Loading...
HomeMy WebLinkAbout2024.0472.CI0006_Willow Glenn IV _9819 Grove Road NE _Civil Eng Approval LTR_(Project# LD 2024.0188).docxMarch 9, 2026 Dennis Balascio 21709 96th Avenue W Edmonds, WA 98020 RE: Civil Engineering Approval – Willow Glenn IV (Application # 2024.0472.CI0006) City of Yelm Project No. LD 2024.0188 Location: 9819 Grove Road NE Parcel # 64303500100 Dear Mr. Balascio: The City of Yelm has completed the final review of the Willow Glenn IV located on Parcel 64303500100. Your application included: Civil Plans (dated November 01, 2024 stamped by Whitney G. Holm, PE) Landscape Plans (dated November 01, 2024 stamped by Jeffry B. Glander, PE) Stormwater Site Plan (dated September 6, 2024 stamped by Dan Phillips, PE) Construction Stormwater Pollution Prevention (Plan dated September 6, 2024 stamped by Dan Phillips, PE) We have reviewed the plans for compliance with the City of Yelm Development Guidelines, the DOE Stormwater Manual and general standards of civil engineering practice. This letter and the signed construction drawings serve as your approval for construction. The following items need to be addressed during the construction process. You must schedule a preconstruction meeting with the City and its inspectors before your construction begins. Prior to preconstruction meeting, provide the City with an updated Construction SWPPP with the CESCL and on-site contact information. Temporary Erosion Control Measures may not be limited to what is shown on the plans. If adverse weather is incurred during construction additional erosion measure may be required. A request from the engineer of record must be presented for any changes requested to the plans. The engineering review invoice must be paid in full before the preconstruction meeting. Prior to the installation of lights not shown on civil engineering plans, submit illumination plans that meets the requirements of the City of Yelm Municipal Code Section 18.59.050. At the time of project closeout the improvements will require final inspection / acceptance before a final Certificate of Occupancy can be issued by the Building Official. This final inspection is requested by submitting a Project Closeout On-Line Form that can be accessed on yelmwa.gov or directly through this link; https://lf.yelmwa.gov/Forms/CloseOut. The following documents will be uploaded as required through this form; As-Build Plans Engineer Construction Report – Stormwater Facilities Applicable O/M Manuals Construction Inspection & Testing Logs Special Test Results & Reports If you have any additional questions or comments please do not hesitate to call or contact me at RezaR@yelmwa.gov or call me at (253) 278-2937. Respectfully City of Yelm Public Service Department - Engineering Reza R. Roukerd Civil Review Engineer cc: Whitney Holm, PE – SCJ Alliance