HomeMy WebLinkAboutSARAO SIGNED - PSE FINAL 105109166 DURANTN
Vicinity Map
46.9430, -122.6208
Owner / Developer Contact Info
officeATTN:
C&E DEVELOPMENTS LLC
P.O. BOX 2983
YELM, WA 98597
ERIC PETERSON 253.278.0343
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
516306912 105109166
N/A 105109829
N/A 101199856
N/A 593270598
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Commercial L/E
Cutout Replace
Re-Fuse
Temporary
Job Order
Distribution
Service Stubs
HP Svc/MSA
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, PER THE TRENCH
PROFILE, AND ALL EXCAVATIONS AT THE TRANSFORMER/HANDHOLE VAULT SITES
SUCH THAT PSE FACILITIES WILL MATCH FINAL GRADE. VAULT HOLES WILL HAVE
STABLE LEVEL BOTTOMS. CUSTOMER WILL PROVIDE 6" OF CRUSHED ROCK FOR
VAULT BEDDING. ALL TRENCHES WILL HAVE 6" OF WASHED SAND COVER AND 4"
BEDDING FOR ALL CONDUITS. THE CUSTOMER WILL PROVIDE SELECT BACKFILL, IF
REQUIRED, AND COMPACTION AS NECESSARY. THE CUSTOMER IS RESPONSIBLE FOR
DISPOSAL OF ALL NATIVE SPOILS NOT SUITABLE FOR USE AS BACKFILL. ALL
TRENCHES MAY BE JOINT WITH GAS, TELEPHONE AND TV CABLE.
ALL CABLES/CONDUITS TO BE INSTALLED IN CUSTOMER'S TRENCH AT THE DEPTH
INDICATED IN TRENCH DETAIL (DEPENDENT UPON SIZE OF CONDUIT BEING INSTALLED
TO MEET MIN 36" OF COVER). INSTALL CABLE ID TAGS AT EACH END OF THE PRIMARY
CABLES PER THE CIRCUIT ONE-LINE DIAGRAM.
UNLESS OTHERWISE SPECIFIED BY MUNICIPALITIES, INSTALL PVC (DB-120) ROAD
CROSSINGS AS INDICATED ON THE CROSSINGS CONDUIT TABLE & AS SHOWN ON
WORK SKETCH. CROSSINGS SHALL BE INSTALLED BY CUSTOMER/DEVELOPER PER
PUGET SOUND ENERGY STANDARDS.
AT SYMBOL: INSTALL UNDERGROUND PRIMARY CABLES IN
CONDUIT. CABLE LENGTH AND CONDUIT SIZE AS INDICATED ON PRIMARY CABLE &
CONDUIT TABLE.
AT SYMBOL: INSTALL 600 VOLT UG SECONDARY CABLES IN
CONDUIT. CABLE/CONDUIT SIZE AND LENGTH AS INDICATED ON SECONDARY CABLE &
CONDUIT TABLE.
AT SYMBOL: INSTALL MINI-PAD HANDHOLE & PADMOUNT TRANSFORMER.
ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE.
AT SYMBOL: INSTALL SECONDARY PEDESTAL/HANDHOLE W/ (3)
MULTI-CONNECTORS. SIZE AS INDICATED ON SECONDARY HH/PEDESTAL TABLE.
(EXCAVATION: 3' SQ.)
AT SYMBOL: INSTALL JUNCTION BOX HANDHOLE. ADDITIONAL EQUIPMENT AS
INDICATED ON VAULT TABLE.
AT SYMBOL: INSTALL SECONDARY CABLE & CONDUIT STUB-OUT.
AT SYMBOL: INSTALL STREET LIGHTING STANDARD. SIZE AND TYPE OF
STANDARD/LUMINARIE AS INDICATED ON STREET LIGHTING TABLE. (CUSTOMER TO
EXCAVATE & INSTALL CORRUGATED STREET LIGHT TUBES FOR PLACEMENT OF THE
STREET LIGHT STANDARDS. )
INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMES
AND DATES.
