Loading...
HomeMy WebLinkAbout10 27 2026 Yelm City Council Agenda PacketC I T Y C O U N C I L A G E N D A O c t o b e r 2 7,2 0 2 6 6:0 0 P M Yelm City Council meetings are held in-person at 106 2 nd St SE Yelm, WA 98597 and virtually on Zoom. Registration is required to attend virtually; please use the link below to register. https://us06web.zoom.us/webinar/register/WN_XetU9YHzQLOvHQrx162F7Q 1.C A L L T O O R D E R/R O L L C A L L 2.A G E N D A A P P R O V A L 3.S P E C I A L P R E S E N T A T I O N S–N ONE SCHEDULED 4.P U B L I C C O M M E N T--C O M P L E T E A B L U E S P E A K E R’S C A R D O R R A I S E H A N D V I R T U A L L Y 5.C O N S E N T A G E N D A a)SEPTEMBER 22, 2026 REGULAR MEETING MINUTES b)SEPTEMBER 29, 2026 SPECIAL STUDY SESSION MINUTES c)OCTOBER 6, 2026 STUDY SESSION MINUTES 6.N E W B U S I N E S S a)PUBLIC HEARING - ORDINANCE NO. 1153 b)O RDINANCE NO. 1153 - FY2027-2028 BIENNIAL BUDGET Final action and second public hearing will take place at the November 24, 2026, Yelm City Counc il m eeting. c)P UBLIC HEARING - ORDINANCE NO. 1152 d)O RDINANCE 1152 FISCAL YEAR 2027 AD VALOREM Final action and second public hearing will take place at the November 24, 2026, Yelm City Counc il m eeting. e)2027/2028 BIENNIAL CAPITAL BUDGET PRESENTATION f)P UBLIC WORKS CONTRACT WITH ACTIVE CONSTRUCTION, INC. FOR CONSTRUCTION OF THE 2026 CREEK ST. WATER MAIN IMPROVEMENTS PROJECT Move to authorize Mayor Joe DePinto to sign the Public Works Contract with Active Construction Inc. for construction of the 2026 Creek St. Water Main Improvements Project in the not to exc eed am ount of $1,597,597,00. 106 2 nd ST SE Yelm, WA 98597 360.458.3244 www.yelmwa.gov The City of Yelm is an equal opportunity employer and provider g) AMENDMENT NO. 2 TO THE PROFESSIONAL SERVICES AGREEMENT WITH RH2 FOR CONSTRUCTION MANAGEMENT OF THE 2026 CREEK ST. WATER MAIN IMPROVEMENTS PROJECT. Move to authorize Mayor Joe DePinto to sign Amendment No. 2 to the Professional Services Agreement with RH2 for construction management of the 2026 Creek St. Water Main Improvements project in the not to exceed amount of $123,000. h) BOYS AND GIRLS CLUB OF THURSTON COUNTY USE AGREEMENT AMENDMENT Move to authorize Mayor DePinto or his designee to sign Amendment No. 2 with the Boys and Girls Club of Thurston County extending the time of the use agreement. 7. O L D B U S I N E S S–N ONE S CHEDULED 8.S T A N D I N G C O U N C I L C O M M I T T E E R E P O R T S a) Public Safety Committee b) Public Services Committee c) Finance Committee d) General Government Committee 9. M A Y O R/C I T Y A D M I N I S T R A T O R/S T A F F R E P O R T S 1 0.C O U N C I L M E M B E R R E P O R T S 1 1.E X E C U T I V E S E S S I O N a) None Scheduled 1 2.A D J O U R N M E E T I N G I N F O R M A T I O N All regular Yelm City Council meetings are recorded. Meetings can be viewed at www.yelmwa.gov or a copy may be purchased by contacting the City Clerk’s office at 360.458.8 816. It is the City of Yelm’s policy to provide reasonable accommodations for people with disabilities. If you require reasonable accommodations to partici pate at a City Council meeting, please contact the City Clerk’s office at 360.458.8816 at least four (4) working days prior to meeting. I nformation on the Americans with Disabilities Act and the Title VI Statement is available at www.yelmwa.gov/human-resources. *The public comment portion of the agenda is an opportunity for the public to address the Council for items that ar e not on the published agenda. Comments are limited to th ree minutes and five speakers. Comment on matters listed on the published agenda are welcomed as part of the normal agenda. Public Comment Guidelines: The City reserves up to five members of the public to address the Council at the beginning of regular business meetings on topics that are not on the agenda. Each speaker will be given 3 minutes and may be asked follow up questions by the Mayor or Council. Further public comment may be allowed on agenda topics as time permits. We ask that speakers use respectful language and remember they are speaking to fellow citizens of Yelm who are committed to listening and responding appropriately to citizens' concerns. Members of the public engaging in disruptive behavior may be removed or blocked from the meetin g Page 2 of 2 CITY COUNCIL MEETING MINUTES VIRTUAL AND IN PERSON TUESDAY, September 22, 2026 Call to Order: Mayor Joe DePinto called t he meeting to order at 6:0 0 PM. Roll Call: Tracey Wood, J oseph Richardson, Griselda Arias, Steph a nie Kang iser, Brian Hess, David Johnstone, Terry Kaminski and Mayor Joe DePinto. Staff Present: City Administrator Todd Stancil, HR Specialist Shelby Denny, Finance Director Stephanie Nanavich, Civil Review Engineer Reza Roukerd, and Public Services Director Cody Colt. APPROVAL OF TH E Motion by Tracey Wood to approve the agenda. AGENDA: Seconded by Terry Kaminski Motion carried 7-0 PUBLIC COMMENT: Judy Hickman shared concerns about the Blue Fern Development. Joshua Crossman spoke in opposition to an automatic CPI that will impact water bills. CONSENT AGENDA: a) September 8, 2026, Regular Meeting Minutes Motion by Terry Kaminski to approve the Consent Agenda. Seconded by Tracey Wood Motion carried 7-0 NEW BUSINESS: 2027-2028 Preliminary Budget Presentation Finance Director Stephanie Nanavich presented an overview of the proposed 2027 2028 preliminary biennial budget, including projected revenues and expenditures, fund balances, proposed staffing changes, anticipated capital and equipment needs, and future technology reserves. The presentation also included a review of the City's major operating and utility funds and an overview of the upcoming budget schedule. Council asked clarifying questions regarding technology reserves and proposed staffing additions. Professional Services Agreement with Parametrix, Inc. for NPDES Program Development and Stormwater Management Plan Update Page 1 of 3 September 22, 2026, City of Yelm Regular Council Meeting. These minutes record the official actions of the Yelm City Council. Compl ete recordings are available on YouTube. Yelm City Council meetings are held in-person at 106 2 nd St SE Yelm, WA 98597 and on Zoom. Registration is required to attend virtually by selecting the link that is available on the city website. Motion by Brian Hess to authorize the Mayor to execute a Professional Services Agreement with Parametrix, Inc. for NPDES Program Development and preparation of an updated Stormwater Management Program Plan in an amount not to exceed $119,935.87. Seconded by Joseph Richardson Motion carried 7-0 Ordinance No. 1158 Amending Yelm Municipal Code Section 13.04.250, Monthly Water Rates Motion by Terry Kaminski to approve Ordinance No. 1158 amending section 13.04.250 Yelm Municipal Code relating to monthly water rates and declaring an effective date of January 1, 2027. Seconded by Brian Hess Motion carried 5-2 with a roll call vote. Ordinance No. 1159 Amending Yelm Municipal Code Section 13.04.095, Monthly Sewer Rates Motion by Brian Hess to approve Ordinance No. 1159 amending section 13.04.095 Yelm Municipal Code relating to and lowering monthly sewer rates and declaring an effective date of January 1, 2027. Seconded by Griselda Arias Motion carried 6-1 with a roll call vote. Ordinance No. 1160 Amending Yelm Municipal Code Section 13.10.050, Monthly Stormwater Rates Motion by Brian Hess to approve Ordinance No. 1160 amending section 13.10.050 Yelm Municipal Code relating to stormwater rates and declaring an effective date of January 1, 2027. Seconded by Stephanie Kangiser Motion carried 5-2 with a roll call vote. STANDING COUNCIL COMMITTEE REPORTS: Public Services Committee Councilmember Richardson gave a report of the Public Services Committee meeting. General Government Committee Councilmember Arias gave a report of the General Government Committee meeting. MAYOR/CITY ADMINISTRATOR/STAFF REPORTS: City Administrator Gave department updates. Mayor Report Will meet with Matt Marshall next week, attended the Thurston County Mayors Meeting, Thurston Regional Planning Council (TRPC) Retreat, shared condolences to the family of Cynthia Schmeir. Page 2 of 3 September 22, 2026, City of Yelm Regular Council Meeting. These minutes record the official actions of the Yelm City Council. Complete recor COUNCILMEMBER REPORTS: Councilmember Wood Attended the Transportation Policy Board meeting. Councilmember Arias Coordinated with Family Support Center and Yelm Prairie Christian Center to pilot staff to assist people with Coordinated Entry, attended Books and Bling at the Community Center, will attend the Regional Housing meeting tomorrow. Councilmember Kangiser Attended the Stars and Stripes Revolutionary, attended the AWC PARC training for elected officials, attended the Planning Commission meeting, attend the levy information session, attended the Dollars for Scholars meeting, helped serve the senior dinner. Councilmember Hess Will attend the SWAC meeting and shared information for retired veterans, shared kudos to Director Colt on the start of construction at the Veterans Memorial location, Councilmember Kaminski Attended the AWC Creative District training, attended the Nisqually River Council meeting, attended the Law and Justice meeting. ADJOURNMENT: Motion by Tracey Wood to adjourn the meeting at 7:15 PM. Seconded by Stephanie Kangiser Motion carried 7-0 __________________________________ Joe DePinto, Mayor ___________________________________ Kathy Linnemeyer, City Clerk Page 3 of 3 September 22, 2026, City of Yelm Regular Council Meeting. These minutes record the official actions of the Yelm City Council. Complete recor CITY COUNCIL SPECIAL STUDY SESSION MEETING MINUTES VIRTUAL AND IN PERSON TUESDAY, September 29, 2026 Call to Order: Mayor DePinto c al led t he meeting to order at 4:0 0 PM Roll Call: Tracey Wood, Joseph Richardson, Griselda Arias, Stephanie Kangiser, Brian Hess, David Johnston e, Terry Kaminski and Joe DePinto. Staff Present: City Administrator Todd Stancil, City Clerk Kathy Linnemeyer, Planning and Building Manager Gary Cooper and Pub lic Services Director Cody Colt PRESENT AT IONS/DISCUSSION ITEMS: Development Agreement between the City of Yelm and Blue Fern Development – Mayor DePinto opened the special study session and clarified that the meeting was informational only, with no action to be taken. He thanked Council and Blue Fern Development for attending and acknowledged the work completed to date. He noted that an oppor tunity for public comment and consideration of the Development Agreement is scheduled for the October 13, 2026, Council meeting. City Administrator Todd Stancil thanked everyone for attending and acknowledged the significant work involved in preparing the proposed Development Agreement. He emphasized that the agreement represents an important step toward moving the project forward, with additional planning and dev elopment processes still required. The Development Agreement is scheduled to return to Council on October 13, 2026, for consideration and action. Blue Fern Development provided an overview of the proposed Yelm Master Planned Community, including project history, location, conceptual site plan, proposed development agreement, Tahoma Boulevard extension, commercial and mixed-use development, affordabl e housing, and parks and open space and answered questions from the City Council. Page 1 of 2 September 29, 2026, City of Yelm Council Special Study Session. These minutes record the official actions of the Yelm City Council. ADJOURNMENT The meeting adjourned at 6:01 PM __________________________ Joe DePinto, Mayor _________________________ Kathy Linnemeyer, City Clerk Page 2 of 2 September 29, 2026, City of Yelm Council Special Study Session. These minutes record the official actions of the Yelm City Council. CITY COUNCIL STUDY SESSION MEETING MINUTES VIRTUAL AND IN PERSON TUESDAY, October 6,2026 Call to Order: Mayor Pro-Tem Kangiser c al led t he meeting to order at 6:0 0 PM Roll Call: Tracey Wood, Joseph Richardson, Griselda Arias, Stephanie Kangiser, Brian Hess, David Johnston e, Terry Kaminski and Joe DePinto. Staff Present: C ity Administrator Todd Stancil, City Clerk Kathy Linnemeyer, Projects & Programs Manager Brad Chatwood, Finance Director Stephanie Nanavich, Court Administrator Sonia Ramirez, IT Director Jason Hardy, Police Chief Rob Carlson and Pub lic Services Director Cody Colt PRESENT AT IONS/DISCUSSION ITEMS: Yelm Community Schools Levy Presentation – School Superintendent Chris Woods gave a presentation on Educational Programs and the Operation Levy. 2027/2028 Department Budget Overview – Finance Director Stephanie Nanavich presented an overview of the 2027–2028 preliminary biennial budget departmental goals and priorities, including proposed staffing changes, capital projects, technology improvements, and operational needs. Department Directors were available to answer ques tions, and Council discussed several departmental requests and upcoming projects. Staff reviewed the remaining budget schedule, including upcoming public hearings and anticipated budget adoption in November. Council Vacancy Process – Mayor DePinto led a discussion on the process to fill Council vacancies to standardize the process and be consistent each time there is a vacancy to fill. Councilmember Arias reported that the General Government discussed the process and prefers Ranked Cho ice voting. MAYORS REPORT – City Administrator Todd Stancil gave an update on the next steps for the 640-acre development and announced that the development agreement will be on October 13, 2026, meeting agenda for further discussion and action. Mayor DePinto announced that he will attend the Puget Sound Energy ribbon cutting for new EV charging stations at Cochrane Park. Page 1 of 2 October 6, 2026, City of Yelm Council Study Session. These minutes record the official actions of the Yelm City Council. COUNCILMEMBER INITIATIVES – Councilmember Johnstone clarified that he a fan of ranked choice voting and that the process needs to be added to the Mayor/Councilmember Protocol Manual. Councilmember Kaminski asked about the status of retention pond maintenance coming back before Council on a future agenda. ADJOURNMENT The meeting adjourned at 7:19 PM __________________________ Joe DePinto, Mayor _________________________ Kathy Linnemeyer, City Clerk Page 2 of 2 October 6, 2026, City of Yelm Council Study Session. These minutes record the official actions of the Yelm City Council. Meeting Date: _____________ CITY COUNCIL AGENDA ITEM SUMMARY City of Yelm, Washington AGENDA ITEM:Ordinance No 1053 2027-2028 Biennium Budget Amendment COMMITTEE REVIEW: X YES COMMITTEE: FINANCE COMMITTEE COMMITTEE RECOMMENDATION: Approved PROPOSED MOTION: Motion to adopt Ordinance No 1053 2027-2028 Biennial Budget KEY FACTS AND INFORMATION SUMMARY: Staff presented the preliminary biennial budget to Council on October 27 th and held two public hearings on October 27 th and November 2 4th on the proposed Ad Valorem Tax and the proposed biennial budget. The attached ordinance provides a balanced budget and reflects a conservative approach to revenue projections and a thorough analysis of planned expenditures. The budget includes the following additional FTE’s; Court Clerk (1), Deputy Clerk (1), Parks Maintenance (1), Streets Maintenance Worker (1), and Collections Assistant (1). The budget also includes promoting two Patrol Officers to Sergeant and one Police R ecords Specialist to Police Executive Assistant. ATTACHMENTS: Ordinance No. 1053 2027-2028 Biennial Budget Respectfully Submitted: __________________ Stephanie Nanavich Finance Director 1 | Page ORDINANCE NO.11 53 AN ORDINANCE OF THE CITY OF YELM, WASHINGTON ADOPTING THE YELM MUNICIPAL BUDGET FOR THE 2027-2028 BIENNIUM. WHEREAS, the City Council held public hearings on October 2 7, 202 6 and November 2 4, 202 6, following required public notification, on the pr oposed biennial budget; now, therefore, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF YELM AS FOLLOWS: Section 1. Funds Appropriated. The City Council hereby adopts the City of Yelm's budget for the 2027–2028 fiscal biennium, commencing January 1, 2027, and ending December 31, 2028. The amounts set forth in Appendix I, attached hereto and incorporated herein by this reference, are hereby appropriated for expenditure from the respective funds and for the purposes identified therein, in the aggregate amount of $83,319,504. Expenditures shall be made in accordance with applicable law and the appropriations established by this ordinance. Section 2. Position s. The budget includes the following additional FTEs; Court Clerk (1), Deputy Clerk (1), Parks Maintenance (1), Streets Maintenance Worker (1), and Collections Assistant (1). The budget also includes promoting two Patrol Officers to Sergeant and one Police Records Specialist to Police Executive Assistant. Section 3. Transmittal. The City Clerk shall transmit copies of the adopted biennial budget to the Washington State Auditor's Office and the Association of Washington Cities, and shall make such other filings and distributions as required by applicable law. Section 4.Effective Date.This Ordinance shall take effect five days following publication. Section 5. Severability. Should any section, paragraph, sentence, clause or phrase of this Ordinance, or its application to any person or circumstance, be declared unconstitutional or otherwise invalid for any reason, or should any portion of this Ordinance be preempted by State or Federal law or regulation, such decision or preemption shall not affect the validity of the remaining portions of this Ordinance or its application to other persons or circumstances. Adopted by the Yelm City Council at the regular meeting this 24 th day of November 202 6. ____________________________ Joe DePinto, Mayor APPROVED AS TO FORM: ____________________________ Brent Dille, City Attorney ATTEST: _____________________________ Kathy Linnemeyer, City Clerk PUBLISHED: EFFECTIVE DATE: Appendix I – 2027–2028 Biennial Budget Appropriations 2027 Total 2027- Beginning 2028 Total 2027- 2028 Ending Fund Budgeted 2028 Budgeted Fund Balance +Revenues = Total Resources -Expenditures =Balance GENERAL FUND City of Yelm General Fund (001) 4,730,001 21,557,064 26,287,065 23,262,124 3,024,941 Total for General Fund 4,730,001 21,557,064 26,287,065 23,262,124 3,024,941 UTILITY ENTERPRISE FUNDS Stormwater Enterprise Fund (400) 874,428 1,166,000 2,040,428 1,446,242 594,186 Water Enterprise Fund (401) 5,282,341 8,893,000 14,175,341 7,107,853 7,067,488 Wastewater Enterprise Fund (412) 2,062,721 10,126,023 12,188,744 10,500,844 1,687,900 Total for Enterprise Funds 8,219,490 20,185,023 28,404,513 19,054,939 9,349,574 SPECIAL PURPOSE FUNDS City Streets (101) 9,958 1,723,926 1,733,884 1,733,300 584 Tourism Promotion (107) 353,525 86,900 440,425 91,000 349,425 Affordable Housing (112) 250 52,463 52,713 51,130 1,583 Transportation Facilities (120) 1,110,000 234,481 1,344,481 1,000,000 344,481 Total Special Purpose Funds 1,473,733 2,097,770 3,571,503 2,875,430 696,073 ER&R FUNDS IT Services ER&R (501) 449,603 1,713,094 2,162,697 1,769,459 393,238 Capital Equipment ER&R (502) 901,670 1,262,784 2,164,454 1,323,177 841,277 Total ER&R Funds 1,351,273 2,975,878 4,327,151 3,092,636 1,234,515 CAPITAL PROJECTS FUNDS Municipal Building Projects (302) 1,955,252 5,850,552 7,805,804 5,200,000 2,605,804 Master Planned Community (305) 50,000 - 50,000 50,000 - Road & Street Construction (316) 802,799 17,966,261 18,769,060 18,750,060 19,000 Water Capital Improvements (404) 516,296 2,570,687 3,086,983 3,000,000 86,983 Sewer/Reuse Improvements (413) 378,604 3,983,250 4,361,854 2,730,400 1,631,454 Total Capital Projects Funds 3,702,951 30,370,750 34,073,701 29,730,460 4,343,241 DEBT SERVICE FUNDS LTGO Bond Fund (200) 45,996 275,238 321,234 271,851 49,383 Sewer Debt Service (203) 124,641 3,942,452 4,067,093 3,936,451 130,642 Sewer Debt Service Reserve (204) 492,692 18,000 510,692 - 510,692 Water Revenue Bond Debt Service (405) 596,153 1,097,000 1,693,153 1,075,613 617,540 Water Revenue Bond Debt Reserve (406) 602,547 22,000 624,547 - 624,547 Sewer Bond Debt Service and Reserve (415) 248,944 10,000 258,944 - 258,944 Total Debt Service Funds 2,110,973 5,364,690 7,475,663 5,283,915 2,191,748 RESERVE FUNDS Cumulative Reserve (104) 521,387 20,000 541,387 - 541,387 Deposits & Retainage (119) 160 - 160 - 160 Utility Consumer Deposits (402) 105,091 14,000 119,091 20,000 99,091 Total Reserve Funds 626,638 34,000 660,638 20,000 640,638 TOTAL ALL FUNDS 22,215,059 82,585,175 104,800,234 83,319,504 21,480,730 Meeting Date: _____________ CITY COUNCIL AGENDA ITEM SUMMARY City of Yelm, Washington AGENDA ITEM:SETTING 202 7 AD VALOREM PROPERTY TAX LEVY COMMITTEE REVIEW: X YES COMMITTEE: FINANCE COMMITTEE COMMITTEE RECOMMENDATION: Approved PROPOSED MOTION: Motion to adopt Ordinance No 105 2 Setting 2027 Ad Valorem Property Tax KEY FACTS AND INFORMATION SUMMARY: Thurston County has provided the Assessed Valuation and Property Tax Worksheet for the purpose of calculating the Ad V a lorem Property Tax for fiscal year 202 7. The City is not electing to take the 1% increase. The City will hold two public hearings as required by RCW 84.55 and is required to pass an ordinance adopting the 202 7 property tax by November 30, 202 6. ATTACHMENTS: Ordinance No. 1 1 52 Respectfully Submitted: __________________ Stephanie Nanavich Finance Director 1 | Page O RDINANCE NO. 1 1 52 (RCW 84.55.120) AN ORDINANCE OF THE CITY OF YELM SETTING THE AMOUNT FIXED AS AD VALOREM FOR THE REGULAR LEVY OF PROPERTY TAX NECESSARY TO RAISE REVENUES FOR ESSENTIAL EXPENDITURES FOR THE CITY OF YELM FOR THE FISCAL YEAR 202 7. WHEREAS,the City Council of the City of Yelm met and considered its budget for the 202 7 fiscal year; and WHEREAS,a duly advertised public hearing to consider the 202 7 regular property tax levy for the fiscal year 202 7 taxes w as held as part of the regular City Council meeting on Tuesday, October 27 th, and Tuesday, November 2 4 th, 202 6; and WHEREAS, the population of this district is more than 10,000; now,therefore, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF YELM AS FOLLOWS: Section 1: The City Council hereby determines that the City of Yelm requires a regular property tax levy for collection in 2027 in the amount of $1,963,641.44, together with an additional refund levy of $12,980.08 authorized under RCW 84.55.070, for a total levy of $1,976,621.52. The levy amounts are based upon the preliminary assessed valuations, new construction and improvements, state-assessed property, and other adjustments authorized by law, as reflected in the levy limitations worksheet accompanying this ordinan ce. Section 2:Pursuant to RCW 84.55.120, the City Council finds that the actual regular property tax levy for the preceding year was $1,886,380.00. The City Council hereby authorizes an increase of $0.00, representing a zero percent (0%) increase over the preceding year's actual levy, exclusive of additional revenue attributable to new construction, improvements to property, increases in the value of state-assessed property, annexations, and any refund levy authorized by law. Secti on 3: A Levy Certification is filed with the County Legislative Authority, separate from this ordinance. As required by RCW 84.52.020, that filing certifies the total amount to be levied for the regular property tax levy on the Department of Revenue provided form for this purpose, REV 64 0100, 'Levy Certification'. Certification is made in a manner prescribed by the County Legislative Authority. Section 4:Effective Date: This ordinance shall take effect five days after its publication as provided by law. Section 5:Severability. If any section, subsection, paragraph, sentence, clause, or phrase of this ordinance is declared unconstitutional or invalid for any reason, such decision shall not affect the validity of the remaining portion of this ordinance. Adopted by the Yelm City Council at the regular meeting this 24 th day of November, 202 6. ____________________________ Joe DePinto, Mayor APPROVED AS TO FORM: ____________________________ Brent Dille, City Attorney ATTEST: _____________________________ Kathy Linnemeyer, City Clerk PUBLISHED: EFFECTIVE DATE: LEVY LIMITATIONS WORKSHEET TAXING DISTRICT City of Yelm 2026 Levy for 2027 Taxes Instructions for electronic version of form - Fill in highlighted cells all other self populate. A.Highest regular tax which could have been lawfully levied beginning with the 1985 levy (refund levy not included). Year 2026$1,886,380.00 101.000%=$1,905,243.80 Highest Lawful Levy Since 1985 Limit Factor/Max Increase 101% B.Current year's assessed value of new construction, improvements, and wind turbines, solar, biomass, and geothermal facilities in original districts before annexation occurred times last year's levy rate (if an error occurred or an error correction was made in the previous year, use the rate that would have been levied had no error occurred). $79,812,241×0.968039956394÷$1,000=$77,261.44 A.V.Last Year's Levy Rate D.Current year's state assessed property value less last year's state assessed property value. The remainder is to be multiplied by last year's regular levy rate (or the rate that should have been levied). $17,338,815-$17,338,815=$ - Current Year's A.V.Previous Year's A.V.Remainder $0×0.968039956394÷$1,000=$0.00 Remainder from Line C Last Year's Levy Rate E.Regular property tax limit: …………………………………….………….A+B+C=$1,982,505.24 Parts E through G are used in calculating the additional levy limit due to annexation. F.To find the rate to be used in F, take the levy limit as shown in Line D above and divide it by the current assessed value of the district, excluding the annexed area. $1,982,505.24÷$2,132,942,346×$1,000=0.929469680096 Total in Line D Assessed Value Less Annexed AV G.Annexed area's current assessed value including new construction and improvements, times the rate in Line E. $0×0.929469680096÷$1,000=$0.00 Annexed Area's A.V.Rate in Line E H.Regular property tax limit including annexation …………………………………D+F=$1,982,505.24 I.Statutory maximum calculation Only enter fire/RFA rate, library rate, & firefighter pension fund rate for cities annexed to a fire/RFA or library, or has a firefighters pension fund. 3.600000000000-1.481476552552-0.228924+=1.889599447448 District base levy rate Fire or RFA Rate Library Rate Firefighter Pension Fund Statutory Rate Limit $2,132,942,346×1.889599447448÷$1,000=$4,030,406.68 A.V. of District Statutory Rate Limit Statutory Amount J.Highest Lawful Levy For This Tax Year (Lesser of G and H) …………………=$1,982,505.24 K.New highest lawful levy since 1985 (lesser of I&H minus C, …………………=$1,982,505.24 unless (before limit factor incr) is greater than I or H mins C, then A before limit factor increase. J.Tax Base For Regular Levy 1. Total district taxable value (including state-assessed property, and excluding boats, timber assessed value, and the senior citizen exemption for the regular levy)$2,132,942,346 K.Tax Base for Excess and Voted Bond Levies 2. Less assessed value of the senior citizen exemption of less than $40,000 income or 65% of the median household income for the county based on lower of frozen or market value. 3. Plus Timber Assessed Value (TAV) ………………………………...……….. 4. Tax base for excess and voted bond levies ………………………...…..……(1-2+3)$2,132,942,346 Excess Levy Rate Computation - Excess levy amount divided by the assessed value in Line K4 above. ÷$2,132,942,346×$1,000=0.000000000000 Levy Amount A.V. from Line K4 above Bond Levy Rate Computation - Bond levy amount divided by the assessed value in Line K4 above. ÷$2,132,942,346×$1,000=0.000000000000 Levy Amount A.V. from Line K4 above B REV 64 007 Page 1 TAXING DISTRICT City of Yelm 2026 Levy For 2027 Taxes Population:Less than 10,000 10,000 or more$18,863.80 Was a resolution/ordinance adopted authorizing an increase over the previous year's Yes No Was a second resolution/ordinance adopted authorizing an increase over the IPD?l? Yes No N/A If so, what was the percentage increase? Calculated % Increase 0.000000000000% A.Previous year's actual levy adjusted by the increases as stated in ordinance or resolution (RCW 84.55.120). Year 2026$1,886,380.00+0.00=$1,886,380.00 Previous Year's Actual Levy Plus Resolution Increase Amount Year 2026$1,886,380.00 0.000000000000%=$1,886,380.00 Previous Year's Actual Levy Resolution Percentage of Increase Prior Levy +(Prior Levy * % Inc.) B.Amount for new construction, improvements, and wind turbines, solar, biomass, and geothermal facilities.(Line B, page 1) ……………………………………………=$77,261.44 D.Amount for increase in value of state-assessed property (Line C, page 1)=$0.00 E.Amount for increase in annexation (Line F, page 1) ………………………=$0.00 F.Total levy amount authorized, including the annexation …………Lesser of A+(B+C+D)=$1,963,641.44 G.Total levy amount authorized by resolution (E) plus amount refunded or to be refunded (RCW 84.55.070). $1,963,641.44+$12,980.08=$1,976,621.52 Total from Line E Amount to be Refunded Amount allowable per H.Total amount certified by county legislative authority or taxing district as applicable. (RCW 84.52.020 and RCW 84.52.070) ……………………………………………..=$1,976,621.52 I.Levy limit from line H on page 1, plus amount refunded or to be refunded (RCW 84.55.070). $1,982,505.24+$12,980.08=$1,995,485.32 Line G, Page 1 Amount to be Refunded Total J.Amount of taxes recovered due to a settlement of highly valued disputed property (RCW 84.52.018). $1,976,621.52=$1,976,621.52 Lesser of F, G, or H Amount Held in Abeyance Total K.Statutory limit from line H on page 1 (dollar amount, not the rate) …………………=$4,030,406.68 L.Lesser of I and J ……………………………………………………………………$1,976,621.52 M.Levy Corrections Year of Error: 1. Minus amount over levied (if applicable) ………………………………………….. 2. Plus amount under levied (if applicable) …………………………………………. N.Total: K +/- L ………………………………………………………………………….$1,976,621.52 O.Regular Levy Rate Computation Without Levy Error Correction Use this rate in next year's levy calculations unless it's reduced due to levy error, other limitation, or there's a road levy shif $1,976,621.52÷$2,132,942,346×$1,000=0.926711180781 Lesser of J and K Amount on line J1 on page 1 rate w/o error correction P.Regular Levy Rate Computation: Lesser of J and M divided by the assessed value in line J1 on page 1. Use this rate for the current year's tax roll unless it is reduced due to another levy limitation such as the $5.90 limit. $1,976,621.52÷$2,132,942,346×$1,000=0.926711180781 Lesser of J and M Amount on line J1 on page 1 rate before aggregate check Q.Road Levy Shift Rate Computation - (Do not enter a shift amount in both shift fields.) R.OR Amount shifted TO this taxing district Amount shifted FROM this taxing district S.$1,976,621.52÷$2,132,942,346×$1,000=0.926711180781 Post Shift Levy Amount Amount on line J1 on page 1 Post Shift Levy Rate REV 64 007 Page 2 Meeting Date: 10-27-2026 CITY COUNCIL AGENDA ITEM SUMMARY City of Yelm, Washington AGENDA ITEM: PUBLIC WORKS CONTRACT WITH ACTIVE CONSTRUCTION, INC. FOR CONSTRUCTION OF THE 2026 CREEK ST. WATER MAIN IMPROVEMENTS PROJECT COMMITTEE REVIEW: 10-27-2026 x YES NO COMMITTEE: Joseph Richardson (Chair), Brian Hess, and Terry Kaminski ATTORNEY REVIEW/APPROVAL:X YES NO N/A PROPOSED MOTION: Authorize Mayor Joe DePinto to sign the Public Works Contract with Active Construction Inc. for construction of the 2026 Creek St. Water Main Improvements Project in the not to exceed amount of $1,597,597,00. KEY FACTS AND INFORMATION SUMMARY: This project will replace and upsize the water main on Creek St., add sidewalk from Algiers to 103 rd Ave., and asphalt overlay from 106 th Ave. to 103 rd. Ave. We received a total of 16 bids on September 28 th for this project. Active Construction Inc. was determined to be the lowest responsive bidder at $1,597,597.00. The engineer’s estimate on the project was 1.8 to 2 million, so we are very happy with the outcome. We look forward to getting this project started. ATTACHMENTS: Public Works Contract Plans & Specifications Respectfully Submitted: Brad Chatwood Projects & Programs Manager 1 | Page PUBLIC WORKS CONTRACT FOR CREEK STREET WATER MAIN IMPROVEMENTS (YELM) THIS PUBLIC WORKS CONTRACT (“Contract”) is dated effective this 27th day of October 2026 and is made by and between the City of Yelm, a Washington municipal corporation (“City or Owner”), and Active Construction, Inc. a corporation (“Contractor”). A. The City desires to retain an independent contractor to furnish all labor and materials necessary to perform work necessary to complete the Creek St. Water Main Improvements, sidewalk extensions and street overlay located in Yelm, Washington (“Right of Way); and B. The Contractor has the requisite skill and experience to perform such work. NOW, THEREFORE, the parties (“Parties”) agree to the following terms and conditions: 1.SERVICES BY CONTRACTOR 1.1 Description of Work. Contractor shall perform all work and furnish all tools, materials, supplies, equipment, labor and other items incidental thereto necessary for the construction and completion of the work, more particularly described as the CREEK STREET WATER MAIN IMPROVEMENTS (YELM) project, including without limitation: This project consists of upsizing approximately 2,300 LF of existing water main along a portion of Yelm Ave E /SR507) to Creek St. and Creek St. SE between Yelm Ave E and 103 rd Ave SE. The plans include the proposed water main alignment, connections to existing water main, and restoration. Additional work includes sidewalk improvements, new concrete approaches, and ADA curb ramps, full scope identified in the plans and specifications, (“Work”), in accordance with and as described in the Contract Documents, which include without limitation, this Contract, Request for Bids, Bidder’s Checklist, Instructions to Bidders, General Contractual Terms and Conditions, Bid Form, Bid Signature Page, Bid Bond, Combined Affidavit and Certification Form, Contractor’s Compliance Statement, Notice of Completion of Public Works Contract attached as Exhibit A, Contract Change Order Agreement attached as Exhibit B, Contractor’s Retainage Agreement attached as Exhibit C or Retainage Bond to City of Yelm attached as Exhibit D, Notice to Labor Unions or Other Employment Organizations Nondiscrimination in Employment attached as Exhibit E, Certificate(s) of Insurance Form attached hereto as Exhibit F, Performance / Payment Bond attached hereto as Exhibit G, Standard Plans and Details attached as Appendix A, current Prevailing Wage Rates attached as Appendix B, and all other Appendices attached hereto and incorporated by this reference, (collectively the “Contract Documents”), which Work shall be completed to the City’s satisfaction, within the time period prescribed by the City and pursuant to the direction of the Mayor or his or her designee. 