Loading...
HomeMy WebLinkAbout109167315_preliminary work sketch_updatedWAL-MART STREET LIGHT TAKEOVER TR A N Q U I L I T Y L N S E GR O V E R D S E 17 0 T H S T S E GR O V E R D S E STATE ROUTE 507 SE BALD H I L L R D S E 10 6 T H A V E S E Owner / Developer Contact Info officeATTN: WSDOT - OLYMPIC REGION N/A N/A DEVIN MAHER (360) 570-6743 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 Reviewed and complied with all construction notes. Recorded all required information on the as-built per GOS 2500.1700. Completed post installation inspection per GOS 2525.1200 and 2525.2700. Left the work area in a clean and safe condition. FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: __________________________ Date ______________ (CHECK BOX TO CONFIRM COMPLETION) 4680 06/11 12504239 109167315 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 108662305 GAS PROJECT PHASE Notification #Order # Retirement Relocate SAP Superior Service/Meter Service/Meter HP Svc/MSA Dis. Reg. / FT Ind. MSA Ind. Service Service/Meter Service/Meter HOLE HOG TABLE CALLOUT LOCATION DEPTH LENGTH BP1 START BP2 END BP3 START BP4 END BP5 START BP6 END BP7 START BP8 END BP9 START BP10 END BP11 START BP12 END BP13 START BP14 END BP15 START BP16 END BP17 START BP18 END BP19 START BP20 END CP APPROVAL 02 / 26 / 2026 PLAN VIEW SCALE: NONE 10 9 1 6 7 3 1 5 Cell Phone: "Locates Required" "Flagging Required" Yes No Yes No E-Mail: Manager: Project Manager Contact Information: TONY FAY (253) 213-2514 tony.fay@pse.com STOP TIME START TIME GAS MAIN PRESSURE & TESTING TESTED BY GAS MAIN INSTALLATION/RETIREMENT SOAP AIR NITROGEN WATER SOAP AIR NITROGEN WATER STOP TIME START TIME TESTED BY TEST RESULTS P F TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 P F Type/Work ManufacturerPipe Size Type Est Length Act Lgth TYPE TEST / / DATE OFF PRESSURE DATE ON DATE OFF TYPE TEST PRESSURE SYS MAOPDESIGN PRESS DATE ON 2023 02/18 TEST RESULTS / / / / / / Verify Testing Requirements, Chart vs Gauge GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5 GASSED UP PIPELINE PIPE SEGMENT FOREMAN'SDATENAME SCAT 6"PE- 561' RETIRE 2"STW 525' RETIRE 6"PE- 400' SCAT 4"PE- 10' 60 60 SAP BATCH YEAR & FOOTAGE ACTUAL LENGTH OF RETIREMENT MATERIAL RETIRED ORIGINAL JOB ORIGINAL YEAR PROPOSED LENGTH OF RETIREMENT SIZE OF RETIRED MAIN STANDARD GAS CONSTRUCTION NOTES: 1.FIELD LOCATE ALL UNDERGROUND UTILITIES. EXCAVATOR TO CALL "ONE-CALL" TWO WORKING DAYS PRIOR TO CONSTRUCTION, IN WESTERN WASHINGTON CALL: 1-800-424-5555. OR CALL NATIONWIDE: 811 2.NOTIFY APPROPRIATE PERMITTING AGENCY PRIOR TO JOB START (SEE PERMIT REQUIREMENTS). 3.ALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS FIELD PROCEDURES. 4.EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. 5.NOTIFY PROPERTY OWNERS ADJACENT TO PROPOSED CONSTRUCTION ACTIVITIES A MINIMUM OF TWO WORKING DAYS PRIOR TO BEGINNING CONSTRUCTION. USE iSi TO DISTRIBUTE FLYERS IF JOB IS LARGE, OTHERWISE HAND DELIVER FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION ABOUT THE OPPORTUNITY TO PURCHASE AN EXCESS FLOW VALVE WHEN THEIR SERVICE IS INSTALLED OR REPLACED PER GAS OPERATING STANDARD 2550.1600. ALLOW ADEQUATE TIME FOR CUSTOMER DECISION AND RESPONSE. 