Loading...
HomeMy WebLinkAboutFloor Truss LayoutStart of 19.2" O.C. Layout 18" Deep Floor Trusses Truss Connector Total List Manuf Product Qty Simpson HUC46 2 Simpson LUC26Z 1 Simpson LUS24 5 Simpson LUS26-2 1 Simpson LUS46 13 3.5"X13.5" BEAM UP TOP CHORD BEARING 5.5"X16.5" BEAM DOWN 1.75" LVL RIM 3.5"X15" BEAM UP TOP CHORD BEARING BEAM DOWN STAIRWELL OPEN 4X12 BEAM UP 4X 1 2 B E A M U P ALTHOUGH EVERY EFFORT HAS BEEN MADE TO AVOID PLUMBING DROPS IN THE PLACEMENT OF TRUSSES ON THIS LAYOUT, THE CONTRACTOR SHOULD VERIFY ALL DRAIN LOCATIONS. FOR BIDDING ONLY LAYOUT FOR VERIFICATION & PRICING GARAGE LUS46 LUS46 LUS24 ZF1 ZF1 ZF1 ZF1 ZF1 ZF1 ZF1 ZF1 ZF1 ZF1 ZF1 ZF1 ZF1 ZF1 ZF1 ZF1 ZF1 ZF1 ZF1 ZF1 ZF1 ZF1 ZF1 ZF1 ZF1 ZF1 F1 0 F0 7 F1 7 F1 8 F1 2 F1 2 F1 5 F1 6 F1 6 F0 5 F0 6 F0 6 T0 1 T02 F0 1 F0 8 F0 3 F1 4 F1 3 F1 9 HU C 4 6 LUS26-2 HU C 4 6 LU C 2 6 Z 90 F09(7) F11(6) F12(3) F02(7) F04(7) 3-00-00 1-06-00 15 - 0 6 - 0 0 1 2 - 0 9 - 0 8 2 5 - 0 2 - 0 8 2-00-00 60 - 0 0 - 0 0 4- 0 6 - 0 0 3 - 0 6 - 0 0 2 4 - 0 9 - 0 8 1 7 - 0 2 - 0 8 1 0 - 0 0 - 0 0 60 - 0 0 - 0 0 21-06-00 8-06-00 30-00-00 13-00-00 17-00-00 30-00-00 20 - 0 0 - 0 0 3-00-084-02-08 11-00-00 10-06-00 12 - 0 5 - 0 0 ** I M P O R T A N T * * = I N D I C A T E S L E F T E N D Address:Orting,WA 98360 Date: Sales Rep: Ryan KittelsonFloor Trusses Soundbuilt NW, LLC Plan: 2612/A/Gar LT Job Name: - THIS IS A TRUSS PLACEMENT PLAN ONLY. All trusses are designed as individual building components built to the building designer's specifications as given to us in the plans, see individual truss design sheets for specific loading and design. - VERIFY ALL DIMENSIONS. Temporary truss bracing is the responsibility of the general contractor, permanent bracing is the responsibility of the building designer. Individual bracing of "at- compression" truss pieces is marked out on the truss seals and it is the responsibility of the contractor to verify it is installed as specified. - Do not install broken/damaged trusses or trusses that do not match the jobsite conditions, please inform your salesman if any such conditions are discovered. - All Truss-To-Structural element connections shown on this layout are a suggestion provided as a courtesy to the builder and must be specified in the construction documents as approved by the building designer per ANSI/TPI 1-2014 2.3.2.4 prior to their installation. 11/11/2025 Estimate By: William Allen Rainier Meadows M-2196 Job Number: Finalized By: William Allen Loading TC/LL=40.0 lb/ft² TC/DL=10.0 lb/ft² BC/LL=0.0 lb/ft² BC/DL=5.0 lb/ft² IRC 2021 Drawing Type:Customer: