Loading...
HomeMy WebLinkAboutSARAO SIGNED - PSE FINAL 105109166 DURANTN Vicinity Map 46.9430, -122.6208 Owner / Developer Contact Info officeATTN: C&E DEVELOPMENTS LLC P.O. BOX 2983 YELM, WA 98597 ERIC PETERSON 253.278.0343 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. GAS PHONE CABLE TV 516306912 105109166 N/A 105109829 N/A 101199856 N/A 593270598 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Commercial L/E Cutout Replace Re-Fuse Temporary Job Order Distribution Service Stubs HP Svc/MSA 10. 9. 8. 7. 6. 5. 4. 3. 2. 1.THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, PER THE TRENCH PROFILE, AND ALL EXCAVATIONS AT THE TRANSFORMER/HANDHOLE VAULT SITES SUCH THAT PSE FACILITIES WILL MATCH FINAL GRADE. VAULT HOLES WILL HAVE STABLE LEVEL BOTTOMS. CUSTOMER WILL PROVIDE 6" OF CRUSHED ROCK FOR VAULT BEDDING. ALL TRENCHES WILL HAVE 6" OF WASHED SAND COVER AND 4" BEDDING FOR ALL CONDUITS. THE CUSTOMER WILL PROVIDE SELECT BACKFILL, IF REQUIRED, AND COMPACTION AS NECESSARY. THE CUSTOMER IS RESPONSIBLE FOR DISPOSAL OF ALL NATIVE SPOILS NOT SUITABLE FOR USE AS BACKFILL. ALL TRENCHES MAY BE JOINT WITH GAS, TELEPHONE AND TV CABLE. ALL CABLES/CONDUITS TO BE INSTALLED IN CUSTOMER'S TRENCH AT THE DEPTH INDICATED IN TRENCH DETAIL (DEPENDENT UPON SIZE OF CONDUIT BEING INSTALLED TO MEET MIN 36" OF COVER). INSTALL CABLE ID TAGS AT EACH END OF THE PRIMARY CABLES PER THE CIRCUIT ONE-LINE DIAGRAM. UNLESS OTHERWISE SPECIFIED BY MUNICIPALITIES, INSTALL PVC (DB-120) ROAD CROSSINGS AS INDICATED ON THE CROSSINGS CONDUIT TABLE & AS SHOWN ON WORK SKETCH. CROSSINGS SHALL BE INSTALLED BY CUSTOMER/DEVELOPER PER PUGET SOUND ENERGY STANDARDS. AT SYMBOL: INSTALL UNDERGROUND PRIMARY CABLES IN CONDUIT. CABLE LENGTH AND CONDUIT SIZE AS INDICATED ON PRIMARY CABLE & CONDUIT TABLE. AT SYMBOL: INSTALL 600 VOLT UG SECONDARY CABLES IN CONDUIT. CABLE/CONDUIT SIZE AND LENGTH AS INDICATED ON SECONDARY CABLE & CONDUIT TABLE. AT SYMBOL: INSTALL MINI-PAD HANDHOLE & PADMOUNT TRANSFORMER. ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE. AT SYMBOL: INSTALL SECONDARY PEDESTAL/HANDHOLE W/ (3) MULTI-CONNECTORS. SIZE AS INDICATED ON SECONDARY HH/PEDESTAL TABLE. (EXCAVATION: 3' SQ.) AT SYMBOL: INSTALL JUNCTION BOX HANDHOLE. ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE. AT SYMBOL: INSTALL SECONDARY CABLE & CONDUIT STUB-OUT. AT SYMBOL: INSTALL STREET LIGHTING STANDARD. SIZE AND TYPE OF STANDARD/LUMINARIE AS INDICATED ON STREET LIGHTING TABLE. (CUSTOMER TO EXCAVATE & INSTALL CORRUGATED STREET LIGHT TUBES FOR PLACEMENT OF THE STREET LIGHT STANDARDS. ) INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMES AND DATES. POWER GENERAL NOTES - PLAT PROJECT 10 5 1 0 9 1 6 6 N/ A DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. CALLAHAN 206.503.1520 . A. DUNN .3.5.26 ... A. CABRERA 425.336.9196 2.2.26 REDT # ( RW-315192 )YELM DURANT ESTATES 1Ø PRIMARY U/G L.E.