. = ABOVE FINISH SURFACE
A.B. = ANCHOR BOLT
AC = ASPHALT CONCRETE
A.G. = ABOVE GRADE
APPROX. = APPROXIMATE
AL. = ALUMINUM
AGGR. = AGGREGATE
BD. = BOARD
ASPH. = ASPHALT
ATS = AUTOMATIC TRANSFER SWITCH
BESS = BATTERY ENERGY STORAGE SYSTEM
BW = BACK OF WALK
BOT. = BOTTOM
BLDG. = BUILDING
C.I. = CAST IRON
CNTR. = CONTRACTOR
CEM. = CEMENT
CLR. = CLEAR
CNTR. = CONTRACTOR
CONT. = CONTINUOUS
CONSTR. = CONSTRUCTION
CONC. = CONCRETE
C.O. = CLEAN OUT
CU = COPPER
CTR. = CENTER
DEPT. = DEPARTMENT
DR. = DOOR
DN. = DOWN
DIM. = DIMENSION
DIA. = DIAMETER
DET. = DETAIL
DS = DISCONNECT SWITCH
DWG. = DRAWING
D.S. = DOWNSPOUT
ELEC. = ELECTRICAL
EL. = ELEVATION
EA. = EACH
(E) = EXISTING
EPO = EMERGENCY SHUT-OFF SWITCH
EXT. = EXTERIOR
EXP. = EXPANSION
EQ. = EQUAL
F = FIXED BOLLARD
FLASH'G = FLASHING
FG = FINISH GRADE
FDN. = FOUNDATION
FNPT = FEMALE NOMINAL PIPE THREAD
F.O.C. = FACE OF CURB
F.O.C. = FACE OF CONCRETE
FO&T. = FIBER OPTIC & TELEPHONE
FUT. = FUTURE
FTG. = FOOTING
G = GAS
GALV. = GALVANIZED
G.A. = GAUGE
GB = GRADE BREAK
GR. = GRADE
GL. = GLASS
HDPE = HIGH DENSITY POLYETHYLENE
H.B. = HOSE BIBB
HDD = HORIZONTAL DIRECTIONAL DRILLING
HORIZ. = HORIZONTAL
H.M. = HOLLOW METAL
INSUL. = INSULATION
I.D. = INSIDE DIAMETER
IE = INVERT ELEVATION
INT. = INTERIOR
ISP = INTERNET SERVICE PROVIDER
LAV. = LAVATORY
LAM. = LAMINATE
JT. = JOINT TRENCH
LIP = EDGE OF SWALE OR GUTTER
GENERAL NOTES
MAX. = MAXIMUM
MDPE = MEDIUM DENSITY POLYETHYLENE
MFR. = MANUFACTURER
MEMB. = MEMBRANE
MECH. = MECHANICAL
MISC. = MISCELLANEOUS
MIN. = MINIMUM
MNPT = MALE NOMINAL PIPE THREAD
MPOE = MAIN POINT OF ENTRY
MSA = METER SET ASSEMBLY
MSB = MAIN SWITCHBOARD
MUL. = MULLION
MTD. = MOUNTED
(N) = NEW
NETA = NATIONAL ELECT. TESTING ASSOC.
NOM. = NOMINAL
NO. OR # = NUMBER
N.I.C. = NOT IN CONTRACT
N.T.S. = NOT TO SCALE
OPP. = OPPOSITE
OPNG. = OPENING
O.D. = OUTSIDE DIAMETER
O.C. = ON CENTER
(P) = PROPOSED
PB = LEVEL PAVEMENT AT DISPENSER PIT BOX
PCC = PORTLAND CEMENT CONCRETE
PCS = POWER CONVERSION SYSTEM
P.I.P. = PROTECT IN PLACE
P.O.C. = POINT OF CONNECTION
PLYWD. = PLYWOOD
P.LAM. = PLASTIC LAMINATE
PL. = PLATE
PVC = POLYMERIZED VINYL CHLORIDE PIPE
R.D. = ROOF DRAIN
R OR RAD. = RADIUS
R= REMOVABLE
REQ'D = REQUIRED
REINF. = REINFORCED
REF. = REFERENCE
R.O. = ROUGH OPENING
RM. = ROOM
R.O.W. = RIGHT OF WAY
R.S.A. = REGULATED SET ASSEMBLY
SECT. = SECTION
SCHED. = SCHEDULE
S.F. = SQUARE FOOTAGE
SPEC. = SPECIFICATION
SIM. = SIMILAR
SHT. = SHEET
SS = STAINLESS STEEL
SQ. = SQUARE
ST = STORM DRAIN
STD. = STANDARD
STL. = STEEL
STS = STATIC TRANSFER SWITCH
SYM. = SYMMETRICAL
STRL. = STRUCTURAL
STOR. = STORAGE
TB = TERMINAL BLOCK
T.& G. = TONGUE & GROOVE
TG = TOP OF GRATE
T.C. = TOP OF CURB
THK. = THICK
T.I.P. = TIE-IN POINT
TYP. = TYPICAL
TW = TOP OF WALK
TS = TELEMETRY SECTION
TP = TOP OF PAVEMENT
TOW = TOP OF WALL
T.O. = TOP OF
UGE = UNDERGROUND ELECTRIC
U.G. = UNDERGROUND
ULD = UTILITY LOCKABLE DISCONNECT
U.O.N. = UNLESS OTHERWISE NOTED
UNF. = UNFINISHED
UPS = INTERRUPTIBLE POWER SUPPLY
VERT = VERTICAL
"X"P = # OF POLES
V = VOLTS
W = WATER
1. IN THE EVENT OF DISCREPANCIES BETWEEN THE DRAWINGS, SPECIFICATIONS, OR SCOPE
OF WORK SUMMARY IN THIS PACKAGE, NOTIFY PSE/POTELCO IMMEDIATELY
2. THE CONTRACTOR IS RESPONSIBLE TO SEE THAT WORK IN FIELD IS DONE IN
ACCORDANCE WITH ALL CURRENT APPLICABLE NATIONAL, STATE, & LOCAL CODES,
ORDINANCES & REQUIREMENTS BY GOVERNING AGENCIES. WHETHER OR NOT SAID
CODES, ORDINANCES, REQUIREMENTS, ETC. ARE SPECIFICALLY SHOWN ON DRAWINGS
AND/OR CALLED FOR IN SPECIFICATIONS.
3. THE CONTRACTOR SHALL PROTECT ALL EXISTING ITEMS AND FACILITIES TO REMAIN
THROUGHOUT CONSTRUCTION. CONTRACTOR SHALL REPAIR AND/OR REPLACE, AT
CONTRACTOR'S EXPENSE, ANY EXISTING ITEMS AND FACILITIES TO REMAIN THAT ARE
DAMAGED BY THE CONTRACTOR'S OPERATIONS, TO THE SATISFACTION OF PROJECT
OWNER, GREENLOTS AND PSE/POTELCO.
4. PRIOR TO EXCAVATION, DETERMINE AND VERIFY LOCATION OF UTILITY SERVICES IN ALL
AREAS TO BE EXCAVATED.
5. THE CONTRACTOR SHALL COMPLY WITH ALL PERTINENT LAWS, CODES, REGULATIONS,
CBC, GOVERNING AGENCIES & MANUFACTURER SPECIFICATIONS, UNLESS GREATER
REQUIREMENTS ARE INDICATED, AND/OR ARE NECESSARY FOR THE SAFETY OF THE
PROJECT.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING JURISDICTIONS AS REQUIRED
FOR INSPECTIONS.
7. THE CONTRACTOR SHALL PROVIDE PSE/POTELCO WITH A CONSTRUCTION
SCHEDULE PRIOR TO STARTING THE WORK, A QUALIFIED JOB SUPERINTENDENT
THROUGHOUT THE WORK, PHOTOS SHOWING: TRENCHES PRIOR TO BACKFILL, SLOPE OF
PRECAST PADS AND RECORD DRAWINGS OF ALL UNDERGROUND CONSTRUCTION.
8. THE CONTRACTOR SHALL PROVIDE BARRICADES AND SAFETY SIGNS PER OSHA/IBC
REQUIREMENTS.
9. THE CONTRACTOR IS RESPONSIBLE FOR OVERALL CONSTRUCTION SITE CLEANLINESS,
INCLUDING PROVISIONS OF A DEBRIS BOX WITH WEEKLY SERVICING, REMOVAL OF ALL
CONTRACTOR/SUBCONTRACTOR REFUSE AND DEBRIS, AND SWEEPING OF THE ENTIRE
YARD AREA AT THE COMPLETION OF THE WORK.
10. UNLESS STATED OTHERWISE IN THE SCOPE OF WORK SUMMARY, ALL OTHER
PROCEDURES, TESTING, MATERIALS AND EQUIPMENT SHOWN ON THE PLANS SHALL BE
FURNISHED AND INSTALLED BY THE CONTRACTOR.
11. DRAWINGS SHOULD NOT BE SCALED. NTS INDICATES "NOT TO SCALE" AND THE LISTED
DIMENSION SHALL GOVERN.
12. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF DAMAGE TO THE WORK OF
OTHER TRADES CAUSED BY HIS OPERATIONS. THE NATURE OF SUCH REPAIR WORK MUST
RECEIVE THE PRIOR APPROVAL OF THE AUTHORIZED AGENT(S).
13. CONSTRUCTION MATERIAL, ASSEMBLIES AND PROCEDURES SHALL FOLLOW LOCALLY
ADOPTED BUILDING CODES AND SUPPLEMENTARY ORDINANCES. WHEN A CONFLICT
OCCURS BETWEEN SUCH LOCAL CODE AND INFORMATION SHOWN ON THE PLANS,
CONSULT PSE/POTELCO FOR RESOLUTION PRIOR TO COMMENCING WORK.
14. THE CONTRACTOR SHALL NOTIFY PSE/POTELCO IF SITE CONDITIONS OR
DIMENSIONS DISAGREE WITH INFORMATION SHOWN ON THE DRAWINGS. WORK IS NOT
TO PROCEED UNTIL SUCH DIFFERENCES ARE RESOLVED.
15. USE THE BUILDING PERMIT SET FOR INSPECTION, APPROVALS, CONSTRUCTION AND/OR
FIELD REFERENCE, HOWEVER THIS SHALL NOT BE CONSTRUED AS THE SOLE RESOURCE.
THE PERMIT SET GENERALLY LACKS CERTAIN DRAWINGS (SUCH AS LOW VOLTAGE, DATA
AND COMMUNICATIONS) AND SPECIFICATIONS WHICH ARE INCLUDED IN THE BID AND
CONSTRUCTION PROCESS, AS WELL AS ADDITIONS AND/OR REVISIONS MADE
THEREAFTER. FOR INSPECTION AND APPROVALS THE CONTRACTOR SHALL PROVIDE THE
APPROVED PERMIT SET, WHICH IS CLEARLY SIGNED AND DATED AS SUCH. FURTHER, THE
APPROVED PERMIT SET SHALL BE KEPT ON SITE, AND MADE AVAILABLE FOR ALL
INSPECTIONS AND FINAL ACCEPTANCE.
16. THE CONTRACTOR SHALL EXAMINE THE SITE AND FAMILIARIZE HIMSELF WITH ALL EXISTING
CONDITIONS, AND BE PREPARED T0 PERFORM THE WORK WITHIN THE EXISTING
CONDITIONS.
17. THE CONTRACTOR AND EACH SUBCONTRACTOR SHALL INSPECT WORK PREVIOUSLY
PREPARED OR INSTALLED BY OTHERS BEFORE APPLYING SUBSEQUENT MATERIALS OR
FINISHES. IF UNSATISFACTORY, NOTIFY PSE/POTELCO AND GREENLOTS. DO NOT
PROCEED UNTIL THE DEFECTIVE WORK HAS BEEN CORRECTED.
18. NEITHER FINAL ACCEPTANCE, FINAL CERTIFICATION, FINAL PAYMENT NOR ANY
PROVISION UNDER THIS CONTRACT SHALL RELIEVE THE CONTRACTOR OF RESPONSIBILITY
FOR FAULTY MATERIALS OR WORKMANSHIP, WHICH THE CONTRACTOR HEREBY
WARRANTS. THE CONTRACTOR SHALL REMEDY AT HIS OWN EXPENSE ANY DEFECTS OR
DAMAGE WHICH APPEAR WITHIN ONE YEAR FROM THE FINAL RETENTION PAYMENT. IN
THE EVENT REPAIRS OR REPLACEMENTS ARE MADE WITHIN THIS PERIOD THEY SHALL BE
FURTHER GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE.
19. IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES AND OSHA
REQUIREMENTS, THE CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR
CONDITIONS OF THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY
DURING PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY
AND WILL NOT BE LIMITED TO NORMAL WORKING HOURS
#
#
PROJECT DESCRIPTION:
THE PROJECT CONSISTS OF INSTALLING NEW CONDUITS INTO AN EXISTING PSE SERVICE
TRANSFORMER, NEW SERVICE SWITCHBOARD, STEP DOWN TRANSFORMER, OUTDOOR
ELECTRIC VEHICLE CHARGING DISPENSERS AND REQUIRED ANCILLARY EQUIPMENT. THE
WORK INCLUDES ALL ASSOCIATED ELECTRICAL UNDERGROUND CONDUIT ROUTING AND
CONNECTIONS.
PROJECT DATA
PROJECT ADDRESS:
VICINITY MAP
PROPERTY OWNER:
PROPERTY ADDRESS:
ASSESSOR'S PARCEL NO.:
COUNTY:
CROSS STREETS:
AREA DISTURBED
EV CHARGING EQUIP AREA
ELECTRICAL UTILITY
BUILDING CODES & STANDARDS:
2018 INTERNATIONAL BUILDING CODE (IBC)(AMENDED)
2017 NATIONAL ELECTRICAL CODE (NEC)(AMENDED)
2018 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)(AMENDED)
2018 INTERNATIONAL FIRE CODE (IFC)(AMENDED)
2018 INTERNATIONAL MECHANICAL CODE (IMC)(AMENDED)
2018 UNIFORM PLUMBING CODE (UPC)(AMENDED)(AMENDED)
750 MILL RD SE, YELM, WA 98597
CITY OF YELM
750 MILL RD SE, YELM, WA 98597
22730220500
THURSTON COUNTY
BERGH CT SW & 104TH AVE SE
PUGET SOUND ENERGY(360) 671-3704
LEGEND
#
##
#
##
#
##
#
SHEET NUMBER
SHEET NUMBER
ELEVATION NUMBER
SHEET NUMBER
SECTION NUMBER
KEYNOTE
℄
REVISION TARGET
NORTH ARROW
CENTER LINE
DETAIL NUMBER
EQUIPMENT SUPPLIER:
PROJECT DIRECTORY
AGENCY
PLANNING:
BUILDING:
FIRE DEPT:
DEPARTMENT
COUNTY OR CITY OF ### PLANNING DEPARTMENT
COUNTY OR CITY OF ### PERMITTING
COUNTY OR CITY OF ### FIRE DEPARTMENT
PROJECT TEAM
PSE/POTELCO
1216 140th AVE CT E
SUMNER WA 98390
PROJECT ENGINEER:
GREENLOTS
777 ALAMEDA STREET, 2ND FLOOR
LOS ANGELES, CA
11/24/25
DRAWING INDEX
PAGE NUMBER DESCRIPTION
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
COVER SHEET
PLOT PLAN
ELECTRICAL SITE PLAN
DETAILS
DETAILS
DETAILS
PHOTOS
SPECS
JOB SITE
OVERALL SITE PLAN
WORK ZONE
DE
S
I
G
N
E
D
B
Y
P
o
t
e
l
c
o
,
I
n
c
.
PLOT PLAN
SHEET NUMBER
2.0
PROJECT INFORMATION
WO #
DATE:
DRAWN BY:
CHECKED BY:
PROJECT
EV CHARGING
SHEET TITLE
AG
R
E
E
S
T
O
I
N
D
E
M
N
I
F
Y
A
N
D
H
O
L
D
T
O
AN
Y
O
T
H
E
R
P
R
O
J
E
C
T
S
,
B
Y
O
W
N
E
R
T
H
E
EX
P
R
E
S
S
E
D
W
R
I
T
T
E
N
C
O
N
S
E
N
T
O
F
TH
A
T
S
P
E
C
I
F
I
C
A
L
L
Y
I
N
T
E
N
D
E
D
,
U
S
E
R
ST
A
T
E
S
G
R
O
U
P
,
I
N
C
L
U
D
I
N
G
T
H
I
S
SP
E
C
I
F
I
C
U
S
E
F
O
R
W
H
I
C
H
T
H
E
Y
W
E
R
E
PS
E
/
P
O
T
E
L
C
O
I
S
D
O
N
E
P
S
E
/
P
O
T
E
L
C
O
HA
R
M
L
E
S
S
O
R
B
Y
A
N
Y
O
T
H
E
R
P
A
R
T
Y
,
WI
T
H
O
U
T
D
O
C
U
M
E
N
T
S
P
R
E
P
A
R
E
D
B
Y
CO
R
E
D
O
C
U
M
E
N
T
,
A
R
E
T
O
B
E
U
S
E
D
ON
L
Y
I
N
T
E
N
D
E
D
.
A
N
Y
E
X
T
E
N
S
I
O
N
O
F
US
E
U
N
L
A
W
F
U
L
L
Y
A
N
D
A
T
T
H
E
U
S
E
R
S
OW
N
R
I
S
K
.
I
F
U
S
E
D
I
N
A
W
A
Y
O
T
H
E
R
TH
A
N
F
O
R
T
H
E
S
P
E
C
I
F
I
C
P
R
O
J
E
C
T
A
N
D
FR
O
M
A
L
L
C
L
A
I
M
S
A
N
D
L
O
S
S
E
S
.
101194344
H. GUZMAN
C. ROATE
11/24/25
PS
E
Y
E
L
M
,
W
A
75
0
M
I
L
L
R
D
S
E
YE
L
M
,
W
A
9
8
5
9
7
WO
#
10
1
1
9
4
3
4
4
NO
T
#
51
5
9
4
8
9
9
5
PO
T
E
L
C
O
P
M
:
CO
R
E
Y
R
O
A
T
E
25
3
-
3
3
1
-
5
3
3
5
CO
R
E
Y
.
R
O
A
T
E
@
P
S
E
.
C
O
M
PK
G
0
1
PK
G
0
2
18'
45'
18'
5'
559229-147289
10'
PKG01-PKG02: 559229-147289
- Asphalt to create two parking spots (45' x 10')
- Inst two (2) parking stalls (18’ x 12') with 5' separation stripping between stalls
- Paint 5' stripping between parking stalls
- Paint stripes along the 5' access strip
- Stencil EV charging symbol within the parking stall as shown below.
- Install signage for EV charger parallel with each stall
'750'
MI
L
L
R
D
S
E
MI
L
L
R
D
S
E
WA-5
0
7
1
S
T
S
T
S
FO
G
CL
RO
W
P0
1
EOP= 11'-4"
CL= 9'-8"
CL= 24'-0"
N
FO
G
EOC= 4'-0"
DE
S
I
G
N
E
D
B
Y
P
o
t
e
l
c
o
,
I
n
c
.
ELECTRICAL
SITE PLAN
SHEET NUMBER
3.0
PROJECT INFORMATION
WO #
DATE:
DRAWN BY:
CHECKED BY:
PROJECT
EV CHARGING
SHEET TITLE
AG
R
E
E
S
T
O
I
N
D
E
M
N
I
F
Y
A
N
D
H
O
L
D
T
O
AN
Y
O
T
H
E
R
P
R
O
J
E
C
T
S
,
B
Y
O
W
N
E
R
T
H
E
EX
P
R
E
S
S
E
D
W
R
I
T
T
E
N
C
O
N
S
E
N
T
O
F
TH
A
T
S
P
E
C
I
F
I
C
A
L
L
Y
I
N
T
E
N
D
E
D
,
U
S
E
R
ST
A
T
E
S
G
R
O
U
P
,
I
N
C
L
U
D
I
N
G
T
H
I
S
SP
E
C
I
F
I
C
U
S
E
F
O
R
W
H
I
C
H
T
H
E
Y
W
E
R
E
PS
E
/
P
O
T
E
L
C
O
I
S
D
O
N
E
P
S
E
/
P
O
T
E
L
C
O
HA
R
M
L
E
S
S
O
R
B
Y
A
N
Y
O
T
H
E
R
P
A
R
T
Y
,
WI
T
H
O
U
T
D
O
C
U
M
E
N
T
S
P
R
E
P
A
R
E
D
B
Y
CO
R
E
D
O
C
U
M
E
N
T
,
A
R
E
T
O
B
E
U
S
E
D
ON
L
Y
I
N
T
E
N
D
E
D
.
A
N
Y
E
X
T
E
N
S
I
O
N
O
F
US
E
U
N
L
A
W
F
U
L
L
Y
A
N
D
A
T
T
H
E
U
S
E
R
S
OW
N
R
I
S
K
.
I
F
U
S
E
D
I
N
A
W
A
Y
O
T
H
E
R
TH
A
N
F
O
R
T
H
E
S
P
E
C
I
F
I
C
P
R
O
J
E
C
T
A
N
D
FR
O
M
A
L
L
C
L
A
I
M
S
A
N
D
L
O
S
S
E
S
.
Know what's below.
Call before you dig.
THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION
AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE
PLANS IS BASED ON DESIGN DRAWINGS, RECORDS OF THE VARIOUS
UTILITY COMPANIES, AND WHERE POSSIBLE, MEASUREMENTS TAKEN IN
THE FIELD. CORE STATES, INC. DOES NOT GUARANTEE THAT
LOCATIONS SHOWN ARE EXACT. THE CONTRACTOR MUST CONTACT
THE APPROPRIATE UTILITY COMPANIES AT LEAST 72 HOURS BEFORE
ANY EXCAVATION TO REQUEST EXACT FIELD LOCATIONS OF UTILITIES.
CONTRACTOR TO CONTACT THE WASHINGTON ONE CALL AT
1-800-424-5555 OR SUBMIT E-TICKET AT WWW.ON1CALL.COM.
101194344
H. GUZMAN
C. ROATE
11/24/25
SCALE: 1:100
SITE PLAN: P01
CITY NOTE:
NEW 45'X10' ASPHALT TO BE APPLIED
IN FRONT OF NEW POLE
PS
E
Y
E
L
M
,
W
A
75
0
M
I
L
L
R
D
S
E
YE
L
M
,
W
A
9
8
5
9
7
POLE TABLE (NEW)
Site
#
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P02 559229-147289 35 2
STREET LIGHT TABLE
SITE
#
POLE LUMINAIRE
WO #BILLING
SCH.