6.ANY CHANGE IN ROUTE, PIPE SIZE/TYPE, TIE-IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BY THE APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE. 7.COMPLETE “EXPOSED PIPE CONDITION REPORT” ON ALL METALLIC PSE FACILITIES. 8.PIPELINE MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2500. 9.INSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. VALVE MARKERS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2600 FOR ALL HP VALVES IF THE LOCATION IS NOT READILY ACCESSIBLE, AND FOR ALL VALVES WHERE PERSISTENT SNOWFALL MAY OBSCURE THE VALVE BOX. 10.TO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO MAINS SHALL BE CONNECTED EXCEPT AS SHOWN ON THIS DESIGN UNLESS APPROVED BY APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE. 11.SYSTEM MAOP DENOTED BY: SYSTEM MAOP = 60 PSIG 12.GAUGE AND MONITOR USE OF ALL STOPPERS TO ENSURE ADEQUATE FEED. 13.RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION. 14.PURGE POINTS TO BE INSTALLED PER PSE GAS OPERATING STANDARDS 2525.3400. 15.MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400. 16.IF METALLIC PIPE IS INVOLVED, COORDINATE INSTALLATION WITH CP TECH. _________SCOTT SALAZAR__________________, PHONE_____360-239-8146_________. 17.NOTE ALL ACTUAL FOOTAGE, LOCATION AND MATERIAL CHANGES ON THE AS-BUILT IN RED. ( ') DENOTES FOOTAGE BETWEEN FITTINGS. 18.EXCESS FLOW VALVE TO BE INSTALLED ON ALL NEW RESIDENTIAL SERVICES PER GOS 2500.2200. (RECORD ALL INFORMATION ON D-4 CARD) STANDARD IP & LP GAS REPLACEMENT CONSTRUCTION NOTES 1.NOTIFY GAS CUSTOMERS, OR DISTRIBUTE FLYER #1443 A MINIMUM OF TWO WORKING DAYS PRIOR TO A PLANNED OUTAGE. 2.INSTALL ONE POUND ANODE FOR EVERY 1000' OF LOCATING WIRE. INSTALL ANODE AND TEST LEAD WIRES PER PSE GAS OPERATING STANDARD 2525.2300. 3.MAINTAIN CATHODIC PROTECTION FOR STEEL MAINS BY THE USE OF CONTINUITY BONDS OR OTHER MEANS DETERMINED BY THE PSE CORROSION ENGINEER PER PSE GAS OPERATING STANDARD 2600.1300. 4.INSTALL ANODES AND TEST LEAD WIRES AS REQUIRED PER PSE GAS FIELD PROCEDURES 4515.1000 AND 4515.1020 AND PSE GAS OPERATING STANDARD 2600.1200. TEST LEAD WIRES ARE REQUIRED ON ALL TRANSITION FITTINGS. 5.INSTALL CURB VALVE AT PROPERTY LINE OR 5/8" PE WHIP AT MAIN (AS REQUIRED) ON NEW AND EXISTING SERVICES PER PSE GAS OPERATING STANDARD 2550.1600. 6.REFER TO PSE GAS OPERATING STANDARD 2525.1700 FOR MAIN AND SERVICE COVER REQUIREMENTS. 7.MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400 AND PSE GAS FIELD PROCEDURE 4700.1500. 8.PROJECT MANAGER TO MAKE AN ACTIVE SERVICE RUN IMMEDIATELY PRIOR TO STARTING CONSTRUCTION. 9.INSTALL REPLACEMENT MAINS PER PSE GAS OPERATING STANDARD 2525.2100. 10.PLUG ENDS OF DEACTIVATED OR INSERTED MAINS AND SERVICES IN ACCORDANCE WITH PSE GAS OPERATING STANDARDS 2525.2100 AND 2525.3600. 11.REMOVE OR RENDER INOPERABLE DEACTIVATED VALVES ON CASING WHERE MPE PIPE IS INSERTED. 12.INSIDE METER SETS SHALL BE MOVED OUTSIDE WHENEVER POSSIBLE OR SET REGULATORS AND VENTS OUTSIDE PER PSE GAS OPERATING STANDARDS 2575.2300 AND 2550.1700. 13.REPLACE EXISTING ACTIVE SERVICES PER PSE GAS OPERATING STANDARDS 2525.2100 AND 2575.2300. 14.REPLACE ALL "NO RECORD" SERVICES AND 1-1/8" PE SERVICES INSTALLED PRIOR TO 1985. 15.ACTIVE SERVICES TO BE REPLACED DENOTED BY: 16.MAINS AND SERVICES SHALL BE CONSTRUCTED IN ACCORDANCE WITH 2525.1200. 