Loading...
HomeMy WebLinkAbout101189063R1_SIGNEDWA-5 0 7 P# 21724440500 15425 P# 22719330801 504 P# 21724440500 15425 MI L L R D S E 100T Y271 X96896FS X96896BP WA-5 0 7 YEL 26 YEL 26 LO A D S I D E LOA D S I D E ROW=90' EOR=28' ROW=40' EOR=34' CL CL CL CL CL 100T X96896FS X96896BP NVicinity Map 10 1 1 8 9 0 6 3 R 1 FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. YEL-26 SW#Y271 INST 3 FS MILL R PHONE CABLE TV 11953620 101189063 PROJECT PHASE PWR NOTIF#ORDER# Superior OH Expense THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) JOB SITEOVERHEAD CONSTRUCTION Poles & Structures -Poles are to be installed or relocated as staked. Unless otherwise noted, all pole location measurements are from the face of the pole. -All new poles set shall be the class indicated on the sketch, or better. Do not set a lower class pole than specified. -Install ground plate assembly on all new poles. Install Switch Ground Assembly per standard specification 6014.1000 at new gang operated switch locations. -Install grid numbers on all new and existing poles as shown on sketch. -Straighten existing poles as indicated or as necessary. -Treat all field-drilled poles with copper napthenate wood preservative. -Remove old poles after communication companies have transferred off and return to PSE storeroom. Fill and crown pole holes and restore area similar to adjacent landscaping. Conductors & Equipment - Transfer all overhead and underground primary, secondary and service conductors and guys to new poles set, unless otherwise indicated on this sketch. - Transfer existing transformers to new poles unless otherwise indicated on this sketch. - Use stirrups to connect all overhead and underground primary taps, and all transformers. Install at all sites being worked within the scope of the project where they are currently missing. - Use 397 AAC and Ampact connectors for all bare conductor feeder jumpers and 600 amp switch jumpers. Install tree wire conductor for jumpers on all poles that are double deadended with tree wire. - Apply grit inhibitor on all Ampact, stirrup, and dead-end connections. - Connect primary taps and transformers to same phase as existing unless otherwise shown on the drawing. - All neutral connections to be made with solid compression connectors. Connect all pole grounds to common neutral. - Use Load-interrupter cutouts (with arc shields) on all primary overhead and underground taps with fused protection above 40T. - Install Wildlife Protectors on all transformers. PLAN VIEW SCALE: 1" = 50' GENERAL SPECIFICATIONS Electric Project Scope Document Project Information: Project Name: YEL-26 SW#Y271 INST 3 FS MILL R Notification Number: 11953620 System Planner: Tim LoPresto 425-748-6374 Required In-Service Date: 12/31/2027 Project Summary: At SW# Y271, Grid # 559260-147279 install 3 Siemens Fusesavers. Install stirrups with hot taps and all jumpers will be insulated. Non-storm customer minute interruptions saved: 1246 Non-storm customer interruptions saved: 21 Non-storm outages saved: 0.12 Project Justification: In PSE's service territory, it is projected that 60% of the outages on overhead systems are temporary in nature, such as a limb falls through the primary line making contact along the way. Fusesavers are devices that when placed in series with fused cutouts will provide an instantaneous operation and then after a period of time reclose. If the fault is temporary then customers will see the brief drop and pick, but if permanent it will allow the fuse to blow. Construction Criteria: Use temporary jumpers around existing fuses to keep system in service and avoid the need for customer outages during the installation of the Siemens Fuse Savers. Install grid number boards on PSE poles where they're missing. Install new OH switch number boards if not present. Provide Planner with preliminary and final work sketches and notify Planner when the project is