1.2 Completion Date. The Work shall be commenced within five (5) days of receipt by the Contractor of the City’s Notice to Proceed. The Work shall be completed on or before February 1, 2027. In the event the Work is not physically completed within the contract time established in the contract documents, Contractor agrees to pay to the City liquidated damages in the amount set forth in the formula included in Section 1.3 of this Contract. The Work shall not be deemed completed until the City has accepted the Work and delivered a written Notice of Completion of Public Works Contract in the form attached hereto as Exhibit A or filing of an online Notice of Completion with the Washington Department of Labor and Industries. Creek St. Water Main Improvements (Yelm) Page 1 1.3 Liquidated Damages. Time is of the essence of the Contract. Delays inconvenience the public and cost taxpayers undue sums of money, adding time needed for administration, inspection, and supervision. It is impractical for the City to calculate the actual cost of delays. Accordingly, the Contractor agrees to pay liquidated damages calculated on the following formula for its failure to complete this Contract on time: (1) To pay (according to the following formula) liquidated damages for each working day beyond the number of working days established for completion, and (2) To authorize the City to deduct these liquidated damages from any money due or coming due to the Contractor. LIQUIDATED DAMAGES FORMULA For purposes of this calculation, 'T' means the total number of working days established in the Contract for completion of the Work, as adjusted by any approved change orders or extensions of time. LD = 0.15C T Where:LD =Liquidated damages per working day (rounded to the nearest dollar). C =Current Contract adjusted amount. T =Original time for completion. When the Work is completed to the extent that the City has full and unrestricted use and benefit of the facilities, both from an operational and safety standpoint, the City may determine the Work is complete. Liquidated damages will not be assessed for any days for which an extension of time is granted. No deduction or payment of liquidated damages will, in any degree, release the Contractor from further obligations and liabilities to complete this entire Contract. 1.4 Performance Standard. Contractor shall perform the Work in a manner consistent with accepted practices for other properly licensed contractors. 1.5 Compliance with Laws. Contractor shall perform the Work in accordance with all applicable federal, state and City laws, including but not limited to all City ordinances, resolutions, standards or policies, as now existing or hereafter adopted or amended, and obtain all necessary permits and pay all permit, inspection or other fees, at its sole cost and expense. 1.6 Change Orders. The City may, at any time, without notice to sureties, order changes within the scope of the Work. Contractor agrees to fully perform any such alterations or additions to the Work. All such change orders shall be in the form of the Contract Change Order Agreement attached hereto as Exhibit B, which shall be signed by both the Contractor and the City, shall specifically state the change of the Work, the completion date for such changed Work, and any increase or decrease in the compensation to be paid to Contractor as a result of such change in the Work. Oral change orders shall not be binding upon the City unless confirmed in writing by the City. If any change hereunder causes an increases or decrease in the Contractor’s cost of, or time required for, the performance or any part of the Work under this Contract, an equitable adjustment will be made and the Contract modified in writing accordingly. If the Contractor intends to assert a claim for an equitable adjustment hereunder, it shall, within five (5) days after receipt of a written change order from the City or after giving the written Creek St. Water Main Improvements (Yelm) Page 2 notice required above, as the case may be, submit to the City a written statement setting forth the general nature and monetary extent of such claim; provided the City, in its sole discretion, may extend such five (5) day submittal period upon request by the Contractor. The Contractor shall supply such supporting documents and analysis for the claims as the City may require to determine if the claims and costs have merit. No claim will be allowed for any costs incurred more than five (5) days before the Contractor gives written notice as required. No claim by the Contractor for an equitable adjustment hereunder will be allowed if asserted after final payment under this Contract. 1.7 Work and Materials Omitted. The Contractor shall, when directed in writing by the City, omit work, services and materials to be furnished under the Contract and the value of the omitted work and materials will be deducted from the Total Compensation and the delivery schedule will be reviewed if appropriate. The value of the omitted work, services and materials will be a lump sum or unit price, as mutually agreed upon in writing by the Contractor and the City. If the parties cannot agree on an appropriate deduction, the City reserves the right to issue a unilateral change order adjusting the price and the delivery schedule. 1.8 Utility Location. Contractor is responsible for locating any underground utilities affected by the Work and is deemed to be an excavator for purposes of Chapter 19.122 RCW, as amended. Contractor shall be responsible for compliance with Chapter 19.122 RCW, including utilization of the “one call” locator system before commencing any excavation activities. 1.9 Air Environment. Contractor shall fully cover any and all loads of loose construction materials including without limitation, sand, dirt, gravel, asphalt, excavated materials, construction debris, etc., to protect said materials from air exposure and to minimize emission of airborne particles to the ambient air environment within the City of Yelm. 2.TERM This Contract shall commence on the effective date of this Contract and continue until the completion of the Work, which shall be no later than February 1, 2027 to complete, and the expiration of all warranties contained in the Contract Documents (“Term”). 3.WARRANTY 3.1 Requisite Skill. The Contractor warrants that it has the requisite skill to complete the Work, and is appropriately accredited and licensed by all applicable agencies and governmental entities, including but not limited to being registered to do business in the City of Yelm by obtaining a City of Yelm business license. Contractor represents that it has visited the site and is familiar with all of the plans and specifications in connection with the completion of the Work. The Contractor specifically agrees to obtain a City of Yelm Business License prior to beginning work on the Contract and pay any applicable business and occupation (B&O) taxes that may be due as a result of the Business License and this Agreement. 3.2 Defective Work. The Contractor shall, at its sole cost and expense, correct all Work which the City deems to have defects in workmanship and material discovered within one (1) year after the City’s final acceptance of the Work as more fully set forth in the General Conditions of the Contract; provided, however, that this warranty may extend beyond this time period pursuant to the warranties attached hereto as Appendix C and incorporated by this reference. This warranty shall survive termination of this Contract. Conducting of tests and inspections, review of specifications or plans, payment for goods or services, or acceptance by the City does not Creek St. Water Main Improvements (Yelm) Page 3 constitute waiver, modification or exclusion of any express or implied warranty or any right under this Contract or law. 4.COMPENSATION 4.1 Contract Price. The City shall pay Contractor for full and satisfactory performance of the Work a fixed Contract Price of $1,597,597.00, inclusive of all applicable taxes. The Contract Price shall not be exceeded except by a written change order authorized and executed in accordance with the Contract Documents, or as otherwise required by applicable law. The Contract Price includes all labor, materials, equipment, supervision, and other costs necessary to complete the Work required by the Contract Documents, including Addendum No. 1 & 2. 4.2 Contractor Responsible for Taxes. The Contractor shall be solely responsible for the payment of any taxes imposed by any lawful jurisdiction as a result of the performance and payment of this Contract. 4.3 Nonpayment. The City shall have the right to withhold payment to the Contractor for any of the Work not completed in a satisfactory manner, in the City’s sole discretion, which shall be withheld until such time as Contractor modifies or repairs the Work so that the Work is acceptable to the City. 4.4 Schedule of Prices; Progress Payments. The Schedule of Prices shall be used to evaluate progress payments and, where applicable, authorized changes in the Work. Estimated quantities and unit prices do not independently entitle Contractor to an increase in the Contract Price. Differences between estimated and actual quantities necessary to complete the original scope of Work shall not, standing alone, increase or decrease the Contract Price. Adjustments for authorized changes or other compensable circumstances shall be governed by the Contract Documents and applicable law. Total payments shall not exceed the Contract Price, as properly adjusted. I cannot recall but I presume the $1,597,597 includes sales tax. Upon completion of all work and after final inspection, the amount due the Contractor under the contract will be paid based upon the final estimate made by the Engineer and signed by the Contractor. Payment to the Contractor for partial estimates, final estimates, and retained percentages shall be subject to controlling laws. 4.5 Retainage. Pursuant to Chapter 60.28 RCW, five percent (5%) of the Total Compensation shall be retained by the City to assure payment of Contractor’s state sales tax as well as payment of subcontractors, suppliers and laborers. Upon execution of this Contract, Contractor shall complete, execute and deliver to the City the Contractor Retainage Agreement attached hereto as Exhibit C or execute the Retainage Bond attached hereto as Exhibit D. No payments shall be made by the City from the retained percentage fund (“Fund”) nor shall the City release any retained percentage escrow account to any person, until the City has received from the Department of Revenue a certificate that all taxes, increases, and penalties due from the Contractor and all taxes due and to become due with respect to the Contract have been paid in full or that they are, in the Department’s opinion, readily collectible without recourse to the State’s lien on the retained Creek St. Water Main Improvements (Yelm) Page 4 percentage. Upon non-payment by the general contractor, any supplier or subcontractor may file a lien against the retainage funds, pursuant to Chapter 60.28 RCW. Subcontractors or suppliers are required to give notice of any lien within forty-five (45) days of the completion of the Work and in the manner provided in RCW 39.08.030. The Retained funds shall be released in accordance with Chapter 60.28 RCW after Final Acceptance and receipt of all required releases and certifications from the Department of Revenue, Department of Labor & Industries, Employment Security Department, and expiration of applicable lien periods. 5.EQUAL OPPORTUNITY EMPLOYER In all Contractor services, programs or activities, and all Contractor hiring and employment made possible by or resulting from this Contract, there shall be no discrimination by Contractor or by Contractor’s employees, agents, subcontractors or representatives against any person because of sex, age (except minimum age and retirement provisions), race, color, creed, national origin, marital status or the presence of any disability, including sensory, mental or physical handicaps, unless based upon a bona fide occupational qualification in relationship to hiring and employment, advertising, layoff or termination, rates of pay or other forms of compensation, and selection for training, including apprenticeship. Contractor comply with and shall not violate any of the terms of Chapter 49.60 RCW, Title VII of the Civil Rights Act of 1964, the Americans With Disabilities Act, Section 504 of the Rehabilitation Act of 1973, 49 CFR Part 26, or any other applicable federal, state, or local law or regulation regarding non-discrimination. Any material violation of this provision shall be grounds for termination of this Contract by the City and, in the case of the Contractor’s breach, may result in ineligibility for further City agreements. 6.INDEPENDENT CONTRACTOR/CONFLICT OF INTEREST 6.1It is the intention and understanding of the Parties that the Contractor shall be an independent contractor and that the City shall be neither liable nor obligated to pay Contractor sick leave, vacation pay or any other benefit of employment, nor to pay any social security or other tax which may arise as an incident of employment. The Contractor shall pay all income and other taxes due. Industrial or any other insurance that is purchased for the benefit of the City, regardless of whether such may provide a secondary or incidental benefit to the Contractor, shall not be deemed to convert this Agreement to an employment contract. It is recognized that Contractor may or will be performing professional services during the Term for other parties; provided, however, that such performance of other services shall not conflict with or interfere with Contractor's ability to perform the Services. Contractor agrees to resolve any such conflicts of interest in favor of the City. 6.2 If the Contractor is a sole proprietorship or if this is a contract with an individual, the contractor agrees to notify the City and complete any required form if the Contractor retired under a State of Washington retirement system and agrees to indemnify any losses the City may sustain through the Contractor’s failure to do so. 7.CITY’S RIGHT TO TERMINATE CONTRACT 7.1 Termination Without Cause. Prior to the expiration of the Term, this Contract may be terminated without cause by written notice delivered to Contractor from the City. Upon termination, all supplies, materials, labor and/or equipment furnished prior to such date shall, at the City’s option, become its property. In the event Contractor is not in breach of any of the provisions of this Contract, Contractor will be paid for any portion of the Work which has been Creek St. Water Main Improvements (Yelm) Page 5 completed to the City’s satisfaction, calculated by the percentage amount that portion of the Work completed and accepted by the City bears to the Total Compensation. 7.2 Termination For Cause. The City may immediately terminate this Contract, take possession of the Property and all materials thereon and finish the Work by whatever methods it may deem expedient, upon the occurrence of any one or more of the following events: (1) If the Contractor should be adjudged a bankrupt. (2) If the Contractor should make a general assignment for the benefit of its creditors. (3) If a receiver should be appointed on the account of insolvency of Contractor. (4) If Contractor should persistently or repeatedly refuse or fail to supply a sufficient number of properly skilled workmen or proper materials for completion of the Work. (5) If the Contractor should fail to complete the Work within the time specified in this Contract. (6) If the Contractor should fail to complete the Work in compliance with the plans and specifications, to the City’s satisfaction. (7) If the Contractor should fail to make prompt payment to subcontractors or for material labor. (8) If Contractor should persistently disregard laws, ordinances or regulations of federal, state, or municipal agencies or subdivisions thereof. (9) If Contractor should persistently disregard instructions of the Mayor or his or her representative. (10) If Contractor shall be in breach or violation of any term or provision of this Contract, or (11) If the Work is not being performed pursuant to RCW 49.28.050 or 49.28.060. 7.3 Result of Termination. In the event that this Contract is terminated for cause by the City, the City may do any or all of the following: (1) Stop payments. The City shall cease any further payments to Contractor and Contractor shall be obligated to repay any payments it received under this contract. (2) Complete Work. The City may, but in no event is the City obligated to, complete the Work, which Work may be completed by the City’s agents, employees or representatives or the City may retain independent persons or entities to complete the Work. Upon demand, Contractor agrees to pay to the City all of its costs and expenses in completing such Work. Creek St. Water Main Improvements (Yelm) Page 6 (3) Take Possession. The City may take possession of the Property and any equipment and materials on the Property and may sell the same, the proceeds of which shall be paid to the City for its damages. (4) Remedies Not Exclusive. No remedy or election under this Contract shall be deemed an election by the City but shall be cumulative and in addition to all other remedies available to the City at law, in equity or by statute. 8.INDEMNIFICATION 8.1 Contractor Indemnification. The Contractor agrees to indemnify, defend, and hold the City, its elected officials, officers, employees, agents, and volunteers harmless from any and all claims, demands, losses, actions and liabilities (including costs and all attorney fees) to or by any and all persons or entities, including, without limitation, their respective agents, licensees, or representatives, arising from, resulting from, or connected with this Contract to the extent caused by the negligent acts, errors or omissions of the Contractor, its partners, shareholders, agents, employees, or by the Contractor’s breach of this Contract. Contractor waives any immunity that may be granted to it under the Washington State Industrial Insurance Act, Title 51 RCW. Contractor’s indemnification shall not be limited in any way by any limitation on the amount of damages, compensation or benefits payable to or by any third party under workers’ compensation acts, disability benefit acts or any other benefits acts or programs. 8.2 City Indemnification. The City agrees to indemnify, defend, and hold the Contractor, its officers, directors, shareholders, partners, employees, and agents harmless from any and all claims, demands, losses, actions and liabilities (including costs and attorney fees) to or by any and all persons or entities, including without limitation, their respective agents, licenses, or representatives, arising from, resulting from or connected with this Contract to the extent solely caused by the negligent acts, errors, or omissions of the City, its employees or agents. 8.3 Survival. The provisions of this Section shall survive the expiration or termination of this Contract with respect to any event occurring prior to such expiration or termination. 9.INSURANCE 9.1 Minimum Limits. The Contractor agrees to carry as a minimum, the following insurance, in such forms and with such carriers who have a rating which is satisfactory to the City: (1) Workers’ compensation and employer’s liability insurance in amounts sufficient pursuant to the laws of the State of Washington; (2) Commercial general liability insurance with combined single limits of liability not less than $2,000,000 for bodily injury, including personal injury or death, products liability and property damage. (3) Automobile liability insurance with combined single limits of liability not less than $2,000,000 for bodily injury, including personal injury or death and property damage. Creek St. Water Main Improvements (Yelm) Page 7 9.2 Endorsements. Each insurance policy shall contain, or be endorsed to contain, the following provisions: (1) The City, its officers, officials, employees, volunteers and agents shall each be named as additional insured. (2) Coverage may not be terminated or reduced in limits except after thirty (30) days prior written notice by certified mail, return receipt requested, to the City. (3) Coverage shall be primary insurance as respects the City, its officials, employees and volunteers. Any insurance or self-insurance maintained by the City, its officials, employees or volunteers shall be in excess of Contractor’s insurance. (4) Coverage shall apply to each insured separately against whom claim is made or suit is brought. (5) Coverage shall be written on an “occurrence” form as opposed to a “claims made” or “claims paid” form. 9.3 Verification. Contractor shall furnish the City with certificates of insurance evidencing the coverage required by the Section, in compliance with the Certificate(s) of Insurance Form attached hereto as Exhibit F, which certificate must be executed by a person authorized by the insurer to bind coverage on its behalf. The City reserves the right to require complete certified copies of all required insurance policies, at any time. 9.4 Subcontractors. Contractors shall include all subcontractors as additional insured under its policies or shall furnish separate certificates for each subcontractor. All coverage for subcontractors shall be subject to all of the requirements stated herein. 9.5 Deductibles and Self-Insured Retentions. Any deductibles or self-insured retentions must be disclosed by Contractor and approved in writing by the City. At the option of the City, Contractor shall either reduce or eliminate such deductibles or self-insured retentions or procure a bond guaranteeing payment for any amounts not covered by the insurance by reason of such deductibles or self-insured retentions. 9.6 Asbestos Abatement or Hazardous Materials. If asbestos abatement or hazardous materials work is performed, Contractor shall review coverage with the City’s Risk Manager and provide scope and limits of coverage that are appropriate for the scope of Work and are satisfactory to the City. Contractor shall not commence any Work until its coverage has been approved by the Risk Manager. 9.7 Termination. The Contractor’s failure to provide the insurance coverage required by this Section shall be deemed to constitute non-acceptance of this Contract by the Contractor and the City may then award this Contract to the next lower bidder. 10.PERFORMANCE/PAYMENT BOND Pursuant to RCW 39.08.010, Contractor shall post a Performance/Payment Bond in favor of the City, in the form attached to this Contract as Exhibit G and incorporated by this reference, in a dollar amount satisfactory to the City; to guarantee Contractor’s performance of the Work to the Creek St. Water Main Improvements (Yelm) Page 8 City’s satisfaction; to insure Contractor’s performance of all of the provisions of this Contract; and to guarantee Contractor’s payment of all laborers, mechanics, subcontractors and material persons. Contractor’s obligations under this Contract shall not be limited to the dollar amount of the bond. 11.SAFETY Contractor shall take all necessary precautions for the safety of employees on the work site and shall comply with all applicable provisions of federal, state and municipal safety and health laws and codes, including without limitation, all OSHA/WISHA requirements, Safety and Health Standards for Construction Work (Chapter 296-155 WAC), General Safety and Health Standards (Chapter 296-24 WAC), and General Occupational Health Standards (Chapter 296-62 WAC). Contractor shall erect and properly maintain, at all times, all necessary guards, barricades, signals and other safeguards at all unsafe places at or near the Work for the protection of its employees and the public, safe passageways at all road crossings, crosswalks, street intersections, post danger signs warning against any known or unusual hazards and do all other things necessary to prevent accident or loss of any kind. Contractor shall protect from danger all water, sewer, gas, steam or other pipes or conduits, and all hydrants and all other property that is likely to become displaced or damaged by the execution of the Work. The Contractor shall, at its own expense, secure and maintain a safe storage place for its materials and equipment and is solely responsible for the same. 12.PREVAILING WAGES 12.1 Wages of Employees. This contract is subject to the minimum wage requirements of Chapter 39.12 RCW and Chapter 49.28 RCW (as amended or supplemented). On Federal-aid projects, Federal wage laws and rules also apply. The Hourly minimum rates for wages and fringe benefits are listed in Appendix B. When Federal wage and fringe benefit rates are listed, the rates match those identified by the U.S. Department of Labor’s “Decision Number” shown in Appendix B. The Contractor, any subcontractor, and all individuals or firms required by Chapter 39.12 RCW, Chapter 296-127 WAC, or the Federal Davis-Bacon and Related Acts (DBRA) to pay minimum prevailing wages, shall not pay any worker less than the minimum hourly wage rates and fringe benefits required by Chapter 39.12 RCW or the DBRA. Higher wages and benefits may be paid. When the project is subject to both State and Federal hourly minimum rates for wages and fringe benefits and when the two rates differ for similar kinds of labor, the Contractor shall not pay less than the higher rate unless the state rates are specifically preempted by Federal law. The Contractor shall ensure that any firm (Supplier, Manufacturer, or Fabricator) that falls under the provisions of Chapter 39.12 RCW because of the definition “Contractor” in Chapter 296- 127-010 WAC, complies with all the requirements of Chapter 39.12 RCW. 12.2 Exemptions to Prevailing Wage. The prevailing wage requirements of Chapter 39.12 RCW, and as required in this Contract do not apply to: (1) Sole owners and their spouses; (2) Any partner who owns at least 30% of a partnership; (3) The President, Vice President and Treasurer of a corporation if each one owns at least 30% of the corporation. Creek St. Water Main Improvements (Yelm) Page 9 12.3 Reporting Requirements. On forms provided by the Industrial Statistician of State L&I, the Contractor shall submit to the Engineer the following for itself and for each firm covered under Chapter 39.12 RCW that provided work and materials of the contract: (1) A copy of an approved “Statement of Intent to Pay Prevailing Wages” State L&I form number F700-029-000. The City will make no payment under this contract for the work performed until this statement has been approved by State L&I and a certified copy of the approved form has been submitted to the City. (2) A copy of an approved “Affidavit of Prevailing Wages Paid,” State L&I form number F700-007-000. The City will not release to the contractor any funds retained under Chapter 60.28.011 RCW until all of the “Affidavit of Prevailing Wages Paid” forms have been approved by State L&I and a certified copy of all the approved forms have been submitted to the City. The Contractor shall be responsible for requesting these forms from the State L&I and for paying any approval fees required by State L&I. Certified payrolls are required to be submitted by the Contractor to the City, for the Contractor and all subcontractors or lower tier subcontractors. 12.4 Disputes. In the event any dispute arises as to what are the prevailing rates of wages for work of a similar nature and such dispute cannot be resolved by the City and the Contractor, the matter shall be referred for arbitration to the Director of the Department of Labor and Industries of the State of Washington and the decision therein shall be final and conclusive and binding on all parties involved in the dispute. 13.FAILURE TO PAY SUBCONTRACTORS In the event the Contractor shall fail to pay any subcontractors or laborers, fail to pay for any materials, or fail to pay any insurance premiums, the City may terminate this Contract and/or the City may withhold from the money which may be due the Contractor an amount necessary for the payment of such subcontractors, laborers, materials or premiums. 14.OWNERSHIP OF DOCUMENTS All originals and copies of work product, including as-built drawings, warranties, manuals plans, sketches, layouts, designs, design specifications, records, files, computer disks, magnetic media, all finished or unfinished documents or material which may be produced or modified by Contractor while performing the Work shall become the property of the City and shall be delivered to the City at its request. 15.CONFIDENTIALITY Any records, reports, information, data or other documents or materials given to or prepared or assembled by the Contractor under this Contract will be kept as confidential and shall not be made available to any individual or organization by the Contractor without prior written approval of the City. 16.BOOKS AND RECORDS Creek St. Water Main Improvements (Yelm) Page 10 The Contractor agrees to maintain books, records, and documents which sufficiently and properly reflect all direct and indirect costs related to the performance of this Contract and such accounting procedures and practices as may be deemed necessary by the City to assure proper accounting of all funds paid pursuant to this Contract. These records shall be subject at all reasonable times to inspection, review or audit by the City, its authorized representative, the State Auditor, or other governmental officials authorized by law to monitor this Contract. 17.CLEAN UP At any time ordered by the City and immediately after completion of the Work, the Contractor shall, at its own expense, clean up and remove all refuse and unused materials of any kind resulting from the Work. In the event the Contractor fails to perform the necessary clean up, the City may, but in no event is it obligated to, perform the necessary clean up and the costs thereof shall be immediately paid by the Contractor to the City and/or the City may deduct its costs from any remaining payments due to the Contractor. 18.CONTRACTOR AND SUBCONTRACTOR RESPONSIBILITY: 18.1Contractor Verification. The Contractor verifies that it has a certificate of registration with the State of Washington; has a current state unified business identifier number; is not disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065 (3); has industrial insurance as required by Title 51 RCW, if applicable; has an employment security department number as required in Title 50 RCW, if applicable; has a state excise tax registration number as required in Title 82 RCW, if applicable; possesses a valid electrical contractor license as required by chapter 19.28 RCW, if applicable; and possesses an elevator contractor license as required by chapter 70.87 RCW, if applicable. 18.2Subcontractor Contracts. The Contractor shall include the language of this section in each of its first tier subcontracts, and shall require each of its subcontractors to include the same language of this section in each of their subcontracts, adjusting only as necessary the terms used for the contracting parties. Upon request of the Owner, the Contractor shall promptly provide documentation to the Owner demonstrating that the subcontractor meets the subcontractor responsibility criteria below. The requirements of this section apply to all subcontractors regardless of tier. 18.3Subcontractor Verification. At the time of subcontract execution, the Contractor shall verify that each of its first tier subcontractors meets the following bidder responsibility criteria: Have a current certificate of registration in compliance with chapter 18.27 RCW, which must have been in effect at the time of subcontract bid submittal; Have a current Washington Unified Business Identifier (UBI) number; Not be disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065 (3); Have Industrial Insurance (workers’ compensation) coverage for the subcontractor’s employees working in Washington, as required in Title 51 RCW, if applicable; A Washington Employment Security Department number, as required in Title 50 RCW, if applicable; A Washington Department of Revenue state excise tax registration number, as required in Title 82 RCW, if applicable; An electrical contractor license, if required by Chapter 19.28 RCW, if applicable; An elevator contractor license, if required by Chapter 70.87 RCW. 19.GENERAL PROVISIONS Creek St. Water Main Improvements (Yelm) Page 11 19.1 Entire Contract. The Contract Documents contain all of the agreements of the Parties with respect to any matter covered or mentioned in this Contract and no prior agreements or understandings pertaining to any such matters shall be effective for any purpose. 19.2 Modification. No provisions of this Contract, including this provision, may be amended or added to except by agreement in writing signed by the Parties or their respective successors in interest. 19.3 Full Force and Effect. Any provision of this Contract, which is declared invalid, void or illegal, shall in no way affect, impair, or invalidate any other provision hereof and such other provisions shall remain in full force and effect. 19.4 Assignment. The Contractor shall not transfer or assign, in whole or in part, any or all of its obligations and rights hereunder without the prior written consent of the City. In the event the City consents to any such assignment or transfer, such consent shall in no way release the Contractor from any of its obligations or liabilities under this Contract. 19.5 Successors in Interest. Subject to the preceding Subsection, this Contract shall be binding upon and inure to the benefit of the Parties’ successors in interest, heirs and assigns. 19.6 Attorney Fees. In the event the City or the Contractor defaults on the performance of any terms in this Contract, and the Contractor or City places the enforcement of the Contract or any part thereof, or the collection of any monies due, or to become due hereunder, or recovery of possession of any belongings, in the hands of an attorney, or file suit upon the same, each Party shall pay all its own attorneys’ fees, costs and expenses. Any action arising out of or relating to this Contract shall be brought exclusively in the Superior Court of Thurston County, Washington. 19.7 No Waiver. Failure of the City to declare any breach or default immediately upon occurrence thereof, or delay in taking any action in connection with, shall not waive such breach or default. Failure of the City to declare one breach or default does not act as a waiver of the City’s right to declare another breach or default. 