SMART STREET
LIGHT NODE
TOTAL
CONN LOAD NOTES
GRID # TAG #TYPE MTG HT.ARM WATTS STYLE
SL1 559229-147289 NEW ROUND POLE 20" AC 8'111W LED CHFL 3K, T3 101194344 53 120/240V
SITE SPECIFIC NOTES
P01 (559227-147283)
-INST RC (6015.1000 INDNRC)
-INST NEW #2 OH TPX APPROX. 40'(____') TO P02
-CREW TO MAINTAIN SAFETY SPACE CLEARANCES
P02 (559229-147289)
-INST 35' CL2 POLE (6010.1000 PD352) AS STAKED CHARGE TO UNIT 2-23
-INST RC (6015.1000 INDNRC)
-CONNECT #2 OH TPX FROM P01
-INST NEW 8' S/L BRKT ARM (6060.1000 AEWN08) CHARGE TO UNIT 2-302
-INST NEW LED LUMINAIRE ON NEW S/L ARM
-INST NEW DUAL ASSY EV CHARGER PER STANDARD (0700.8575)
-INST NEW #2 OH TPX SERVICE TO EV CHARGER CHARGE TO UNIT 3-7
-INST NEW EV SIGNS PARALLEL WITH PARKING STALLS
UNITS OF PROPERTY
INSTALL ONLY
CROSSARMS
MATERIAL QTY
DIST. WOOD
DIST. FIBERGLASS
DIST. STEEL
DIST. OTHERS
TRANS. WOOD
TRANS. FIBERGLASS
TRANS. STEEL
TRANS. OTHERS
UNITS OF PROPERTY
INSTALL ONLY
LINE FIXTURES
MATERIAL QTY
DIST. ARRESTERS
DIST. CUTOUTS
DIST. INSULATORS
TRANS. ARRESTERS
TRANS. INSULATORS
UNITS OF PROPERTY
REMOVAL ONLY
MATERIAL QTY
DIST. ARRESTERS
DIST. CUTOUTS
DIST. INSULATORS
TRANS. ARRESTERS
TRANS. INSULATORS
CROSSARMS
CREW NOTE:
NEW POLE TO BE PLACED AS
STAKED
ON-SITE CONTACT INFO:
PUBLIC WORKS DIRECTOR:
PSE CONTACT INFO:
ANDREA BUREN
ANDREA.BUREN@PSE.COM
206-397-5411
POTELCO PM:
COREY ROATE
COREY.ROATE@PSE.COM
253-331-5335
WO
#
10
1
1
9
4
3
4
4
NO
T
#
51
5
9
4
8
9
9
5
PO
T
E
L
C
O
P
M
:
CO
R
E
Y
R
O
A
T
E
25
3
-
3
3
1
-
5
3
3
5
CO
R
E
Y
.
R
O
A
T
E
@
P
S
E
.
C
O
M
SCALE: 1:50
ROW PROFILE: P01
WIRE STRINGING PRIMARY & SECONDARY
LOCATION
PRI SEC WIRE SIZE & TYPE QUANTITY LENGTH (PER
CONDUCTOR)TOTAL ACTUAL
FROM TO
P01 P02 X 1/0 OH
12.077
12.640 4.600 QUADRANTS
ECO REV
N/A A
N/A B
18.000
40.636
VIEW SHOWN AS CROSS-SECTIONAL REPRESENTATION
WITHOUT CHARGERS, MOUNTING PANELS, OR FRONT
OF BRACKET TO REFERENCE TOP BRACKET BOLTING DESIGN.
25"
21"
9"
DETAIL A
SCALE .30:1
10" WOODEN POLE
REVISION HISTORY
DESCRIPTION
UPDATED VIEWS TO SHOW CORRECT BRACKETS,
CHANGED BREAKER NOTE ON SHTS 1 AND 4
DATE APPROVED
12/11/20
12/16/20
JAG
JAG
CHARGER(S) SUPPLIED
BY EVSE LLC.
A
13"
MOUNTING PANELS AND
BRACKETS SUPPLIED BY
EVSE LLC.
18
MAIN POWER FROM UTILITY PROVIDER
(SCH 40 CONDUIT, CLAMPS, AND
WEATHERHEAD SUPPLIED BY INSTALLER)HIGH
VOLTAGE
WIRING TROUGH
SUPPLIED BY EVSE LLC.
125A LOAD CENTER WITH
TWO 40A OR 50A CIRCUIT BREAKERS.
DOOR NOT TO BE LOCKED
SUPPLIED BY EVSE LLC.
UTILITY PROVIDER APPROVED
QUICK DISCONNECT SUPPLIED
MOUNTING PANEL WITH BRACKETS
5068-051: (2)40A BREAKERS FOR 30A CHARGE MODE
5068-052: (2)50A BREAKERS FOR 40A CHARGE MODE
WEIGHT: 33-LBS AND INSTALLED BY INSTALLER
(CHECK LOCAL CODE IF A MAIN WILL BE REQUIRED)
UNLESS OTHERWISE SPECIFIEDDIMENSIONS ARE IN INCHES
TOLERANCES:
DECIMAL
FRACTIONAL
ANGLES
NEXT ASSY
.XX .01
.XX X .005
1/32
0 30'
USED ON
MATERIAL
DRAWN BYJGuzman
ENG
QA
MFG.
ECO
DATE 10/15/2019
DATE
DATE
DATE
DATE
CONTROL MODULE INC.
TITLE
89 PHOENIX AVE., ENFILED, CT 06082
AN EQUAL OPPORTUNITY EMPLOYER
ASSY, WOODEN UTILITY
POLE DUAL, EXTERNAL METER
DRAWING NO.
FINISH
DWG SIZE SCALEEVSE/BSL/DOUBLE UNIT WT SHT. 1 OF 4
REVB
3/8" LAG BOLT (GALV)
2 PLCS
QUICK DISCONNECT
28.630
CENTER OF GRAVITY
MARKER 6.000
WEIGHTINDIVIDUAL CHARGER
33 LBS
25"
45"
UNLESS OTHERWISE SPECIFIED
DIMENSIONS ARE IN INCHES
TOLERANCES:
DECIMAL
FRACTIONAL
ANGLES
NEXT ASSY
.XX .01
.XX X .005
1/32
0 30'
USED ON
MATERIAL
DRAWN BYJGuzman
ENG
QA
MFG.
ECO
DATE 10/15/2019
DATE
DATE
DATE
DATE
CONTROL MODULE INC.
TITLE
89 PHOENIX AVE., ENFILED, CT 06082
AN EQUAL OPPORTUNITY EMPLOYER
ASSY, WOODEN UTILITY
POLE DUAL, QUICK DISSCONNECT
DRAWING NO.
FINISH
DWG SIZE SCALEEVSE/BSL/DOUBLE UNIT WT SHT. 1 OF 4
REVB
ECO REV
N/A A
N/A B
REVISION HISTORY
DESCRIPTION
UPDATED VIEWS TO SHOW CORRECT BRACKETS,
CHANGED BREAKER NOTE ON SHTS 1 AND 4
MOVED QUICK DISCONNECT AND SOCKET TO SIDE
OF POLE, ADDED AND CHANGED SEVERAL NOTES,
IDENTIFIED CURBS, REMOVED RFID
DATE APPROVED
12/11/20
12/16/20
JAG
JAG
MOVED QUICK DISCONNECT AND SOCKET TO SIDE
OF POLE, ADDED AND CHANGED SEVERAL NOTES,
IDENTIFIED CURBS, REMOVED RFID
125A LOAD CENTER WITH TWO 40A
OR 50A CIRCUIT BREAKERS.
DOOR NOT TO BE LOCKED
SUPPLIED BY EVSE LLC.
CONDUIT SCH 40
UTILITY PROVIDER APPROVED
QUICK DISCONNECT SUPPLIED
AND INSTALLED BY INSTALLER
OPERATIONAL/ QR SIGNAGE
SUPPLIED BY EVSE LLC.
(OPTIONAL)
CURB/ GROUND LEVEL
A 25' CORD LENGTH WILL REACH 24' RADIUS
WITH CONNECTOR 4' FROM THE GROUND
12'-0"
9'-3"
8'-0"
(MIN)
4'-0"
24'-0"
4'-0"Install ground rod per
Standard 6014.1000
EV Charger on a Wood Pole (Front)
Plug Charger
12' to 16' Above Groundline
EV Charger Station
Communications
Communications
Neutral / Secondary
Secondary wire drop loop
(not a service point)
High
Voltage
29"
25"
40" Min
40" Min
18" Top of Conduit
DE
S
I
G
N
E
D
B
Y
P
o
t
e
l
c
o
,
I
n
c
.
DETAILS
SHEET NUMBER
4.0
PROJECT INFORMATION
WO #
DATE:
DRAWN BY:
CHECKED BY:
PROJECT
EV CHARGING
SHEET TITLE
AG
R
E
E
S
T
O
I
N
D
E
M
N
I
F
Y
A
N
D
H
O
L
D
T
O
AN
Y
O
T
H
E
R
P
R
O
J
E
C
T
S
,
B
Y
O
W
N
E
R
T
H
E
EX
P
R
E
S
S
E
D
W
R
I
T
T
E
N
C
O
N
S
E
N
T
O
F
TH
A
T
S
P
E
C
I
F
I
C
A
L
L
Y
I
N
T
E
N
D
E
D
,
U
S
E
R
ST
A
T
E
S
G
R
O
U
P
,
I
N
C
L
U
D
I
N
G
T
H
I
S
SP
E
C
I
F
I
C
U
S
E
F
O
R
W
H
I
C
H
T
H
E
Y
W
E
R
E
PS
E
/
P
O
T
E
L
C
O
I
S
D
O
N
E
P
S
E
/
P
O
T
E
L
C
O
HA
R
M
L
E
S
S
O
R
B
Y
A
N
Y
O
T
H
E
R
P
A
R
T
Y
,
WI
T
H
O
U
T
D
O
C
U
M
E
N
T
S
P
R
E
P
A
R
E
D
B
Y
CO
R
E
D
O
C
U
M
E
N
T
,
A
R
E
T
O
B
E
U
S
E
D
ON
L
Y
I
N
T
E
N
D
E
D
.
A
N
Y
E
X
T
E
N
S
I
O
N
O
F
US
E
U
N
L
A
W
F
U
L
L
Y
A
N
D
A
T
T
H
E
U
S
E
R
S
OW
N
R
I
S
K
.
I
F
U
S
E
D
I
N
A
W
A
Y
O
T
H
E
R
TH
A
N
F
O
R
T
H
E
S
P
E
C
I
F
I
C
P
R
O
J
E
C
T
A
N
D
FR
O
M
A
L
L
C
L
A
I
M
S
A
N
D
L
O
S
S
E
S
.
101194344
H. GUZMAN
C. ROATE
11/24/25
SCALE 3SIGNAGE DETAIL NTS
PARKING WHILE NOT CONNECTED
TO CHARGING EQUIPMENT
IS A PARKING INFRACTION
A1A4 PENALT
RCW 46.08.185
ELECTRIC EHICLE
CHARGING ONL
ECEPT FOR
ELECTRIC
EHICLE
CHARGING
R7-11 K2-0013
PARKING WHILE NOT CONNECTED
TO CHARGING EQUIPMENT
IS A PARKING INFRACTION
A1A4 PENALT
RCW 46.08.185
ELECTRIC EHICLE
CHARGING ONL
ECEPT FOR
ELECTRIC
EHICLE
CHARGING
FINISH GRADE
3'
-
6
"
PARKING WHILE NOT CONNECTED
TO CHARGING EQUIPMENT
IS A PARKING INFRACTION
A1A4 PENALT
RCW 46.08.185
ELECTRIC EHICLE
CHARGING ONL
ECEPT FOR
ELECTRIC
EHICLE
CHARGING
LOCATION:PARALLEL WITH EACH PARKING STALL
SCALE 2NTS
SCALE 1NTS ELECTRIC VEHICLE POLE MOUNTED EQUIPMENT SPECIFICATIONS
POLE MOUNTED EQUIPMENT EXAMPLE
PS
E
Y
E
L
M
,
W
A
75
0
M
I
L
L
R
D
S
E
YE
L
M
,
W
A
9
8
5
9
7
WO
#
10
1
1
9
4
3
4
4
NO
T
#
51
5
9
4
8
9
9
5
PO
T
E
L
C
O
P
M
:
CO
R
E
Y
R
O
A
T
E
25
3
-
3
3
1
-
5
3
3
5
CO
R
E
Y
.
R
O
A
T
E
@
P
S
E
.
C
O
M
Mount the cost sticker on the kiosk
similar to Seattle City Light
48"
(ADA HEIGHT)
11'
POWER
DISCONNECT
BOX HEIGHT
Mount the instructions for
use above the kiosk similar
to Seattle City Light
(*PSE may issue
something slightly different)
48"
(ADA HEIGHT)
11'
POWER
DISCONNECT
BOX HEIGHT
DE
S
I
G
N
E
D
B
Y
P
o
t
e
l
c
o
,
I
n
c
.
DETAILS
SHEET NUMBER
5.0
PROJECT INFORMATION
WO #
DATE:
DRAWN BY:
CHECKED BY:
PROJECT
EV CHARGING
SHEET TITLE
AG
R
E
E
S
T
O
I
N
D
E
M
N
I
F
Y
A
N
D
H
O
L
D
T
O
AN
Y
O
T
H
E
R
P
R
O
J
E
C
T
S
,
B
Y
O
W
N
E
R
T
H
E
EX
P
R
E
S
S
E
D
W
R
I
T
T
E
N
C
O
N
S
E
N
T
O
F
TH
A
T
S
P
E
C
I
F
I
C
A
L
L
Y
I
N
T
E
N
D
E
D
,
U
S
E
R
ST
A
T
E
S
G
R
O
U
P
,
I
N
C
L
U
D
I
N
G
T
H
I
S
SP
E
C
I
F
I
C
U
S
E
F
O
R
W
H
I
C
H
T
H
E
Y
W
E
R
E
PS
E
/
P
O
T
E
L
C
O
I
S
D
O
N
E
P
S
E
/
P
O
T
E
L
C
O
HA
R
M
L
E
S
S
O
R
B
Y
A
N
Y
O
T
H
E
R
P
A
R
T
Y
,
WI
T
H
O
U
T
D
O
C
U
M
E
N
T
S
P
R
E
P
A
R
E
D
B
Y
CO
R
E
D
O
C
U
M
E
N
T
,
A
R
E
T
O
B
E
U
S
E
D
ON
L
Y
I
N
T
E
N
D
E
D
.
A
N
Y
E
X
T
E
N
S
I
O
N
O
F
US
E
U
N
L
A
W
F
U
L
L
Y
A
N
D
A
T
T
H
E
U
S
E
R
S
OW
N
R
I
S
K
.
I
F
U
S
E
D
I
N
A
W
A
Y
O
T
H
E
R
TH
A
N
F
O
R
T
H
E
S
P
E
C
I
F
I
C
P
R
O
J
E
C
T
A
N
D
FR
O
M
A
L
L
C
L
A
I
M
S
A
N
D
L
O
S
S
E
S
.
101194344
H. GUZMAN
C. ROATE
11/24/25
SCALE 5NTS
SCALE 4NTS ELECTRIC VEHICLE STICKERS
ELECTRIC VEHICLE STICKERS
PS
E
Y
E
L
M
,
W
A
75
0
M
I
L
L
R
D
S
E
YE
L
M
,
W
A
9
8
5
9
7
WO
#
10
1
1
9
4
3
4
4
NO
T
#
51
5
9
4
8
9
9
5
PO
T
E
L
C
O
P
M
:
CO
R
E
Y
R
O
A
T
E
25
3
-
3
3
1
-
5
3
3
5
CO
R
E
Y
.
R
O
A
T
E
@
P
S
E
.
C
O
M
DE
S
I
G
N
E
D
B
Y
P
o
t
e
l
c
o
,
I
n
c
.
DETAILS
SHEET NUMBER
6.0
PROJECT INFORMATION
WO #
DATE:
DRAWN BY:
CHECKED BY:
PROJECT
EV CHARGING
SHEET TITLE
AG
R
E
E
S
T
O
I
N
D
E
M
N
I
F
Y
A
N
D
H
O
L
D
T
O
AN
Y
O
T
H
E
R
P
R
O
J
E
C
T
S
,
B
Y
O
W
N
E
R
T
H
E
EX
P
R
E
S
S
E
D
W
R
I
T
T
E
N
C
O
N
S
E
N
T
O
F
TH
A
T
S
P
E
C
I
F
I
C
A
L
L
Y
I
N
T
E
N
D
E
D
,
U
S
E
R
ST
A
T
E
S
G
R
O
U
P
,
I
N
C
L
U
D
I
N
G
T
H
I
S
SP
E
C
I
F
I
C
U
S
E
F
O
R
W
H
I
C
H
T
H
E
Y
W
E
R
E
PS
E
/
P
O
T
E
L
C
O
I
S
D
O
N
E
P
S
E
/
P
O
T
E
L
C
O
HA
R
M
L
E
S
S
O
R
B
Y
A
N
Y
O
T
H
E
R
P
A
R
T
Y
,
WI
T
H
O
U
T
D
O
C
U
M
E
N
T
S
P
R
E
P
A
R
E
D
B
Y
CO
R
E
D
O
C
U
M
E
N
T
,
A
R
E
T
O
B
E
U
S
E
D
ON
L
Y
I
N
T
E
N
D
E
D
.
A
N
Y
E
X
T
E
N
S
I
O
N
O
F
US
E
U
N
L
A
W
F
U
L
L
Y
A
N
D
A
T
T
H
E
U
S
E
R
S
OW
N
R
I
S
K
.
I
F
U
S
E
D
I
N
A
W
A
Y
O
T
H
E
R
TH
A
N
F
O
R
T
H
E
S
P
E
C
I
F
I
C
P
R
O
J
E
C
T
A
N
D
FR
O
M
A
L
L
C
L
A
I
M
S
A
N
D
L
O
S
S
E
S
.
101194344
H. GUZMAN
C. ROATE
11/24/25
SCALE 6NTSPOLE MOUNTED PAYMENT EXAMPLE
SCALE 7NTSPOLE MOUNTED PAYMENT EXAMPLE
PS
E
Y
E
L
M
,
W
A
75
0
M
I
L
L
R
D
S
E
YE
L
M
,
W
A
9
8
5
9
7
WO
#
10
1
1
9
4
3
4
4
NO
T
#
51
5
9
4
8
9
9
5
PO
T
E
L
C
O
P
M
:
CO
R
E
Y
R
O
A
T
E
25
3
-
3
3
1
-
5
3
3
5
CO
R
E
Y
.
R
O
A
T
E
@
P
S
E
.
C
O
M
DE
S
I
G
N
E
D
B
Y
P
o
t
e
l
c
o
,
I
n
c
.
PHOTOS
SHEET NUMBER
7.0
PROJECT INFORMATION
WO #
DATE:
DRAWN BY:
CHECKED BY:
PROJECT
EV CHARGING
SHEET TITLE
AG
R
E
E
S
T
O
I
N
D
E
M
N
I
F
Y
A
N
D
H
O
L
D
T
O
AN
Y
O
T
H
E
R
P
R
O
J
E
C
T
S
,
B
Y
O
W
N
E
R
T
H
E
EX
P
R
E
S
S
E
D
W
R
I
T
T
E
N
C
O
N
S
E
N
T
O
F
TH
A
T
S
P
E
C
I
F
I
C
A
L
L
Y
I
N
T
E
N
D
E
D
,
U
S
E
R
ST
A
T
E
S
G
R
O
U
P
,
I
N
C
L
U
D
I
N
G
T
H
I
S
SP
E
C
I
F
I
C
U
S
E
F
O
R
W
H
I
C
H
T
H
E
Y
W
E
R
E
PS
E
/
P
O
T
E
L
C
O
I
S
D
O
N
E
P
S
E
/
P
O
T
E
L
C
O
HA
R
M
L
E
S
S
O
R
B
Y
A
N
Y
O
T
H
E
R
P
A
R
T
Y
,
WI
T
H
O
U
T
D
O
C
U
M
E
N
T
S
P
R
E
P
A
R
E
D
B
Y
CO
R
E
D
O
C
U
M
E
N
T
,
A
R
E
T
O
B
E
U
S
E
D
ON
L
Y
I
N
T
E
N
D
E
D
.
A
N
Y
E
X
T
E
N
S
I
O
N
O
F
US
E
U
N
L
A
W
F
U
L
L
Y
A
N
D
A
T
T
H
E
U
S
E
R
S
OW
N
R
I
S
K
.
I
F
U
S
E
D
I
N
A
W
A
Y
O
T
H
E
R
TH
A
N
F
O
R
T
H
E
S
P
E
C
I
F
I
C
P
R
O
J
E
C
T
A
N
D
FR
O
M
A
L
L
C
L
A
I
M
S
A
N
D
L
O
S
S
E
S
.
101194344
H. GUZMAN
C. ROATE
11/24/25
POLE MOUNT EXAPMLES
PS
E
Y
E
L
M
,
W
A
75
0
M
I
L
L
R
D
S
E
YE
L
M
,
W
A
9
8
5
9
7
WO
#
10
1
1
9
4
3
4
4
NO
T
#
51
5
9
4
8
9
9
5
PO
T
E
L
C
O
P
M
:
CO
R
E
Y
R
O
A
T
E
25
3
-
3
3
1
-
5
3
3
5
CO
R
E
Y
.
R
O
A
T
E
@
P
S
E
.
C
O
M
DE
S
I
G
N
E
D
B
Y
P
o
t
e
l
c
o
,
I
n
c
.
SPECS
SHEET NUMBER
8.0
PROJECT INFORMATION
WO #
DATE:
DRAWN BY:
CHECKED BY:
PROJECT
EV CHARGING
SHEET TITLE
AG
R
E
E
S
T
O
I
N
D
E
M
N
I
F
Y
A
N
D
H
O
L
D
T
O
AN
Y
O
T
H
E
R
P
R
O
J
E
C
T
S
,
B
Y
O
W
N
E
R
T
H
E
EX
P
R
E
S
S
E
D
W
R
I
T
T
E
N
C
O
N
S
E
N
T
O
F
TH
A
T
S
P
E
C
I
F
I
C
A
L
L
Y
I
N
T
E
N
D
E
D
,
U
S
E
R
ST
A
T
E
S
G
R
O
U
P
,
I
N
C
L
U
D
I
N
G
T
H
I
S
SP
E
C
I
F
I
C
U
S
E
F
O
R
W
H
I
C
H
T
H
E
Y
W
E
R
E
PS
E
/
P
O
T
E
L
C
O
I
S
D
O
N
E
P
S
E
/
P
O
T
E
L
C
O
HA
R
M
L
E
S
S
O
R
B
Y
A
N
Y
O
T
H
E
R
P
A
R
T
Y
,
WI
T
H
O
U
T
D
O
C
U
M
E
N
T
S
P
R
E
P
A
R
E
D
B
Y
CO
R
E
D
O
C
U
M
E
N
T
,
A
R
E
T
O
B
E
U
S
E
D
ON
L
Y
I
N
T
E
N
D
E
D
.
A
N
Y
E
X
T
E
N
S
I
O
N
O
F
US
E
U
N
L
A
W
F
U
L
L
Y
A
N
D
A
T
T
H
E
U
S
E
R
S
OW
N
R
I
S
K
.
