HomeMy WebLinkAbout2024.0472.CI0006_Willow Glenn IV _9819 Grove Road NE _Civil Eng Approval LTR_(Project# LD 2024.0188).docxMarch 9, 2026
Dennis Balascio
21709 96th Avenue W
Edmonds, WA 98020
RE: Civil Engineering Approval – Willow Glenn IV (Application # 2024.0472.CI0006)
City of Yelm Project No. LD 2024.0188
Location: 9819 Grove Road NE Parcel # 64303500100
Dear Mr. Balascio:
The City of Yelm has completed the final review of the Willow Glenn IV located on Parcel 64303500100. Your application included:
Civil Plans (dated November 01, 2024 stamped by Whitney G. Holm, PE)
Landscape Plans (dated November 01, 2024 stamped by Jeffry B. Glander, PE)
Stormwater Site Plan (dated September 6, 2024 stamped by Dan Phillips, PE)
Construction Stormwater Pollution Prevention (Plan dated September 6, 2024 stamped by Dan Phillips, PE)
We have reviewed the plans for compliance with the City of Yelm Development Guidelines, the DOE Stormwater Manual and general standards of civil engineering practice. This letter and
the signed construction drawings serve as your approval for construction. The following items need to be addressed during the construction process.
You must schedule a preconstruction meeting with the City and its inspectors before your construction begins. Prior to preconstruction meeting, provide the City with an updated Construction
SWPPP with the CESCL and on-site contact information.
Temporary Erosion Control Measures may not be limited to what is shown on the plans. If adverse weather is incurred during construction additional erosion measure may be required.
A request from the engineer of record must be presented for any changes requested to the plans.
The engineering review invoice must be paid in full before the preconstruction meeting.
Prior to the installation of lights not shown on civil engineering plans, submit illumination plans that meets the requirements of the City of Yelm Municipal Code Section 18.59.050.
At the time of project closeout the improvements will require final inspection / acceptance before a final Certificate of Occupancy can be issued by the Building Official. This final
inspection is requested by submitting a Project Closeout On-Line Form that can be accessed on yelmwa.gov or directly through this link; https://lf.yelmwa.gov/Forms/CloseOut. The following
documents will be uploaded as required through this form;
As-Build Plans
Engineer Construction Report – Stormwater Facilities
Applicable O/M Manuals
Construction Inspection & Testing Logs
Special Test Results & Reports
If you have any additional questions or comments please do not hesitate to call or contact me at RezaR@yelmwa.gov or call me at (253) 278-2937.
Respectfully
City of Yelm Public Service Department - Engineering
Reza R. Roukerd
Civil Review Engineer
cc: Whitney Holm, PE – SCJ Alliance