19.8 Governing Law. This Contract shall be made in and shall be governed by and interpreted in accordance with the laws of the State of Washington. 19.9 Authority. Each individual executing this Contract on behalf of the City and Contractor represents and warrants that such individuals are duly authorized to execute and deliver this Contract on behalf of the Contractor or City. 19.10 Notices. Any notices required to be given by the City to Contractor or by the Contractor to the City shall be delivered to the Parties at the addresses set forth below. Any notices may be delivered personally to the addressee of the notice or may be deposited in the United States mail, postage prepaid, to the address set forth herein. Any notice so posted in the United States mail shall be deemed received three (3) days after the date of mailing. 19.11 Captions. The respective captions of the Sections of this Contract are inserted for convenience of reference only and shall not be deemed to modify or otherwise affect in any respect any of the provisions of this Contract. Creek St. Water Main Improvements (Yelm) Page 12 19.12 Performance. Time is of the essence of this Contract and each and all of its provisions in which performance is a factor. Adherence to completion dates is essential to the Contractor’s performance of this Contract. 19.13 Compliance with Ethics Code. If a violation of the City’s Ethics Resolution No. 91-54, as amended, occurs as a result of the formation and/or performance of this Contract, this Contract may be rendered null and void, at the City’s option. 19.14 Conflicting Provisions. In the event of any inconsistency among the Contract Documents, the following order of precedence shall govern unless expressly stated otherwise: 1.Executed Contract and Change Orders 2.Addenda 3.Special Provisions 4.Project Plans 5.Technical Specifications 6.WSDOT/APWA Standard Specifications 7.Standard Plans 8.Bid Documents and Contractor's Bid If, after application of the foregoing order of precedence, a conflict, ambiguity, or discrepancy remains, the Engineer shall make the initial interpretation of the Contract Documents. Any party disagreeing with the Engineer's interpretation may submit the matter to the Mayor or the Mayor's designee for review. The Mayor's or designee's written interpretation shall govern the administration of the Contract unless modified through a written Change Order, other written agreement of the parties, or by a court of competent jurisdiction. Nothing in this Section shall be construed to authorize a change in the scope of the Work, Contract Time, or Contract Price except through a written Change Order or other written amendments executed in accordance with this Contract. DATED the day and year set forth above. CITY OF YELM By:___________________________________ Joe DePinto, Mayor City of Yelm, 106 Second St. SE, Yelm WA 98597 ATTEST: _______________________________ Kathy Linnemeyer, City Clerk Creek St. Water Main Improvements (Yelm) Page 13 APPROVED AS TO FORM: _______________________________ City Attorney, Brent Dille Active Construction Inc. By:___________________________________ (Signature) ___________________________________ (Name) ___________________________________ ___________________________________ (Address) ___________________________________ (Phone) [Corporate Notary] STATE OF WASHINGTON) ) ss. COUNTY OF ____________) On this day personally appeared before me ____________________________________, to me known to be the ________________________________ of _______________________ that executed the foregoing instrument, and acknowledged the said instrument to be the free and voluntary act and deed of said corporation, for the uses and purposes therein mentioned, and on oath stated that he/she was authorized to execute said instrument and that the seal affixed, if any, is the corporate seal of said corporation. GIVEN my hand and official seal this ______ day of _______________________, 20__. ______________________________________ ______________________________________ (typed/printed name of notary) Notary Public in and for the State of Washington. My commission expires ____________________ Creek St. Water Main Improvements (Yelm) Page 14 EXHIBIT A NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT Creek St. Water Main Improvements (Yelm) Page 15 EXHIBIT B CITY OF YELM CONTRACT CHANGE ORDER AGREEMENT ______________________________________________________ PROJECTCHANGE ORDEREFFECTIVE DATE NUMBERNUMBER ___________________________________________________ PROJECT TITLECONTRACTOR SUMMARY OF PROPOSED CHANGES: The time provided for completion in the Contract is Unchanged Increased Decreased by ____ Calendar Days. This Document shall become an Amendment to the Contract and all provisions of the Contract not amended herein will apply to this Change Order. Will this change affect expiration or extent of Insurance coverage? Yes No If “Yes” Will the Policies Be Extended? Yes No _____________________________________________________________________________ PRICE CHANGELUMP SUM:INCREASE $DECREASE $ UNIT PRICE: THE ITEMS ARE APPROXIMATE OR ESTIMATED QUANTITIES INVOLVED IN THIS CHANGE ITEM NO.ITEMQUANTITYUNIT PRICEADD OR DELETE TOTAL NET CONTRACT:INCREASE $DECREASE $ STATEMENT: _____________________________________________________________________________ CONTRACTOR’SDEPT. DIRECTOR/MANAGERDATE SIGNATURESIGNATURE Creek St. Water Main Improvements (Yelm) Page 16 DEPARTMENT RECAP TO DATE:*Adjustments: ORIGINAL CONTRACT AMOUNT$_____ PREVIOUS CHANGE ORDERS$_____ THIS CHANGE ORDER$_____ *ADJUSTMENTS$_____ NEW CONTRACT AMOUNT$_____ ADJUSTMENTS CHANGE ORDER ESTIMATE IS HEREBY INCREASED$_____ DECREASED$_____ PAY THIS ADJUSTED AMOUNT$_____ ______________________________ DEPARTMENT DIRECTOR’S SIGNATURE Creek St. Water Main Improvements (Yelm) Page 17 EXHIBIT C CONTRACTOR’S RETAINAGE AGREEMENT City of Yelm Bid/Contract Number 106 Second St.. SE, Yelm WA 98597 360.458.8499 IDENTIFICATION AND DESCRIPTION Project Title______________________________________________________________________________ Contractor_______________________________________Representative________________________ Bid No._____________________________Date_______Administering Department_______________ City Representative________________________________Funding Source________________________ Project Authority__________________________________________________________________________ RETAINAGE FORMULA In accordance with applicable State Statutes, the following provisions will be made for the disposition of the retainage held for investment: 1.All investments selected below are subject to City approval. 2.Retainage under this agreement will be held in escrow by the _________________________ (referred to herein as the Bank), the terms of which are specified by separate escrow agreement. The cost of the investment program and the risk thereof is to be borne entirely by the contractor. 3.The final disposition of the contract retainage will be made in accordance with applicable statutes. CONTRACTOR’S INSTRUCTIONS Pursuant to RCW 60.28.010 I hereby notify the City of Yelm of my instructions to invest not to invest the retainage withheld under the terms of this contract. If the investment option is selected, please provide the following information: Name of Bank, Mutual Fund, or Savings & Loan Association: ______________________________________ Address: ________________________________________________________________________________ Account #: _______________________________________Contact Person: _______________________ Contractor: _______________________________________Date: _______________________________ By: _____________________________________________Title: _______________________________ Address: _________________________________________________________Phone: _______________ Fed ID #: ________________________________________Est. Completion Date: __________________ CITY APPROVAL Approval of Investment Program and Retainage Agreement ____________________________________ Finance Director Date CERTIFICATION FOR RELEASE OF CONTRACT RETAINAGE Contract No. __________Project Title: ______________________________________________________________ I hereby certify, as Contract Administrator for this Contract representing the City of Yelm, that all work required by the above cited contract was completed on ________________________ and final acceptance by the City was granted on _________________________. I also certify that no liens have been received within 30 days from the above date from any person, persons, mechanics, subcontractors or materialman who has performed any work or provided any material of subject contract. ____________________________________ Contract Administrator ____________________________________ Director of Administering Department Also, please find attached certifications by the applicable state agencies of the receipt of: 1) Washington State Business Taxes (Washington State Dept. of Revenue); 2) Industrial Insurance Premiums (State Dept. of Labor & Industries); and 3) Employment Security, Unemployment Insurance Premiums (State of Washington Employment Security Dept.) Creek St. Water Main Improvements (Yelm) Page 18 EXHIBIT D RETAINAGE BOND TO CITY OF YELM (CREEK ST. WATER MAIN IMPROVEMENTS) KNOW ALL PERSONS BY THESE PRESENTS that we, the undersigned, ____________________________________________, as principal (“Principal”), and __________________________________, a Corporation organized and existing under the laws of the State of _________________, as a surety Corporation, and qualified under the laws of the State of Washington to become surety upon bonds of Contractors with Municipal Corporations, as surety (“Surety”), are jointly and severally held and firmly bonded to the City of Yelm (“City”) in the penal sum of: ________________________________________ ($ _______________) for the payment of which sum we bind ourselves and our successors, heirs, administrators or personal representatives, as the case may be. A. This obligation is entered into in pursuant to the statutes of the State of Washington and the ordinances, regulations, standards and policies of the City, as now existing or hereafter amended or adopted. B. Pursuant to proper authorization, the Mayor is authorized to enter into a certain contract with the Principal, providing for the _________________________ Project, which contract is incorporated herein by this reference (“Contract”), and C. Pursuant to State law, Chapter 60.28 RCW, the City is required to reserve from the monies earned by the Principal pursuant to the contract, a sum not to exceed five percent (5%), said sum to be retained by the City as a trust fund for the protection and payment of any person or persons, mechanic, subcontractor or materialmen who shall perform any labor upon such contract or the doing of such work, and all persons who shall supply such person or persons or subcontractors with provisions and supplies for the carrying on of such work, and the State with the respect to taxes imposed pursuant to Title 82 RCW which may be due from said Principal. Every person performing labor or furnishing supplies towards completion of said improvement or work shall have a lien on said monies so reserved, provided that such notice of the lien of such claimant shall be given in the manner and within the time provided in RCW 39.08.030 as now existing and in accordance with any amendments that may hereafter be provided thereto; and D. State law further provides that with the consent of the City, the Principal may submit a bond for all or any portion of the amount of funds retained by the public body in a form acceptable to the public body conditioned upon such bond any proceeds therefrom being made subject to all claims and liens and in the same manner and priority as set forth retained percentages pursuant to Chapter 60.28 RCW; and E. The Principal has accepted, or is about to accept, the Contract, and undertake to perform the work therein provided for in the manner and within the time set forth, for the amount of $ _________________________; and F. The City is prepared to release any required retainage money previously paid by the Principal prior to acceptance and successful operation and fulfillment of all other terms of said contract upon being indemnified by these presents, NOW, THEREFORE, if the Principal shall perform all the provisions of the Contract in the manner and within the time period prescribed by the City, or within such extensions of time as may be granted under the Contract, and shall pay all laborers, mechanics, subcontractors and material men or women, and all persons who shall supply the Principal or subcontractors with provisions and supplies for the carrying on of said work, and if the Principal shall pay to the State all taxes imposed pursuant to Title 82 RCW which may be due from such Principal as a result of this contract then and in the event this obligation shall be void; but otherwise it shall be and remain in full force and effect. And the Surety, for value received, hereby further stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract or to the work to be performed thereunder or the specifications accompanying the same shall in any way affect its obligation on this bond, and it does hereby waive notice of any change, extension of time, alterations or additions to the terms of the Contract or to the Work. The Surety hereby agrees that modifications and changes may be made in the terms and provisions of the Contract without notice to Surety, and any such modifications or changes increasing the total amount to be paid the Principal shall automatically increase the obligation of the Surety on this Retainage Bond in a like amount, such increase, however, not to exceed twenty-five percent (25%) of the original amount of this bond without consent of the Surety. Creek St. Water Main Improvements (Yelm) Page 19 Within forty-five (45) days of receiving notice that the Principal has defaulted on all or part of the terms of the Contract, the Surety shall make written commitment to the City that it will either: (a) cure the default itself within a reasonable time period, or (b) tender to the City, the amount necessary for the City to remedy the default, including legal fees incurred by the City, or (c) in the event that Surety’s evaluation of the dispute is not complete or in the event the Surety disputes the City’s claim of default, the Surety shall notify the City of its finding and its intent, if any, to interplead. The Surety shall then fulfill its obligations under this bond, according to the option it has elected. Should Surety elect option (a) to cure the default, the penal sum of the Bond shall be reduced in an amount equal to the costs actually incurred by the Surety in curing the default. If the Surety elects option (b), then upon completion of the necessary work, the City shall notify the Surety of its actual costs. The City shall return, without interest, any overpayment made by the Surety and the Surety shall pay to the City any actual costs which exceed the City estimate, limited to the bond amount. Should the Surety elect option (c), the Parties shall first complete participation in mediation, described in the below paragraph, prior to any interplead action. In the event a dispute should arise between the Parties to this Bond with respect to the City’s declaration of default by the Principal, the Parties agree to participate in at least four hours of mediation in accordance with the mediation procedures of United States Arbitration and Mediation (“USA&M”). The Parties shall proportionately share in the cost of the mediation. The mediation shall be administered by the Seattle USA&M office, 4300 Two Union Square, 601 Union Street, Seattle, Washington 98101-2327. The Surety shall not interplead prior to completion of the mediation. The parties have executed this instrument under their separate seals this _____ day of _______________, 20___, the name and corporate seal of each corporate party hereto affixed, and these presents duly signed by its undersigned representatives pursuant to authority of its governing body. CORPORATE SEAL: PRINCIPAL By: __________________________ Title: _________________________ Address: ______________________ _______________________ CORPORATE SEAL: SURETY By: __________________________ Attorney-in-Fact (Attach Power of Attorney) Title: _________________________ Address: ______________________ _______________________ Creek St. Water Main Improvements (Yelm) Page 20 CERTIFICATES AS TO CORPORATE SEAL I hereby certify that I am the (Assistant) Secretary of the Corporation named as Principal in the within bond; that __________________________, who signed the said bond on behalf of the Principal, was __________________________ of said Corporation; that I know his or her signature thereto is genuine, and that said bond was duly signed, sealed, and attested for and in behalf of said Corporation by authority of its governing body. ____________________________________ Secretary of Assistant Secretary I hereby certify that I am the (Assistant) Secretary of the Corporation named as Surety in the within bond; that __________________________, who signed the said bond on behalf of the Surety, was __________________________ of the said Corporation; that I know his or her signature thereto is genuine, and that said bond was duly signed, sealed, and attested for and in behalf of said Corporation by authority of its governing body. ____________________________________ Secretary of Assistant Secretary APPROVED AS TO FORM: _________________________________ Brent Dille, City Attorney Creek St. Water Main Improvements (Yelm) Page 21 EXHIBIT E NOTICE TO LABOR UNIONS OR OTHER EMPLOYMENT ORGANIZATIONS NONDISCRIMINATION IN EMPLOYMENT TO: ALL EMPLOYEES AND TO: _________________________________________________________________ (Name of Union or Organization) The undersigned currently holds contract(s) with _____________________________ involving funds or credit of the City of Yelm, Washington, or (a) subcontract(s) with a prime contractor holding such contract(s). You are advised that, under the provisions of the above contract(s) or subcontract(s) and in accordance with Section 202 of Executive Order 11246 dated September 24, 1965, the undersigned is obliged not to discriminate against any employee or applicant of employment because of race, color, creed or national origin. This obligation not to discriminate in employment includes, but is not limited to, the following: EMPLOYMENT, UPGRADING, TRANSFER OR DEMOTION RECRUITMENT AND ADVERTISING RATES OF PAY OR OTHER FORMS OF COMPENSATION SELECTION FOR TRAINING INCLUDING APPRENTICESHIP, LAYOFF OR TERMINATION This notice is furnished to you pursuant to the provisions of the above contract(s) or subcontractor(s) and Executive Order 11246. Copies of this Notice will be posted by the undersigned in conspicuous places available to employees or applicants for employment. Complaints may be submitted to: _____________________________ City of Yelm, 106 Second St SE Yelm WA 98597 ____________________________________ ____________________________________ ____________________________________ (Contractor or subcontractor) ____________________________________ Date Creek St. Water Main Improvements (Yelm) Page 22 EXHIBIT F CERTIFICATE OF INSURANCE Creek St. Water Main Improvements (Yelm) Page 23 EXHIBIT G CITY OF YELM PERFORMANCE/PAYMENT BOND KNOW ALL PEOPLE BY THESE PRESENTS: We, the undersigned , (“Principal”) and , the undersigned corporation organized and existing under the laws of the State of and legally doing business in the State of Washington as a surety (“Surety”), are held and firmly bonded unto the City of Yelm, a Washington municipal corporation (“City”) in the penal sum of __________________ Dollars and no/100 ($) for the payment of which we firmly bind ourselves and our legal representatives, heirs, successors and assigns, jointly and severally. This obligation is entered into an Agreement with the City dated , 20 for ________ _________________. NOW, THEREFORE, if the Principal shall perform all the provisions of the Agreement in the manner and within the time period prescribed by the City, or within such extensions of time as may be granted under the Agreement, and shall pay all laborers, mechanics, subcontractors and material men or women, and all persons who shall supply the Principal or subcontractors with provisions and supplies for the carrying on of said work, and shall hold the City, their officials, agents, employees and volunteers harmless from any loss or damage occasioned to any person or property by reason of any carelessness or negligence on the part of the Principal, or any subcontractor in the performance of said work, and shall indemnify and hold the City harmless from any damage or expense by reason of failure of performance as specified in the Agreement within a period of two (2) years after its final acceptance thereof by the City, then and in the event this obligation shall be void; but otherwise, it shall be and remain in full force and effect. And the Surety, for value received, hereby further stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the work to be performed thereunder or the specifications accompanying the same shall in any way affect its obligation on this bond, and it does hereby waive notice of any change, extension of time, alterations or additions to the terms of the Agreement or to the Work. The Surety hereby agrees that modifications and changes may be made in terms and provisions of the Agreement without notice to Surety, and any such modifications or changes increasing the total amount to be paid the Principal shall automatically increase the obligation of the Surety on this Performance Bond in a like amount, such increase, however, not to exceed twenty-five percent (25%) of the original amount of this bond without the consent of the Surety. Within forty-five (45) days of receiving notice that the Principal has defaulted on all or part of the terms of the Agreement, the Surety shall make a written commitment to the City that it will either: (a) cure the default itself within a reasonable time period, or (b) tender to the city, the amount necessary for the City to remedy the default, including legal fees incurred by the City, or (c) in the event that Surety’s evaluation of the dispute is not complete or in the event the Surety disputes the City’s claim of default, the Surety shall notify the City of its finding and its intent, if any, to interplead. The Surety shall then fulfill its obligations under this bond, according to the option it has elected. Should Surety elect option (a) to cure the default, the penal sum of the Bond shall be reduced in an amount equal to the costs actually incurred by the Surety in curing the default. If the Surety elects option (b), then upon completion of the necessary work, the City shall notify the Surety of its actual costs. The City shall return, without interest, any overpayment made by the Surety and the Surety shall pay to the City any actual costs which exceed the City estimate, limited to the bond amount. Should the Surety elect option (c), the Parties shall first complete participation in mediation, described in the below paragraph, prior to any interplead action. Creek St. Water Main Improvements (Yelm) Page 24 In the event a dispute should arise between the Parties to this Bond with respect to the City’s declaration of default by the Principal, the Parties agree to participate in at least four hours of mediation in accordance with the mediation procedures of United States Arbitration and Mediation (“USA&M”). The Parties shall proportionately share in the cost of the mediation. The mediation shall be administered Washington Arbitration & Mediation Service (WAMS), 3600 Port of Tacoma Road, Suite 304, Tacoma, WA 98424 The Surety shall not interplead prior to completion of the mediation. DATED this ___ day of _____, 20___. CORPORATE SEAL OF PRINCIPAL:PRINCIPAL By:_____ (Name of Person Executing Bond) Its:_____ (Title) _____ _____ (Address) _____ (Phone) CERTIFICATE AS TO CORPORATE SEAL I hereby certify that I am the (Assistant) Secretary of the Corporation named as Principal in the within bond; that __, who signed the said bond on behalf of the Principal, was _____ of the said Corporation; that I know his or her signature thereto is genuine, and that said bond was duly signed, sealed, and attested for and in behalf of said Corporation by authority of its governing body. _____ Secretary of Assistant Secretary CORPORATE SEAL OF SURETY: SURETY By:_____ Attorney-in-Fact (Attach Power of Attorney) _____ (Name of Person Executing Bond) _____ _____ (Address) _____ (Phone) Creek St. Water Main Improvements (Yelm) Page 25 APPROVED AS TO FORM: _____ Brent Dille, City Attorney Creek St. Water Main Improvements (Yelm) Page 26 Creek Street Water Main Improvements BID AND CONTRACT DOCUMENTS AND SPECIFICATIONS Creek Street Water Main Improvements Bids Accepted Until 11:0 0 a.m.,September 28, 20 2 6 Bids Opened 1 1:0 0 a.m.,Septe mber 28, 202 6 AT: City of Yelm Public Services Conference Room 901 Rhoton Road SE, Yelm WA 98597 Prepared By:Approved By: RH2 Engineering, Inc.Reza R.Roukerd,City Engineer 1 201 Pacific Avenue, Suite 1 750 901 Rhoton Road Tacoma, WA 98 402 Yelm, WA 98597 Creek Street Water Main Improvements Page 2 TABLE OF CONTENTS REQUEST FOR BIDS.............................................................................................................1 3 SECTION 1: INSTRUCTIONS TO BIDDERS 1-1 TIME AND PLACE FOR SUBMISSION AND OPENING OF BIDS.......................................1 6 1-2 BID FORM...............................................................................................................1 6 1-3 BID SIGNATURE.......................................................................................................1 6 1-4 BID WITHDRAWAL DUE TO ERROR...........................................................................1 6 1-5 MODIFICATION OF BID............................................................................................1 6 1-6 EXAMINATION OF BID AND CONTRACT DOCUMENTS–BIDDER RESPONSIBILITIES.....1 7 1-7 INTERPRETATION OF BID AND CONTRACT DOCUMENTS...........................................1 7 1-8 ADDENDA................................................................................................................1 7 1-9 BID PRICE...............................................................................................................1 7 1-10 POSTPONEMENT OF BID OPENING..........................................................................1 7 1-11 REJECTION OF BIDS...............................................................................................1 8 1-12 ALTERATIONS TO DOCUMENTS PROHIBITED...........................................................1 8 1-13 DISQUALIFICATION OF BIDDER..............................................................................1 8 1-14 EVALUATION OF BIDS............................................................................................1 8 1-15 PROCEDURES WHEN ONLY ONE BID IS RECEIVED....................................................2 0 1-16 BID DOCUMENTS...................................................................................................2 0 1-17 CONFLICTS OF INTEREST AND NONCOMPETITIVE PRACTICES..................................2 1 1-18 BID SECURITY.......................................................................................................2 1 1-19 PERFORMANCE/PAYMENT BOND.............................................................................2 2 1-20 BID DISPUTE.........................................................................................................2 2 SECTION 2: BID DOCUMENTS BIDDER’S CHECKLIST.....................................................................................................2 5 BID FORM.....................................................................................................................2 6 BID SIGNATURE PAGE....................................................................................................3 1 BID BOND FORM...........................................................................................................3 2 SUBCONTRACTOR LIST..................................................................................................3 3 NON-COLLUSION AFFIDAVIT..........................................................................................3 4 CONTRACTOR CERTIFICATION.......................................................................................3 5 SECTION 3: AWARD DOCUMENTS PUBLIC WORKS CONTRACT............................................................................................3 7 1. SERVICES BY CONTRACTOR..................................................................................3 7 2. TERM..................................................................................................................39 3. WARRANTY..........................................................................................................39 4. COMPENSATION..................................................................................................4 0 5. EQUAL OPPORTUNITY EMPLOYER.........................................................................4 1 6. INDEPENDENT CONTRACTOR/CONFLICT OF INTEREST...........................................4 1 7. CITY’S RIGHT TO TERMINATE CONTRACT.............................................................4 1 8. INDEMNIFICATION...............................................................................................4 3 Creek Street Water Main Improvements Page 3 9. INSURANCE.........................................................................................................4 3 10. PERFORMANCE/PAYMENT BOND.........................................................................4 4 11. SAFETY..............................................................................................................4 5 12. PREVAILING WAGES...........................................................................................4 5 13. FAILURE TO PAY SUBCONTRACTORS...................................................................4 6 14. OWNERSHIP OF DOCUMENTS.............................................................................4 6 15. CONFIDENTIALITY.............................................................................................4 6 16. BOOKS AND RECORDS........................................................................................4 7 17. CLEAN UP..........................................................................................................4 7 18. CONTRACTOR AND SUBCONTRACTOR RESPONSIBILITY.......................................4 7 19. GENERAL PROVISIONS.......................................................................................4 8 NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT.................................................5 2 CONTRACT CHANGE ORDER AGREEMENT........................................................................5 4 CONTRACTOR’S RETAINAGE AGREEMENT........................................................................5 6 RETAINAGE BOND TO CITY OF YELM..............................................................................5 7 NONDISCRIMINATION IN EMPLOYMENT..........................................................................60 CERTIFICATE OF INSURANCE.........................................................................................6 2 PERFORMANCE/PAYMENT BOND.....................................................................................6 3 SECTION 4:SPECIAL PROVISIONS DIVISION 1–GENERAL REQUIREMENTS 1-01.3 Definitions..................................................................................................................2 1-01.3 Definitions..................................................................................................................3 1-02 Bid Procedures and Conditions..............................................................................................4 1-02.1 Qualifications of Bidder................................................................................................4 1-02.1(1) Supplemental Qualifications Criteria....................................................................5 1-02.1(1) Supplemental Qualifications Criteria....................................................................5 1-02.2 Plans and Specifications...............................................................................................5 1-02.4(2) Subsurface Information......................................................................................5 1-02.5 Proposal Forms............................................................................................................5 1-02.6 Preparation of Proposal................................................................................................6 1-04 Scope of the Work................................................................................................................6 1-04.1(2) Bid Items Not Included in the Proposal................................................................6 1-04.2 Coordination of Contract Documents.............................................................................6 1-04.4 Changes.....................................................................................................................7 1-04.6 Variation in Estimated Quantities...................................................................................7 1-04.7 Differing Site Conditions...............................................................................................7 1-04.11 Final Cleanup.............................................................................................................8 1-04.12 Intermediate Cleanup.................................................................................................8 1-05 Control of Work....................................................................................................................8 1-05.4 Conformity with and Deviations from Plans and Stakes...................................................8 1-05.4 Conformity with and Deviations from Plans and Stakes.................................................10 Creek Street Water Main Improvements Page 4 1-05.7 Nonconforming Work.................................................................................................11 