I
F
U
S
E
D
I
N
A
W
A
Y
O
T
H
E
R
TH
A
N
F
O
R
T
H
E
S
P
E
C
I
F
I
C
P
R
O
J
E
C
T
A
N
D
FR
O
M
A
L
L
C
L
A
I
M
S
A
N
D
L
O
S
S
E
S
.
SECTION 16A: ELECTRICAL
16A.1 GENERAL INSTRUCTIONS
16A 1-1 GENERAL REQUIREMENTS
THE SPECIFICATIONS AND DRAWINGS FOR THE PROJECT ARE COMPLEMENTARY,
AND PORTIONS OF THE WORK DESCRIBED IN ONE, SHALL BE PROVIDED AS IF
DESCRIBED IN BOTH. IN THE EVENT OF DISCREPANCIES, NOTIFY THE ENGINEER
AND REQUEST CLARIFICATION PRIOR TO PROCEEDING WITH THE WORK
INVOLVED.
DRAWINGS ARE GRAPHIC REPRESENTATIONS OF THE WORK UPON WHICH THE
CONTRACT IS BASED. THEY SHOW THE MATERIALS AND THEIR RELATIONSHIP TO
ONE ANOTHER, INCLUDING SIZES, SHAPES, LOCATIONS, AND CONNECTIONS.
THEY ALSO CONVEY THE SCOPE OF WORK, INDICATING THE INTENDED
GENERAL ARRANGEMENT OF THE EQUIPMENT, FIXTURES, OUTLETS AND
CIRCUITS WITHOUT SHOWING ALL OF THE EXACT DETAILS AS TO ELEVATIONS,
OFFSETS, CONTROL LINES, AND OTHER INSTALLATION REQUIREMENTS. USE OF
THE DRAWINGS AS A GUIDE WHEN LAYING OUT THE WORK AND TO VERIFY THAT
MATERIALS AND EQUIPMENT WILL FIT INTO THE DESIGNATED SPACES, AND
WHICH, WHEN INSTALLED PER MANUFACTURES' REQUIREMENTS, WILL ENSURE A
COMPLETE, COORDINATED, SATISFACTORY AND PROPERLY OPERATING SYSTEM.
SPECIFICATIONS DEFINE THE QUALITATIVE REQUIREMENTS FOR PRODUCTS,
MATERIALS, AND WORKMANSHIP UPON WHICH THE CONTRACT IS BASED.
16A 1-2 PRE-BID SITE INSPECTION
PERSONALLY INSPECT THE SITE OF THE PROPOSED WORK AND BECOME FULLY
INFORMED OF CONDITIONS UNDER WHICH THE WORK IS TO BE DONE. FAILURE
TO DO SO WILL NOT BE CONSIDERED SUFFICIENT JUSTIFICATION TO REQUEST
OR OBTAIN EXTRA COMPENSATION OVER AND ABOVE THE CONTRACT PRICE.
16A 1-3 MATERIAL AND WORKMANSHIP
PROVIDE ALL MATERIAL AND EQUIPMENT NEW AND IN FIRST CLASS CONDITION.
PROVIDE MARKINGS OR A NAMEPLATE FOR ALL MATERIAL AND EQUIPMENT
IDENTIFYING THE MANUFACTURER AND PROVIDING SUFFICIENT REFERENCE TO
ESTABLISH QUALITY, SIZE AND CAPACITY. ALL WORKMANSHIP SHALL BE OF THE
FINEST POSSIBLE BY EXPERIENCED MECHANICS OF THE PROPER TRADE. IN
GENERAL, PROVIDE COMMERCIAL SPECIFICATION GRADE QUALITY FOR ALL
MATERIALS AND EQUIPMENT. LIGHT DUTY AND RESIDENTIAL TYPE EQUIPMENT
WILL NOT BE ACCEPTABLE. PROVIDE ALL HOIST, SCAFFOLDS, STAGING,
RUNWAYS, TOOLS, MACHINERY AND EQUIPMENT REQUIRED FOR THE
PERFORMANCE OF THE ELECTRICAL WORK. STORE AND MAINTAIN MATERIAL
AND EQUIPMENT IN CLEAN CONDITION, AND PROTECTED FROM WEATHER,
MOISTURE, AND PHYSICAL DAMAGE.
FURNISH ONLY MATERIAL AND EQUIPMENT THAT ARE LISTED. LABELED, OR
BOTH, BY A NATIONALLY RECOGNIZED TESTING LABORATORY (NRTL),
WHENEVER ANY LISTING OR LABELING EXIST FOR THE TYPES OF MATERIAL AND
EQUIPMENT SPECIFIED.
16A 1-4 COORDINATION
COORDINATE ALL WORK WITH OTHER DIVISION AND TRADES SO THAT THE
VARIOUS COMPONENTS OF THE ELECTRICAL SYSTEMS ARE INSTALLED AT THE
PROPER TIME, FIT THE AVAILABLE SPACE, AND ALLOW PROPER SERVICE ACCESS
TO ALL EQUIPMENT. REFER TO ALL DRAWINGS AND TO RELEVANT EQUIPMENT
SUBMITTALS AND SHOP DRAWINGS TO DETERMINE THE EXTENT OF THE CLEAR
SPACES. MAKE ALL OFFSETS REQUIRED TO CLEAR EQUIPMENT, BEAMS AND
OTHER STRUCTURAL MEMBERS, AND TO FACILITATE CONCEALING RACEWAYS IN
THE MANNER ANTICIPATED IN THE DESIGN. PROVIDE MATERIALS WITH TRIM
THAT WILL PROPERLY FIT THE TYPES OF CEILING, WALL OR FLOOR FINISHES
ACTUALLY INSTALLED.
16A 1-5 DEFINITIONS
WHENEVER USED IN THESE SPECIFICATIONS OR DRAWINGS, THE FOLLOWING
TERMS SHALL HAVE THE INDICATED MEANINGS.
FURNISH: "TO SUPPLY AND DELIVER TO THE PROJECT SITE, READY FOR
UNLOADING, UNPACKING, ASSEMBLING, INSTALLING, AND SIMILAR
OPERATIONS."
INSTALL: "TO PERFORM ALL OPERATIONS AT THE PROJECT SITE, INCLUDING, BUT
NOT LIMITED TO, AND AS REQUIRED, UNLOADING, UNPACKING, ASSEMBLING,
ERECTING, PLACING, ANCHORING, APPLYING, WORKING TO DIMENSION,
FINISHING, CURING, PROTECTING, CLEANING, TESTING, COMMISSIONING,
STARTING UP AND SIMILAR OPERATIONS, COMPLETE, AND READY FOR THE
INTENDED USE."
PROVIDE: "TO FURNISH AND INSTALL, COMPLETE AND READY FOR THE INTENDED
USE."
FURNISHED BY OWNER (OR OWNER-FURNISHED) OR FURNISHED BY OTHERS: "AN
ITEM FURNISHED BY THE OWNER OR UNDER OTHER DIVISIONS OR CONTRACTS,
AND INSTALLED UNDER THE REQUIREMENTS OF THIS DIVISION, COMPLETE AND
READY FOR THE INTENDED USE, INCLUDING ALL ITEMS INCIDENTAL TO THE
WORK NECESSARY FOR PROPER INSTALLATION AND OPERATION. INCLUDE THE
INSTALLATION UNDER THE WARRANTY REQUIRED BY THIS DIVISION.
ENGINEER: WHERE REFERRED TO IN THIS DIVISION, "ENGINEER" IS THE
ENGINEER OF RECORD AND THE DESIGN PROFESSION FOR THE WORK UNDER
THIS DIVISION, AND IS A CONSULTANT TO, AND AN AUTHORIZED
REPRESENTATIVE OF, THE ARCHITECT, AS DEFINED IN THE GENERAL AND/OR
SUPPLEMENTARY CONDITIONS. WHEN USED IN THIS DIVISION, IT MEANS
INCREASED INVOLVEMENT BY, AND OBLIGATIONS TO, THE ENGINEER, IN
ADDITION TO INVOLVEMENT BY, AND OBLIGATIONS TO THE "ARCHITECT".
AHJ:THE LOCAL CODE AND/OR INSPECTION AGENCY (AUTHORITY) HAVING
JURISDICTION OVER THE WORK.
NRTL:NATIONALLY RECOGNIZED TESTING LABORATORY, AS DEFINED AND
LISTED BY OSHA IN 29 CFR 1910.7 (E.G., UL, ETL, CSA), AND ACCEPTABLE TO THE
AHJ OVER THIS PROJECT.
THE TERMS "APPROVED EQUAL", "EQUIVALENT", OR "EQUAL", ARE USED
SYNONYMOUSLY AND SHALL MEAN "ACCEPTED BY OR ACCEPTABLE TO THE
ENGINEER AS EQUIVALENT TO THE ITEM OR MANUFACTURER SPECIFIED". THE
TERM "APPROVED" SHALL MEAN LABELED, LISTED, OR BOTH, BY AN NRTL, AND
ACCEPTABLE TO THE AHJ OVER THIS PROJECT.
16A 1-6 DIMENSION AND LAYOUTS
DRAWINGS ARE SCHEMATIC IN NATURE, SHOW THE VARIOUS COMPONENTS OF
THE SYSTEMS APPROXIMATELY TO SCALE AND ATTEMPT TO INDICATE HOW
THEY WILL BE INTEGRATED WITH OTHER PARTS OF THE WORK. FIGURED
DIMENSIONS TAKE PRECEDENCE TO SCALED DIMENSIONS. DETERMINE EXACT
LOCATIONS BY JOB MEASUREMENTS, BY CHECKING THE REQUIREMENTS OF
OTHER TRADES, AND BY REVIEWING ALL CONTRACT DOCUMENTS, CORRECT
ERRORS THAT COULD HAVE BEEN AVOIDED BY PROPER CHECKING AND
INSPECTION, AT NO ADDITIONAL COST TO THE OWNER.
16A 1-7 ORDINANCES AND CODES
COMPLY, AT A MINIMUM, WITH NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
CODES, STATE AND LOCAL BUILDING CODES, AND ALL OTHER APPLICABLE
CODES AND ORDINANCES FOR PERFORMANCE, WORKMANSHIP, EQUIPMENT,
AND MATERIALS. ADDITIONALLY, COMPLY WITH RULES AND REGULATIONS OF
PUBLIC UTILITIES AND MUNICIPAL DEPARTMENTS AFFECTED BY CONNECTION OF
SERVICES.
WHERE CONFLICTS BETWEEN VARIOUS CODES, ORDINANCES, RULES, AND
REGULATIONS EXIST, COMPLY WITH THE MOST STRINGENT. WHEREVER
REQUIREMENTS OF THESE SPECIFICATIONS, DRAWINGS, OR BOTH, EXCEED
THOSE OF THE ABOVE ITEMS, THE REQUIREMENTS OF THESE SPECIFICATIONS,
DRAWINGS, OR BOTH, SHALL GOVERN CODE COMPLIANCE, AT A MINIMUM, IS
MANDATORY. CONSTRUE NOTHING IN THESE CONSTRUCTION DOCUMENTS AS
PERMITTING WORK NOT IN COMPLIANCE, AT A MINIMUM, WITH THESE CODES.
BRING ALL CONFLICTS OBSERVED BETWEEN CODES, ORDINANCES, RULES,
REGULATIONS AND THESE DOCUMENTS TO THE ENGINEER'S ATTENTION FOR
FINAL RESOLUTION. CONTRACTOR WILL BE HELD RESPONSIBLE FOR ANY
VIOLATION OF THE LAW.