- 19 S/F LOTS & 4 M/F BLDGS, 8 UNITS 9910 DURANT ST SE, YELM, WA 98597 PUGET SOUND ENERGY N/A N/A N/A 105109166 N/A 1 OF 4 THURSTON N/A N/A QSTHLE 24SE-T17N-R01E N/A N/A 1701E096 1702E116 1701E096 YEL-25 COMCAST TED AXTEL 253.878.2794 LUMEN Dewayne Richert 253.221.0133 RIGHT OF WAY CAROLYN BANASKY 253.476.6416 . . . 11. E-Mail: Cell Phone: Project Manager Contact Information: Manager:JESSICA CALLAHAN 206.503.1520 jessica.callahan@pse.com x x x ... ... ... x CEDEVELOPMENT05@GMAIL.COM TYPICAL NOTCH-OUT FOR TRANSFORMER, NOT TO SCALE & SECONDARY PEDESTAL/HANDHOLE BACK OF EASEMENT STANDARD EASEMENT LINE ROW 10' PL 1' 4' - 5' Min. 1' 7'7' TRANSFORMER (WHEN PRESENT) 42" 45°42" 1' 45° Pr o p e r t y L i n e Road Side Top View of Mainline Trench for Single Stubout Location 4' Pr o p e r t y L i n e Road Side Top View of Mainline Trench for Pedestal or Double Stubout Location 42"45° 4' 45° STUBOUT EXCAVATION DIMENSIONS NOT TO SCALE MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE OIL-FILLED EQUIPMENT TRANSFORMER APPROVED AREA CO M B U S T I B L E B U I L D I N G W A L L S & R O O F 10' 10' 10' COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 3' MIN 3' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA 3' MIN SHALL BE STAGGERED CONNECTOR BARS IN THE FRONT NEUTRALS SHALL BE 18" 16" 13" 12"10" 2" 10" Pedestal will accept up to six 3" conduits SEALED WITH FOAM CONDUIT SHALL BE 120 PVC CONDUIT ELBOWS TYPICAL 24" RADIUS DB SIDE VIEW WITH CONDUIT 10" 18" 16" 13" 10" 2" 36" FRONT VIEW WITH CONDUIT SECONDARY PEDESTAL DETAIL NOT TO SCALE SITE POWER GENERAL NOTES - MULTIFAMILY PROJECT 11. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. 9. 10. JOINT TRENCH DETAIL NOT TO SCALE JOINT TRENCH DETAIL NOTES: 1. If the final backfill contains rocks greater than 8 inches in diameter , install 12 inches compacted sand shading across the full width of the trench. * If the final backfill contains rocks 8 inches in diameter or smaller , install 6 inches compacted sand shading across the full width of the trench. * 2. Rocks greater than 10 inches diameter are not permitted in the final backfill. 3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line. 4. Utilities shall not be stacked over the gas line in the trench. 5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements. 6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies. * Alternatives to full-width trench shading require PSE approval. Primary & Secondary & Communications (NTS) ROAD SIDE MINIPAD MINIPAD FIELD SIDE VAULT 6" of crushed rock (base for vault) P/L Power Secondary Power Primary Communications 42" Min 21"1' Feeder 38" 2" 4" Sand Bedding 12" Sand Cover 36" Cover 4" Sand Bedding 42" 6" Additional depth when Feeder is required PSE 10' FRONTAGE EASEMENT 1' TRANSFORMER Final Backfill Initial Backfill Trench