scheduled, then complete. Keep Planner notified of correspondence with ROW. Safety -Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements. -Refer to PSE standards 6275.9050 for personal protective grounding requirements. -Refer to PSE standards 6275.9150 for vehicle grounding and barricading requirements. -Proper line clearances shall be taken at the beginning, and released at the end, of each work day, or as otherwise instructed by the System Operator. -Provide signs, barricades, and traffic control in conformance with permit regulations. -Utilize flagging and other vehicle traffic control as necessary and in conformance with local traffic regulations. -Maintain traffic flow as required by permitting agency. Erosion & Sediment Control -Refer to PSE standards 0150.3200 for minimum requirements. -Comply with all requirements of permitting agency. -Installed erosion & sediment devices shall be maintained until vegetation has been re-established or disturbed soil has been otherwise permanently stabilized. UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP K. BARTENHAGEN 253-561-4641 11/13/25 N. COSME 253-569-6158 11/13/25 N/A N/A N/A C. RAVANERA 253-308-8956 11/13/25 N/A CITY OF YELM YEL-26 SW#Y271 INST 3 FS MILL R INSTALL 3-PH FUSESAVERS W/ BYPASS 15425 WA-507, YELM, WA 98597 N/A N/A N/A 101189063R1 AS NOTED 1/1 THURSTON N/A N/A QSTHLE SE 24-01-17 N/A N/A 1701E096 1702E116 1701E096 YEL-26 WAVE BROADBAND COMCAST - OLYMPIA 2/25/26 ALEX V.CITY OF YELM JURISDICTION N/A N/A N/A N/A N/A N/A Potelco, Inc.DESIGNED BY Installed at site: Grid Number: Material ID#: Foreman to redline the following information INSTALLATION Company ID#: Primary phase connected to: FUSE SAVER TRIP SAVER P01 559260-147279 9946707 * No No No Yes Yes Yes "Flagging Required" "Outages Required" "Locates Required" No No Yes Yes "Joint Trench Coordination Required" "Vegtation Management Required" UNITS OF PROPERTY REMOVAL ONLY MATERIAL QTY DIST. ARRESTERS DIST. CUTOUTS DIST. INSULATORS TRANS. ARRESTERS TRANS. INSULATORS CROSSARMS - DISTRIBUTION CROSSARMS - TRANSMISSION Installed at site: Grid Number: Material ID#: Foreman to redline the following information INSTALLATION Company ID#: Primary phase connected to: FUSE SAVER TRIP SAVER P01 559260-147279 9946707 Installed at site: Grid Number: Material ID#: Foreman to redline the following information INSTALLATION Company ID#: Primary phase connected to: FUSE SAVER TRIP SAVER P01 559260-147279 9946707 Removal 593266069 108168568 SITE SPECIFIC NOTES: P01: 559260-147279 -EX 80' CL H2, 2010 POLE TO REMAIN -INST 3Ø ARM MTD FUSESAVERS ON BUCK ARM (6022.1061, FUS3AMB) 2-24Nx2 -INST BYPASS C/O'S ON BUCK ARM (6022.1061) -HANG FUSE DOORS AT NEUT LEVEL -REPL EXIST L/I C/O'S ON BUCK ARM (6022.1061) 2-24O -FUSE AT 100T -RETIRE SW# Y271 -INST SW# X96896FS -INST SW# X96896BP JOB SITE SCALE: 1:880 OH CIRCUIT (BEFORE): MAP 1702E116 SCALE: NTS OH CIRCUIT (AFTER): MAP 1702E116 UNITS OF PROPERTY INSTALL ONLY CROSSARMS MATERIAL QTY DIST. ARRESTERS DIST. CUTOUTS DIST. INSULATORS TRANS. ARRESTERS TRANS. INSULATORS CROSSARM - DISTRIBUTION CROSSARM - TRANSMISSION EXISTING PROPERTY LINE EXISTING UG RISER NEW UG RISER EXISTING 3Ø WIRE EXISTING CENTER LINE EXISTING CONDUCTOR TO BE REMOVED DISCONNECT - FUSED EXISTING 1Ø WIRE EXISTING RIGHT OF WAY EXISTING POLE DOWN GUY EXISTING SECONDARY SERVICE LINE DISCONNECT - UNFUSED SPAN GUY NEW POLE NEW CONDUCTOR REMOVAL WINGARM EXISTING TRANSFORMER DISCONNECT - FUSED DISCONNECT - UNFUSED OR OR OVERHEAD JUMPER CONNECTION GANG OPERATED SWITCH FUSESAVER W/ FUSED BYPASS PHASE SHIFTER STREET LIGHT 9" 3'-3" Note: The common neutral height should be 10'-1" based on single phase tap standard 6031.5100 12 kV 10'-1" 34 kV 10'-1" Hang fuse door at pole Down/span guy position ±8"of the neutral position Down guy position 4'-1" X 1 2 3 4 B P X 1 2 3 4 F S FUSESAVER W/ 100T BYPASS - 6022.1061 THREE PHASE ARM MOUNT INSTALLATION (PERPENDICULAR)