POWER GENERAL NOTES - PLAT PROJECT
10
5
1
0
9
1
6
6
N/
A
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
J. CALLAHAN 206.503.1520 .
A. DUNN .3.5.26
...
A. CABRERA 425.336.9196 2.2.26
REDT # ( RW-315192 )YELM
DURANT ESTATES
1Ø PRIMARY U/G L.E.- 19 S/F LOTS & 4 M/F BLDGS, 8 UNITS
9910 DURANT ST SE, YELM, WA 98597
PUGET SOUND ENERGY
N/A N/A
N/A 105109166
N/A 1 OF 4
THURSTON N/A N/A QSTHLE
24SE-T17N-R01E N/A N/A
1701E096 1702E116 1701E096 YEL-25
COMCAST
TED AXTEL
253.878.2794
LUMEN
Dewayne Richert
253.221.0133
RIGHT OF WAY
CAROLYN BANASKY
253.476.6416
.
.
.
11.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:JESSICA CALLAHAN
206.503.1520
jessica.callahan@pse.com
x
x
x
...
...
...
x
CEDEVELOPMENT05@GMAIL.COM
TYPICAL NOTCH-OUT FOR TRANSFORMER,
NOT TO SCALE
& SECONDARY PEDESTAL/HANDHOLE
BACK OF EASEMENT
STANDARD
EASEMENT
LINE
ROW
10'
PL
1'
4' - 5'
Min.
1'
7'7'
TRANSFORMER
(WHEN PRESENT)
42"
45°42"
1'
45°
Pr
o
p
e
r
t
y
L
i
n
e
Road Side
Top View of Mainline Trench for
Single Stubout Location
4'
Pr
o
p
e
r
t
y
L
i
n
e
Road Side
Top View of Mainline Trench for Pedestal
or Double Stubout Location
42"45°
4'
45°
STUBOUT EXCAVATION DIMENSIONS
NOT TO SCALE
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
OIL-FILLED EQUIPMENT
TRANSFORMER
APPROVED
AREA
CO
M
B
U
S
T
I
B
L
E
B
U
I
L
D
I
N
G
W
A
L
L
S
&
R
O
O
F
10'
10'
10'
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
3'
MIN
3' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
3' MIN
SHALL BE STAGGERED
CONNECTOR BARS
IN THE FRONT
NEUTRALS SHALL BE 18"
16"
13"
12"10"
2"
10"
Pedestal will accept up to six 3" conduits
SEALED WITH FOAM
CONDUIT SHALL BE
120 PVC CONDUIT ELBOWS
TYPICAL 24" RADIUS DB
SIDE VIEW WITH CONDUIT
10"
18"
16"
13"
10"
2"
36"
FRONT VIEW WITH CONDUIT
SECONDARY PEDESTAL DETAIL
NOT TO SCALE
SITE
POWER GENERAL NOTES - MULTIFAMILY PROJECT
11.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
9.
10.
JOINT TRENCH DETAIL
NOT TO SCALE
JOINT TRENCH DETAIL
NOTES:
1. If the final backfill contains rocks greater than 8 inches in diameter , install 12 inches compacted sand shading across the full width of the trench. *
If the final backfill contains rocks 8 inches in diameter or smaller , install 6 inches compacted sand shading across the full width of the trench. *
2. Rocks greater than 10 inches diameter are not permitted in the final backfill.
3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the
side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line.
4. Utilities shall not be stacked over the gas line in the trench.
5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements.
6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies.
* Alternatives to full-width trench shading require PSE approval.