1-05.7(1) Identification of Nonconforming Work...............................................................11 1-05.7(2) Reporting of Nonconforming Work....................................................................11 1-05.7(3) Remediation of Nonconforming Work................................................................11 1-05.11 Final Inspections and Operational Testing..................................................................12 1-05.11(1) Substantial Completion Date...........................................................................12 1-05.11(2) Final Inspection and Physical Completion Date.................................................13 1-05.11(3) Operational Testing........................................................................................13 1-05.13 Superintendents, Labor, and Equipment of Contractor.................................................13 1-05.16 Water and Power.....................................................................................................14 1-05.17 Oral Agreements......................................................................................................14 1-05.18 Record Drawings.....................................................................................................14 1-06 Control of Material..............................................................................................................14 1-06.1 Approval of Materials Prior to Use...............................................................................14 1-06.2(1)A Compaction Testing.......................................................................................15 1-06.2(2)B Financial Incentive.........................................................................................15 1-07 Legal Relations and Responsibilities to the Public..................................................................15 1-07.1 Laws to be Observed.................................................................................................15 1-07.2 State Sales Tax.........................................................................................................16 1-07.2(1) State Sales Tax—Rule 171..............................................................................16 1-07.2(2) State Sales Tax—Rule 170..............................................................................17 1-07.2(3) Services..........................................................................................................17 1-07.6 Permits and Licenses.................................................................................................17 1-07.7 Load Limits...............................................................................................................17 1-07.8 High Visibility Apparel................................................................................................17 1-07.8(1) Traffic Control Personnel..................................................................................17 1-07.9(3) Apprentices.....................................................................................................18 1-07.9(3) Apprentices.....................................................................................................18 1-07.11(1) Regulatory Authorities....................................................................................21 1-07.11(2) Contractual Requirements..............................................................................22 1-07.16 Protection and Restoration of Property.......................................................................22 1-07.16(1) Private/Public Property...................................................................................22 1-07.16(2) Vegetation Protection and Restoration.............................................................22 1-07.17 Utilities and Similar Facilities.....................................................................................23 1-08 Prosecution and Progress....................................................................................................23 1-08.0 Preliminary Matters....................................................................................................23 1-08.0(1) Preconstruction Conference..............................................................................23 1-08.0(2) Hours of Work.................................................................................................24 1-08.0(3) Days of Work..................................................................................................24 1-08.1 Subcontracting..........................................................................................................2 5 Creek Street Water Main Improvements Page 5 1-08.1(7)A Payment Reporting........................................................................................25 1-08.1(8)B Clauses Required in Subcontracts of All Tiers...................................................25 1-08.1(9) Submittal of Executed Subcontracts........................................................................25 1-08.3 Progress Schedule.....................................................................................................2 5 1-08.3(2) General Requirements......................................................................................25 1-08.3(2)A Type A Progress Schedule..............................................................................25 1-08.4 Notice to Proceed and Prosecution of Work..................................................................25 1-08.5 Time for Completion..................................................................................................26 1-09 Measurement and Payment.................................................................................................27 1-0 9.2 Weighing Equipment..................................................................................................27 1-09.2(1) General Requirements for Weighing Equipment..................................................27 1-09.2(1) General Requirements for Weighing Equipment..................................................27 1-09.2(5) Measurement..................................................................................................28 1-09.6 Force Account...........................................................................................................28 1-09.9 Payments..................................................................................................................28 1-09.11 Disputes and Claims.................................................................................................2 9 1-09.11(3) Time Limitation and Jurisdiction......................................................................29 1-0 9.13 Claims Resolution....................................................................................................2 9 1-09.13(3)A Arbitration General.......................................................................................29 1-09.13(4) Venue for Litigation.......................................................................................29 1-09.14 Attorney Fees..........................................................................................................30 DIVISION 2–TEMPORARY FEATURES 2-01 Mobilization/Demobilization...................................................................................................1 2-01.3 Construction Requirements...........................................................................................1 2-03.3(4) Temporary Road Closures..................................................................................3 2-04.3(1)B Traffic Control Supervisor (TCS)........................................................................6 2-04.3(2) Traffic Control Plans................................................................................................6 2-04.3(4)B Other Traffic Control Labor...............................................................................6 2-04.3(6)A Construction Signs...........................................................................................6 DIVISION 3–EARTHWORK 3-01 Clearing, Grubbing, and Roadside Cleanup.............................................................................1 3-01.1 Description..................................................................................................................1 3-01.2 Disposal of Usable Material and Debris..........................................................................1 3-01.2(1) Disposal Method No. 1–Open Burning...............................................................1 3-01.3 Construction Requirements...........................................................................................1 3-01.3(1) Clearing............................................................................................................1 3-01.3(1)A Root Protection...............................................................................................1 3-02 Removal of Structures and Obstructions.................................................................................2 3-02.3 Construction Requirements...........................................................................................2 Creek Street Water Main Improvements Page 6 3-02.3(3) Removal of Pavement, Sidewalks, Curbs, and Gutters...........................................2 3-02.3(4) Asbestos Handling and Disposal..........................................................................2 3-02.3(4)A Asbestos-Cement Pipe Removal or Abandonment...............................................3 3-03 Roadway Excavation and Embankment..................................................................................5 3-03.1 Description..................................................................................................................5 3-05 Subgrade Preparation...........................................................................................................5 3-05.3 Construction Requirements...........................................................................................5 3-05.3(2) Subgrade for Pavement......................................................................................5 3-06 Watering.............................................................................................................................6 3-06.1 Description..................................................................................................................6 3-06.2 Watering for Compaction..............................................................................................6 3-07 Structure Excavation.............................................................................................................6 3-07.3 Construction Requirements...........................................................................................6 3-07.3(1) General Requirements........................................................................................6 3-07.3(1)E Backfilling.......................................................................................................6 DIVISION 5–SURFACE TREATMENTS AND PAVEMENTS 5-04 Hot Mix Asphalt....................................................................................................................1 5-04.1 Description..................................................................................................................1 5-04.2 Materials.....................................................................................................................1 5-04.2(1) How to Get an HMA Mix Design on the QPL.........................................................2 5-04.2(1)A Vacant............................................................................................................2 5-04.2(2) Mix Design-Obtaining Project Approval..............................................................2 5-04.2(2)B Using Warm Mix Asphalt Processes...................................................................3 5-04.3 Construction Requirements...........................................................................................3 5-04.3(1) Weather Limitations...........................................................................................3 5-04.3(2) Paving Under Traffic..........................................................................................4 5-04.3(3) Equipment........................................................................................................4 5-04.3(3)A Mixing Plant....................................................................................................4 5-04.3(3)B Hauling Equipment..........................................................................................5 5-04.3(3)C Pavers............................................................................................................5 5-04.3(3)D Material Transfer Device or Material Transfer Vehicle..........................................6 5-04.3(3)E Rollers............................................................................................................7 5-04.3(4) Preparation of Existing Paved Surfaces................................................................7 5-04.3(4)A Crack Sealing..................................................................................................8 5-04.3(4)B Vacant............................................................................................................8 5-04.3(4)C Pavement Repair.............................................................................................8 5-04.3(5) Producing/Stockpiling Aggregates and RAP..........................................................8 5-04.3(5)A Vacant............................................................................................................9 5-04.3(6) Mixing..............................................................................................................9 5-04.3(7) Spreading and Finishing.....................................................................................9 5-04.3(8) Aggregate Acceptance Prior to Incorporation in HMA..........................................10 5-04.3(9) HMA Mixture Acceptance..................................................................................10 5-04.3(9)A Vacant..........................................................................................................11 Creek Street Water Main Improvements Page 7 5-04.3(9)B Vacant..........................................................................................................11 5-04.3(9)C Mixture Acceptance–Nonstatistical Evaluation.................................................11 5-04.3(9)C1 Mixture Nonstatistical Evaluation–Lots and Sublots.......................................11 5-04.3(9)C2 Mixture Nonstatistical Evaluation Sampling.....................................................12 5-04.3(9)C3 Mixture Nonstatistical Evaluation–Acceptance Testing...................................12 5-04.3(9)C4 Mixture Nonstatistical Evaluation–Pay Factors...............................................12 5-04.3(9)C5 Vacant........................................................................................................13 5-04.3(9)C6 Mixture Nonstatistical Evaluation–Price Adjustments.....................................13 5-04.3(9)C7 Mixture Nonstatistical Evaluation-Retests.....................................................13 5-04.3(9)D Mixture Acceptance–Commercial Evaluation...................................................13 5-04.3(10) HMA Compaction Acceptance..........................................................................14 5-04.3(10)A HMA Compaction–General Compaction Requirements...................................15 5-04.3(10)B HMA Compaction-Cyclic Density..................................................................15 5-04.3(10)C Vacant........................................................................................................1 6 5-04.3(10)D HMA Nonstatistical Compaction.....................................................................1 6 5-04.3(10)D1 HMA Nonstatistical Compaction-Lots and Sublots........................................16 5-04.3(10)D2 HMA Compaction Nonstatistical Evaluation–Acceptance Testing...................16 5-04.3(10)D3 HMA Nonstatistical Compaction–Price Adjustments.....................................16 5-04.3(11) Reject Work..................................................................................................1 7 5-04.3(11)A Reject Work General....................................................................................1 7 5-04.3(11)B Rejection by Contractor................................................................................17 5-04.3(11)C Rejection Without Testing (Mixture or Compaction)........................................17 5-04.3(11)D Rejection-A Partial Sublot...........................................................................17 5-04.3(11)E Rejection-An Entire Sublot..........................................................................17 5-04.3(11)F Rejection-A Lot in Progress.........................................................................17 5-04.3(11)G Rejection-An Entire Lot (Mixture or Compaction)..........................................18 5-04.3(12) Joints...........................................................................................................18 5-04.3(12)A HMA Joints..................................................................................................18 5-04.3(12)A1 Transverse Joints.......................................................................................18 5-04.3(12)A2 Longitudinal Joints.....................................................................................18 5-04.3(13) Surface Smoothness......................................................................................18 5-04.3(14) Planing (Milling) Bituminous Pavement............................................................19 5-04.3(14)A Pre-Planing Metal Detection Check................................................................20 5-04.3(14)B Paving and Planing Under Traffic...................................................................20 5-04.3(14)B1 General.....................................................................................................20 5-04.3(14)B2 Submittals-Planing Plan and HMA Paving Plan............................................21 5-04.3(14)B3 Pre-Paving and Pre-Planing Briefing.............................................................22 5-04.3(15) Sealing Pavement Surfaces.............................................................................2 4 5-04.3(16) HMA Road Approaches...................................................................................24 DIVISION 7–UTILITIES 7-04 Storm Sewers......................................................................................................................1 7-04.3 Construction Requirements...........................................................................................1 7-05 Manholes, Inlets, Catch Basins, and Drywells..........................................................................1 Creek Street Water Main Improvements Page 8 7-05.2 Materials.....................................................................................................................1 7-05.3 Construction Requirements...........................................................................................1 7-05.3(1) Adjusting Manholes and Catch Basins to Grade....................................................1 7-08 General Pipe Installation Requirements..................................................................................1 7-08.1 Description..................................................................................................................1 7-08.3 Construction Requirements...........................................................................................1 7-08.3(1) Excavation and Preparation of Trench.................................................................2 7-08.3(1)A Trenches........................................................................................................2 7-08.3(1)D Potholing........................................................................................................3 7-08.3(1)F Handling of Pipe..............................................................................................3 7-08.3(2)B Pipe Laying-General.......................................................................................3 7-08.3(2)E Rubber Gasketed Joints....................................................................................3 7-08.3(2)K Restrained Joint Pipe and Fitting Installation......................................................4 7-08.3(3) Backfilling.........................................................................................................4 7-08.3(4) Plugging Existing Pipe........................................................................................5 7-08.3(5) Pipe Crossing Existing Utilities.............................................................................5 7-08.3(6) Existing Unlocated Wet Utilities...........................................................................5 7-08.3(7) General Surface Restoration...............................................................................6 7-09 Water Mains........................................................................................................................6 7-09.1 Description..................................................................................................................6 7-09.2 Materials.....................................................................................................................6 7-09.3 Construction Requirements...........................................................................................7 7-09.3(3) Clearing and Grubbing in Ungraded Streets..........................................................7 7-09.3(4) Removal of Existing Street Improvements............................................................7 7-09.3(5) Grade and Alignment.........................................................................................7 7-09.3(7) Trench Excavation.............................................................................................7 7-09.3(8) Removal and Replacement of Unsuitable Materials...............................................7 7-09.3(9) Bedding the Pipe...............................................................................................7 7-09.3(10) Backfilling Trenches.........................................................................................8 7-09.3(13) Handling of Pipe..............................................................................................8 7-09.3(14) Cutting Pipe....................................................................................................8 7-09.3(15) Laying of Pipe on Curves..................................................................................8 7-09.3(15)B Laying Pipe on Curves-PVC Pipe (4 Inches and Over).......................................9 7-09.3(19)A Connections to Existing Mains.........................................................................9 7-09.3(19)B Maintaining Service........................................................................................9 7-09.3(21) Concrete Thrust Blocking..................................................................................9 7-09.3(22) Blowoff Assemblies........................................................................................10 7-09.3(23) Hydrostatic Pressure Test...............................................................................10 7-09.3(23)D Valve Pressure Test.....................................................................................1 0 7-09.3(24) Disinfection of Water Mains............................................................................11 7-09.3(24)A Flushing......................................................................................................11 7-09.3(24)B Requirement of Chlorine...............................................................................13 7-09.3(24)K Retention Period..........................................................................................13 7-09.3(24)M Chlorinating Connections to Existing Water Mains&Water Service Connections 13 Creek Street Water Main Improvements Page 9 7-09.3(24)N Final Flushing and Testing............................................................................13 7-09.3(25) Abandonment / Removal of Terminated Water Facilities....................................14 7-12 Valves for Water Mains.......................................................................................................15 7-12.3(2) Adjust Valve Box.............................................................................................15 7-14 Hydrants...........................................................................................................................16 7-14.1 Description................................................................................................................16 7-14.2 Materials...................................................................................................................16 7-14.3 Construction Requirements.........................................................................................16 7-14.3(1) Setting Hydrants.............................................................................................16 7-14.3(2)A Hydrant Restraints.........................................................................................16 7-14.3(2)C Hydrant Guard Post.......................................................................................16 7-14.3(6) Hydrant Extensions..........................................................................................16 7-15 Service Connections...........................................................................................................17 7-15.2 Materials...................................................................................................................17 7-15.3 Construction Requirements.........................................................................................17 DIVISION 8–MISCELLANEOUS CONSTRUCTION 8-01 Erosion Control and Water Pollution Control............................................................................1 8-01.1 Description..................................................................................................................1 8-01.3 Construction Requirements...........................................................................................1 8-01.3(1) General............................................................................................................1 8-01.3(1)F Vehicular Transport of Sediment.......................................................................1 8-02 Roadside Restoration............................................................................................................1 8-02.2 Materials.....................................................................................................................1 8-02.3 Construction Requirements...........................................................................................2 8-02.3(15) Lawn Installation.............................................................................................2 8-04 Curbs, Gutters, and Spillways................................................................................................2 8-0 4.3 Construction Requirements...........................................................................................2 8-04.3(1) Cement Concrete Curbs, Gutters, and Spillways...................................................2 8-05 Quality of Workmanship........................................................................................................2 8-05.3 Construction Requirements...........................................................................................2 8-05.3(1) Cast-in-place Concrete.......................................................................................2 8-06 Cement Concrete Driveway Entrances....................................................................................3 8-06.3 Construction Requirements...........................................................................................3 8-14 Cement Concrete Sidewalks..................................................................................................4 8-14.3 Construction Requirements...........................................................................................4 8-14.3(5) Detectable Warning Surface...............................................................................5 8-22 Pavement Marking................................................................................................................5 8-22.2 Materials.....................................................................................................................5 8-22.3 Construction Requirements...........................................................................................5 8-23 Temporary Pavement Markings.............................................................................................6 8-23.3 Construction Requirements...........................................................................................6 DIVISION 9–MATERIALS Creek Street Water Main Improvements Page 10 9-03 Aggregates..........................................................................................................................1 9-03.12 Gravel Backfill............................................................................................................1 9-03.12(3) Gravel Backfill for Pipe Zone Bedding.................................................................1 9-05 Drainage Structures, Culverts, and Conduits...........................................................................3 9-05.12 Polyvinyl Chloride (PVC) Pipe......................................................................................3 9-05.12(1) Solid Wall PVC Culvert Pipe, Solid Wall PVC Storm Sewer Pipe, and Solid Wall PVC Sanitary Sewer Pipe.........................................................................................................3 9-05.12(3) Tracer Wire and Splices....................................................................................3 9-05.12(4) Buried Utility Marking Tape...............................................................................3 9-30 Water Distribution Materials..................................................................................................3 9-30.1 Pipe............................................................................................................................4 9-30.1(5) Polyvinyl Chloride (PVC).....................................................................................4 9-30.1(5)A PVC Pipe (4 Inches and Over)...........................................................................4 9-30.1(8) Restrained Joint Pipe.........................................................................................4 9-30.2 Fittings.......................................................................................................................4 9-30.2(1) Ductile Iron Pipe Fittings....................................................................................4 9-30.2(6) Restrained Joint Fittings.....................................................................................5 9-30.2(7) Bolted, Sleeve-Type Couplings for Plain End Pipe.................................................5 9-30.3 Valves........................................................................................................................5 9-30.3(1) Gate Valves (3 to 16 inches)...............................................................................5 9-30.3(4) Valve Boxes......................................................................................................5 9-30.3(5) Valve Marker Posts............................................................................................5 9-30.3(6) Valve Stem Extensions.......................................................................................5 9-30.3(7) Combination Air Release/Air Vacuum Valves........................................................6 9-30.6 Water Service Connections...........................................................................................6 9-30.6(1) Saddles............................................................................................................6 9-30.6(3) Service Pipes.....................................................................................................6 9-30.6(3)B Polyethylene Tubing........................................................................................6 9-30.6(5) Meter Setters....................................................................................................6 9-30.6(7) Meter Boxes......................................................................................................6 DIVISION 10–MEASUREMENT & PAYMENT (SCHEDULE A) 10.00 General..............................................................................................................................1 Bid Item 101–Mobilization, Demobilization, Site Preparation, and Cleanup (10%)............................1 Bid Item 102–Construction Survey and As-Built Record Drawings...................................................1 Bid Item 103–Temporary Sedimentation and Erosion Control.........................................................2 Bid Item 104–Potholing Existing Utilities......................................................................................2 Bid Item 105–Shoring and Trench Safety Systems........................................................................2 Bid Item 106, 107, & 10 8–6-inch, 8-inch, & 12-inch C900 Water Main............................................2 Bid Item 1 09, 11 0, 11 1, & 11 2–6-inch, 8-inch, 10-inch, & 12-inch Gate Valve.................................3 Bid Item 11 3–Service Connections...............................................................................................3 Bid Item 11 4–Service Connections–Yelm Creek Apartments.........................................................3 