PROVIDE AND MAINTAIN ALL NECESSARY SIGNAL LIGHTS AND GUARDS FOR THE
SAFETY OF THE PUBLIC. OBTAIN AND PAY FOR ALL PERMITS FOR WORK IN THIS
DIVISION.
16A 1-8 MANUFACTURERS
IN OTHER ARTICLES WHERE LIST OF MANUFACTURERS ARE INTRODUCED, THE
FOLLOWING REQUIREMENTS APPLY TO PRODUCT SELECTION:
A.MANUFACTURERS: SUBJECT TO COMPLIANCE WITH REQUIREMENTS,
PROVIDE PRODUCTS BY ONE OF THE MANUFACTURERS SPECIFIED.
WHERE A LIST IS PROVIDED, MANUFACTURERS ARE LISTED ALPHABETICALLY
AND NOT IN ACCORDANCE WITH ANY RANKING OR PREFERENCE.
16A 1-9 SUBMITTALS
ASSEMBLE AND SUBMIT FOR ENGINEER'S REVIEW, MANUFACTURERS' PRODUCT
LITERATURE FOR MATERIAL AND EQUIPMENT TO BE FURNISHED, INSTALLED, OR
WITH, UNDER THIS DIVISION, INCLUDING SHOP DRAWINGS, MANUFACTURERS'
PRODUCT DATA AND PERFORMANCE SHEETS, SAMPLES, AND OTHER
SUBMITTALS REQUIRED BY THIS DIVISION. BEFORE SUBMITTING, VERIFY THAT
ALL MATERIALS AND EQUIPMENT SUBMITTED ARE MUTUALLY COMPATIBLE AND
SUITABLE FOR THE INTENDED USE, AND FIT THE AVAILABLE SPACES, AND ALLOW
AMPLE AND CODE-REQUIRED ROOM FOR ACCESS AND MAINTENANCE.
SUBMITTALS SHALL CONTAIN THE FOLLOWING INFORMATION. SUBMITTALS NOT
SO IDENTIFIED WILL BE RETURNED TO THE CONTRACTOR WITHOUT ACTION:
A.THE PROJECT NAME.
B.APPLICABLE SPECIFICATION SECTION AND PARAGRAPH.
C.THE SUBMITTAL DATE.
D.THE CONTRACTOR'S STAMP, WHICH SHALL CERTIFY THAT THE STAMPED
DRAWINGS HAVE BEEN CHECKED BY THE CONTRACTOR, COMPLY WITH
THE DRAWINGS AND SPECIFICATIONS, AND HAVE BEEN COORDINATED
WITH OTHER TRADES.
TRANSMIT SUBMITTALS AS EARLY AS REQUIRED TO SUPPORT THE PROJECT
SCHEDULE. ALLOW FOR TWO WEEKS ENGINEER REVIEW TIME, PLUS MAILING
TIME, PLUS A DUPLICATION OF THIS TIME FOR RESUBMITTALS, IF REQUIRED.
TRANSMIT SUBMITTALS AS SOON AS POSSIBLE AFTER NOTICE TO PROCEED AND
BEFORE CONSTRUCTION STARTS. THE ENGINEER'S SUBMITTAL REVIEWS WILL
NOT RELIEVE THE CONTRACTOR FROM RESPONSIBILITY FOR ERRORS IN
DIMENSIONS, DETAILS, SIZE OF MEMBERS, OR QUANTITIES OR OMITTING
COMPONENTS OR FITTINGS OR COORDINATING ITEMS WITH ACTUAL BUILDING
CONDITION.
16A 1-10 ADJUSTING, ALIGNING AND TESTING
ADJUST, ALIGN, AND TEST ALL ELECTRICAL EQUIPMENT ON THIS PROJECT
PROVIDED UNDER THIS DIVISION AND ALL ELECTRICAL EQUIPMENT FURNISHED
BY OTHERS FOR INSTALLATION OR WIRING UNDER THIS DIVISION, FOR PROPER
OPERATION.
TEST ALL SYSTEMS AND EQUIPMENT ACCORDING TO THE REQUIREMENTS IN
NETA ATS (LATEST EDITION).
MAINTAIN THE FOLLOWING ON THE PROJECT PREMISES AT ALL TIMES: A TRUE
RMS READING VOLTMETER, A TRUE RMS READING AMMETER, AND A
MEGOHMMETER INSULATION RESISTANCE TESTER. PROVIDE TEST DATA
READINGS AS REQUESTED OR AS REQUIRED BY THE ENGINEER.
16A 1-11 OPERATION AND MAINTENANCE INSTRUCTIONS
SUBMIT FOR ENGINEER'S REVIEW, COPIES OF EACH OPERATIONS AND
MAINTENANCE INSTRUCTION MANUALS, APPROPRIATELY BOUND INTO MANUAL
FORM INCLUDING APPROVED COPIES OF THE FOLLOWING, REVISED IF
NECESSARY TO SHOW SYSTEM AND EQUIPMENT AS ACTUALLY INSTALLED.
INCLUDE, AT A MINIMUM, THE FOLLOWING INFORMATION:
A.MANUFACTURERS' CATALOG AND PRODUCT DATA SHEETS
B.WIRING DIAGRAMS
C.MAINTENANCE INSTRUCTIONS
D.OPERATING INSTRUCTIONS
E.PARTS LISTS
F.TEST REPORTS AS DEFINED IN NETA ATS FOR THE SYSTEMS AND
EQUIPMENT PROVIDED AND INSTALLED UNDER THIS CONTRACT.
G.NAMES, ADDRESSES, TELEPHONE NUMBERS, AND E-MAIL ADDRESSES OF
LOCAL CONTACTS FOR WARRANTY SERVICES AND SPARE PARTS.
SUBMIT MANUALS PRIOR TO REQUESTING THE FINAL PUNCH LIST AND BEFORE
ANY REQUEST FOR SUBSTANTIAL COMPLETION. ALSO, PROVIDE VERBAL
INSTRUCTIONS OF SYSTEM OPERATIONS TO OWNER'S REPRESENTATIVE PRIOR
TO FINAL ACCEPTANCE OF WORK.
16A 1-12 SYSTEM START UP
PRIOR TO STARTING UP THE ELECTRICAL SYSTEMS, CHECK ALL COMPONENTS
AND DEVICES, LUBRICATE ITEMS ACCORDINGLY, AND TIGHTEN SCREWS AND
BOLTS FOR CONNECTORS AND TERMINALS ACCORDING TO MANUFACTURER'S
PUBLISHED TORQUE-TIGHTENING VALUES. IF MANUFACTURE'S TORQUE VALUES
ARE NOT INDICATED, USE THOSE SPECIFIED IN UL 486A. ADJUST TAPS ON EACH
TRANSFORMER FOR RATED SECONDARY VOLTAGE. CHECK AND RECORD
BUILDING'S SERVICE ENTRANCE VOLTAGE, GROUNDING CONDITIONS,
GROUNDING RESISTANCE, AND PROPER PHASING. BALANCE ALL SINGLE-PHASE
LOADS AT EACH PANELBOARD, REDISTRIBUTING BRANCH CIRCUIT CONNECTIONS
UNTIL BALANCE IS ACHIEVED. DO NOT TYPE UP FINAL PANELBOARD
DIRECTORIES UNTIL ALL RE-BALANCING AND REDISTRIBUTION OF CIRCUITS ARE
COMPLETE. REPLACE ALL BURNED-OUT LAMPS AND LAMPS USED FOR
TEMPORARY CONSTRUCTION LIGHTING IN PERMANENT LIGHT FIXTURES. AFTER
ALL SYSTEMS HAVE BEEN INSPECTED AND ADJUSTED, CONFIRM ALL OPERATION
FEATURES REQUIRED BY THE DRAWINGS AND SPECIFICATIONS AND MAKE FINAL
ADJUSTMENTS AS NECESSARY.
16A 1-13 WARRANTIES
WARRANT EACH ELECTRICAL SYSTEM AND EACH ELEMENT THEREOF AGAINST
ALL DEFECTS DUE TO FAULTY WORKMANSHIP, DESIGN, OR MATERIAL FOR A
PERIOD OF 12 MONTHS FROM DATE OF SUBSTANTIAL COMPLETION, UNLESS
SPECIFIC ITEMS ARE NOTED TO CARRY A LONGER WARRANTY IN THE
CONSTRUCTION DOCUMENTS OR MANUFACTURER'S STANDARD WARRANTY
EXCEEDS 12 MONTHS. REMEDY ALL DEFECTS, OCCURRING WITHIN THE
WARRANTY PERIOD(S), AS STATED IN THE GENERAL CONDITIONS AND DIVISION
A.ALSO WARRANT THE FOLLOWING ADDITION ITEMS:
A.1. ALL RACEWAYS ARE FREE FROM OBSTRUCTIONS, HOLES, CRUSHING, OR
BREAKS OF ANY NATURE.
A.2. ALL RACEWAY SEALS ARE EFFECTIVE
A.3. THE ENTIRE ELECTRICAL SYSTEM IS FREE FROM SHORT CIRCUITS AND
UNWANTED OPEN CIRCUITS AND GROUNDS.
THE ABOVE WARRANTIES SHALL INCLUDE LABOR AND MATERIAL. MAKE REPAIRS
OR REPLACEMENTS WITHOUT ANY ADDITIONAL COST TO THE OWNER.
PERFORM THE REMEDIAL WORK PROMPTLY, UPON WRITTEN NOTICE FROM THE
ENGINEER OR OWNER.
AT THE TIME OF SUBSTANTIAL COMPLETION, DELIVER TO THE OWNER ALL
WARRANTIES, IN WRITING AND PROPERLY EXECUTED, INCLUDING TERM LIMITS
FOR WARRANTIES EXTENDING BEYOND THE ONE YEAR PERIOD, EACH
WARRANTY INSTRUMENT BEING ADDRESSED TO THE OWNER AND STATING THE
COMMENCEMENT DATE AND TERM.
16A 2 ELECTRICAL WORK
16A 2-1 CUTTING AND PATCHING
CUT WALLS, FLOORS, CEILINGS, AND OTHER PORTIONS OF THE FACILITY AS
REQUIRED TO PERFORM WORK UNDER THIS DIVISION. OBTAIN PERMISSION OF
THE ENGINEER, OWNER, OR BOTH, BEFORE DOING ANY CUTTING. CUT ALL HOLES
AS SMALL AS POSSIBLE. PATCH WALLS, FLOORS, AND OTHER PORTIONS OF THE
FACILITY AS REQUIRED BY WORK UNDER THIS DIVISION. ALL PATCHING SHALL BE
THOROUGHLY FIRST CLASS AND SHALL MATCH THE ORIGINAL MATERIAL AND
CONSTRUCTION, INCLUDING FIRE RATINGS IF APPLICABLE.
16A 2-2 ROUGH-IN
COORDINATE WITHOUT DELAY ALL ROUGHING-IN WITH OTHERS. CONCEAL ALL
RACEWAYS EXCEPT IN UNFINISHED AREAS AND WHERE OTHERWISE INDICATED
ON THE DRAWINGS.