Depth 42" - 48" ROAD SIDE NATIVE SECONDARY POWER PEDESTAL MATERIAL P/L Power Secondary Power Primary Conduit Tel. & TV Sand 6" or 12" 4" Sand Bedding 1' 36" Cover 42" 12" 18" Lower 2" 10" Pedestal PSE 10' FRONTAGE EASEMENT 1' Cover Primary Dirt Pile Final Grade 24" Min 36" Min Cover Over Power 48" Max Depth Final Backfill 4" Sand Bedding Property Line intercept (depth varies). SidewalkCurb Location of roof drain 48" Typical Width may vary per Number of Utilities and Conduits R/W or Excavated 12" Typical Power Secondary Power TV & TEL 12" Min 4,5 1,2 3 6 6" or 12" Min Sand Shading Over Power after Compaction1 VAULT DETAIL @ V01-V03 NOT TO SCALE EXCAVATION: _____ CUBIC YARDS 3'-6" SIDE VIEW 2" 6" CRUSHED ROCK TOP VIEW 7' 7' 6 1/3 MINIMUM CLEARANCES FROM OIL-FILLED EQUIP. TO BLDG. FEATURES NOT TO SCALE FIRE ESCAPE SERVICE GAS RELIEF DOOR, WINDOW, VENT, OR OTHER OPENING TANK FUEL VENT OIL-FILLED ELECTRICAL EQUIPMENT SPRINKLER VALVE, STANDPIPE, OR HYDRANT 20' 3' 10' 6' 10' (TRANSFORMER) LONGMIRE ST SE DU R A N T S T S E DU R A N T D R S E TE R R A G L E N N S T S E Oil-Filled Equipment Clearances per PSE Std 0700.1500 If the oil-filled equipment is adjacent to… Clearance Requirement Combustible walls or roof (including stucco).10 FT Noncombustible walls, soffits, and roofs (including brick, concrete, steel and stone) providing the side of the transformer facing the wall does not have doors. Materials that pass UBC Std. 2-1 or ASTM E136-79 are considered to be noncombustible. 3 FT Fire sprinkler valves, standpipes, and fire hydrants.6 FT Doors, windows, vents, fire escapes, or other building openings.10 FT The water's edge of a swimming pool or any body of water.15 FT Individual domestic and irrigation wells. Clearance not required on pole mounted transformers (pole placement still applies as stated in 6450.3000), TUT's installed in sealed vaults, 7200V single-phase padmount transformers 50kva or less, and ones with reduced flammability oil. 100 FT Facilities used to dispense or store LP, hazardous liquids, or fuel.20 FT Gas service meter relief vent.3 FT Generators, customer-owned transformers, etc.6 FT @ H1A, H1B, H2A, H3A & H3B LOT 1 LOT 2 LOT 3 LOT 5 LOT 6 LOT 7 LOT 8 LOT 9 LOT 10 LOT 11 LOT 15 LOT 16 LOT 17 LOT 22LOT 18 LOT 19 13A DUPLEX 14A DUPLEX 20A DUPLEX 21A DUPLEX LOT 23 LOT 4 LOT 12 OPEN SPACE & STORM TRACT A 13B DUPLEX 14B DUPLEX 20B DUPLEX 21B DUPLEX (2) 4/0 BLDG 1 1700 SQ.FT. 2 UNITS BLDG 2 1700 SQ.FT. 2 UNITS BLDG 3 1700 SQ.FT. 2 UNITS BLDG 4 1700 SQ.FT. 2 UNITS EX: 1-2" 56 ' 56' RO A D A DURANT DR SE #2 A C S R C YEL 25 FE E D DEVELOPER RESPONSIBLE FOR CONDUIT/WIRE FROM HH TO METER LOCATION (TYPICAL) (1) #8 ST. LIGHTS (1) 2/0 (1) 1/0 (2) 4/0 (1) 2/0 (1) 1/0 (2) 4/0 (1) 2/0 (1) 1/0 (2) 4/0 (1) 2/0 (1) 1/0 56 ' REFUSE @ 65T T97614 100 T H A V E S E LO N G M I R E S T S E 1" = 50' DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. CALLAHAN 206.503.1520 . A. DUNN .3.5.26 ... A. CABRERA 425.336.9196 2.2.26 REDT # ( RW-315192 )YELM DURANT ESTATES 1Ø PRIMARY U/G L.E.