Bid Item 11 5–Removal or Abandonment of Inactive Water System................................................4 Bid Item 11 6–Disposal of Asbestos Cement Water Main................................................................4 Creek Street Water Main Improvements Page 11 Bid Item 11 7–Fire Hydrant Assembly...........................................................................................4 Bid Item 1 18–Connection to Existing System................................................................................4 Bid Item 1 19–Demolition............................................................................................................5 Bid Item 12 0–Hot Mix Asphalt (HMA)–Trench Restoration...........................................................5 Bid Item 12 1–Concrete Cement Sidewalk–Trench Restoration......................................................5 Bid Item 12 2–Site Restoration.....................................................................................................6 Bid Item 12 3–Traffic Control.......................................................................................................6 Bid Item 12 4–Minor Change.......................................................................................................6 DIVISION 10–MEASUREMENT & PAYMENT (SCHEDULE B) Bid Item 201–Mobilization, Demobilization Site Preparation, and Cleanup (10%).............................1 Bid Item 202–Construction Survey and As-Built Record Drawings...................................................1 Bid Item 203–Temporary Sedimentation and Erosion Control.........................................................1 Bid Item 204–Roadway Demolition..............................................................................................1 Bid Item 205–Single Direction Curb Ramp (Type A)......................................................................2 Bid Item 206–Single Direction Curb Ramp (Type B)......................................................................2 Bid Item 207–Cement Concrete Approach (Type 1).......................................................................2 Bid Item 208–Cement Concrete Sidewalk.....................................................................................3 Bid Item 209–Cement Concrete Traffic Curb and Gutter................................................................3 Bid Item 210–Hot Mix Asphalt (HMA)...........................................................................................3 Bid Item 211–Utility Relocation...................................................................................................3 Bid Item 212–Traffic Markings....................................................................................................4 Bid Item 213–Stormwater Pipe Replacement................................................................................4 Bid Item 214–Roadway Site Restoration......................................................................................4 Bid Item 215–Traffic Control and Temporary Roadway Closures.....................................................5 Bid Item 216–Minor Change.......................................................................................................5 Attachments: Appendix A–Standard Plans and Details Appendix B–Prevailing Wages and Benefit Code Key Creek Street Water Main Improvements Page 12 Creek Street Water Main Improvements Page 13 CITY OF YELM REQUEST FOR BIDS Creek Street Water Main Improvements Notice is hereby given that the City of Yelm, Washington, will receive sealed bids through Septe mber 28, 202 6, until 11:00 a.m.,at the City Public Services Office or by US Mail at 901 Rhoton RD NW Yelm, 98597.Proposals received after 11:00 a.m.on said date will not be considered.Bids received by the submission deadline will be publicly opened and read in the Public Services Conference Room promptly at 11:00 a.m. All bid proposals shall be accompanied by a bid deposit by a cashier’s or certified check, or Bid Bond in an amount equal to five percent (5%) of the amount of such bid proposal.Should the successful bidder fail to enter into a contract and furnish satisfactory Performance Bond within the time stated in the specifications, the bid deposit or bond shall be forfeited to the City of Yelm. This project consists of upsizing approximately 2,300 linear feet of existing water main along a portion of Yelm A venue East(SR 507) to C reek S treet and C reek S treet SE between Y elm A venue East and 103rd A venue East.T he plans will include the proposed water main alignment, connections to existing water main, and restoration.A dditional work includes sidewalk improvements, new concrete approaches, and ADA curb ramp. The Contractor shall complete all work within 6 0 working days from the Notice to Proceed. The estimated construction cost is$1,8 00,000 to $2,000,000. All bid proposals shall be in accordance with the Instructions to Bidders and all other contract documents. Any questions concerning the bid documents, award documents, bonds, insurance must be directed in written form only to Brad Chatwood., by email at BradC@yelmwa.gov prior to bid opening date. Free-of-charge access to project bid documents (plans, specifications, addenda, and Bidders List) is provided to Prime Bidders, Subcontractors, and Vendors by going to www.bxwa.com and clicking on “Posted Projects”, “Public Works”, and “City of Yelm”. This online plan room provides Bidders with fully usable online documents with the ability to: download, view, print, order full/partial plan sets from numerous reprographic sources, a nd a free online digitizer/take-off tool. It is recommended that Bidder’s “Register” in order to receive automatic e-mail notification of future addenda and to place themselves on the “Self-Registered Bidders List”. Bidders that do not register will not be automatically notified of addenda and will need to periodically check the on-line plan room for addenda issued on this project. Contact Bidders Exchange of Washington at (425) 258-1303 should you require assistance with access or registration.The plans and specifications can also be viewed on the City of Yelm Website at https://www.ci.yelm.wa.us/government/transparency/public_notices.php#outer-188sub-1182. The City, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49 C.F.R., Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-assisted program s of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 23 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against Creek Street Water Main Improvements Page 14 on the grounds of race, color, national origin, or sex in consideration for an award. The City encourages minority and women-owned firms to submit bids consistent with the City’s policy to ensure that such firms are afforded the maximum practicable opportu nity to compete for and obtain public contracts. The Contractor will be required to comply with all local, State, and Federal laws and regulations pertaining to equal employment opportunities. The City of Yelm reserves the right to reject any and all bids, waive any informalities or minor irregularities in the bidding, and determine which bid or bidder meets the criteria set forth in the bid documents. No bidder may withdraw his bid after the hour set for the opening thereof unless the award is delaye d for a period exceeding thirty (30) days. Dated the 3rd day of September 202 6. Dates of Publication: Nisqually Valley News:September 10 th, 202 6 September 1 7 th, 202 6 Daily Journal of Commerce:September 10 th, 202 6 September 1 7 th, 202 6 Creek Street Water Main Improvements Page 15 SECTION 1:INSTRUCTIONS TO BIDDERS Creek Street Water Main Improvements Page 16 SECTION 1:INSTRUCTIONS TO BIDDERS 1-1 Time and Place for Submission and Opening of Bids Sealed bids must be submitted by 11:00 a.m. local time on Septe mber 28,20 2 6,at the City Public Services Office or by US Mail at 901 Rhoton RD NW Yelm, 98597 The City’s Project Manager must receive the sealed bid before the time and date specified in order to be considered.Telex or facsimile bids will not be accepted.The bidder accepts all risks of late delivery of mailed bids or of mis-delivery regardless of fault.Late bids will be returned unopened. 1-2 Bid Form Bids shall be made on the “Bid Form” issued by the City as part of these contract documents, without reservation or amendment.Bids must be typewritten or printed in ink.Upon completion, the Bid Form and the bid bond or certified check and any requested information shall be placed in a sealed envelope.On the outside of the envelope, place the bid name, bid number and the time bids are due. 1-3 Bid Signature All bids shall give the total bid price and shall be signed in ink by the bidder or their authorized representative, with the address.If the bid is made by an individual, the name, signature, and address must be shown.If the bid is made by a firm or partnership, the name and address of the firm or partnership and the signature of at least one of the general partners must be shown.If the bid is made by a corporation, the bid shall show the title of the person authorized to sign on behalf of the corporation, his or her title and the address.The City reserves the right to request documentation showing the authority of the individual signing the bid to execute contracts on behalf of anyone, or any entity, other than himself/herself.Refusal to provide such information upon request may cause the bid to be rejected as nonresponsive. 1-4 Bid Withdrawal Due to Error Bids may not be withdrawn due to a claim of error in a bid unless written notice of such claim and supporting evidence for such claim including cost breakdown sheets are delivered to the City within forty-eight (48) hours prior to the opening of bids. 1-5 Modification of Bid A modification of a bid already received will be considered only if the modification is received prior to the time announced for bid opening.All modifications shall be made in writing, executed and submitted in the same form and manner as the original bid. Creek Street Water Main Improvements Page 17 1-6 Examination of Bid and Contract Documents–Bidder Responsibilities The submission of a bid shall constitute an acknowledgment upon which the City may rely that the bidder has thoroughly examined and is familiar with the bid and contract documents and has reviewed and inspected all applicable federal, state and local statu tes, regulations, ordinances and resolutions dealing with or related to the equipment and/or services to be provided herein. The failure or neglect of a bidder to examine such documents, statutes, regulations, ordinances or resolutions shall in no way relieve the bidder from any obligations with respect to the bidder’s bid or the contract documents.No claim for additional compensation will be allowed which is based upon a lack of knowledge of any contract documents, statutes, regulations, ordinances or resolutions.Bidders shall visit delivery and service locations(s) as required.Bidders shall become familiar with and verify any environmental factors, which may impact current or future prices for this requirement. 1-7 Interpretation of Bid and Contract Documents No oral interpretations will be made to any bidder as to the meaning of the bid or contract documents and no oral communications will be binding upon the City.Requests for an interpretation shall be made by facsimile,by email at BradC@yelmwa.gov,or by mail and delivered to the Purchasing Coordinator of the City at the address indicated in Section 1-1, at least ten (10) days before the date announced for opening the bids.Any interpretation deemed necessary by the City will be in the form of an addendum to the bid documents and when issued will be sent as promptly as is practical to all parties to whom the bid documents have been issued. All such addenda shall become part of the bid. 1-8 Addenda Each bid shall include acknowledgment of receipt and review of all addenda issued during the bidding period on the Bid Form. 1-9 Bid Price The bid price shall include everything necessary for the completion of the contract including, but not limited to, furnishing all materials, equipment, tools, freight charges, facilities and all management, superintendence, labor and service, except as may be provided otherwise in the contract documents.All Washington State sales tax and all other government taxes, assessments and charges shall be included in the various Bid item prices as required by law.The offer shall remain in effect ninety (90) days after the bid opening.In the event of a discrepancy between a unit price and an extended amount and/or the total price, the unit price will govern and the extended amount and/or total price will be corrected accordingly.However, downward correction of a bid, which would displace the apparent low bidder, will only be permitted if the error made and the intended bid price can be determined solely from the bid documents. 1-10 Postponement of Bid Opening The City reserves the right to postpone the date and time for the opening of bids by announcing such postponement at any time prior to the date and time announced in these documents. Creek Street Water Main Improvements Page 18 1-11 Rejection of Bids A.The City reserves the right to reject any bid for any reason including, but not limited to, the following:any bid which is incomplete, obscure, irregular or lacking necessary detail and specificity; any bid which omits a price on any one or more items on the Bid Form and Bid Schedule; any bid in which prices are unbalanced in the opinion of the City; any bid a ccompanied by insufficient or irregular bid bond; any bid from bidders who (in the sole judgment of the City) lack the qualifications and/or responsibility necessary to perform the work after considering the elements in Section 1-14.B; any bid for which a bidder fails or neglects to complete and submit any qualifications information within the time specified by the City and as may be otherwise required herein; and, any bid submitted by a bidder who is not registered or licensed as may be required by the law s of the State of Washington. B.The C ity further reserves the right to reject any portion of any bid and/or to reject all bids.In consideration for the City’s review and evaluation of its bid, the bidder waives and releases any claims against the City arising from any rejection of any or all bids. 1-12 Alterations to Documents Prohibited Any addition, limitation or provision attached to the bid may render it informal or nonresponsive and cause its rejection.Alteration by erasure or interlineations must be explained or noted in the bid form over the signature of the bidder.No oral, telegraphic or telephonic bids or modifications will be considered. 1-13 Disqualification of Bidder If, in the opinion of the City, there is reason to believe that collusion exists among bidders, none of the bids of the participants in such collusion will be considered.All bidders are required to submit the Affidavit of Non-Collusion with their bids. 1-14 Evaluation of Bids It is the intent of City to award a contract to the lowest responsive bid by a responsible bidder as evaluated by the City.The bidder may be required by the City to submit documentation demonstrating compliance with the criteria. A.Responsiveness–The bidder must complete all required forms and bid documents and provide all required and requested information.Refusal to provide such information may cause the bid to be rejected.The City will consider all the material submitted by the bidder to determine whether the bid is in compliance with the bid terms and documents and responsive to the requested work. B.Responsibility–The City will consider all the material submitted by the bidder, and other evidence it may obtain including information from previous project owners, to determine whether the bidder is responsible. The bidder must meet the following bidder responsibility criteria and supplemental bidder responsibility criteria to be considered a responsible bidder: 1.Mandatory Bidder Responsibility Criteria Creek Street Water Main Improvements Page 19 a.Have a current certificate of registration as a contractor in compliance with chapter 18.27 RCW, which must have been in effect at the time of bid submittal; b.Have a current Washington Unified Business Identifier (UBI) number; c.If applicable: i.Have Industrial Insurance (workers’ compensation) coverage for the bidder’s employees working in Washington, as required in Title 51 RCW; ii.Have a Washington Employment Security Department number, as required in Title 50 RCW; iii.Have a Washington Department of Revenue state excise tax registration number, as required in Title 82 RCW; d.Not be disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065(3). 2.Supplemental Bidder Responsibility Criteria a.The bidder shall not have a record of excessive claims filed against the retainage, payment, or performance bonds for public works projects during the previous three years, that demonstrate a lack of effective management by the bidder of making timely and appropriate payments to its subcontractors, suppliers, and workers, unless there are extenuating circumstances acceptable to the City. b.The bidder shall have a reasonable history of successfully completed projects of a similar size and scope as required by the contract documents for this project.T he City will evaluat e whether the projects were “successfully completed” and of a “similar size and scope.” c.The bidder shall have evidence that it is able to begin and complete the work, and complete it in a timely fashion. 3.As evidence that the bidder meets the supplemental bidder responsibility criteria in paragraph (B)(2) above, the apparent low bidder must submit the following documentation to the City within 48 hours of the bid opening.The City reserves the right to request such documentation from other bidders also. Refusal to provide such information upon request may cause the bid to be rejected. a.The bidder shall submit a list of the public works projects completed within the previous three years and include for each project the following information; the owner and contact information for the owner; a list of claims filed against the retainage, pay ment, or performance bond for any of the projects listed; a written explanation of the circumstances surrounding each claim and the ultimate resolution of the claim. b.The bidder shall submit a list of projects of similar size and scope to this project and include information about each project, including the following: the owner and contact information for the owner; the awarded contract amount; the final contract amoun t; a description of the scope of the project and how the project is similar to this project; the bidder’s assessment of its performance of each project.The information should include any information regarding performance in the following areas;quality control; safety record; timeliness of performance; use of skilled personnel; management of subcontractors; availability of and use of appropriate equipment; compliance with contract documents; management of submittals process, change orders, and close-out. Creek Street Water Main Improvements Page 20 c.The bidder shall furnish acceptable evidence of the bidder’s current ability to perform, such as firm commitments by subcontractors, equipment, supplies and facilities, and the bidder’s ability to obtain the necessary personnel. d.The bidder shall obtain a City of Yelm Business Registration.The registration may be obtained at:http://dor.wa.gov. 4.If the City determines the bidder does not meet the bidder responsibility criteria in paragraph (B)(2)above and is therefore not a responsible bidder, the City shall notify the bidder in writing with the reasons for its determination.If the bidder disagrees with this determination, it may appeal the determination within 24 hours of receipt of the City’s determination by presenting additional information to the City and meeting the requirements of section 1-20(B).The City will consider the additional information before issuing its final determination.If the final determination affirms that the bidder is not responsible, the City will not execute a contract with any other bidder until two business days after the bidder determined to be not responsible has received the final determination. C.Lowest Bid–The lowest bid shall be determined as set forth on the Bid Form. The acceptance of a bid will be evidenced by a Notice of Award.No other act of the City shall constitute acceptance of a bid.Within ten (10) days after receipt of Notice of Award, the bidder whose bid is accepted, shall furnish the required performance bond, certificate of insurance, execute the contract and perform all other acts required by the bid and contract documents as co nditions precedent to formation of the contract. 1-15 Procedures When Only One Bid is Received In the event only a single responsive bid is received, the City reserves the right to conduct a price and/or cost analysis of such bid.The sole bidder shall provide such information, data and other documentation as deemed necessary by the City for such analysis.The City reserves the right to reject such bid. 1-16 Bid Documents Bidders are required to submit with the bid package the following: A.Bid Form B.Bid Proposal Sheet C.Bid Signature Page D.Bid Bond Form E.Subcontractor List F.Contractor Certification of Wage Law Compliance Creek Street Water Main Improvements Page 21 G.Non–Collusion Declaration 1-17 Conflicts of Interest and Noncompetitive Practices By submitting a bid, the Contractor agrees as follows: A.Conflict of Interest–That it has no direct or indirect pecuniary or proprietary interest, that it shall not acquire any interest which conflicts in any manner or degree with the work, services, equipment or materials required to be performed and/or provided under this contr act and that it shall not employ any person or agent having any such interests.In the event that the Contractor or its agents, employees or representatives hereafter acquires such a conflict of interest, it shall immediately disclose such interest to the City and take action immediately to eliminate the conflict or to withdraw from this contract, as the City may require. B.Contingent Fees and Gratuities 1. That no person or selling agency except bona fide employees or designated agents or representatives of the Contractor have been employed or retained to solicit or secure this contract with an agreement or understanding that a commission, percentage, bro kerage, or contingent fee would be paid; and 2.That no gratuities in the form of entertainment, gifts or otherwise, were offered or given by the Contractor or any of its agents, employees or representatives, to any official, member or employee of the City or other governmental agency with a view toward securing this contract or securing favorable treatment with respect to the awarding or amending, or the making of any determination with respect to the performance of this contract. 1-18 Bid Security No bid will be considered unless accompanied by either a cashier’s or certified check in an amount equal to five percent (5%) of the Total Bid Price as indicated on “Bid Form”, or a letter of credit for a like amount.The check or bond shall be payable to the City; it shall be forfeited as fixed and liquidated damages in case the bidder fails, neglects or refuses to enter into a contract for the faithful performance of said work (including the providing of any evidence of insurance and/or performance bond required herein), in the event the contract is awarded to them, within ten (10) days after the award is made.If a bid bond is submitted in lieu of a check, it shall be executed by a corporate surety authorized to transact business in the State of Washington and “Bid Bond”. If a letter of credit is offered in lieu of a check or bidder’s bond, it shall be issued as an irrevocable documentary letter of credit drawn on a banking institution licensed to do business in the State of Washington.The letter of credit shall include instruction and provisions prescribed in “Bid Bond”.Any questions as to the qualification of the banking institution or instruction shall be submitted to the City at least ten (10) days prior to the bid submittal date.The check, bidder’s bond or letter of credit shall be attached to the bid form. The City further reserves the right to hold all bids (and the accompanying bid security) from the date of the bid opening until the contract and any performance/payment bond are executed, Creek Street Water Main Improvements Page 22 provided that such period does not exceed ninety (90) days, and each bid shall remain effective during that period. 1-19 Performance/Payment Bond The bidder to whom the City has awarded this Contract will remove the Performance/Payment Bond attached to the Public Works Contract and deliver it to the City fully executed by the bidder and a surety company in the amount of one hundred percent (100%) of the contract price as security for the faithful performance of the work including the payment of all persons furnishing materials and performing labor on the work and all payments arising from the performance of the work due the State of Washington pursua nt to Titles 50 and 51 RCW.Such bond must be executed by a duly licensed surety company, which is registered with the Washington State Insurance Commissioner, and the surety’s name shall appear in the current Authorized Insurance Company List in the State of Washington, published by the Office of the Insurance Commissioner. The scope of the Performance/Payment Bond shall in no way affect or alter the liabilities of the Contractor to the City under Section 8 “Indemnification” of the Public Works Contract. The City may require the surety company to appear and qualify itself upon the bond.If, at any time, the City determines in its sole judgment that the surety company is insufficient, the City may require the Contractor to furnish additional surety in form and arrangement satisfactory to the City and in an amount not exceeding that origina lly required.The Contractor shall submit a performance bond complying with the requirements of this paragraph within ten (10) days after the award is made.Payments will not be made on the Contract until sufficient surety as required is furnished. 1-20 Bid Dispute A.Any actual or prospective bidder, including sub-contractors and suppliers showing a substantial economic interest in this contract who is aggrieved in connection with the solicitation or award of this contract, may protest to the City in accordance with the procedures set forth herein.Protests based on the specifications or other terms in the contract documents, which are apparent prior to the date established for submittal of bids, shall be submitted not later than ten (10) calendar days prior to said date, or shall be deemed waived.All other protests shall be accepted only from actual bidders and shall be submitted within five (5) calendar days after the aggrieved person knows or should have known of the facts and circumstances upon which the protest is based; provided, however, that in no event shall a protest be considered if all bids are rejected or after the award of this contract. B.In order to be considered, a protest shall be in writing and shall include:(1) the name and address of the aggrieved person; (2) the RFB number and contract title under which the protest is submitted; (3) a detailed description of the specific grounds for protest and any supporting documentation; and (4) the specific ruling or re lief requested.The written protest shall be addressed to: Creek Street Water Main Improvements Page 23 City of Yelm, 901 Rhoton RD NW Yelm, 98597 Attention:Bid Protest–Creek Street Water Main Improvements C.Upon receipt of a written protest, the City will promptly consider the protest.The City may give notice of the protest and its basis to other persons, including bidders involved in or affected by the protest; such other persons may be given an opportunity to submit their views and relevant information.If the protest is not resolved by mutual agreement of the aggrieved person and the City, the City will promptly issue a decision in writing stating the reasons for the action taken and informing the aggrieved person of his or her right to appeal the decisi on to the Mayor or his or her designee.A copy of the decision shall be mailed (by certified mail, return receipt requested) or otherwise promptly furnished to the aggrieved person and any other interested parties who requested a copy of the decision.The decision will be considered final and conclusive unless appealed within five (5) calendar days after receipt of the decision to the Mayor or his or her designee.If the decision is appealed, then the subsequent determination of the Mayor or his or her designee shall issue within five (5) days of the Mayor’s receipt of the appeal and shall be final and conclusive. D.Failure to comply with these protest procedures will render a protest untimely or inadequate and shall result in rejection thereof by the City. Creek Street Water Main Improvements Page 24 SECTION 2:BID DOCUMENTS Creek Street Water Main Improvements Page 25 SECTION 3: AWARD DOCUMENTS Creek Street Water Main Improvements Page 37 PUBLIC WORKS CONTRACT FOR Creek Street Water Main Improvements THIS PUBLIC WORKS CONTRACT (“Contract”) is dated effective this _____ day of __________, 202__ and is made by and between the City of Yelm, a Washington municipal corporation (“City or Owner”),and ______________________, a ___________________(“Contractor”). A. The City desires to retain an independent contractor to furnish all labor and materials necessary to perform work necessary to complete water main and sidewalk improvements, located a long Creek Street East, Yelm, Washington (“Property”); and B. The Contractor has the requisite skill and experience to perform such work. NOW, THEREFORE, the parties (“Parties”) agree to the following terms and conditions: 1.SERVICES BY CONTRACTOR 1.1 Description of Work. Contractor shall perform all work and furnish all tools, materials, supplies, equipment, labor and other items incidental thereto necessary for the construction and completion of the work, more particularly described as the Creek Street Water Main Improvements project, including without limitation: This project consists of upsizing approximately 2,300 linear feet of existing water main along a portion of Yelm Avenue East (SR 507) to Creek Street and Creek Street SE between Yelm Avenue East and 103rd Avenue East. The plans will include the proposed wa ter main alignment, connections to existing water main, and restoration. Additional work includes sidewalk improvements, new concrete approaches, and ADA curb ramp. (“Work”), in accordance with and as described in the Contract Documents, which include without limitation, this Contract, Request for Bids, Bidder’s Checklist, Instructions to Bidders, General Contractual Terms and Conditions, Bid Form, Bid Signature Page, Bid Bond, Combined Affidavit and Certification Form, Contractor’s Compliance Statement, Notice of Completion of Public Works Contract attached as Exhibit A, Contract Change Order Agreement attached as Exhibit B,Contractor’s Retainage Agreement attached as Exhibit C or Retainage Bond to City of Yelm attached as Exhibit D, Notice to Labor Unions or Other Employment Organizations Nondiscrimination in Employment attached as Exhibit E, Certificate(s) of Insurance Form attached hereto as Exhibit F, Performance / Payment Bond attached hereto as Exhibit G, Standard Plans and Details attached as Appendix A, current Prevailing Wage Rates attached as Appendix B, and 20 2 6 WSDOT/ APWA Standard Specifications for Road, Bridge and Municipal Construction (“Standard Specifications”) and all other Appendices attached hereto and incorporated by this reference, (collectively the “Contract Documents”), which Work shall be completed to t he City’s satisfaction, within the time period prescribed by the City and pursuant to the direction of the Mayor or his or her designee. 1.2 Completion Date. The Work shall be commenced within five (5) days of receipt by the Contractor of the City’s Notice to Proceed. The Work shall be completed within 60 working days of the Notice to Proceed. In the event the Work is not substantially completed within the time specified, Contractor agrees to pay to the City liquidated damages in the amount set forth in the formula included Creek Street Water Main Improvements Page 38 in Section 1.3 of this Contract. The Work shall not be deemed completed until the City has accepted the Work and delivered a written Notice of Completion of Public Works Contract in the form attached hereto as Exhibit A or filing of an online Notice of Completion with the Washington Department of Labor and Industries. 1.3 Liquidated Damages. Time is of the essence of the Contract. Delays inconvenience the public and cost taxpayers undue sums of money, adding time needed for administration, inspection, and supervision. It is impractical for the City to calculate the actual cost of delays. Accordingly, the Contractor agrees to pay liquidated damages calculated on the following form ula for its failure to complete this Contract on time: (1) To pay (according to the following formula) liquidated damages for each working day beyond the number of working days established for completion, and (2) To authorize the City to deduct these liquidated damages from any money due or coming due to the Contractor. LIQUIDATED DAMAGES FORMULA For purposes of this calculation, 'T' means the total number of working days established in the Contract for completion of the Work, as adjusted by any approved change orders or extensions of time. LD =0.15C T Where:LD =Liquidated damages per working day (rounded to the nearest dollar). C =Original Contract amount. T =Original time for completion. When the Work is completed to the extent that the City has full and unrestricted use and benefit of the facilities, both from an operational and safety standpoint, the City may determine the Work is complete. Liquidated damages will not be assessed for an y days for which an extension of time is granted. No deduction or payment of liquidated damages will, in any degree, release the Contractor from further obligations and liabilities to complete this entire Contract. 1.4 Performance Standard. Contractor shall perform the Work in a manner consistent with accepted practices for other properly licensed contractors. 