16A 2-3 RACEWAYS
CONDUIT AND TUBING:
A.ELECTRICAL METALLIC TUBING AND FITTINGS (EMT): ANSI C80.3, UL 797
B.FLEXIBLE METAL CONDUIT (FMC): ZINC-COATED STEEL, UL 1
C.INTERMEDIATE METAL CONDUIT (IMC): HOT-DIPPED GALVANIZED RIGID
STEEL CONDUIT: ANSI C80.6, UL 1242
D.LIQUID TIGHT FLEXIBLE METAL CONDUIT (LFMC): FLEXIBLE STEEL CONDUIT
WITH PVC JACKET: UL 360
E.RIGID METAL CONDUIT (RMC):
E.1. HOT-DIP GALVANIZED RIGID STEEL CONDUIT (GRS): ANSI C80.1 UL 6
E.2. RIGID ALUMINUM CONDUIT (RAC): ANSI C80.5, UL6A
F.IMC AND RMC FITTINGS: NEMA FB 1+- COMPATIBLE WITH CONDUIT TYPE
AND MATERIAL, UL LISTED.
G.UNDERGROUND ELECTRICAL CONDUIT: SCHEDULE 40 PVC
H.UNDERGROUND DATA CONDUIT: SCHEDULE 40 PVC
I.HORIZONTAL DIRECTIONAL DRILLING ELECTRICAL CONDUIT: CARLON
ELECTRICAL UL HDPE CONDUIT
J.HORIZONTAL DIRECTIONAL DRILLING DATA CONDUIT: JM EAGLE HDPE
COMMUNICATION DUCT CONDUIT.
K.UNDERGROUND ELECTRICAL CONDUIT UNDER HIGH VEHICULAR TRAFFIC
AREAS: SCHEDULE 80 PVC
16A 2-4 RACEWAY INSTALLATION
INSTALL ALL CIRCULAR RACEWAYS CONCEALED ABOVE SUSPENDED CEILINGS,
IN WALLS, OR FLOORS WHEREVER POSSIBLE EXCEPT WHERE OTHERWISE
INDICATED. PROVIDE GRS FOR ALL CONDUITS EXPOSED TO PHYSICAL DAMAGE.
ALL OTHER RACEWAY MAY BE EMT WHERE APPROVED BY LOCAL CODE, AHJ'S
AND UTILITY. USE COMPRESSION TYPE FITTINGS FOR EMT, WITH ALL FITTINGS UL
LISTED FOR THE ENVIRONMENT IN WHICH THEY ARE USED. UL LISTED PVC
CONDUIT MAY BE USED UNDERGROUND WHERE PERMITTED BY LOCAL CODE,
AUTHORITY HAVING JURISDICTION, UTILITIES, AND WHERE NOT SPECIFICALLY
RESTRICTED BY THESE DOCUMENTS.
USE FMC FOR FINAL CONNECTION TO EACH MOTOR AND TRANSFORMER, AND TO
ANY DEVICE THAT WOULD OTHERWISE TRANSMIT MOTION, VIBRATION, OR NOISE.
WHERE EXPOSED TO LIQUIDS, VAPORS OR SUNLIGHT, USE LFMC. PROVIDE
ALL FMC AND LFMC WITH INSULATED GROUND WIRE.
INSTALL RACEWAYS PARALLEL TO BUILDING LINES.
INSTALL RACEWAYS TO REQUIREMENTS OF STRUCTURE AND TO REQUIREMENTS
OF ALL OTHER WORK ON THE PROJECT. INSTALL RACEWAY TO CLEAR ALL
OPENINGS, DEPRESSIONS, PIPES, DUCTS, REINFORCING STEEL, AND OTHER
IMMOVABLE OBSTACLES. INSTALL RACEWAYS SET IN FORMS FOR CONCRETE
STRUCTURE IN SUCH A MANNER THAT INSTALLATION WILL NOT AFFECT THE
STRENGTH OF STRUCTURE. EXCEPT WHERE APPROVED IN WRITING BY THE
ENGINEER, INSTALL NO RACEWAY IN A SLAB-ON-GRADE. LOCATE RACEWAY
BELOW GRANULAR FILL BELOW SLABS-ON-GRADE.
INSTALL RACEWAYS CONTINUOUS BETWEEN CONNECTION TO OUTLETS, BOXES
AND CABINETS WITH A MINIMUM POSSIBLE NUMBER OF BENDS AND NOT MORE
THAN THE EQUIVALENT OF FOUR 90-DEGREE BENDS BETWEEN CONNECTIONS.
USE MANUFACTURED ELBOWS FOR ALL 45- AND 90- DEGREE BENDS, UNLESS
APPROVED BY THE ENGINEER IN ADVANCE. MAKE OTHER BENDS SMOOTH AND
EVEN AND WITHOUT FLATTENING RACEWAY OR FLAKING GALVANIZED OR
ENAMEL. RADII OF BENDS SHALL BE AS LONG AS POSSIBLE AND NEVER
SHORTER THAN THE CORRESPONDING TRADE ELBOW. USE LONG RADIUS
ELBOWS WHERE NECESSARY, INDICATED, OR BOTH.
SECURELY FASTEN RACEWAYS IN PLACE WITH APPROVED STRAPS, HANGERS
AND STEEL SUPPORTS AS REQUIRED PER ALL APPLICABLE CODES. ATTACH
RACEWAY SUPPORTS TO THE BUILDING STRUCTURE. HANG SINGLE RACEWAYS
FOR FEEDERS WITH MALLEABLE SPLIT RING HANGERS WITH ROD AND
TURNBUCKLE SUSPENSION FROM INSERTS SPACED NOT OVER 10 FEET APART IN
CONSTRUCTION ABOVE. CLAMP GROUPS OF HORIZONTAL FEEDER FACEWAYS
TO STEEL CHANNELS THAT ARE SUSPENDED FROM INSERTS SPACED NOT OVER
10 FEET APART IN CONSTRUCTION ABOVE. SECURELY CLAMP VERTICAL FEEDER
RACEWAYS TO STRUCTURAL STEEL MEMBERS ATTACHED TO STRUCTURE.
INSTALL CABLE CLAMPS FOR SUPPORT OF VERTICAL FEEDERS WHERE
REQUIRED. ADD RACEWAY SUPPORTS WITHIN 12 INCHES OF ALL
BENDS, ON BOTH SIDES OF THE BENDS. DO NOT SUPPORT RACEWAYS FROM
SUSPENDED CEILING COMPONENTS.
REAM RACEWAY ENDS, THOROUGHLY CLEAN RACEWAYS BEFORE INSTALLATION,
AND KEEP CLEAN AFTER INSTALLATION. PLUG OR COVER OPENINGS AND BOXES
AS REQUIRED TO KEEP RACEWAYS CLEAN DURING CONSTRUCTION AND FISH
ALL RACEWAYS CLEAR OF OBSTRUCTIONS BEFORE PULLING CONDUCTORS
WIRES. PROVIDE RACEWAYS OF AMPLE SIZE FOR PULLING OF WIRE AND NOT
SMALLER THAN CODE REQUIREMENTS AND NOT LESS THAN 1/2-INCH IN SIZE,
UNLESS INDICATED OTHERWISE ON DRAWINGS.
PROTECT ALL RACEWAY INSTALLATIONS AGAINST DAMAGE DURING
CONSTRUCTION. REPLACE ALL RACEWAYS DAMAGED OR MOVED OUT OF LINE
AFTER ROUGHING-IN TO MEET ENGINEER'S APPROVAL WITHOUT ADDITION COST
TO THE OWNER.
ALIGN AND INSTALL TRUE AND PLUMB ALL RACEWAY TERMINATIONS AT
PANELBOARDS, SWITCHBOARDS, MOTOR CONTROL, EQUIPMENT AND JUNCTION
BOXES.
INSTALL APPROVED EXPANSION/DEFLECTION FITTINGS WHERE RACEWAYS PASS
THROUGH OR ACROSS EXPANSION JOINTS.
INSTALL MEASURED PULLING LINE IN EACH EMPTY RACEWAY THAT IS LEFT FOR
INSTALLATION OF CONDUCTORS OR CABLES UNDER OTHER DIVISIONS OR
CONTRACTS. USE POLYPROPYLENE OR MONOFILAMENT PLASTIC LINE WITH NOT
LESS THAN 200-LB TENSILE STRENGTH. LEAVE AT LEAST 12 INCHES OF SLACK AT
EACH END OF PULL WIRE.
MAKE ALL JOINTS AND CONNECTIONS IN A MANNER THAT WILL ENSURE
MECHANICAL STRENGTH AND ELECTRICAL CONTINUITY.
INSTALL CONDUIT-SEALING FITTINGS IN ALL RACEWAYS PASSING FROM
NON-HEATED TO HEATED SPACES.
16A 2-5 BUSHINGS AND LOCKNUTS
RIGIDLY CLAMP CONDUITS ENTERING SHEET METAL BOXES TO THE BOX WITH A
BUSHING AND LOCKNUT ON THE INSIDE AND A LOCKNUT ON THE OUTSIDE.
CONDUIT SHALL ENTER THE BOX SQUARELY. PROVIDE BUSHINGS AND
LOCKNUTS MADE OF GALVANIZED MALLEABLE IRON WITH SHARP, CLEAN-CUT
THREADS. WHERE EMT ENTERS A BOX, PROVIDE APPROVED EMT COMPRESSION
CONNECTORS. USE INSULATED AND/OR GROUNDING BUSHINGS WHEREVER
CONNECTION IS SUBJECT TO VIBRATION OR MOISTURE, WHEN REQUIRED BY
NFPA 70, OR BOTH.
16A 2-6 SUPPORT SYSTEMS
STEEL SLOTTED SUPPORT SYSTEMS (SLOTTED CHANNEL): COMPLY WITH
MFMA-3, FACTORY-FABRICATED COMPONENTS FOR FIELD ASSEMBLY 12-GAUGE,
1-5/8-INCH BY 1-5/8-INCH COPPER B-LINE ERICO INTERNATIONAL CORPORATION,
POWER-STRUT, THOMAS BETTS CORPORATION, UNISTRUT.
FINISHES:
METALLIC COATING: HOT-DIP GALVANIZED AFTER FABRICATION AND APPLIED
ACCORDING TO MFMA-3
NONMETALLIC COATINGS: MANUFACTURER'S STANDARD PVC, POLYURETHANE,
OR POLYESTER COATING APPLIED ACCORDING TO MFMA-3.
PAINTED COATINGS: MANUFACTURER'S STANDARD PAINTED COATING APPLIED
ACCORDING TO MFMA-3.
STAINLESS STEEL TYPE 304, PER ASTM A240.
ALUMINUM (EXTRUDED) TYPE 6063-T6, PER ASTM B221
FIELD FABRICATION
WHERE FIELD CUTTING OF STANDARD LENGTHS OF CHANNEL ARE REQUIRED,
MAKE CUTS STRAIGHT AND PERPENDICULAR TO MANUFACTURED SURFACES.
FOR FIELD-CUT OR DAMAGED SURFACES OF COATED CHANNELS, DRESS CUT
ENDS, DAMAGED SURFACES, OR BOTH, WITH AN ABRASIVE MATERIAL (E.G. FILE,
GRINDING STONE, OR SIMILAR) AND CLEANER TO REMOVE OILS, RUST, SHARP
EDGES AND SHARDS.
FOR CHANNEL WITH FACTORY-APPLIED COATING, RE-FINISH CUT EDGES EIGHT
COATING COMPATIBLE WITH THE FACTORY FINISH AND AS RECOMMENDED BY
THE MANUFACTURER (E.G., MANUFACTURER'S TOUCH-UP PAINT OR ZINC-RICH
COLD-GALVANIZING COMPOUND, AS APPLICABLE).
16A 2-7 CONDUCTORS
PROVIDE COPPER CONDUCTORS, WITH UL LABEL, AND 600V INSULATION UNLESS
OTHERWISE SPECIFIED.
SERVICE LATERAL CONDUCTORS TYPE THWN OR XHHW WITH STRANDED
CONDUCTORS.