17. PIPE SQUEEZING SHALL BE DONE IN ACCORDANCE WITH GOS 2525.1200 AND GAS FIELD PROCEDURES 4700.1300 AND 4700.1310. 18.WHEN INSTALLING, DEACTIVATING, REPAIRING, OR OTHERWISE MODIFYING A PIPELINE THAT IS LOCATED WITHIN 200 FEET OF ANY ACTIVE REGULATING STATION, PRESSURE RELIEF AND LIMITING DEVICE, OR SINGLE SERVICE FARM TAP WHERE GAS SYSTEM ENGINEERING REVIEW AND APPROVAL IS REQUIRED PER GAS OPERATING STANDARDS. SEE REVIEW DOCUMENTS, PROVIDED BY ENGINEERING. 19.FIELD TO VERIFY THAT ALL PROPER SERVICE ACTIONS (FOLLOWING THE KEY TO SERVICE ACTION LEGEND) HAVE BEEN ACCOUNTED FOR PER THE "SERVICE CHECKLIST". IF A RISER IS FOUND IN THE FIELD AND WASN'T ACCOUNTED FOR, FIELD PERSONNEL SHALL CONFIRM WHETHER THE RISER IS AN ABANDONED OR IDLE RISER: 19.1 IF IT IS AN ABANDONED RISER, CONTACT THE POINT DESK TO REQUEST GFR TO REMOVE IT. 19.2 IF IT IS AN IDLE RISER, REPORT THE RISER TO THE PROJECT MANAGER SO THAT THE PROJECT MANAGER MAY CONFIRM WITH THE CUSTOMER WHETHER THEY WOULD LIKE TO KEEP THE SERVICE AND RISER. THE PROJECT MANAGER MAY INSTRUCT TO TEST AND TIE THE SERVICE IF THE CUSTOMER WANTS GAS OR DOESN'T PROVIDE PSE A RESPONSE IN A TIMELY MANNER. ### Excavated Dirt Pile 24" Min NOTE: Install 12" shading if the backfill contains rocks greater than 6" dia. 36" Cover Gas Main Line SIDE ACCESS VEHICLE Final Grade 4" Sand Bedding 12" Min. of Acceptable Backfill (See Definition Above) 6" Sand Shading 12"-18" Min Backfill for Direct Bury - The final backfill may be soil-based select material or native soil, but free of construction debris and shall not contain rocks larger than 10"-in. diameter to prevent impedence of gas system maintenance. TYPICAL GAS MAINLINE TRENCH DETAIL Not to scale CP NOTES: NOTIFY: SCOTT SALAZAR CORRISION TECH. @ 360-239-8146 AS NOTED 1 / 3 LEGEND EXISTING IP GAS MAIN PROPOSED IP GAS MAIN EXISTING GAS SERVICE //////////////DEACTIVATED IP GAS MAIN //////////////DEACTIVATED GAS SERVICE DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT CONTACT PHONE NO DATE Drawing Number SAP Sup Order Nbr PC APPROVAL T.FAY 253-213-2514 1/27/26 N/A N/A N/A E.WALKER-PAUL 253-625-0964 1/27/25 T.FAY 253-213-2514 S.SALAZAR 360-239-8146 2/26/26 N/A N/A N/A N/A YELM YELM LOOP PH 2 - SR 507 & 170TH ST SE PUBLIC IMPROVEMENT 6" PE IP MAIN REL. & 2" STW IP MAIN RET. SR 507 & 170TH ST SE, YELM, WA 98597PSE 109167315 N/A THURSTON 344 CSPPGPM S29-17-02E 284.044 284.046 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 2 1 REV# 3 DATE DESCRIPTIONBY 02/26/2026 Reviewed the print dated Feb 06, 2026 - 1:26pm, no changes to the current design. Contact scott salazar at the job completion with the retired STW Footage so that System GA-039421 can be updated. ssalaz WORK AREA 170TH ST SE ST A T E R O U T E 5 0 7 S E 235 50 / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / 740'E 19 ' S 47 ' N IP GAS FLOW IP G A S F L O W IP G A S F L O W ////// / / / / / / ////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////// 6" MPE IP 736'E (*40'E) 107026100 2006 6" MPE IP 736'E (*40'E) 107026100 2006 IP GAS FLOW CONSTRU C T I O N C L CO N S T R U C T I O N C L EX I S T I N G C L EXISTING CL CONSTRU C T I O N C L CO N S T R U C T I O N C L 2" S T W I P 1 9 ' S 64 - 3 5 