- 19 S/F LOTS & 4 M/F BLDGS, 8 UNITS 9910 DURANT ST SE, YELM, WA 98597 PUGET SOUND ENERGY N/A N/A N/A 105109166 1" = 50'2 OF 4 THURSTON N/A N/A QSTHLE 24SE-T17N-R01E N/A N/A 1701E096 1702E116 1701E096 YEL-25 COMCAST TED AXTEL 253.878.2794 LUMEN Dewayne Richert 253.221.0133 RIGHT OF WAY CAROLYN BANASKY 253.476.6416 . . . SITE PLAN CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE YEL-25 6.13.17 430 375 323 35 0 0 463 375 323 ... ... ... THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) Developer Note: The following Fault Current information MUST BE conveyed to the builder of the units: All units may require upgraded house electrical equipment as the fault current at the meter base may exceed 10,000 amps. FAULT CURRENT TABLE 1Ø PM TRANSFORMERS (240/120V) 120V WINDINGS 240V WINDINGS LOCATION SIZE R/X MIN. %Z FAULT CURRENT MIN. %Z FAULT CURRENT V01-V03 75kVA 0.5 2.30 36,200 AMPS 1.80 23,100 AMPS LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: Units: BUILDING #1 2 1700 200 ELEC 11kW+7kW (EV) 80A 2.5 @ H3A 1.4 @ H3A CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLE BLDG.# OF METERS SOURCE # OF RUNS WIRE SIZE REMARKS 1 1 H3A 2 4/0 - 1 2/0 - 1 1/0 - 2 1 H3B 2 4/0 - 1 2/0 - 1 1/0 - 3 1 H1A 2 4/0 - 1 2/0 - 1 1/0 - 4 1 H1B 2 4/0 - 1 2/0 - 1 1/0 - ST. LIGHTS 1 H2A 1 #8 - CHARGE TO WO# 105109166 ALL CUSTOMER-OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLE DEVELOPER TO COORDINATE WITH PSE PROJECT MANGER & SERVICE PROVIDER PRIOR TO EXCAVATING WITHIN 3' OF LOCATE MARKS OF PSE ENERGIZED FACILITIES TRANSFORMERS HAVE BEEN SIZED FOR 3.4KW EXTRA EV DEMAND PER UNIT LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: Units: BUILDING #2 2 1700 200 ELEC 11kW+7kW (EV) 80A 3.1 @ H3B 1.6 @ H3B LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: Units: BUILDING #3 2 1700 200 ELEC 11kW+7kW (EV) 80A 2.4 @ H1A 1.5 @ H1A LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: Units: BUILDING #4 2 1700 200 ELEC 11kW+7kW (EV) 80A 2.2 @ H1B 1.3 @ H1B CROSSING CONDUIT TABLE X-ING # LOCATION POWER XING LENGTH ASBUILT LOCATION TYPE OF CROSSING (Feeder, Primary, Secondary, etc.)FROM TO SIZE (IN)TYPE QTY X01 LOT 10 LOT 23 3 DB120 2 65 ( )' WCL SECONDARY X02 LOT 9 BLDG 4 3 DB120 1 65 ( )' WCL SECONDARY X03 LOT 8 BLDG 3 3 DB120 1 65 ( )' ECL SECONDARY X04 LOT 7 LOT 19 3 DB120 2 65 ( )' ECL SECONDARY X05 LOT 5 LOT 16 3 DB120 2 65 ( )' ECL SECONDARY X06 LOT 4 LOT 3 2 DB120 1 75 ( )' NCL PRIMARY X07 LOT 2 LOT 11 3 DB120 4 65 ( )' WCL SECONDARY 2" DB120 GREY PVC = 75 FT 2" PVC PLUG /CAPS = 2 3" DB120 GREY PVC = 780 FT 3" PVC PLUG /CAPS = 24 DEDICATED FACILITIES (105109166) for Dedicated Stub Locations SITE SPAN ADDITIONAL REMARKS