1.5 Compliance with Laws. Contractor shall perform the Work in accordance with all applicable federal, state and City laws, including but not limited to all City ordinances, resolutions, standards or policies, as now existing or hereafter adopted or amended, and obtain all neces sary permits and pay all permit, inspection or other fees, at its sole cost and expense. 1.6 Change Orders. The City may, at any time, without notice to sureties, order changes within the scope of the Work. Contractor agrees to fully perform any such alterations or additions to the Work. All such change orders shall be in the form of the Contract Change Ord er Agreement attached hereto as Exhibit B, which shall be signed by both the Contractor and the City, shall specifically state the change of the Work, the completion date for such changed Work, and any increase or decrease in the compensation to be paid to Contractor as a result of such change in the Work. Oral change orders shall not be binding upon the City unless confirmed in writing by the City. If an y change hereunder causes Creek Street Water Main Improvements Page 39 an increases or decrease in the Contractor’s cost of, or time required for, the performance or any part of the Work under this Contract, an equitable adjustment will be made and the Contract modified in writing accordingly. If the Contractor intends to assert a claim for an equitable adjustment hereunder, it shall, within five (5) days after receipt of a written change order from the City or after giving the written notice required above, as the case may be, submit to the Cit y a written statement setting forth the general nature and monetary extent of such claim; provided the City, in its sole discretion, may extend such five (5) day submittal period upon request by the Contractor. The Contractor shall supply such supporting documents and analysis for the claims as the City may require to determine if the claims and costs have merit. No claim will be allowed for any costs incurred more than five (5) days before the Contractor gives written notice as required. No claim by the Contractor for an equitable adjustment hereunder will be allo wed if asserted after final payment under this Contract. 1.7 Work and Materials Omitted. The Contractor shall, when directed in writing by the City, omit work, services and materials to be furnished under the Contract and the value of the omitted work and materials will be deducted from the Total Compensation and the delivery schedule will be reviewed if appropriate. The value of the omitted work, services and materials will be a lump sum or unit price, as mutually agreed upon in writing by the Contractor and the City. If the parties cannot agree on an appro priate deduction, the City reserves the right to issue a unilateral change order adjusting the price and the delivery schedule. 1.8 Utility Location. Contractor is responsible for locating any underground utilities affected by the Work and is deemed to be an excavator for purposes of Chapter 19.122 RCW, as amended. Contractor shall be responsible for compliance with Chapter 19.122 RCW, including uti lization of the “one call” locator system before commencing any excavation activities. 1.9 Air Environment. Contractor shall fully cover any and all loads of loose construction materials including without limitation, sand, dirt, gravel, asphalt, excavated materials, construction debris, etc., to protect said materials from air exposure and to minimize emission of airborne particles to the ambient air environment within the City of Yelm. 2.TERM This Contract shall commence on the effective date of this Contract and continue until the completion of the Work, which shall be no later than ___________, 202__ to complete, and the expiration of all warranties contained in the Contract Documents (“Term”). 3.WARRANTY 3.1 Requisite Skill. The Contractor warrants that it has the requisite skill to complete the Work, and is appropriately accredited and licensed by all applicable agencies and governmental entities, including but not limited to being registered to do business in the City of Yelm by obtaining a City of Yelm business license. Contractor represents that it has visited the site and is familiar with all of the plans and specifications in connection with the completion of the Work. The Contractor specifically agrees to obtain a City of Yelm Business License prior to beginning work on the Contract and pay any applicable business and occupation (B&O) taxes that may be due as a result of the Business License and this Agreement. Creek Street Water Main Improvements Page 40 3.2 Defective Work. The Contractor shall, at its sole cost and expense, correct all Work which the City deems to have defects in workmanship and material discovered within one (1) year after the City’s final acceptance of the Work as more fully set forth in the General Conditions of the Contract; provided, however, that this warranty may extend beyond this time period pursuant to the warranties attached hereto as Appe ndix C and incorporated by this reference.This warranty shall survive termination of this Contract. Conducting of tests and inspections, review of specifications or plans, payment for goods or services, or acceptance by the City does not constitute waiver, modification or exclusion of any express or implied warranty or any right under this Contract or law. 4.COMPENSATION 4.1 Total Compensation. In consideration of the Contractor performing the Work, the City agrees to pay the Contractor an amount not to exceed _______________________ and 00/100 Dollars ($ __________), which amount shall constitute full and complete payment by the City (“Total Compensation”). 4.2 Contractor Responsible for Taxes. The Contractor shall be solely responsible for the payment of any taxes imposed by any lawful jurisdiction as a result of the performance and payment of this Contract. 4.3 Nonpayment. The City shall have the right to withhold payment to the Contractor for any of the Work not completed in a satisfactory manner, in the City’s sole discretion, which shall be withheld until such time as Contractor modifies or repairs the Work so that the Work is acceptable to the City. 4.4 Method of Payment. The basis of payment will be the actual quantities of work performed according to the contract and as specified for payment. Payments will be made for work and labor performed and materials furnished under the contract according to the price in the pro posal unless otherwise provided. Partial payments will be made once each month, based on partial estimates prepared by the Engineer and signed by the Contractor. Failure to perform any obligation under this Contract may be adequate reason for the City to withhold payments until the obligation is performed. Upon completion of all work and after final inspection, the amount due the Contractor under the contract will be paid based upon the final estimate made by the Engineer and signed by the Contractor. Payment to the Contractor for partial estimates, final estimates, and retained percentages shall be subject to controlling laws. 4.5 Retainage. Pursuant to Chapter 60.28 RCW, five percent (5%) of the Total Compensation shall be retained by the City to assure payment of Contractor’s state sales tax as well as payment of subcontractors, suppliers and laborers. Upon execution of this Contract, Contractor shall complete, execute and deliver to the City the Contractor Retainage Agreement attached hereto as Exhibit C or execute the Retainage Bond attached hereto as Exhibit D. No payments shall be made by the City from the retained percentage fun d (“Fund”) nor shall the City release any retained percentage escrow account to any person, until the City has received from the Department of Revenue a certificate that all taxes, increases, and penalties due from the Contractor and all taxes due and to become due with respect to the Contract have been paid in full or that they are, in the Department’s opinion, readily collectible without recourse to the State’s lien on the retained percentage. Upon non-payment by the general contractor, any supplier or subcontractor may file a lien against the retainage funds, pur suant to Chapter Creek Street Water Main Improvements Page 41 60.28 RCW. Subcontractors or suppliers are required to give notice of any lien within forty-five (45) days of the completion of the Work and in the manner provided in RCW 39.08.030. Within sixty (60) days after completion of all Work on this Contract, th e City shall release and pay in full the money held in the Fund, unless the City becomes aware of outstanding claims made against this Fund. 5.EQUAL OPPORTUNITY EMPLOYER In all Contractor services, programs or activities, and all Contractor hiring and employment made possible by or resulting from this Contract, there shall be no discrimination by Contractor or by Contractor’s employees, agents, subcontractors or representa tives against any person because of sex, age (except minimum age and retirement provisions), race, color, creed, national origin, marital status or the presence of any disability, including sensory, mental or physical handicaps, unless based upon a bona fi de occupational qualification in relationship to hiring and employment, advertising, layoff or termination, rates of pay or other forms of compensation, and selection for training, including apprenticeship. Contractor comply with and shall not violate any of the terms of Chapter 49.60 RCW, Title VII of the Civil Rights Act of 1964, the Americans With Disabilities Act, Section 504 of the Rehabilitation Act of 1973, 49 CFR Part 26, or any other applicable federal, state, or local law or regulation regarding non-discrimination. Any material violation of this provision shall be grounds for termination of this Contract by the City and, in the case of the Contractor’s breach, may result in ineligibility for further City agreements. If this project involves federal funds including USDOT funds administered by WSDOT, the contractor agrees to the clauses contained in Exhibit H. 6.INDEPENDENT CONTRACTOR/CONFLICT OF INTEREST 6.1 It is the intention and understanding of the Parties that the Contractor shall be an independent contractor and that the City shall be neither liable nor obligated to pay Contractor sick leave, vacation pay or any other benefit of employment, nor to pay an y social security or other tax which may arise as an incident of employment. The Contractor shall pay all income and other taxes due. Industrial or any other insurance that is purchased for the benefit of the City, regardless of whether such may provide a secondary or incidental benefit to the Contractor, shall not be deemed to convert this Agreement to an employment contract. It is recognized that Contractor may or will be performing professional services during the Term for other parties; provided, how ever, that such performance of other services shall not conflict with or interfere with Contractor's ability to perform the Services. Contractor agrees to resolve any such conflicts of interest in favor of the City. 6.2 If the Contractor is a sole proprietorship or if this is a contract with an individual, the contractor agrees to notify the City and complete any required form if the Contractor retired under a State of Washington retirement system and agrees to indemnify any losses the City may sustain through the Contractor’s failure to do so. 7.CITY’S RIGHT TO TERMINATE CONTRACT 7.1 Termination Without Cause. Prior to the expiration of the Term, this Contract may be terminated without cause by written notice delivered to Contractor from the City. Upon termination, all supplies, materials, labor and/or equipment furnished prior to such date shall, at the Cit y’s option, become its property. In the event Contractor is not in breach of any of the provisions of this Contract, Contractor will be paid for any portion of the Work which has been completed to the City’s satisfaction, Creek Street Water Main Improvements Page 42 calculated by the percentage amount that portion of the Work completed and accepted by the City bears to the Total Compensation. 7.2 Termination For Cause. The City may immediately terminate this Contract, take possession of the Property and all materials thereon and finish the Work by whatever methods it may deem expedient, upon the occurrence of any one or more of the following events: (1) If the Contractor should be adjudged a bankrupt. (2) If the Contractor should make a general assignment for the benefit of its creditors. (3) If a receiver should be appointed on the account of insolvency of Contractor. (4) If Contractor should persistently or repeatedly refuse or fail to supply a sufficient number of properly skilled workmen or proper materials for completion of the Work. (5) If the Contractor should fail to complete the Work within the time specified in this Contract. (6) If the Contractor should fail to complete the Work in compliance with the plans and specifications, to the City’s satisfaction. (7) If the Contractor should fail to make prompt payment to subcontractors or for material labor. (8) If Contractor should persistently disregard laws, ordinances or regulations of federal, state, or municipal agencies or subdivisions thereof. (9) If Contractor should persistently disregard instructions of the Mayor or his or her representative. (10) If Contractor shall be in breach or violation of any term or provision of this Contract, or (11) If the Work is not being performed pursuant to RCW 49.28.050 or 49.28.060. 7.3 Result of Termination. In the event that this Contract is terminated for cause by the City, the City may do any or all of the following: (1)Stop payments. The City shall cease any further payments to Contractor and Contractor shall be obligated to repay any payments it received under this contract. (2)Complete Work. The City may, but in no event is the City obligated to, complete the Work, which Work may be completed by the City’s agents, employees or representatives or the City may retain independent persons or entities to complete the Work. Upon demand, Contract or agrees to pay to the City all of its costs and expenses in completing such Work. Creek Street Water Main Improvements Page 43 (3)Take Possession. The City may take possession of the Property and any equipment and materials on the Property and may sale the same, the proceeds of which shall be paid to the City for its damages. (4)Remedies Not Exclusive. No remedy or election under this Contract shall be deemed an election by the City but shall be cumulative and in addition to all other remedies available to the City at law, in equity or by statute. 8.INDEMNIFICATION 8.1 Contractor Indemnification. The Contractor agrees to indemnify, defend, and hold the City, its elected officials, officers, employees, agents, and volunteers harmless from any and all claims, demands, losses, actions and liabilities (including costs and all attorney fees) to or by any and all persons or entities, including, without limitation, their respective agents, licensees, or representatives, arising from, resulting from, or connected with this Contract to the extent caused by the negligent acts, errors or omissions of the Co ntractor, its partners, shareholders, agents, employees, or by the Contractor’s breach of this Contract. Contractor waives any immunity that may be granted to it under the Washington State Industrial Insurance Act, Title 51 RCW. Contractor’s indemnificat ion shall not be limited in any way by any limitation on the amount of damages, compensation or benefits payable to or by any third party under workers’ compensation acts, disability benefit acts or any other benefits acts or programs. 8.2 City Indemnification. The City agrees to indemnify, defend, and hold the Contractor, its officers, directors, shareholders, partners, employees, and agents harmless from any and all claims, demands, losses, actions and liabilities (including costs and attorney fees) to or by any and all persons or entities, including without limitation, their respective agents, licenses, or representatives, arising from, resulting from or connected with this Contract to the extent solely caused by the negligent acts, errors, or omissions of t he City, its employees or agents. 8.3 Survival. The provisions of this Section shall survive the expiration or termination of this Contract with respect to any event occurring prior to such expiration or termination. 9.INSURANCE 9.1 Minimum Limits. The Contractor agrees to carry as a minimum, the following insurance, in such forms and with such carriers who have a rating which is satisfactory to the City: (1) Workers’ compensation and employer’s liability insurance in amounts sufficient pursuant to the laws of the State of Washington; (2) Commercial general liability insurance with combined single limits of liability not less than $2,000,000 for bodily injury, including personal injury or death, products liability and property damage. (3) Automobile liability insurance with combined single limits of liability not less than $2,000,000 for bodily injury, including personal injury or death and property damage. 9.2 Endorsements. Each insurance policy shall contain, or be endorsed to contain, the following provisions: Creek Street Water Main Improvements Page 44 (1) The City, its officers, officials, employees, volunteers and agents shall each be named as additional insured. (2) Coverage may not be terminated or reduced in limits except after thirty (30) days prior written notice by certified mail, return receipt requested, to the City. (3) Coverage shall be primary insurance as respects the City, its officials, employees and volunteers. Any insurance or self-insurance maintained by the City, its officials, employees or volunteers shall be in excess of Contractor’s insurance. (4) Coverage shall apply to each insured separately against whom claim is made or suit is brought. (5) Coverage shall be written on an “occurrence” form as opposed to a “claims made” or “claims paid” form. 9.3 Verification. Contractor shall furnish the City with certificates of insurance evidencing the coverage required by the Section, in compliance with the Certificate(s) of Insurance Form attached hereto as Exhibit F, which certificate must be executed by a person authorized by the insurer to bind coverage on its behalf. The City reserves the right to require complete certified copies of all required insurance policies, at any time. 9.4 Subcontractors. Contractors shall include all subcontractors as additional insured under its policies or shall furnish separate certificates for each subcontractor. All coverage for subcontractors shall be subject to all of the requirements stated herein. 9.5 Deductibles and Self-Insured Retentions. Any deductibles or self-insured retentions must be disclosed by Contractor and approved in writing by the City. At the option of the City, Contractor shall either reduce or eliminate such deductibles or self-insured retentions or procure a bond guarant eeing payment for any amounts not covered by the insurance by reason of such deductibles or self-insured retentions. 9.6 Asbestos Abatement or Hazardous Materials. If asbestos abatement or hazardous materials work is performed, Contractor shall review coverage with the City’s Risk Manager and provide scope and limits of coverage that are appropriate for the scope of Work and are satisfactory to the City. Contract or shall not commence any Work until its coverage has been approved by the Risk Manager. 9.7 Termination. The Contractor’s failure to provide the insurance coverage required by this Section shall be deemed to constitute non-acceptance of this Contract by the Contractor and the City may then award this Contract to the next lower bidder. 10.PERFORMANCE/PAYMENT BOND Pursuant to RCW 39.08.010, Contractor shall post a Performance/Payment Bond in favor of the City, in the form attached to this Contract as Exhibit G and incorporated by this reference, in a dollar amount satisfactory to the City; to guarantee Contractor’s performance of the Work to the City’s satisfaction; to insure Contractor’s performance of all of the provisions of this Contract; and to guarantee Creek Street Water Main Improvements Page 45 Contractor’s payment of all laborers, mechanics, subcontractors and material persons. Contractor’s obligations under this Contract shall not be limited to the dollar amount of the bond. 11.SAFETY Contractor shall take all necessary precautions for the safety of employees on the work site and shall comply with all applicable provisions of federal, state and municipal safety and health laws and codes, including without limitation, all OSHA/WISHA requ irements, Safety and Health Standards for Construction Work (Chapter 296-155 WAC), General Safety and Health Standards (Chapter 296-24 WAC), and General Occupational Health Standards (Chapter 296-62 WAC). Contractor shall erect and properly maintain, at a ll times, all necessary guards, barricades, signals and other safeguards at all unsafe places at or near the Work for the protection of its employees and the public, safe passageways at all road crossings, crosswalks, street intersections, post danger sign s warning against any known or unusual hazards and do all other things necessary to prevent accident or loss of any kind.Contractor shall protect from danger all water, sewer, gas, steam or other pipes or conduits, and all hydrants and all other property that is likely to become displaced or damaged by the execution of the Work. The Contractor shall, at its own expense, sec ure and maintain a safe storage place for its materials and equipment and is solely responsible for the same. 12.PREVAILING WAGES 12.1 Wages of Employees. This contract is subject to the minimum wage requirements of Chapter 39.12 RCW and Chapter 49.28 RCW (as amended or supplemented). On Federal-aid projects, Federal wage laws and rules also apply. The Hourly minimum rates for wages and fringe benefits are listed in Appendix B. When Federal wage and fringe benefit rates are listed, the rates match those identified by the U.S. Department of Labor’s “Decision Number” shown in Appendix B. The Contractor, any subcontractor, and all individuals or firms required by Chapter 39.12 RCW, Chapter 296-127 WAC, or the Federal Davis-Bacon and Related Acts (DBRA) to pay minimum prevailing wages, shall not pay any worker less than the minimum hourly wa ge rates and fringe benefits required by Chapter 39.12 RCW or the DBRA. Higher wages and benefits may be paid. When the project is subject to both State and Federal hourly minimum rates for wages and fringe benefits and when the two rates differ for similar kinds of labor, the Contractor shall not pay less than the higher rate unless the state rates are specificall y preempted by Federal law. The Contractor shall ensure that any firm (Supplier, Manufacturer, or Fabricator) that falls under the provisions of Chapter 39.12 RCW because of the definition “Contractor” in Chapter 296-127-010 WAC, complies with all the requirements of Chapter 39.12 RC W. 12.2 Exemptions to Prevailing Wage. The prevailing wage requirements of Chapter 39.12 RCW, and as required in this Contract do not apply to: (1) Sole owners and their spouses; (2) Any partner who owns at least 30% of a partnership; Creek Street Water Main Improvements Page 46 (3) The President, Vice President and Treasurer of a corporation if each one owns at least 30% of the corporation. 12.3 Reporting Requirements. On forms provided by the Industrial Statistician of State L&I, the Contractor shall submit to the Engineer the following for itself and for each firm covered under Chapter 39.12 RCW that provided work and materials of the contract: (1) A copy of an approved “Statement of Intent to Pay Prevailing Wages” State L&I form number F700-029-000. The City will make no payment under this contract for the work performed until this statement has been approved by State L&I and a certified copy o f the approved form has been submitted to the City. (2) A copy of an approved “Affidavit of Prevailing Wages Paid,” State L&I form number F700-007- 000. The City will not release to the contractor any funds retained under Chapter 60.28.011 RCW until all of the “Affidavit of Prevailing Wages Paid” forms have been approved by State L&I and a certified copy of all the approved forms have been submitted to the City. The Contractor shall be responsible for requesting these forms from the State L&I and for paying any approval fees required by State L&I. Certified payrolls are required to be submitted by the Contractor to the City, for the Contractor and all subcontractors or lower tier subcontractors. 12.4 Disputes. In the event any dispute arises as to what are the prevailing rates of wages for work of a similar nature and such dispute cannot be resolved by the City and the Contractor, the matter shall be referred for arbitration to the Director of the Department of Labor and Industries of the State of Washington and the decision therein shall be final and conclusive and binding on all parties involved in the dispute. 13.FAILURE TO PAY SUBCONTRACTORS In the event the Contractor shall fail to pay any subcontractors or laborers, fail to pay for any materials, or fail to pay any insurance premiums, the City may terminate this Contract and/or the City may withhold from the money which may be due the Contra ctor an amount necessary for the payment of such subcontractors, laborers, materials or premiums. 14.OWNERSHIP OF DOCUMENTS All originals and copies of work product, including plans, sketches, layouts, designs, design specifications, records, files, computer disks, magnetic media, all finished or unfinished documents or material which may be produced or modified by Contractor w hile performing the Work shall become the property of the City and shall be delivered to the City at its request. 15.CONFIDENTIALITY Any records, reports, information, data or other documents or materials given to or prepared or assembled by the Contractor under this Contract will be kept as confidential and shall not be made available to any individual or organization by the Contractor without prior written approval of the City. Creek Street Water Main Improvements Page 47 16.BOOKS AND RECORDS The Contractor agrees to maintain books, records, and documents which sufficiently and properly reflect all direct and indirect costs related to the performance of this Contract and such accounting procedures and practices as may be deemed necessary by the City to assure proper accounting of all funds paid pursuant to this Contract. These r ecords shall be subject at all reasonable times to inspection, review or audit by the City, its authorized representative, the State Auditor, or other governmental officials authorized by law to monitor this Contract. 17.CLEAN UP At any time ordered by the City and immediately after completion of the Work, the Contractor shall, at its own expense, clean up and remove all refuse and unused materials of any kind resulting from the Work. In the event the Contractor fails to perform t he necessary clean up, the City may, but in no event is it obligated to, perform the necessary clean up and the costs thereof shall be immediately paid by the Contractor to the City and/or the City may deduct its costs from any remaining payments due to th e Contractor. 18.CONTRACTOR AND SUBCONTRACTOR RESPONSIBILITY: 18.1 Contractor Verification.The Contractor verifies that it has a certificate of registration with the State of Washington; has a current state unified business identifier number; is not disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065 (3); has industrial insurance as required by Title 51 RCW, if applicable; has an employment security department number as required in Title 50 RCW, if applicable; has a state excise tax registration number as required in Title 82 RCW, if applicable; possesses a va lid electrical contractor license as required by chapter 19.28 RCW, if applicable; and possesses an elevator contractor license as required by chapter 70.87 RCW, if applicable. 18.2 Subcontractor Contracts. The Contractor shall include the language of this section in each of its first tier subcontracts, and shall require each of its subcontractors to include the same language of this section in each of their subcontracts, adjusting only as necessary the terms used for the contracting parties. Upon request of the Owner, the Contractor shall promptly provide documentation to the Owner demonstrating that the subcontractor meets the subcontractor responsibility criteria below. The requirements of this section apply to all subcontractors regardless of tier. 18.3 Subcontractor Verification. At the time of subcontract execution, the Contractor shall verify that each of its first tier subcontractors meets the following bidder responsibility criteria: Have a current certificate of registration in compliance with chapter 18.27 RCW, which must have been in effect at the time of subcontract bid submittal; Have a current Washington Unified Business Identifier (UBI) number; Not be disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065 (3); Have Industrial Insurance(workers’ compensation) coverage for the subcontractor’s employees working in Washington, as required in Title 51 RCW, if applicable; A Washington Employment Security Department number, as required in Title 50 RCW, if applicable; A Washington Department o f Revenue state excise tax registration number, as required in Title 82 RCW, if applicable; An electrical contractor license, if required by Chapter 19.28 RCW, if applicable; An elevator contractor license, if required by Chapter 70.87 RCW. Creek Street Water Main Improvements Page 48 19.GENERAL PROVISIONS 19.1 Entire Contract. The Contract Documents contain all of the agreements of the Parties with respect to any matter covered or mentioned in this Contract and no prior agreements or understandings pertaining to any such matters shall be effective for any purpose. 19.2 Modification. No provisions of this Contract, including this provision, may be amended or added to except by agreement in writing signed by the Parties or their respective successors in interest. 19.3 Full Force and Effect. Any provision of this Contract, which is declared invalid, void or illegal, shall in no way affect, impair, or invalidate any other provision hereof and such other provisions shall remain in full force and effect. 19.4 Assignment. The Contractor shall not transfer or assign, in whole or in part, any or all of its obligations and rights hereunder without the prior written consent of the City. In the event the City consents to any such assignment or transfer, such consent shall in no way release the Contractor from any of its obligations or liabilities under th is Contract. 19.5 Successors In Interest. Subject to the preceding Subsection, this Contract shall be binding upon and inure to the benefit of the Parties’ successors in interest, heirs and assigns. 19.6 Attorney Fees. In the event the City or the Contractor defaults on the performance of any terms in this Contract, and the Contractor or City places the enforcement of the Contract or any part thereof, or the collection of any monies due, or to become due hereunder, or recovery of possession of any belongings, in the hands of an attorney, or file suit upon the same, each Party shall pay all its own attorneys’ fees, costs and expenses. Any action arising out of or relating to this Contract shall be brought exclusively in the Superior Court of Thurston County, Washington. 19.7 No Waiver. Failure of the City to declare any breach or default immediately upon occurrence thereof, or delay in taking any action in connection with, shall not waive such breach or default. Failure of the City to declare one breach or default does not act as a waiver of the City’s right to declare another breach or default. 19.8 Governing Law. This Contract shall be made in and shall be governed by and interpreted in accordance with the laws of the State of Washington. 19.9 Authority.Each individual executing this Contract on behalf of the City and Contractor represents and warrants that such individuals are duly authorized to execute and deliver this Contract on behalf of the Contractor or City. 19.10 Notices. Any notices required to be given by the City to Contractor or by the Contractor to the City shall be delivered to the Parties at the addresses set forth below. Any notices may be delivered personally to the addressee of the notice or may be deposited i n the United States mail, postage prepaid, to the address set forth herein. Any notice so posted in the United States mail shall be deemed received three (3) days after the date of mailing. Creek Street Water Main Improvements Page 49 19.11 Captions. The respective captions of the Sections of this Contract are inserted for convenience of reference only and shall not be deemed to modify or otherwise affect in any respect any of the provisions of this Contract. 19.12 Performance. Time is of the essence of this Contract and each and all of its provisions in which performance is a factor. Adherence to completion dates is essential to the Contractor’s performance of this Contract. 19.13 Compliance with Ethics Code. If a violation of the City’s Ethics Resolution No. 91-54, as amended, occurs as a result of the formation and/or performance of this Contract, this Contract may be rendered null and void, at the City’s option. 