Primary & Secondary & Communications (NTS)
ROAD SIDE
MINIPAD
MINIPAD
FIELD SIDE
VAULT
6" of crushed rock
(base for vault)
P/L
Power
Secondary
Power
Primary
Communications
42" Min
21"1'
Feeder
38"
2"
4" Sand Bedding
12" Sand
Cover
36"
Cover
4" Sand Bedding
42"
6" Additional depth when
Feeder is required
PSE 10' FRONTAGE EASEMENT
1'
TRANSFORMER
Final
Backfill
Initial
Backfill
Trench Depth
42" - 48"
ROAD SIDE
NATIVE
SECONDARY POWER
PEDESTAL
MATERIAL
P/L
Power
Secondary
Power
Primary
Conduit
Tel. & TV
Sand
6" or 12"
4" Sand Bedding
1'
36"
Cover
42"
12"
18"
Lower 2"
10"
Pedestal
PSE 10' FRONTAGE
EASEMENT
1'
Cover
Primary
Dirt Pile
Final Grade
24" Min
36"
Min Cover
Over Power
48"
Max
Depth
Final Backfill
4" Sand Bedding
Property Line
intercept (depth varies).
SidewalkCurb
Location of roof drain
48" Typical
Width may vary per
Number of Utilities
and Conduits
R/W or
Excavated
12" Typical
Power
Secondary
Power
TV & TEL
12" Min
4,5
1,2
3
6
6" or 12" Min Sand Shading
Over Power after Compaction1
VAULT DETAIL @ V01-V03
NOT TO SCALE
EXCAVATION: _____ CUBIC YARDS
3'-6"
SIDE VIEW
2"
6"
CRUSHED
ROCK
TOP VIEW
7'
7'
6 1/3
MINIMUM CLEARANCES FROM OIL-FILLED EQUIP. TO BLDG. FEATURES
NOT TO SCALE
FIRE ESCAPE
SERVICE
GAS
RELIEF
DOOR, WINDOW, VENT,
OR OTHER OPENING
TANK
FUEL VENT OIL-FILLED
ELECTRICAL
EQUIPMENT
SPRINKLER VALVE,
STANDPIPE, OR
HYDRANT
20'
3'
10'
6'
10'
(TRANSFORMER)
LONGMIRE ST SE
DU
R
A
N
T
S
T
S
E
DU
R
A
N
T
D
R
S
E
TE
R
R
A
G
L
E
N
N
S
T
S
E
Oil-Filled Equipment Clearances per PSE Std 0700.1500
If the oil-filled equipment is adjacent to… Clearance
Requirement
Combustible walls or roof (including stucco).10 FT
Noncombustible walls, soffits, and roofs (including brick, concrete,
steel and stone) providing the side of the transformer facing the wall
does not have doors. Materials that pass UBC Std. 2-1 or ASTM
E136-79 are considered to be noncombustible.
3 FT
Fire sprinkler valves, standpipes, and fire hydrants.6 FT
Doors, windows, vents, fire escapes, or other building openings.10 FT
The water's edge of a swimming pool or any body of water.15 FT
Individual domestic and irrigation wells. Clearance not required on
pole mounted transformers (pole placement still applies as stated in
6450.3000), TUT's installed in sealed vaults, 7200V single-phase
padmount transformers 50kva or less, and ones with reduced
flammability oil.