LABOR UNITS #FROM TO FOOTAGE -V03 LOT 1 40 DED. CONDUIT & WIRE 2-36, 2-54A -V02 LOT 7 45 DED. CONDUIT & WIRE 2-36, 2-54A -V01 LOT 8 40 DED. CONDUIT & WIRE 2-36, 2-54A -V02 LOT 17 35 DED. CONDUIT & WIRE 2-36, 2-54A -V02 LOT 18 55 DED. CONDUIT & WIRE 2-36, 2-54A TOTAL FT=215 AT P01 (559386-147153) 2005 CLASS 4 - 45' -REMOVE LINKBREAK SWITCH CUTOUT (Y2096) -INSTALL 1Ø LOAD INTERRUPTER SWITCH CUTOUT (DLS115F) 6022.1000 -FUSE @ 65T (3421600); TAP AØ -INSTALL SW#T97614 SCHED.SQ. FT. MAX LRC = CIRCUIT FEET ADDED: 725' 17 2500 115 AMPS SITE SPECIFIC NOTES LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: Units: BUILDING #ST. LIGHTS N/A N/A 200 N/A 1 80A H2A @ 1.9 H2A @ 0.8 UNITS OF PROPERTY - INSTALL ONLY MATERIAL QTY DIST. ARRESTERS DIST. CUTOUTS DIST. INSULATORS TRANS. ARRESTERS TRANS. INSULATORS CROSSARM - DISTRIBUTION CROSSARM - TRANSMISSION UNITS OF PROPERTY - REMOVAL ONLY MATERIAL QTY DIST. ARRESTERS DIST. CUTOUTS DIST. INSULATORS TRANS. ARRESTERS TRANS. INSULATORS CROSSARM - DISTRIBUTION CROSSARM - TRANSMISSION NEW 1/O AL EKN191-AØ NEW 1/O AL EKN193-AØ NEW 1/O AL EKN192-AØ AØADX256 DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. CALLAHAN 206.503.1520 . A. DUNN .3.5.26 ... A. CABRERA 425.336.9196 2.2.26 REDT # ( RW-315192 )YELM DURANT ESTATES 1Ø PRIMARY U/G L.E.- 19 S/F LOTS & 4 M/F BLDGS, 8 UNITS 9910 DURANT ST SE, YELM, WA 98597 PUGET SOUND ENERGY N/A N/A N/A 105109166 AS SHOWN 3 OF 4 THURSTON N/A N/A QSTHLE 24SE-T17N-R01E N/A N/A 1701E096 1702E116 1701E096 YEL-25 COMCAST TED AXTEL 253.878.2794 LUMEN Dewayne Richert 253.221.0133 RIGHT OF WAY CAROLYN BANASKY 253.476.6416 . . . ... ... ... EX OVERHEAD CIRCUIT MAP 1702E116 SCALE: 6" = 1 MILE NEW PRIMARY UNDERGROUND CIRCUIT ONE-LINE DIAGRAM NOT TO SCALE EX UNDERGROUND CIRCUIT MAP 1701E096 NOT TO SCALE PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE FROM TO SIZE (IN)QTY. DESIGN LENGTH (FT) BENDS PULL (LBS) PULL REV (LBS) CABLE SIZE DESIGN LENGTH (FT) PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED LUBRICANT (Gal.) 90°45°22°11°A B C MANUFACTU RER COMPOUND YEAR NOTES CONDUIT CABLE EST.ACTUAL E01 V01 2 1 50 ----CONDUIT ONLY ----- V04 V01 CABLE ONLY 159 169 1/0 AL JKT 315 EKN191 ---1.4 V01 V02 2 1 205 ----102 102 1/0 AL JKT 215 EKN192 ---0.9 V02 V03 2 1 160 ----108 108 1/0 AL JKT 245 EKN193 ---1.0 2" PVC (FT) & BENDS =415 0 0 0 0 1/0 AL JKT TOTAL (FT) =775 TTL(Gal.)3.3 VAULT & EQUIPMENT TABLE SITE #GRID # VAULT SIZE & COVER TYPE & SIZE EQUIPMENT IN VAULT PRIMARY BUSHINGS TRANSFORMER ID NUMBERS (COMPANY ID) AS-BUILT INFORMATION LB DC FOREMAN: INCLUDE PHASE TAPPED V01 559425 147090 54"x54"x38" Unistrut HH Matid: 7663002 75KVA MP TRF 120/240 Matid: 9995530 2 - MINU1LL 6045.1010 AØ V02 559426 147070 54"x54"x38" Unistrut HH Matid: 7663002 75KVA MP TRF 120/240 Matid: 9995530 2 - MINU1LL 6045.1010 AØ V03 559427 147047 54"x54"x38" Unistrut