19.14 Conflicting Provisions. In the event of a conflict between the terms and provisions of any of the Contract Documents, the Mayor or his or her designee shall issue an interpretation of the controlling document, which interpretation shall be final and binding. DATED the day and year set forth above. CITY OF YELM By:___________________________________ Joe DePinto, Mayor City of Yelm, 106 Second St. SE, Yelm WA 98597 ATTEST: _______________________________ Kathy Linnemeyer, City Clerk APPROVED AS TO FORM: _______________________________ City Attorney, Brent Dille [CONTRACTOR’S NAME] By:___________________________________ (Signature) ___________________________________ (Name) ___________________________________ (Address) ___________________________________ (Phone) Creek Street Water Main Improvements Page 50 STAFF SELECT APPROPRIATE NOTARY BLOCK FOR APPLICANT [Individual Notary] STATE OF WASHINGTON) ) ss. COUNTY OF _____________ ) On this day personally appeared before me, ____________________________________, to me known to be the individual described in and who executed the foregoing instrument, and on oath swore that he/she/they executed the foregoing instrument as his/her/their free and voluntary act and deed for the uses and purposes therein mentioned. GIVEN my hand and official seal this ______ day of _______________________, 20__. ______________________________________ ______________________________________ (typed/printed name of notary) Notary Public in and for the State of Washington. My commission expires ____________________ [Corporate Notary] STATE OF WASHINGTON) ) ss. COUNTY OF ____________) On this day personally appeared before me ____________________________________, to me known to be the ________________________________ of _______________________ that executed the foregoing instrument, and acknowledged the said instrument to be the free an d voluntary act and deed of said corporation, for the uses and purposes therein mentioned, and on oath stated that he/she was authorized to execute said instrument and that the seal affixed, if any, is the corporate seal of said corporation. GIVEN my hand and official seal this ______ day of _______________________, 20__. ______________________________________ ______________________________________ (typed/printed name of notary) Notary Public in and for the State of Washington. My commission expires ____________________ Creek Street Water Main Improvements Page 51 EXHIBIT A NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT Creek Street Water Main Improvements Page 52 Creek Street Water Main Improvements Page 53 Creek Street Water Main Improvements Page 54 EXHIBIT B CITY OF YELM CONTRACT CHANGE ORDER AGREEMENT ______________________________________________________ PROJECT CHANGE ORDER EFFECTIVE DATE NUMBER NUMBER ___________________________________________________ PROJECT TITLE CONTRACTOR SUMMARY OF PROPOSED CHANGES: The time provided for completion in the Contract is Unchanged Increased Decreased by ____ Calendar Days. This Document shall become an Amendment to the Contract and all provisions of the Contract not amended herein will apply to this Change Order. Will this change affect expiration or extent of Insurance coverage?Yes No If “Yes” Will the Policies Be Extended?Yes No _____________________________________________________________________________ PRICE CHANGE LUMP SUM:INCREASE $DECREASE $ UNIT PRICE: THE ITEMS ARE APPROXIMATE OR ESTIMATED QUANTITIES INVOLVED IN THIS CHANGE ITEM NO.ITEM QUANTITY UNIT PRICE ADD OR DELETE TOTAL NET CONTRACT:INCREASE $DECREASE $ STATEMENT: _____________________________________________________________________________ CONTRACTOR’S DEPT. DIRECTOR/MANAGER DATE SIGNATURE SIGNATURE Creek Street Water Main Improvements Page 55 DEPARTMENT RECAP TO DATE:*Adjustments: ORIGINAL CONTRACT AMOUNT$_____ PREVIOUS CHANGE ORDERS$_____ THIS CHANGE ORDER$_____ *ADJUSTMENTS$_____ NEW CONTRACT AMOUNT$_____ ADJUSTMENTS CHANGE ORDER ESTIMATE IS HEREBY INCREASED$_____ DECREASED$_____ PAY THIS ADJUSTED AMOUNT$_____ ______________________________ DEPARTMENT DIRECTOR’S SIGNATURE Creek Street Water Main Improvements Page 56 EXHIBIT C:CONTRACTOR’S RETAINAGE AGREEMENT City of Yelm Bid/Contract Number 106 Second St.. SE, Yelm WA 98597 360.458.8499 IDENTIFICATION AND DESCRIPTION Project Title______________________________________________________________________________ Contractor_______________________________________Representative________________________ Bid No._____________________________Date_______Administering Department_______________ City Representative________________________________Funding Source________________________ Project Authority__________________________________________________________________________ RETAINAGE FORMULA In accordance with applicable State Statutes, the following provisions will be made for the disposition of the retainage held for investment: 1.All investments selected below are subject to City approval. 2.Retainage under this agreement will be held in escrow by the _________________________ (referred to herein as the Bank), the terms of which are specified by separate escrow agreement. The cost of the investment program and the risk thereof is to be borne entirely by the contractor. 3.The final disposition of the contract retainage will be made in accordance with applicable statutes. CONTRACTOR’S INSTRUCTIONS Pursuant to RCW 60.28.010 I hereby notify the City of Yelm of my instructions to invest not to invest the retainage withheld under the terms of this contract. If the investment option is selected, please provide the following information: Name of Bank, Mutual Fund, or Savings & Loan Association: ______________________________________ Address: ________________________________________________________________________________ Account #: _______________________________________Contact Person: _______________________ Contractor: _______________________________________Date: _______________________________ By: _____________________________________________Title: _______________________________ Address: _________________________________________________________Phone: _______________ Fed ID #: ________________________________________Est. Completion Date: __________________ CITY APPROVAL Approval of Investment Program and Retainage Agreement ____________________________________ Finance Director Date CERTIFICATION FOR RELEASE OF CONTRACT RETAINAGE Contract No. __________Project Title: ______________________________________________________________ I hereby certify, as Contract Administrator for this Contract representing the City of Yelm, that all work required by the ab ove cited contract was completed on ________________________ and final acceptance by the City was granted on _________________________. I also certify that no liens have been received within 30 days from the above date from any person, persons, mechanics, subcontractors or materialman who has performed any work or provided any material of subject contract. ____________________________________ Contract Administrator ____________________________________ Director of Administering Department Also, please find attached certifications by the applicable state agencies of the receipt of:1) Washington State Business Taxes (Washington State Dept. of Revenue); 2) Industrial Insurance Premiums (State Dept. of Labor & Industries); and 3) Employment Security, Un employment Insurance Premiums (State of Washington Employment Security Dept.) Creek Street Water Main Improvements Page 57 EXHIBIT D RETAINAGE BOND TO CITY OF YELM Creek Street Water Main Improvements KNOW ALL PERSONS BY THESE PRESENTS that we, the undersigned, ____________________________________________, as principal (“Principal”), and __________________________________, a Corporation organized and existing under the laws of the State of _________________, as a surety Corporation, and qualified under the laws of the State of Washington to become surety upon bonds of Contractors with Municipal Corporations, as surety (“Surety”), are jointly and severally held and firmly bonded to t he City of Yelm (“City”) in the penal sum of: ________________________________________ ($ _______________) for the payment of which sum we bind ourselves and our successors, heirs, administrators or personal representatives, as the case may be. A. This obligation is entered into in pursuant to the statutes of the State of Washington and the ordinances, regulations, standards and policies of the City, as now existing or hereafter amended or adopted. B. Pursuant to proper authorization, the Mayor is authorized to enter into a certain contract with the Principal, providing for the _________________________ Project, which contract is incorporated herein by this reference (“Contract”), and C. Pursuant to State law, Chapter 60.28 RCW, the City is required to reserve from the monies earned by the Principal pursuant to the contract, a sum not to exceed five percent (5%), said sum to be retained by the City as a trust fund for the protection an d payment of any person or persons, mechanic, subcontractor or materialmen who shall perform any labor upon such contract or the doing of such work, and all persons who shall supply such person or persons or subcontractors with provisions and supplies for the carrying on of such work, and the State with the respect to taxes imposed pursuant to Title 82 RCW which may be due from said Principal. Every person performing labor or furnishing supplies towards completion of said improvement or work shall have a l ien on said monies so reserved, provided that such notice of the lien of such claimant shall be given in the manner and within the time provided in RCW 39.08.030 as now existing and in accordance with any amendments that may hereafter be provided thereto;and D. State law further provides that with the consent of the City, the Principal may submit a bond for all or any portion of the amount of funds retained by the public body in a form acceptable to the public body conditioned upon such bond any proceeds the refrom being made subject to all claims and liens and in the same manner and priority as set forth retained percentages pursuant to Chapter 60.28 RCW; and E. The Principal has accepted, or is about to accept, the Contract, and undertake to perform the work therein provided for in the manner and within the time set forth, for the amount of $ _________________________; and F. The City is prepared to release any required retainage money previously paid by the Principal prior to acceptance and successful operation and fulfillment of all other terms of said contract upon being indemnified by these presents, NOW, THEREFORE, if the Principal shall perform all the provisions of the Contract in the manner and within the time period prescribed by the City, or within such extensions of time as may be granted under the Contract, and shall pay all labo rers, mechanics, subcontractors and material men or women, and all persons who shall supply the Principal or subcontractors with provisions and supplies for the carrying on of said work, and if the Principal shall pay to the State all taxes imposed pursu ant to Title 82 R CW which may be due from such Principal as a result of this contract then and in the event this obligation shall be void; but otherwise it shall be and remain in full force and effect. And the Surety, for value received, hereby further stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract or to the work to be performed thereunder or the specifications accompanying the sam e shall in any way affect its obligation on this bond, and it does hereby waive notice of any change, extension of time, alterations or additions to the terms of the Contract or to the Work. The Surety hereby agrees that modifications and changes may be made in the terms and provisions of the Contract without notice to Surety, and any such modifications or changes increasing the total amount to be paid the Principal shall automatically increas e the obligation of the Surety on this Retainage Bond in a like amount, such increase, however, not to exceed twenty-five percent (25%) of the original amount of this bond without consent of the Surety. Creek Street Water Main Improvements Page 58 Within forty-five (45) days of receiving notice that the Principal has defaulted on all or part of the terms of the Contract, the Surety shall make written commitment to the City that it will either: (a) cure the default itself within a reasonable ti me pe riod, or (b) tender to the City, the amount necessary for the City to remedy the default, including legal fees incurred by th e City, or (c) in the event that Surety’s evaluation of the dispute is not complete or in the event the Surety disputes the Cit y’s claim of default, the Surety shall notify the City of its finding and its intent, if any, to interplead. The Surety shall th en fulfill its obligations under this bond, according to the option it has elected. Should Surety elect option (a) to cure the default, the penal sum of the Bond shall be reduced in an amount equal to the costs actually incurred by the Surety in curing the default. If t he Surety elects option (b), then upon completion of the necessary work, the City shall notify the Surety of its actual costs. The City shall return, without interest, any overpayment made by the Surety and the Surety shall pay to the City any actual costs which exceed t he City estimate, limited to the bond amount. Should the Surety elect option (c), the Parties shall first complete participation in mediation, described in the below paragraph, prior to any interplead action. In the event a dispute should arise between the Parties to this Bond with respect to the City’s declaration of default by the Principal, the Parties agree to participate in at least four hours of mediation in accordance with the mediation procedur es of Uni ted States Arbitration and Mediation (“USA&M”). The Parties shall proportionately share in the cost of the mediation. The mediation shall be administered by the Seattle USA&M office, 4300 Two Union Square, 601 Union Street, Seattle, Washington 98101-2327. The Surety shall not interplead prior to completion of the mediation. The parties have executed this instrument under their separate seals this _____ day of _______________, 20___, the name and corporate seal of each corporate party hereto affixed, and these presents duly signed by its undersigned representatives pursuant t o authority of its governing body. CORPORATE SEAL: PRINCIPAL By: __________________________ Title: _________________________ Address: ______________________ _______________________ CORPORATE SEAL: SURETY By: __________________________ Attorney-in-Fact (Attach Power of Attorney) Title: _________________________ Address: ______________________ _______________________ Creek Street Water Main Improvements Page 59 CERTIFICATES AS TO CORPORATE SEAL I hereby certify that I am the (Assistant) Secretary of the Corporation named as Principal in the within bond; that__________________________, who signed the said bond on behalf of the Principal, was __________________________of said Corporation; that I know his or her signature thereto is genuine, and that said bond was duly signed, sealed, and attested for and in behalf of said Corporation by authority of its governing body. ____________________________________ Secretary of Assistant Secretary I hereby certify that I am the (Assistant) Secretary of the Corporation named as Surety in the within bond; that__________________________, who signed the said bond on behalf of the Surety, was __________________________of the said Corporation; that I know his or her signature thereto is genuine, and that said bond was duly signed, sealed, and attested for and in behalf of said Corporation by authority of its governing body. ____________________________________ Secretary of Assistant Secretary APPROVED AS TO FORM: _________________________________ Brent Dille, City Attorney Creek Street Water Main Improvements Page 60 EXHIBIT E NOTICE TO LABOR UNIONS OR OTHER EMPLOYMENT ORGANIZATIONS NONDISCRIMINATION IN EMPLOYMENT TO:ALL EMPLOYEES AND TO:_________________________________________________________________ (Name of Union or Organization) The undersigned currently holds contract(s) with _____________________________ involving funds or credit of the City of Yelm, Washington, or (a) subcontract(s) with a prime contractor holding such contract(s). You are advised that, under the provisions of the above contract(s) or subcontract(s) and in accordance with Section 202 of Executive Order 11246 dated September 24, 1965, the undersigned is obliged not to discriminate against any employee or applicant of employment because of race, color, creed or national origin. This obligation not to discriminate in employment includes, but is not limited to, the following: EMPLOYMENT, UPGRADING, TRANSFER OR DEMOTION RECRUITMENT AND ADVERTISING RATES OF PAY OR OTHER FORMS OF COMPENSATION SELECTION FOR TRAINING INCLUDING APPRENTICESHIP, LAYOFF OR TERMINATION This notice is furnished to you pursuant to the provisions of the above contract(s) or subcontractor(s) and Executive Order 11246. Copies of this Notice will be posted by the undersigned in conspicuous places available to employees or applicants for employment. Complaints may be submitted to: _____________________________ City of Yelm, 106 Second St SE Yelm WA 98597 ____________________________________ ____________________________________ ____________________________________ (Contractor or subcontractor) ____________________________________ Date Creek Street Water Main Improvements Page 61 EXHIBIT F CERTIFICATE OF INSURANCE Creek Street Water Main Improvements Page 62 Creek Street Water Main Improvements Page 63 EXHIBIT G CITY OF YELM PERFORMANCE/PAYMENT BOND KNOW ALL PEOPLE BY THESE PRESENTS: We, the undersigned, (“Principal”) and , the undersigned corporation organized and existing under the laws of the State of and legally doing business in the State of Washington as a surety (“Surety”), are held and firmly bonded unto the City of Yelm, a Washington municipal corporation (“City”) in the penal sum of __________________Dollars and no/100 ($) for the payment of which we firmly bind ourselves and our legal representatives, heirs, successors and assigns, jointly and severally. This obligation is entered into an Agreement with the City dated, 20 for________ _________________. NOW, THEREFORE, if the Principal shall perform all the provisions of the Agreement in the manner and within the time period prescribed by the City, or within such extensions of time as may be granted under the Agreement, and shall pay all laborers, mechani cs, subcontractors and material men or women, and all persons who shall supply the Principal or subcontractors with provisions and supplies for the carrying on of said work, and shall hold the City, their officials, agents, employees and volunteers harmles s from any loss or damage occasioned to any person or property by reason of any carelessness or negligence on the part of the Principal, or any subcontractor in the performance of said work, and shall indemnify and hold the City harmless from any damage or expense by reason of failure of performance as specified in the Agreement within a period of two (2) years after its final acceptance thereof by the City, then and in the event this obligation shall be void; but otherwise, it shall be and remain in full f orce and effect. And the Surety, for value received, hereby further stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the work to be performed thereunder or the specifications accompanying the same shall in any way affect its obligation on this bond, and it does hereby waive notice of any change, extension of time, alterations or additions to the terms of the Agreement or to the Work. The Surety hereby agrees that modifications and changes may be made in terms and provisions of the Agreement without notice to Surety, and any such modifications or changes increasing the total amount to be paid the Principal shall automatically increase t he obligation of the Surety on this Performance Bond in a like amount, such increase, however, not to exceed twenty-five percent (25%) of the original amount of this bond without the consent of the Surety. Within forty-five (45) days of receiving notice that the Principal has defaulted on all or part of the terms of the Agreement, the Surety shall make a written commitment to the City that it will either: (a) cure the default itself within a reasonable time period, or (b) tender to the city, the amount necessary for the City to remedy the default, including legal fees incurred by the City, or (c) in the event that Surety’s evaluation of the dispute is not complete or in the event the Surety disputes the City’s claim of default, the Surety shall notify the City of its finding and its intent, if any, to interplead. The Surety shall then fulfill its obligations under this bond, according to the option it has elected. Should Surety elect option (a) to cure the default, the penal sum of the Bond shall be reduced in an amount equal to the costs actually incurred by the Surety in curing the default. If the Surety elects option (b), then upon completion of the necessary work, the City shall notify the Surety of its actual costs. The City shall return, without interest, any overpayment made by the Surety and the Surety shall pay to the City any actual costs which exceed t he City estimate, limited to the bond amount. Should the Surety elect option (c), the Parties shall first complete participation in mediation, described in the below paragraph, prior to any interplead action. Creek Street Water Main Improvements Page 64 In the event a dispute should arise between the Parties to this Bond with respect to the City’s declaration of default by the Principal, the Parties agree to participate in at least four hours of mediation in accordance with the mediation procedures of Uni ted States Arbitration and Mediation (“USA&M”). The Parties shall proportionately share in the cost of the mediation. The mediation shall be administered Washington Arbitration & Mediation Service (WAMS), 3600 Port of Tacoma Road, Suite 304, Tacoma, WA 98424 The Surety shall not interplead prior to completion of the mediation. DATED this ___ day of_____, 20___. CORPORATE SEAL OF PRINCIPAL:PRINCIPAL By:_____ (Name of Person Executing Bond) Its:_____ (Title) _____ _____ (Address) _____ (Phone) CERTIFICATE AS TO CORPORATE SEAL I hereby certify that I am the (Assistant) Secretary of the Corporation named as Principal in the within bond; that__, who signed the said bond on behalf of the Principal, was _____of the said Corporation; that I know his or her signature thereto is genuine, and that said bond was duly signed, sealed, and attested for and in behalf of said Corporation by authority of its governing body. _____ Secretary of Assistant Secretary CORPORATE SEAL OF SURETY: SURETY By:_____ Attorney-in-Fact (Attach Power of Attorney) _____ (Name of Person Executing Bond) _____ _____ (Address) Creek Street Water Main Improvements Page 65 _____ (Phone) APPROVED AS TO FORM: _____ Brent Dille, City Attorney STATE IF WASHINGTON ) ) SS. COUNTY OF ____________) On this day personally appeared before me__________________________, to me known to be the ______________________of ______________________________________ that executed the foregoing instrument, and acknowledged the said instrument to be the free and volun tary act and deed of said limited liability company, for the uses and purposed therein mentioned, and on oath stated that he/she was authorized to execute said instrument. GIVEN my hand and official seal this _____ day of _______________, 20__. Notary’s signature ______________________________ Notary’s printed name_____________________________ Notary Public in and for the State of Washington. My commission expires___________________ CORPORATE SEAL OF SURETY SURETY BY: ______________________________ Attorney-in Fact (Attach Power of Attorney) _______________________________ (Name of Person Executing Bond) ________________________________ ________________________________ (Address) ________________________________ (Phone) APPROVED AS TO FORM: _____________________________ Brent Dille Creek Street Water Main Improvements Page 66 SECTION 4:SPECIAL PROVISIONS Creek Street Water Main Improvements Page 67 INTRODUCTION TO THE SPECIAL PROVISIONS (July 8, 2024 APWA GSP, Option B) The work on this project shall be accomplished in accordance with the Standard Specifications for Road, Bridge and Municipal Construction, 20 26 edition, as issued by the Washington State Department of Transportation (WSDOT) and the American Public Works Association (APWA), Washington State Chapter (hereafter “Standard Specifications”). The Standard Specifications, as modified or supplemented b y these Special Provisions, all of which are made a part of the Contract Documents, shall govern all of the Work. These Special Provisions are made up of both General Special Provisions (GSPs) from various sources, which may have project-specific fill-ins; and project-specific Special Provisions. Each Provision either supplements, modifies, or replaces the comparable Standard Specification, or is a new Provision. The deletion, amendment, alteration, or addition to any subsection or portion of the Standard Specifications is meant to pertain only to that particular portion of the section, and in no way should it be int erpreted that the balance of the section does not apply. All references to Measurement and Payment in the Standard Specifications are deleted and replaced with Division 10–Measurement and Payment. The GSPs are labeled under the headers of each GSP, with the effective date of the GSP and its source. For example: (March 8, 2013 APWA GSP) (April 1, 2013) for WSDOT GSPs, only use date (May 1, 2013$$2$$GSP) Agency Special Provision Project specific special provisions are labeled without a date as such: (*****) Also incorporated into the Contract Documents by reference are: Manual on Uniform Traffic Control Devices for Streets and Highways, currently adopted edition, with Washington State modifications, if any Standard Plans for Road, Bridge and Municipal Construction, WSDOT Manual M21-01, current edition Contractor shall obtain copies of these publications, at Contractor’s own expense. DIVISION 1 1 Division 1 General Requirements DESCRIPTION OF WORK (March 13, 1995) This Contract provides for the improvement of Creek Street Water Main Improvements and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications. General 1-01.3 Definitions (January 19, 2022 APWA GSP) Delete the heading Completion Dates and the three paragraphs that follow it, and replace them with the following: Dates Bid Opening Date The date on which the Contracting Agency publicly opens and reads the Bids. Award Date The date of the formal decision of the Contracting Agency to accept the lowest responsible and responsive Bidder for the Work. Contract Execution Date The date the Contracting Agency officially binds the Agency to the Contract. Notice to Proceed Date The date stated in the Notice to Proceed on which the Contract time begins. Substantial Completion Date The day the Engineer determines the Contracting Agency has full and unrestricted use and benefit of the facilities, both from the operational and safety standpoint, any remaining traffic disruptions will be rare and brief, and only minor incidental work, r eplacement of temporary substitute facilities, plant establishment periods, or correction or repair remains for the Physical Completion of the total Contract. Physical Completion Date The day all of the Work is physically completed on the project. All documentation required by the Contract and required by law does not necessarily need to be furnished by the Contractor by this date. Completion Date The day all the Work specified in the Contract is completed and all the obligations of the Contractor under the contract are fulfilled by the Contractor. All documentation required by the Contract and required by law must be furnished by the Contractor be fore establishment of this date. Final Acceptance Date The date on which the Contracting Agency accepts the Work as complete. Supplement this Section with the following: All references in the Standard Specifications or WSDOT General Special Provisions, to the terms “Department of Transportation”, “Washington State Transportation Commission”, “Commission”, DIVISION 1 2 “Secretary of Transportation”, “Secretary”, “Headquarters”, and “State Treasurer” shall be revised to read “Contracting Agency”. All references to the terms “State” or “state” shall be revised to read “Contracting Agency” unless the reference is to an administrative agency of the State of Washington, a State statute or regulation, or the context reasonably indicates otherwise. All references to “State Materials Laboratory” shall be revised to read “Contracting Agency designated location”. All references to “final contract voucher certification” shall be interpreted to mean the Contracting Agency form(s) by which final payment is authorized, and final completion and acceptance granted. Additive A supplemental unit of work or group of bid items, identified separately in the Bid Proposal, which may, at the discretion of the Contracting Agency, be awarded in addition to the base bid. Alternate One of two or more units of work or groups of bid items, identified separately in the Bid Proposal, from which the Contracting Agency may make a choice between different methods or material of construction for performing the same work. Business Day A business day is any day from Monday through Friday except holidays as listed in Section 1-08.5. Contract Bond The definition in the Standard Specifications for “Contract Bond” applies to whatever bond form(s) are required by the Contract Documents, which may be a combination of a Payment Bond and a Performance Bond. Contract Documents See definition for “Contract”. Contract Time The period of time established by the terms and conditions of the Contract within which the Work must be physically completed. Notice of Award The written notice from the Contracting Agency to the successful Bidder signifying the Contracting Agency’s acceptance of the Bid Proposal. Notice to Proceed The written notice from the Contracting Agency or Engineer to the Contractor authorizing and directing the Contractor to proceed with the Work and establishing the date on which the Contract time begins. Traffic Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, wheelchairs, and equestrian traffic. 1-01.3 Definitions This section is supplemented with the following: DIVISION 1 3 Approximate: Generally as shown or described, but has not been verified, or may require adjustment. No level of accuracy is implied or should be assumed. Bid Documents:The Contracting Agency’s standard construction details are included in this definition. These standard details can be obtained at https://www.ci.yelm.wa.us/departments/public_services/development_guidelines.php Calculation(s):When any contract documents require the Contractor to provide calculations, those calculations must be prepared and stamped by a Professional Engineer licensed to practice in the State where the project is constructed or where components requiring calculat ions are fabricated. Day:A calendar day or a continuous 24-hour period unless specifically stated otherwise. Deleted Section:A section of the Standard Specifications that does not apply to this project. Diameter: The nominal diameter classification common for the type of product and purpose. Should not be assumed to represent the actual measured inside or outside diameter unless specifically identified as such. Engineer:The City of Yelm and its duly authorized representatives. Equal to:A product that is the same or better than the product named in function, performance, reliability, quality, and general configuration. Determination of equality will be made by the Owner. New Section:This section does not appear in the Standard Specifications. Owner (Same as Contracting Agency):City of Yelm Proposed:Work that is part of the Contract and to be performed by the Contractor. Purveyor:The agency providing the applicable service. Replacement Section:All or portions of the Standard Specification section are replaced as described herein. Supplemental Section:The Standard Specification is to be used in its entirety with the addition of the information provided herein. If the information conflicts with the Standard Specification, the supplemental section will govern. 1-02 BID PROCEDURES AND CONDITIONS 1-02.1 Prequalification of Bidders Delete this section and replace it with the following: 1-02.1 Qualifications of Bidder (January 24, 2011 APWA GSP) Before award of a public works contract, a bidder must meet at least the minimum qualifications of RCW 39.04.350(1) to be considered a responsible bidder and qualified to be awarded a public works project. Add the following new section: DIVISION 1 4 1-02.1(1)Supplemental Qualifications Criteria (July 31, 2017 APWA GSP; requires pre-approval on FHWA funded projects, through WSDOT/Local Programs) In addition, the Contracting Agency has established Contracting Agency-specific and/or project-specific supplemental criteria, in accordance with RCW 39.04.350(3), for determining Bidder responsibility, including the basis for evaluation and the deadline f or appealing a determination that a Bidder is not responsible. These criteria are contained in Section 1-02.14 Option C of these Special Provisions. 1-02.1(1) Supplemental Qualifications Criteria The APWA GSP is supplemented with the following: Section 1-02.14 Option B may be included in these Special Provisions instead of Option C. Supplemental criteria presented in other places, such as the Information to Bidders, is binding. 1-02.2 Plans and Specifications (June 27, 2011 APWA GSP) Delete this section and replace it with the following: Information as to where Bid Documents can be obtained or reviewed can be found in the Call for Bids (Advertisement for Bids) for the work. After award of the contract, plans and specifications will be issued to the Contractor at no cost as detailed below: To Prime Contractor No. of Sets Basis of Distribution Reduced plans (11" x 17")1 Furnished automatically upon award. Contract Provisions 1 Furnished automatically upon award. Large plans (e.g., 22" x 1 Furnished only upon 34")request. Additional plans and Contract Provisions may be obtained by the Contractor from the source stated in the Call for Bids, at the Contractor’s own expense. 1-02.4(2) Subsurface Information This section is replaced with the following: No subsurface exploration has been performed for this project unless specifically noted as such on the plans. Existing soils are unclassified. 1-02.5 Proposal Forms (February 17, 2026 APWA GSP) Delete this section and replace it with the following: DIVISION 1 5 The Proposal Form will identify the project and its location and describe the work. It will also list estimated quantities, units of measurement, the items of work, and the materials to be furnished at the unit bid prices. The bidder shall complete spaces on the proposal form that call for, but are not limited to, unit prices; extensions; summations; the total bid amount; signatures; date; and, where applicable, retail sales taxes and acknowledgment of addenda; the bidder’s name, address, telephone number,and signature. Bids shall be in legible figures (not words) written in ink or typed and expressed in U.S. dollars. The required certifications are included as part of the Proposal Form. The Contracting Agency reserves the right to arrange the proposal forms with alternates and additives, if such be to the advantage of the Contracting Agency. The bidder shall bid on all alternates and additives set forth in the Proposal Form unless otherwi se specified. 