100 FT
Facilities used to dispense or store LP, hazardous liquids, or fuel.20 FT
Gas service meter relief vent.3 FT
Generators, customer-owned transformers, etc.6 FT
@ H1A, H1B, H2A, H3A & H3B
LOT 1 LOT 2 LOT 3 LOT 5 LOT 6 LOT 7 LOT 8 LOT 9 LOT 10
LOT 11 LOT 15 LOT 16 LOT 17 LOT 22LOT 18 LOT 19
13A
DUPLEX 14A
DUPLEX 20A
DUPLEX
21A
DUPLEX
LOT 23
LOT 4
LOT 12
OPEN SPACE
& STORM
TRACT A
13B
DUPLEX 14B
DUPLEX
20B
DUPLEX
21B
DUPLEX
(2) 4/0
BLDG 1
1700 SQ.FT.
2 UNITS BLDG 2
1700 SQ.FT.
2 UNITS BLDG 3
1700 SQ.FT.
2 UNITS BLDG 4
1700 SQ.FT.
2 UNITS
EX: 1-2"
56
'
56'
RO
A
D
A
DURANT DR SE
#2
A
C
S
R
C
YEL
25
FE
E
D
DEVELOPER RESPONSIBLE
FOR CONDUIT/WIRE FROM
HH TO METER LOCATION
(TYPICAL)
(1) #8
ST. LIGHTS
(1) 2/0
(1) 1/0
(2) 4/0
(1) 2/0
(1) 1/0
(2) 4/0
(1) 2/0
(1) 1/0
(2) 4/0
(1) 2/0
(1) 1/0
56
'
REFUSE @ 65T
T97614
100
T
H
A
V
E
S
E
LO
N
G
M
I
R
E
S
T
S
E
1" = 50'
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
J. CALLAHAN 206.503.1520 .
A. DUNN .3.5.26
...
A. CABRERA 425.336.9196 2.2.26
REDT # ( RW-315192 )YELM
DURANT ESTATES
1Ø PRIMARY U/G L.E.- 19 S/F LOTS & 4 M/F BLDGS, 8 UNITS
9910 DURANT ST SE, YELM, WA 98597
PUGET SOUND ENERGY
N/A N/A
N/A 105109166
1" = 50'2 OF 4
THURSTON N/A N/A QSTHLE
24SE-T17N-R01E N/A N/A
1701E096 1702E116 1701E096 YEL-25
COMCAST
TED AXTEL
253.878.2794
LUMEN
Dewayne Richert
253.221.0133
RIGHT OF WAY
CAROLYN BANASKY
253.476.6416
.
.
.
SITE PLAN
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
YEL-25
6.13.17
430 375 323
35 0 0
463 375 323
...
...
...
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
Developer Note:
The following Fault Current information MUST BE conveyed
to the builder of the units:
All units may require upgraded house electrical equipment as the
fault current at the meter base may exceed 10,000 amps.
FAULT CURRENT TABLE
1Ø PM TRANSFORMERS (240/120V)
120V WINDINGS 240V WINDINGS
LOCATION SIZE R/X MIN.
%Z
FAULT
CURRENT
MIN.
%Z
FAULT
CURRENT
V01-V03 75kVA 0.5 2.30 36,200 AMPS 1.80 23,100 AMPS
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #1
2
1700
200
ELEC
11kW+7kW (EV)
80A
2.5 @ H3A
1.4 @ H3A
CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLE
BLDG.# OF
METERS SOURCE # OF RUNS WIRE SIZE REMARKS
1 1 H3A
2 4/0 -
1 2/0 -
1 1/0 -
2 1 H3B
2 4/0 -
1 2/0 -
1 1/0 -
3 1 H1A
2 4/0 -
1 2/0 -
1 1/0 -
4 1 H1B
2 4/0 -
1 2/0 -
1 1/0 -
ST. LIGHTS 1 H2A 1 #8 - CHARGE TO WO# 105109166
ALL CUSTOMER-OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLE
DEVELOPER TO COORDINATE WITH PSE
PROJECT MANGER & SERVICE PROVIDER
PRIOR TO EXCAVATING WITHIN 3' OF LOCATE
MARKS OF PSE ENERGIZED FACILITIES
TRANSFORMERS HAVE BEEN SIZED FOR