HH Matid: 7663002 75KVA MP TRF 120/240 Matid: 9995530 1 1 MINU1LR 6045.1010 AØ Existing V04 559410 147109 42"x48"x38" Unistrut HH Matid: existing 37.5KVA MP 120/240 Matid: existing 1 - ELB10J 6041.1000 TAP AØ SITE THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) SITE LOT 1 LOT 2 LOT 3 LOT 5 LOT 6 LOT 7 LOT 8 LOT 9 LOT 10 LOT 11 LOT 15 LOT 16 LOT 17 LOT 22LOT 18 LOT 19 LOT 23 LOT 4 LOT 12 BLDG 1 1700 SQ.FT. 2 UNITS BLDG 2 1700 SQ.FT. 2 UNITS BLDG 3 1700 SQ.FT. 2 UNITS BLDG 4 1700 SQ.FT. 2 UNITS EX: 1-2" DEVELOPER RESPONSIBLE FOR CONDUIT/WIRE FROM HH TO METER LOCATION (TYPICAL) (1) #8 ST. LIGHTS (2) 4/0 (1) 2/0 (1) 1/0 (2) 4/0 (1) 2/0 (1) 1/0 (2) 4/0 (1) 2/0 (1) 1/0 (2) 4/0 (1) 2/0 (1) 1/0 DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. CALLAHAN 206.503.1520 . A. DUNN .3.5.26 ... A. CABRERA 425.336.9196 2.2.26 REDT # ( RW-315192 )YELM DURANT ESTATES 1Ø PRIMARY U/G L.E.- 19 S/F LOTS & 4 M/F BLDGS, 8 UNITS 9910 DURANT ST SE, YELM, WA 98597 PUGET SOUND ENERGY N/A N/A N/A 105109166 AS SHOWN 4 OF 4 THURSTON N/A N/A QSTHLE 24SE-T17N-R01E N/A N/A 1701E096 1702E116 1701E096 YEL-25 COMCAST TED AXTEL 253.878.2794 LUMEN Dewayne Richert 253.221.0133 RIGHT OF WAY CAROLYN BANASKY 253.476.6416 . . . ... ... ... NOT TO SCALE NEW CONDUIT DIAGRAM SECONDARY HH/PEDESTAL TABLE Site Pedestal or Handhole Number of Positions Required Remarks H1A PEDESTAL 5 - SEPL6 6050.1000 H1B PEDESTAL 5 - SEPL6 6050.1000 H2A PEDESTAL 3 -SEPS3 6050.1000 H3A PEDESTAL 5 - SEPL6 6050.1000 H3B PEDESTAL 6 - SEPL6 6050.1000 SECONDARY CABLE & CONDUIT TABLE LOCATION CABLE CONDUIT VOLTAGE ASBUILT INFORMATION SIZE LENGTH ASSUMED SIZE LENGTH BENDS DROP FLICKER Foreman - Complete FROM TO (1/O,4/O,350)Design (ft)Lot Corner to Meter (ft)(in)Design (ft)90°45°22°11°(Percent)(Percent)Actual Amount Installed Cable Conduit V01 H1A 350 165 3 100 3 2.4 1.5 V01 H1B 350 130 3 65 3 2.2 1.3 V01 LOT 8 4/O 100 50 3 100 1 3.2 2.4 V01 LOT 9 4/O 10 50 3 10 1 2.6 1.4 V01 LOT 10 4/O 10 50 3 10 1 2.6 1.4 V01 LOT 22 4/O 90 50 3 25 3 3.2 2.3 V01 LOT 23 4/O 85 50 3 20 2 3.1 2.2 V02 H2A 350 50 3 50 2 2.0 0.8 V02 LOT 5 4/O 10 50 3 10 1 2.5 1.4 V02 LOT 6 4/O 10 50 3 10 1 2.5 1.4 V02 LOT 7 4/O 105 50 3 105 1 3.1 2.4 V02 LOT 16 4/O 120 50 3 55 2 3.2 2.6 V02 LOT 17 4/O 125 50 3 60 3 3.2 2.6 V02 LOT 18 4/O 145 50 3 80 3 3.3 2.8 V02 LOT 19 4/O 140 50 3 75 2 3.3 2.8 H2A LOT 4 350 50 3 2.6 1.7 V03 H3A 350 140 3 75 4 2.5 1.4 V03 H3B 350 175 3 110 4 3.1 1.6 V03 LOT 1 4/O 100 50 3 100 1 3.4 2.4 V03 LOT 2 4/O 10 50 3 10 1 2.9 1.4 V03 LOT 3 4/O 10 50 3 10 1 2.9 1.4 V03 LOT 11 4/O 90 50 3 25 2 3.4 2.3 V03 LOT 12 4/O 95 50 3 30 3 3.4 2.3 H3B LOT 15 4/O 50 3 0 1 3.1 1.6 4/O UG Triplex (ft) =1255 3" PVC & BENDS (ft)=1150 46 0 0 0 4.3 350 UG Triplex (ft) =675 TOTAL QTS OF GLUE 4.3 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) CUST. OWNED SECONDARY 3" PRIMARY 2" CONDUIT LEGEND