0 1 9 6 4 2" S T W I P 1 9 ' S 64 S 3 4 9 1 9 6 4 PP P P AS NOTED 2 / 3 Owner / Developer Contact Info officeATTN: WSDOT - OLYMPIC REGION N/A N/A DEVIN MAHER (360) 570-6743 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 Reviewed and complied with all construction notes. Recorded all required information on the as-built per GOS 2500.1700. Completed post installation inspection per GOS 2525.1200 and 2525.2700. Left the work area in a clean and safe condition. FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: __________________________ Date ______________ (CHECK BOX TO CONFIRM COMPLETION) 4680 06/11 PLOT PLAN SCALE: 1" = 20'-0" DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT CONTACT PHONE NO DATE Drawing Number SAP Sup Order Nbr PC APPROVAL T.FAY 253-213-2514 1/27/26 N/A N/A N/A E.WALKER-PAUL 253-625-0964 1/27/25 T.FAY 253-213-2514 S.SALAZAR 360-239-8146 2/26/26 N/A N/A N/A N/A YELM YELM LOOP PH 2 - SR 507 & 170TH ST SE PUBLIC IMPROVEMENT 6" PE IP MAIN REL. & 2" STW IP MAIN RET. SR 507 & 170TH ST SE, YELM, WA 98597PSE 109167315 N/A THURSTON 344 CSPPGPM S29-17-02E 284.044 284.046 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 2 1 REV# 3 DATE DESCRIPTIONBY (____') CONSTRUCTION NOTE: ALL NEW PIPE TO BE INSTALLED @ 60" BELOW EXISTING GRADE DUE TO GRADE CUTS G PROP. 6" MPE IP - 12'ECL / EXIST. 6" MPE (*40'ECL) E 5.5'27' CL 22.5' W ASPHALT S/W CONC.SHOULDER ASPHALT CROSS SECTION - 170TH ST E SCALE: NONE G PL A N T E R 7' ASPHALT (____')(____') (__ _ _ ' ) (_ _ _ _ ' ) STATE ROUTE 507 SE ///////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////// ////////////////////////////////////////////////////////////////////// @PL 40'N " Polyethylene IP @PL 1985 91 8 ' E 2" STW IP 19'S 69S257 1969 2" STW IP 19'S 64-350 1964 IP GAS FLOW IP GAS FLOW EXISTING CL CONSTRUCTION CL / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / P /////////////////////////////// PP AS NOTED 3 / 3 Owner / Developer Contact Info officeATTN: WSDOT - OLYMPIC REGION N/A N/A DEVIN MAHER (360) 570-6743 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 Reviewed and complied with all construction notes. Recorded all required information on the as-built per GOS 2500.1700. Completed post installation inspection per GOS 2525.1200 and 2525.2700. Left the work area in a clean and safe condition. FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: __________________________ Date ______________ (CHECK BOX TO CONFIRM COMPLETION) 4680 06/11 PLOT PLAN SCALE: 1" = 20'-0" DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT CONTACT PHONE NO DATE Drawing Number SAP Sup Order Nbr PC APPROVAL T.FAY 253-213-2514 1/27/26 N/A N/A N/A E.WALKER-PAUL 253-625-0964 1/27/25 T.FAY 253-213-2514 S.SALAZAR 360-239-8146 2/26/26 N/A N/A N/A N/A YELM YELM LOOP PH 2 - SR 507 & 170TH ST SE PUBLIC IMPROVEMENT 6" PE IP MAIN REL. & 2" STW IP MAIN RET. SR 507 & 170TH ST SE, YELM, WA 98597PSE 109167315 N/A THURSTON 344 CSPPGPM S29-17-02E 284.044 284.046 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 2 1 REV# 3 DATE DESCRIPTIONBY Scale: None DETAIL1 2 6" MPE IP 736'E (*40'E) 107026100 (_ _ _ _ ' ) 2" S T W I P 1 9 ' S 64 - 3 5 0 1 9 6 4 (___') Scale: None DETAIL2 2 IP G A S F L O W IP GAS FLOW (_ _ _ _ ' ) (___')