3.4KW EXTRA EV DEMAND PER UNIT
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #2
2
1700
200
ELEC
11kW+7kW (EV)
80A
3.1 @ H3B
1.6 @ H3B
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #3
2
1700
200
ELEC
11kW+7kW (EV)
80A
2.4 @ H1A
1.5 @ H1A
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #4
2
1700
200
ELEC
11kW+7kW (EV)
80A
2.2 @ H1B
1.3 @ H1B
CROSSING CONDUIT TABLE
X-ING
#
LOCATION POWER
XING LENGTH ASBUILT LOCATION
TYPE OF CROSSING (Feeder, Primary,
Secondary, etc.)FROM TO SIZE (IN)TYPE QTY
X01 LOT 10 LOT 23 3 DB120 2 65 ( )' WCL SECONDARY
X02 LOT 9 BLDG 4 3 DB120 1 65 ( )' WCL SECONDARY
X03 LOT 8 BLDG 3 3 DB120 1 65 ( )' ECL SECONDARY
X04 LOT 7 LOT 19 3 DB120 2 65 ( )' ECL SECONDARY
X05 LOT 5 LOT 16 3 DB120 2 65 ( )' ECL SECONDARY
X06 LOT 4 LOT 3 2 DB120 1 75 ( )' NCL PRIMARY
X07 LOT 2 LOT 11 3 DB120 4 65 ( )' WCL SECONDARY
2" DB120 GREY PVC = 75 FT 2" PVC PLUG /CAPS = 2
3" DB120 GREY PVC = 780 FT 3" PVC PLUG /CAPS = 24
DEDICATED FACILITIES (105109166) for Dedicated Stub Locations
SITE SPAN ADDITIONAL REMARKS LABOR UNITS
#FROM TO FOOTAGE
-V03 LOT 1 40 DED. CONDUIT & WIRE 2-36, 2-54A
-V02 LOT 7 45 DED. CONDUIT & WIRE 2-36, 2-54A
-V01 LOT 8 40 DED. CONDUIT & WIRE 2-36, 2-54A
-V02 LOT 17 35 DED. CONDUIT & WIRE 2-36, 2-54A
-V02 LOT 18 55 DED. CONDUIT & WIRE 2-36, 2-54A
TOTAL FT=215
AT P01 (559386-147153) 2005 CLASS 4 - 45'
-REMOVE LINKBREAK SWITCH CUTOUT (Y2096)
-INSTALL 1Ø LOAD INTERRUPTER SWITCH CUTOUT (DLS115F) 6022.1000
-FUSE @ 65T (3421600); TAP AØ
-INSTALL SW#T97614
SCHED.SQ. FT.
MAX LRC =
CIRCUIT FEET ADDED: 725'
17 2500
115 AMPS
SITE SPECIFIC NOTES
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #ST. LIGHTS
N/A
N/A
200
N/A
1
80A
H2A @ 1.9
H2A @ 0.8
UNITS OF PROPERTY -
INSTALL ONLY
MATERIAL QTY
DIST. ARRESTERS
DIST. CUTOUTS
DIST. INSULATORS
TRANS. ARRESTERS
TRANS. INSULATORS
CROSSARM - DISTRIBUTION
CROSSARM - TRANSMISSION
UNITS OF PROPERTY -
REMOVAL ONLY
MATERIAL QTY
DIST. ARRESTERS
DIST. CUTOUTS
DIST. INSULATORS
TRANS. ARRESTERS
TRANS. INSULATORS
CROSSARM - DISTRIBUTION
CROSSARM - TRANSMISSION
NEW 1/O AL
EKN191-AØ
NEW 1/O AL
EKN193-AØ
NEW 1/O AL
EKN192-AØ
AØADX256
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
J. CALLAHAN 206.503.1520 .
A. DUNN .3.5.26
...
A. CABRERA 425.336.9196 2.2.26
REDT # ( RW-315192 )YELM
DURANT ESTATES
1Ø PRIMARY U/G L.E.- 19 S/F LOTS & 4 M/F BLDGS, 8 UNITS
9910 DURANT ST SE, YELM, WA 98597
PUGET SOUND ENERGY
N/A N/A
N/A 105109166
AS SHOWN 3 OF 4
THURSTON N/A N/A QSTHLE
24SE-T17N-R01E N/A N/A
1701E096 1702E116 1701E096 YEL-25
COMCAST
TED AXTEL
253.878.2794
LUMEN
Dewayne Richert
253.221.0133
RIGHT OF WAY
CAROLYN BANASKY
253.476.6416
.