ALL FEEDER AND BRANCH CIRCUIT CONDUCTORS NO. 8 AWG AND LARGER
STRANDED, TYPE THWN OR XHHW INSULATION.
ALL CONDUCTORS, NO 10 AWG AND SMALLER, USED FOR POWER AND LIGHTING
CIRCUITS SOLID COPPER, TYPE THWN (WET OR DAMP LOCATIONS, OR IN
CONDUIT BELOW GRADE OR SLAB), TYPE THHN (DRY LOCATIONS ONLY AND
ABOVE GRADE) INSULATION, OR DUAL-RATED TYPE THHN/THWN.
ALL BRANCH CIRCUIT WIRING NOT SMALLER THAN NO. 12 AWG. IF NO
CONDUCTOR SIZE IS INDICATED ON THE DRAWINGS FOR A BRANCH CIRCUIT,
PROVIDE NO. 12 AWG CONDUCTORS AND A 20A CIRCUIT BREAKER.
CONTROL WIRING: STRANDED COPPER CONDUCTORS, 600V INSULATION, OF THE
PROPER TYPE, SIZE AND NUMBER AS REQUIRED TO ACCOMPLISH SPECIFIED
FUNCTION. MINIMUM SIZE : NO. 18 AWG, UNLESS OTHERWISE NOTED.
16A 2-8 WIRING INSTALLATION
EXCEPT WHERE SPECIFIED OR INDICATED, FOR LOW-VOLTAGE WIRING, INSTALL
ALL WIRING IN APPROVED RACEWAY AND ENCLOSURES.
SUPPORT ALL CONDUCTORS AND CABLES IN VERTICAL INSTALLATIONS, AS
REQUIRED BY NFPA 70, BY INSTALLING CABLE SUPPORTS OR PLUG-TYPE
CONDUIT RISER SUPPORTS, OR WIRE-MESH SAFETY GRIPS.
INSTALL ALL CONDUCTORS AND CABLE IN RACEWAYS CONTINUOUS WITHOUT
TAPS OR SPLICES. SPLICE OR TAP ONLY IN APPROVED BOXES AND ENCLOSURES
WITH APPROVED SOLDERLESS CONNECTORS, OR CRIMP CONNECTORS AND
TERMINAL BLOCKS FOR CONTROL WIRING, AND KEEP TO THE MINIMUM
REQUIRED. INSULATE ALL SPLICES, TAPS, AND JOINTS AS REQUIRED BY CODES.
ALL MATERIAL USED TO TERMINATE, SPLICE, OR TAP CONDUCTORS: DESIGNED
FOR, PROPERLY SIZED FOR, AND UL LISTED FOR SPECIFIC APPLICATION AND
CONDUCTORS INVOLVED, AND INSTALLED IN STRICT ACCORDANCE WITH THE
MANUFACTURER'S RECOMMENDATIONS, USING THE MANUFACTURER'S
RECOMMENDED TOOLS.
WHERE WIRING IS INDICATED AS INSTALLED, BUT THE CONNECTION IS INDICATED
"FUTURE" OR "BY OTHER DIVISION, TRADES, OR CONTRACTS", LEAVE A MINIMUM
3-FOOT "PIGTAIL " AT THE BOX, TAPE THE ENDS OF THE CONDUCTORS, AND
COVER THE BOX.
THE NUMBER OF THE CONDUCTORS IN A SPECIFIC RACEWAY "HOME RUN" IS
INDICATED WITH CROSS LINES (TICK MARKS) ON EACH "CIRCUIT RUN" ON THE
DRAWINGS. IN GENERAL, THE DIRECTION OF BRANCH CIRCUIT "HOME RUN"
ROUTING IS INDICATED ON THE DRAWINGS COMPLETE WITH CIRCUIT NUMBERS
AND PANELBOARD DESIGNATION. CONTINUE ALL SUCH "HOME RUN" WIRING TO
THE DESIGNATED PANELBOARD, AS THOUGH "CIRCUIT RUNS" WHERE INDICATED
IN THEIR ENTIRETY.
WHEN MULTIPLE HOME RUNS ARE COMBINED INTO A SINGLE RACEWAY SUCH
THAT THE NUMBER OF CONDUCTORS EXCEEDS FOUR (CONDUCTOR COUNT IS
MADE UP OF ANY COMBINATION OF PHASE AND NEUTRAL CONDUCTORS), THE
FOLLOWING RESTRICTIONS APPLY, WHICH ARE IN ADDITION TO THOSE IN NFAP
70.
WIRING SHALL HAVE INSULATION OF THE PROPER COLOR TO MATCH COLOR
CODE SYSTEM IN THE TABLE BELOW. IN LARGER SIZES (500KCMIL AND OVER),
WHERE PROPERLY COLORED INSULATION IS NOT AVAILABLE, USE VINYL PLASTIC
ELECTRICAL TAPE OF THE APPROPRIATE COLOR AROUND EACH CONDUCTOR AT
LL TERMINATION POINTS, JUNCTION AND PULL BOXES.
SYSTEM VOLTAGE CONDUCTOR TYPE COLOR
480Y/277 PHASE A BROWN
PHASE B ORANGE
PHASE C YELLOW
NEUTRAL GRAY
EQUIPMENT GROUND GREEN
208Y/120 PHASE A BLACK
PHASE B RED
PHASE C BLUE
NEUTRAL WHITE
EQUIPMENT GROUND GREEN
ISOLATED GROUND GREEN W/ YELLOW STRIPE
PROPERLY NUMBER ALL TERMINAL BLOCKS AND WIRE TERMINALS FOR
CONTROL WIRING FOR IDENTIFICATION WITH VINYL STICK-ON MARKERS OR
EQUIVALENT. PROVIDE AN EQUIPMENT-GROUNDING CONDUCTOR, OR BONDING
JUMPER, AS APPLICABLE, IN ALL BRANCH CIRCUITS AND FEEDERS, SIZED IN
ACCORDANCE WITH NFPA 70 TABLES 250.66 OR 250.122, AS APPLICABLE, UNLESS
INDICATED AS LARGER ON THE DRAWINGS.
VOLTAGE DROP IN BRANCH CIRCUITS SHALL NOT EXCEED 3 PERCENT.
16A 2-91 JUNCTION BOXES, PULL BOXES, CABINETS, AND WIREWAYS
PROVIDE JUNCTION BOXES, PULL BOXES, CABINETS AND WIREWAYS WHEREVER
NECESSARY FOR PROPER INSTALLATION OF VARIOUS ELECTRICAL SYSTEMS
ACCORDING TO NFPA 70 AND WHERE INDICATED ON THE DRAWINGS. SIZE AS
REQUIRED FOR THE SPECIFIC FUNCTION OR AS REQUIRED BY NFPA 70,
WHICHEVER IS LARGER. CONSTRUCTION SHALL BE OF A NEMA DESIGN SUITABLE
FOR THE ENVIRONMENT INSTALLED.
JUNCTION BOXES INSTALLED BEHIND WALL CASES, AND IN OR ON OTHER STORE
FIXTURES, EXCEPT WHERE OTHERWISE SPECIFIED, SHALL BE 4-INCH SQUARE
OR LARGER, WITH GALVANIZED COVERS.
16A 2-10 OUTLET BOXES
ALL OUTLETS INCLUDING LIGHT FIXTURE, SWITCH, RECEPTACLE, AND SIMILAR
OUTLETS: NATIONAL ELECTRICAL, APPLETON, STEEL CITY, RACO, OR APPROVED
EQUAL, GALVANIZED STEEL KNOCKOUT BOXES, SUITABLE IN DESIGN TO THE
PURPOSE THEY SERVE AND THE SPACE THEY OCCUPY. SIZE AS REQUIRED FOR
THE SPECIFIC FUNCTION OR AS REQUIRED BY NFPA 70, WHICHEVER IS LARGER.
SET ALL OUTLET BOXES IN WALLS, COLUMNS, FLOORS, OR CEILINGS SO THEY
ARE FLUSH WITH THE FINISHED SURFACE, ACCURATELY SET, AND RIGIDLY
SECURED IN POSITION. PROVIDE PLASTER RINGS, EXTENSION RINGS AND/OR
MASONRY RINGS AS REQUIRED FOR FLUSH MOUNTING. PROVIDE APPROVED
CAST OUTLET BOXES, WITH HUBS AND WEATHERPROOF COVERS, IN ALL AREAS
SUBJECT TO DAMP, WET, OR HARSH CONDITIONS.
16A 2-12 FIRESTOPPING FLOOR AND WALL PENETRATIONS
FIRE-RESISTANT PENETRATION SEALANTS: TWO-PART, FOAMED-IN-PLACE,
SILICONE SEALANT FORMULATED FOR USE IN THROUGH-PENETRATION
FIRE-STOPPING AROUND CABLES, RACEWAYS, AND CABLE TRAY PENETRATIONS
THROUGH FIRE-RATED WALLS AND FLOORS. SEALANTS AND ACCESSORIES
SHALL HAVE FIRE-RESISTANT RATINGS INDICATED, AS ESTABLISHED BY TESTING
IDENTICAL ASSEMBLIES IN ACCORDANCE WITH ASTM E 814, BY UNDERWRITERS'
LABORATORIES, INC, OR OTHER NRTL ACCEPTABLE TO AHJ.
PRODUCTS: SUBJECT TO COMPLIANCE WITH REQUIREMENTS, PROVIDE ONE OF
THE FOLLOWING:
1."3M FIRE STOP FOAM 2001," 3M CORP.
2."METACAULK 835," RECTORSEAL
3."SPECSEAL PENSIL 200 SILICONE FOAM," SPECIFY TECHNOLOGY INC.
4."FIRE STOP SYSTEM," UNITED STATES GYPSUM COMPANY.
16A 2-13 EQUIPMENT IDENTIFICATION
PROVIDE EQUIPMENT IDENTIFICATION NAMEPLATES ON ALL PANELBOARDS,
SWITCHES, AND WHERE INDICATED ON THE DRAWINGS.
NAMEPLATES:
A.ENGRAVED, CONTRASTING COLOR, THREE-LAYER, LAMINATED PLASTIC
INDICATING THE NAME OF THE EQUIPMENT, LOAD, OR CIRCUIT AS
DESIGNATED ON THE DRAWINGS AND IN THE SPECIFICATIONS.
B.FIELD-APPLIED PERMANENT EPOXY ADHESIVE, COMPATIBLE WITH THE
EQUIPMENT FINISH, ATTACHMENT METHOD SHALL BE ACCEPTABLE TO THE
MANUFACTURERS OF THE EQUIPMENT TO WHICH THE NAMEPLATES ARE
BEING APPLIED.
C.COLOR: BLACK BACKGROUND WITH WHITE LETTERS FOR NORMAL
POWER. LETTER HEIGHT: 1/2-INCH MINIMUM.
16A 2-14 ELECTRICAL EQUIPMENT AND MATERIALS LISTING
ALL ELECTRICAL EQUIPMENT AND MATERIALS USED ON THIS PROJECT SHALL BE
LISTED FOR THEIR INTENDED USE BY A NATIONALLY RECOGNIZED TESTING
AGENCY.
101194344
H. GUZMAN
C. ROATE
11/24/25
PS
E
Y
E
L
M
,
W
A
75
0
M
I
L
L
R
D
S
E
YE
L
M
,
W
A
9
8
5
9
7
WO
#
10
1
1
9
4
3
4
4
NO
T
#
51
5
9
4
8
9
9
5
PO
T
E
L
C
O
P
M
:
CO
R
E
Y
R
O
A
T
E
25
3
-
3
3
1
-
5
3
3
5
CO
R
E
Y
.
R
O
A
T
E
@
P
S
E
.
C
O
M