.
.
...
...
...
EX OVERHEAD CIRCUIT MAP 1702E116
SCALE: 6" = 1 MILE
NEW PRIMARY UNDERGROUND CIRCUIT ONE-LINE DIAGRAM
NOT TO SCALE
EX UNDERGROUND CIRCUIT MAP 1701E096
NOT TO SCALE
PRIMARY CABLE & CONDUIT TABLE
LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE
FROM TO SIZE
(IN)QTY.
DESIGN
LENGTH
(FT)
BENDS PULL
(LBS)
PULL
REV
(LBS)
CABLE SIZE
DESIGN
LENGTH
(FT)
PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED LUBRICANT (Gal.)
90°45°22°11°A B C MANUFACTU
RER COMPOUND YEAR NOTES CONDUIT CABLE EST.ACTUAL
E01 V01 2 1 50 ----CONDUIT ONLY -----
V04 V01 CABLE ONLY 159 169 1/0 AL JKT 315 EKN191 ---1.4
V01 V02 2 1 205 ----102 102 1/0 AL JKT 215 EKN192 ---0.9
V02 V03 2 1 160 ----108 108 1/0 AL JKT 245 EKN193 ---1.0
2" PVC (FT) & BENDS =415 0 0 0 0 1/0 AL JKT TOTAL (FT) =775 TTL(Gal.)3.3
VAULT & EQUIPMENT TABLE
SITE #GRID #
VAULT SIZE &
COVER
TYPE & SIZE
EQUIPMENT IN
VAULT
PRIMARY
BUSHINGS TRANSFORMER ID NUMBERS
(COMPANY ID)
AS-BUILT INFORMATION
LB DC FOREMAN: INCLUDE PHASE TAPPED
V01 559425
147090
54"x54"x38"
Unistrut HH
Matid: 7663002
75KVA MP TRF
120/240
Matid: 9995530
2 -
MINU1LL 6045.1010 AØ
V02 559426
147070
54"x54"x38"
Unistrut HH
Matid: 7663002
75KVA MP TRF
120/240
Matid: 9995530
2 -
MINU1LL 6045.1010 AØ
V03 559427
147047
54"x54"x38"
Unistrut HH
Matid: 7663002
75KVA MP TRF
120/240
Matid: 9995530
1 1
MINU1LR 6045.1010 AØ
Existing
V04
559410
147109
42"x48"x38"
Unistrut HH
Matid: existing
37.5KVA MP
120/240
Matid: existing
1 -
ELB10J 6041.1000 TAP AØ
SITE
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
SITE
LOT 1
LOT 2 LOT 3 LOT 5 LOT 6 LOT 7 LOT 8 LOT 9 LOT 10
LOT 11 LOT 15 LOT 16 LOT 17
LOT 22LOT 18 LOT 19
LOT 23
LOT 4
LOT 12
BLDG 1
1700 SQ.FT.
2 UNITS
BLDG 2
1700 SQ.FT.
2 UNITS
BLDG 3
1700 SQ.FT.
2 UNITS
BLDG 4
1700 SQ.FT.
2 UNITS
EX: 1-2"
DEVELOPER RESPONSIBLE
FOR CONDUIT/WIRE FROM
HH TO METER LOCATION
(TYPICAL)
(1) #8
ST. LIGHTS
(2) 4/0
(1) 2/0
(1) 1/0
(2) 4/0
(1) 2/0
(1) 1/0
(2) 4/0
(1) 2/0
(1) 1/0
(2) 4/0
(1) 2/0
(1) 1/0
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
J. CALLAHAN 206.503.1520 .
A. DUNN .3.5.26
...
A. CABRERA 425.336.9196 2.2.26
REDT # ( RW-315192 )YELM
DURANT ESTATES
1Ø PRIMARY U/G L.E.- 19 S/F LOTS & 4 M/F BLDGS, 8 UNITS
9910 DURANT ST SE, YELM, WA 98597
PUGET SOUND ENERGY
N/A N/A
N/A 105109166
AS SHOWN 4 OF 4
THURSTON N/A N/A QSTHLE
24SE-T17N-R01E N/A N/A
1701E096 1702E116 1701E096 YEL-25
COMCAST
TED AXTEL
253.878.2794
LUMEN
Dewayne Richert
253.221.0133
RIGHT OF WAY
CAROLYN BANASKY
253.476.6416
.
.
.
...
...
...
NOT TO SCALE
NEW CONDUIT DIAGRAM
SECONDARY HH/PEDESTAL TABLE
Site
Pedestal
or
Handhole
Number of
Positions
Required
Remarks
H1A PEDESTAL 5 - SEPL6 6050.1000
H1B PEDESTAL 5 - SEPL6 6050.1000
H2A PEDESTAL 3 -SEPS3 6050.1000
H3A PEDESTAL 5 - SEPL6 6050.1000
H3B PEDESTAL 6 - SEPL6 6050.1000
SECONDARY CABLE & CONDUIT TABLE
LOCATION
CABLE CONDUIT VOLTAGE ASBUILT INFORMATION
SIZE LENGTH ASSUMED SIZE LENGTH BENDS DROP FLICKER Foreman - Complete
FROM TO (1/O,4/O,350)Design (ft)Lot Corner to
Meter (ft)(in)Design (ft)90°45°22°11°(Percent)(Percent)Actual Amount Installed Cable Conduit
V01 H1A 350 165 3 100 3 2.4 1.5
V01 H1B 350 130 3 65 3 2.2 1.3
V01 LOT 8 4/O 100 50 3 100 1 3.2 2.4
V01 LOT 9 4/O 10 50 3 10 1 2.6 1.4
V01 LOT 10 4/O 10 50 3 10 1 2.6 1.4
V01 LOT 22 4/O 90 50 3 25 3 3.2 2.3
V01 LOT 23 4/O 85 50 3 20 2 3.1 2.2
V02 H2A 350 50 3 50 2 2.0 0.8
V02 LOT 5 4/O 10 50 3 10 1 2.5 1.4
V02 LOT 6 4/O 10 50 3 10 1 2.5 1.4
V02 LOT 7 4/O 105 50 3 105 1 3.1 2.4
V02 LOT 16 4/O 120 50 3 55 2 3.2 2.6
V02 LOT 17 4/O 125 50 3 60 3 3.2 2.6
V02 LOT 18 4/O 145 50 3 80 3 3.3 2.8
V02 LOT 19 4/O 140 50 3 75 2 3.3 2.8
H2A LOT 4 350 50 3 2.6 1.7
V03 H3A 350 140 3 75 4 2.5 1.4
V03 H3B 350 175 3 110 4 3.1 1.6
V03 LOT 1 4/O 100 50 3 100 1 3.4 2.4
V03 LOT 2 4/O 10 50 3 10 1 2.9 1.4
V03 LOT 3 4/O 10 50 3 10 1 2.9 1.4
V03 LOT 11 4/O 90 50 3 25 2 3.4 2.3
V03 LOT 12 4/O 95 50 3 30 3 3.4 2.3
H3B LOT 15 4/O 50 3 0 1 3.1 1.6
4/O UG Triplex (ft) =1255 3" PVC & BENDS (ft)=1150 46 0 0 0 4.3
350 UG Triplex (ft) =675 TOTAL QTS OF GLUE 4.3
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
CUST. OWNED
SECONDARY 3"
PRIMARY 2"
CONDUIT LEGEND