1-02.6 Preparation of Proposal Supplement the second paragraph with the following: 4.If a minimum bid amount has been established for any item, the unit or lump sum price must equal or exceed the minimum amount stated. Delete the last two paragraphs, and replace them with the following: The Bidder shall submit a completed Contractor Certification Wage Law Compliance form prior to award. A Contractor Certification of Wage Law Compliance form is included in the Proposal Forms. The Bidder shall make no stipulation on the Bid Form, nor qualify the bid in any manner. A bid by a corporation shall be executed in the corporate name, by the president or a vice president (or other corporate officer accompanied by evidence of authority to sign). A bid by a partnership shall be executed in the partnership name and signed by a partner. A bid by a joint venture shall be executed in the joint venture name and signed by a member of the joint venture. 1-04 Scope of the Work 1-04.1(2) Bid Items Not Included in the Proposal This section is replaced with the following: All work that is not specified as being included with or incidental to other bid items as shown on the plans, described in the specifications, and necessary to complete the work by standard industry practices shall be included in the Contractor’s bid price of the most closely applicable bid item. 1-04.2 Coordination of Contract Documents The second paragraph is revised to read: In resolving inconsistencies among two or more sections of the contract documents, precedence shall be given in the following order: 1.Change Orders 2.Addenda 3.Agreement (Contract) 4.Contract Plans 5.Instructions (or Information) to Bidders DIVISION 1 6 6.Special Provisions 7.Contracting Agency Standard Details * 8.General Conditions 9.Standard Specifications * When Contracting Agency Standard Details are incorporated into the Contract Plans, it is only for convenience of publishing. The order of precedence above shall still govern, with the Contracting Agency Standard Details treated as a section of the contra ct documents distinct from the Contract Plans. 1-04.4 Changes (January 19, 2022 APWA GSP) The first two sentences of the last paragraph of Section 1-04.4 are deleted. This section is supplemented with the following: This section also supplements 1-04.7 Differing Site Conditions. The Contractor is responsible for determining all work, scheduling and cost impacts caused by changes, and shall include such when proposing the price and time for the change. No subsequent r equests for compensation or time will be accepted once the change has been approved or the protest period [section 1-04.5] expires. 1-04.6 Variation in Estimated Quantities (December 30, 2022 APWA GSP, Option B) Revise the first paragraph to read: Payment to the Contractor will be made only for the actual quantities of Work performed and accepted in conformance with the Contract. When the accepted quantity of Work performed under a unit item varies from the original Proposal quantity, payment will b e at the unit Contract price for all Work unless the total accepted quantity of the Contract item, adjusted to exclude added or deleted amounts included in change orders accepted by both parties, increases or decreases by more than 25 percent from the orig inal Proposal quantity, and if the total extended bid price for that item at time of award is equal to or greater than 10 percent of the total contract price at time of award. In that case, payment for contract work may be adjusted as described herein: This section is supplemented with the following: If more or fewer materials are needed when the constructed quantity is within plus or minus 25% of the bid quantity, costs for restocking of unused materials, or delivery and handling costs on additional materials shall be incidental to the bid price and n o additional payment will be made. 1-04.7 Differing Site Conditions Supplement the first paragraph with the following: The Contractor shall provide written notice no later than the end of the working day following discovery of real or perceived differing conditions. Contractor’s written notice shall include a summary of the issue; the time, date, and location the issue aro se; and a statement if the Contractor believes the issue may increase cost, time, or both. The Owner is not required to provide any time extension for the period between the discovery and Owner’s receipt of the written notice. DIVISION 1 7 1-04.11 Final Cleanup This section is supplemented with the following: Restore all areas impacted by the work to at least original condition, unless specifically identified otherwise in the plans or specifications. All costs are incidental. Add the following new section: 1-04.12 Intermediate Cleanup If an area of the project will be left idle, or minimal work performed for more than two weeks, the Contractor shall clean up the area prior to moving. In this context, clean-up means: stockpiles and materials removed so as not to be obstructions or hazard s; surfaces graded smooth as to their purpose; traffic control systems removed and traffic restored to the satisfaction of the local road agency. 1-05 Control of Work 1-05.4 Conformity with and Deviations from Plans and Stakes Section 1-05.4 is supplemented with the following: (January 13, 2021) Contractor Surveying-Roadway The Contracting Agency has provided primary survey control in the Plans. The Contractor shall be responsible for setting, maintaining, and resetting all alignment stakes, slope stakes, and grades necessary for the construction of the roadbed, drainage, surfacing, paving, channelization and pavement marking, illumination and sig nals, guardrails and barriers, and signing. Except for the survey control data to be furnished by the Contracting Agency, calculations, surveying, and measuring required for setting and maintaining the necessary lines and grades shall be the Contractor's responsibility. The Contractor shall inform the Engineer when monuments are discovered that were not identified in the Plans and construction activity may disturb or damage the monuments. All monuments noted on the plans “DO NOT DISTURB” shall be protected throughout the length of the project or be replaced at the Contractors expense. Detailed survey records shall be maintained, including a description of the work performed on each shift, the methods utilized, and the control points used. The record shall be adequate to allow the survey to be reproduced. A copy of each day's record sh all be provided to the Engineer within three working days after the end of the shift. The meaning of words and terms used in this provision shall be as listed in "Definitions of Surveying and Associated Terms" current edition, published by the American Congress on Surveying and Mapping and the American Society of Civil Engineers. The survey work shall include but not be limited to the following: 1.Verify the primary horizontal and vertical control furnished by the Contracting Agency, and expand into secondary control by adding stakes and hubs as well as additional survey control needed for the project. Provide descriptions of secondary control to t he Contracting Agency. The description shall include coordinates and elevations of all secondary control points. DIVISION 1 8 2.Establish, the centerlines of all alignments, by placing hubs, stakes, or marks on centerline or on offsets to centerline at all curve points (PCs, PTs, and PIs) and at points on the alignments spaced no further than 50 feet. 3.Establish clearing limits, placing stakes at all angle points and at intermediate points not more than 50 feet apart. The clearing and grubbing limits shall be 5 feet beyond the toe of a fill and 10 feet beyond the top of a cut unless otherwise shown in the Plans. 4.Establish grading limits, placing slope stakes at centerline increments not more than 50 feet apart. Establish offset reference to all slope stakes. If Global Positioning Satellite (GPS) Machine Controls are used to provide grade control, then slope stak es may be omitted at the discretion of the Contractor 5.Establish the horizontal and vertical location of all drainage features, placing offset stakes to all drainage structures and to pipes at a horizontal interval not greater than 25 feet. 6.Establish roadbed and surfacing elevations by placing stakes at the top of subgrade and at the top of each course of surfacing. Subgrade and surfacing stakes shall be set at horizontal intervals not greater than 50 feet in tangent sections, 25 feet in cur ve sections with a radius less than 300 feet, and at 10-foot intervals in intersection radii with a radius less than 10 feet. Transversely, stakes shall be placed at all locations where the roadway slope changes and at additional points such that the tran sverse spacing of stakes is not more than 12 feet. If GPS Machine Controls are used to provide grade control, then roadbed and surfacing stakes may be omitted at the discretion of the Contractor. 7.Establish intermediate elevation benchmarks as needed to check work throughout the project. 8.Provide references for paving pins at 25-foot intervals or provide simultaneous surveying to establish location and elevation of paving pins as they are being placed. 9.For all other types of construction included in this provision, (including but not limited to channelization and pavement marking, illumination and signals, guardrails and barriers, and signing) provide staking and layout as necessary to adequately locate,construct, and check the specific construction activity. 10.Contractor shall determine if changes are needed to the profiles or roadway sections shown in the Contract Plans in order to achieve proper smoothness and drainage where matching into existing features, such as a smooth transition from new pavement to exis ting pavement. The Contractor shall submit these changes to the Engineer for review and approval 10 days prior to the beginning of work. The Contractor shall provide the Contracting Agency copies of any calculations and staking data when requested by the Engineer. The Contractor shall ensure a surveying accuracy within the following tolerances: DIVISION 1 9 Vertical Horizontal Slope stakes 0.10 feet 0.10 feet Subgrade grade stakes set 0.04 feet below grade 0.01 feet 0.5 feet (parallel to alignment) 0.1 feet (normal to alignment) Stationing on roadway N/A 0.1 feet Alignment on roadway N/A 0.04 feet Surfacing grade stakes 0.01 feet 0.5 feet (parallel to alignment) 0.1 feet (normal to alignment) Roadway paving pins for surfacing or paving 0.01 feet 0.2 feet (parallel to alignment) 0.1 feet (normal to alignment) The Contracting Agency may spot-check the Contractor's surveying. These spot-checks will not change the requirements for normal checking by the Contractor. When staking roadway alignment and stationing, the Contractor shall perform independent checks from different secondary control to ensure that the points staked are within the specified survey accuracy tolerances. The Contractor shall calculate coordinates for the alignment. The Contracting Agency will verify these coordinates prior to issuing approval to the Contractor for commencing with the work. The Contracting Agency will require up to seven calendar days fro m the date the data is received. Contract work to be performed using contractor-provided stakes shall not begin until the stakes are approved by the Contracting Agency. Such approval shall not relieve the Contractor of responsibility for the accuracy of the stakes. Stakes shall be marked in accordance with Standard Plan A10.10. When stakes are needed that are not described in the Plans, then those stakes shall be marked, at no additional cost to the Contracting Agency as ordered by the Engineer. 1-05.4 Conformity With and Deviations from Plans and Stakes (April 22, 2025 APWA GSP, Option D) Supplement this section with the following: Contractor Surveying–ADA Features ADA Feature Staking Requirements The Contractor shall be responsible for setting, maintaining, and resetting all alignment stakes, and grades necessary for the construction of the ADA features. Calculations, surveying, and measuring required for setting and maintaining the necessary lines and grades shall be the Contractor’s responsibility. The Contractor shall build the ADA features within the specifications in the Standard Plans and contract documents. DIVISION 1 10 ADA Feature Contract Compliance The Contractor shall be responsible for completing measurements to verify all ADA features comply with the Contract in the presence of the Engineer. ADA Feature Measurements The Contractor shall be responsible for providing the latitude and longitude of each ADA feature as indicated on the ADA Post Inspection Form(s) (WSDOT Form 224-020LP). The completed ADA Post Inspection Form(s) (WSDOT Form 224-020LP) shall be submitted as a Type 3 Working Drawing and transmitted to the Engineer within 30 calendar days of completing the ADA feature. After acceptance, the Contracting Agency will retain the final form(s) for their records. Add the following new section: 1-05.7 Nonconforming Work (February 17, 2026 APWA GSP) Supplement this section with the following: The rights exercised under the provisions of this Section shall not diminish the Contracting Agency’s right to pursue any other avenue for additional remedy or damages with respect to the Contractor’s failure to perform the Work as required. The Engineer h as the right to reject all or part of the Nonconforming Work, and the Engineer’s decision is final and not subject to protest. No additional contract time or compensation will be allowed when the Contracting Agency exercises their rights provided by this Section. 1-05.7(1) Identification of Nonconforming Work Replace this section with the following: The Contractor is responsible for quality control and shall identify all Nonconforming Work. The Contracting Agency may also identify Nonconforming Work. However, failure by the Contracting Agency to identify Nonconforming Work shall not relieve the Contra ctor from their responsibility for the quality of the Work, nor shall it constitute acceptance or approval of the Nonconforming Work. 1-05.7(2) Reporting of Nonconforming Work Replace this section with the following: The Contractor shall immediately report all Nonconforming Work to the Engineer and shall include any relevant information known for suggested remediation of Nonconforming Work. When the Contracting Agency identifies Nonconforming Work, the Engineer will notify the Contractor in writing specifying a time when a remedy must be complete. If the Contractor fails to remedy Nonconforming Work within the time specified in a written noti ce from the Engineer, or fails to perform any part of the Work required by the Contract Documents, the Engineer may correct and remedy such Work as may be identified in the written notice. 1-05.7(3) Remediation of Nonconforming Work Supplement this section with the following: The Contractor shall be responsible and bear all costs for remediating Nonconforming Work. DIVISION 1 11 If the Contracting Agency remedies Nonconforming Work after the specified time when a remedy was to be completed,by any means deemed necessary,direct and indirect costs incurred by the Contracting Agency attributable to correcting and remedying Nonconforming Work not corrected by the time provided in the notice, or Work the Contractor failed or refused to perform, shall be paid by the Contractor. If the Contractor fails to comply with a written order to remedy what the Engineer determines to be an emergency situation, the Engineer may have the N onconforming W ork corrected immediately, have the W ork removed and replaced, or have W ork the Contractor refuses to perform completed by using Contracting Agency or other forces. An emergency situation is any situation when, in the opinion of the Engineer, a delay in its remedy could be potentially unsafe, or might cause risk of loss or dam age to the public. When costs are incurred by the Contracting Agency, payment will be deducted by the Engineer from monies due, or to become due, to the Contractor. Such direct and indirect costs shall include in particular, but without limitation, compensation for additiona l professional services required, and compensation for removal, repair, replacement and/or correction of the Contractor’s N onconforming W ork. 1-05.11 Final Inspection Delete this section and replace it with the following: 1-05.11 Final Inspections and Operational Testing (October 1, 2005 APWA GSP) 1-05.11(1)Substantial Completion Date When the Contractor considers the work to be substantially complete, the Contractor shall so notify the Engineer and request the Engineer establish the Substantial Completion Date. The Contractor’s request shall list the specific items of work that remain to be completed in order to reach physical completion. The Engineer will schedule an inspection of the work with the Contractor to determine the status of completion. The Engineer may also establish the Substantial Completion Date unilaterally. If, after this inspection, the Engineer concurs with the Contractor that the work is substantially complete and ready for its intended use, the Engineer, by written notice to the Contractor, will set the Substantial Completion Date. If, after this inspecti on the Engineer does not consider the work substantially complete and ready for its intended use, the Engineer will, by written notice, so notify the Contractor giving the reasons therefor. Upon receipt of written notice concurring in or denying substantial completion, whichever is applicable, the Contractor shall pursue vigorously, diligently and without unauthorized interruption, the work necessary to reach Substantial and Physical Completi on. The Contractor shall provide the Engineer with a revised schedule indicating when the Contractor expects to reach substantial and physical completion of the work. The above process shall be repeated until the Engineer establishes the Substantial Completion Date and the Contractor considers the work physically complete and ready for final inspection. DIVISION 1 12 1-05.11(2)Final Inspection and Physical Completion Date When the Contractor considers the work physically complete and ready for final inspection, the Contractor by written notice, shall request the Engineer to schedule a final inspection. The Engineer will set a date for final inspection. The Engineer and the Contractor will then make a final inspection and the Engineer will notify the Contractor in writing of all particulars in which the final inspection reveals the work incomplete or unacceptable. The Contractor shall immediately take such corrective measures as are necessary to remedy the listed deficiencies. Corrective work shall be pursued vigorously, diligently, and without interruption until physical completion of the listed deficiencies. This process will continue until the Engineer is satisfied the list ed deficiencies have been corrected. If action to correct the listed deficiencies is not initiated within 7 days after receipt of the written notice listing the deficiencies, the Engineer may, upon written notice to the Contractor, take whatever steps are necessary to correct those deficienci es pursuant to Section 1-05.7. The Contractor will not be allowed an extension of contract time because of a delay in the performance of the work attributable to the exercise of the Engineer’s right hereunder. Upon correction of all deficiencies, the Engineer will notify the Contractor and the Contracting Agency, in writing, of the date upon which the work was considered physically complete. That date shall constitute the Physical Completion Date of the contract, but shall not imply acceptance of the work or that all the obligations of the Contractor under the contract have been fulfilled. 1-05.11(3)Operational Testing It is the intent of the Contracting Agency to have at the Physical Completion Date a complete and operable system. Therefore when the work involves the installation of machinery or other mechanical equipment; street lighting, electrical distribution or sig nal systems; irrigation systems; buildings; or other similar work it may be desirable for the Engineer to have the Contractor operate and test the work for a period of time after final inspection but prior to the physical completion date. Whenever items of work are listed in the Contract Provisions for operational testing they shall be fully tested under operating conditions for the time period specified to ensure their acceptability prior to the Physical Completion Date. During and following the test perio d, the Contractor shall correct any items of workmanship, materials, or equipment which prove faulty, or that are not in first class operating condition. Equipment, electrical controls, meters, or other devices and equipment to be tested during this period shall be tested under the observation of the Engineer, so that the Engineer may determine their suitability for the purpose for which they were installed. The Physical Completion Date cannot be established until testing and corrections have been completed to the satisfaction of the Engineer. The costs for power, gas, labor, material, supplies, and everything else needed to successfully complete operational testing, shall be included in the unit contract prices related to the system being tested, unless specifically set forth otherwise in the p roposal. Operational and test periods, when required by the Engineer, shall not affect a manufacturer’s guaranties or warranties furnished under the terms of the contract. Add the following new section: 1-05.13 Superintendents, Labor, and Equipment of Contractor (August 14, 2013 APWA GSP) Delete the sixth and seventh paragraphs of this section. DIVISION 1 13 Add the following new section: 1-05.16 Water and Power (October 1, 2005 APWA GSP) The Contractor shall make necessary arrangements, and shall bear the costs for power and water necessary for the performance of the work, unless the contract includes power and water as a pay item. Add the following new section: 1-05.17 Oral Agreements No oral agreement or conversation with any officer, agent, or employee of the Contracting Agency, either before or after execution of the contract, shall affect or modify any of the terms or obligations contained in any of the documents comprising the cont ract. Such oral agreement or conversation shall be considered as unofficial information and in no way binding upon the Contracting Agency, unless subsequently put in writing and signed by the Contracting Agency. Add the following new section: 1-05.18 Record Drawings This section is supplemented with the following: The Contractor is fully responsible for maintaining as-constructed records and measurements. Any measurements taken by the Engineer or Contracting Agency are done for their own benefit and do not relieve the Contractor from this responsibility. Show size, material, horizontal, and vertical locations of all existing utilities encountered during construction. CAD files (AutoCAD .DWG or .DXF) will only qualify as record drawings if they include the full and complete record of changes, are scaled correctly, fully annotated, and can be overlaid directly on the original CAD files to create a legible record set. The Engineer will be the sole determiner if the CAD files meet these criteria. Provide a survey record in AutoCAD .DWG format and hard copy (or electronic) of all surveyed as-built information. 1-06 Control of Material Section 1-06 is supplemented with the following: 1-06.1 Approval of Materials Prior to Use Section 1-06.1 is supplemented with the following: The Contractor shall submit 2 copies of all QPL’s, RAM’s, and shop drawings to: City of Yelm Public Services Department 901 NW Rhoton Rd, Yelm, WA 98597 DIVISION 1 14 Attn:Brad Chatwood 1-06.2(1)A Compaction Testing Add the following new section: The Contractor will coordinate all testing with a qualified special inspection company, acceptable to the Owner, to verify proper compaction. The special inspection company shall invoice the Owner directly, no Contractor markup. The Owner will pay for the initial testing. If tests indicate failure of compaction requirements, the Contractor shall pay for subsequent tests until tests indicate compliance with the specifications. Methods include nuclear densometer, visual inspection, and probing as appropriate for the location being tested. The Owner may, at their discretion, perform their own testing. Owner’s testing does not relieve the Contractor of this requirement. Results of the tests shall be delivered to the Owner and Engineer. Compaction testing is required at the following locations, unless waived by the Owner. Utility Trench backfill (visual, probe, and nuclear densometer testing). o One test per lift within 20 feet of the start of the trench. o One test per lift every 3 00 feet and at road intersections. Native subgrade (not including utility trenches) in vehicular areas (visual, probe, nuclear densometer testing if deemed necessary by the Engineer or Owner). One test per 5,000 square feet. Asphalt (probe and nuclear densometer testing per Division 5). Areas of native undisturbed subgrade shall be visually observed by the Engineer prior to placement of any material overtop. The Contractor shall coordinate with the Engineer a minimum of two working days prior to inspection being needed. Provide safe access for testing and observation personnel and equipment. Testing is a normal component of work and will not be claim for additional time or cost. 1-06.2(2)B Financial Incentive (January 4, 2024 AWPA GSP) Replace the first sentence of this Section with the following: The maximum Composite Pay Factor shall be 1.00. 1-07 Legal Relations and Responsibilities to the Public 1-07.1 Laws to be Observed (October 1, 2005 APWA GSP) Supplement this section with the following: In cases of conflict between different safety regulations, the more stringent regulation shall apply. DIVISION 1 15 The Washington State Department of Labor and Industries shall be the sole and paramount administrative agency responsible for the administration of the provisions of the Washington Industrial Safety and Health Act of 1973 (WISHA). The Contractor shall maintain at the project site office, or other well known place at the project site, all articles necessary for providing first aid to the injured. The Contractor shall establish, publish, and make known to all employees, procedures for ensuring immediate removal to a hospital, or doctor’s care, persons, includ ing employees, who may have been injured on the project site. Employees should not be permitted to work on the project site before the Contractor has established and made known procedures for removal of injured persons to a hospital or a doctor’s care. The Contractor shall have sole responsibility for the safety, efficiency, and adequacy of the Contractor’s plant, appliances, and methods, and for any damage or injury resulting from their failure, or improper maintenance, use, or operation. The Contracto r shall be solely and completely responsible for the conditions of the project site, including safety for all persons and property in the performance of the work. This requirement shall apply continuously, and not be limited to normal working hours. The required or implied duty of the Engineer to conduct construction review of the Contractor’s performance does not, and shall not, be intended to include review and adequacy of the Contractor’s safety measures in, on, or near the project site. 1-07.2 State Taxes Delete this section, including its sub-sections, in its entirety and replace it with the following: 1-07.2 State Sales Tax (June 27, 2011 APWA GSP) The Washington State Department of Revenue has issued special rules on the State sales tax. Sections 1-07.2(1) through 1-07.2(3) are meant to clarify those rules. The Contractor should contact the Washington State Department of Revenue for answers to que stions in this area. The Contracting Agency will not adjust its payment if the Contractor bases a bid on a misunderstood tax liability. The Contractor shall include all Contractor-paid taxes in the unit bid prices or other contract amounts. In some cases, however, state retail sales tax will not be included.Section 1-07.2(2) describes this exception. The Contracting Agency will pay the retained percentage (or release the Contract Bond if a FHWA- funded Project) only if the Contractor has obtained from the Washington State Department of Revenue a certificate showing that all contract-related taxes have b een paid (RCW 60.28.051). The Contracting Agency may deduct from its payments to the Contractor any amount the Contractor may owe the Washington State Department of Revenue, whether the amount owed relates to this contract or not. Any amount so deducted will be paid into the proper State fund. 1-07.2(1)State Sales Tax—Rule 171 WAC 458-20-171, and its related rules, apply to building, repairing, or improving streets, roads, etc., which are owned by a municipal corporation, or political subdivision of the state, or by the United States, and which are used primarily for foot or veh icular traffic. This includes storm or combined sewer systems within and included as a part of the street or road drainage system and power lines when such are part of the roadway lighting system. For work performed in such cases, the Contractor shall in clude Washington State Retail Sales Taxes in the various unit bid item prices, or other contract amounts, including those that the Contractor pays on the purchase of the materials, equipment, or supplies used or consumed in doing the work. DIVISION 1 16 1-07.2(2)State Sales Tax—Rule 170 WAC 458-20-170, and its related rules, apply to the constructing and repairing of new or existing buildings, or other structures, upon real property. This includes, but is not limited to, the construction of streets, roads, highways, etc., owned by the st ate of Washington; water mains and their appurtenances; sanitary sewers and sewage disposal systems unless such sewers and disposal systems are within, and a part of, a street or road drainage system; telephone, telegraph, electrical power distribution lin es, or other conduits or lines in or above streets or roads, unless such power lines become a part of a street or road lighting system; and installing or attaching of any article of tangible personal property in or to real property, whether or not such per sonal property becomes a part of the realty by virtue of installation. For work performed in such cases, the Contractor shall collect from the Contracting Agency, retail sales tax on the full contract price. The Contracting Agency will automatically add this sales tax to each payment to the Contractor. For this reason, the Contractor shall not include the retail sales tax in the unit bid item prices, or in any other contract amount subject to Rule 170, with the following exception. Exception: The Contracting Agency will not add in sales tax for a payment the Contractor or a subcontractor makes on the purchase or rental of tools, machinery, equipment, or consumable supplies not integrated into the project. Such sales taxes shall be i ncluded in the unit bid item prices or in any other contract amount. 1-07.2(3)Services The Contractor shall not collect retail sales tax from the Contracting Agency on any contract wholly for professional or other services (as defined in Washington State Department of Revenue Rules 138 and 244). 1-07.6 Permits and Licenses This section is supplemented with the following: The Contractor shall obtain all additional permits necessary, which may include, but not be limited to the following: Haul Route Asbestos Cement Pipe removal and disposal–see 2-02.3(4) 1-07.7 Load Limits Section 1-07.7 is supplemented with the following: (March 13, 1995) If the sources of materials provided by the Contractor necessitates hauling over roads other than State Highways, the Contractor shall, at the Contractor's expense, make all arrangements for the use of the haul routes. 1-07.8 High-Visibility Apparel 1-07.8(1)Traffic Control Personnel Section 1-07.8(1) is revised to read: (September 16, 2025) DIVISION 1 17 All personnel performing the Work described in Section 2-04 (including traffic control supervisors, flaggers, and others performing traffic control labor of any kind) shall comply with the following: 1.During daylight hours with clear visibility, workers shall wear a high-visibility ANSI/ISEA 107 Type R Class 2 or 3 garment with background material that are fluorescent yellow-green, fluorescent orange-red, or fluorescent red in color; and a high visibili ty hardhat that is white, yellow, yellow-green, orange, or red in color; and 2.During hours of darkness (½ hour before sunset to ½ hour after sunrise) or other low-visibility conditions (snow, fog, etc.), workers shall wear a high-visibility ANSI/ISEA 107 Type R Class 2 or 3 garment with background material that are fluorescent yello w-green, fluorescent orange-red, or fluorescent red in color; a high-visibility lower garment meeting ANSI/ISEA 107 Class E, and a high visibility hardhat marked with at least 12 square inches of retroreflective material applied to provide 360 degrees of v isibility. 1-07.9(3) Apprentices This section is supplemented with the following: The Contractor shall follow the apprentice requirements in RCW 39.04.300-320 for public projects of the following sizes and dates: Projects estimated to cost over $1,500,000 bid on or after July 1, 2026; Projects estimated to cost over $1,000,000 bid on or after July 1, 2028. Irrigation and Reclamation Districts not meeting the definition of a municipality under RCW 39.04.010 are exempt from this requirement unless specifically stated otherwise. 1-07.9(3) Apprentices (February 17, 2026 APWA GSP) Supplement this section with the following: Apprentice Utilization This Contract includes an Apprentice Utilization Requirement. Fifteen percent or more of project Labor Hours shall be performed by Apprentices unless Good Faith Efforts are accepted.Apprentice Utilization will be determined using the Department of Labor and Industries (L&I) online Prevailing Wage Intent & Affidavit (PWIA) system. Definitions For the purposes of this specification the following definitions apply: 1.Apprentice is a person enrolled in a State-approved Apprenticeship Training Program. 2.Apprentice Utilization is the apprentice labor hours, on the project, expressed as a percentage of project Labor Hours based on certified payrolls or the affidavits of wages paid, whichever is least. The percentage is not rounded up. 3.Apprentice Utilization Requirement is the minimum percentage of apprentice labor hours required by the Contract. DIVISION 1 18 4.Good Faith Effort(s) (GFE)describes the Contractor’s efforts to meet the Apprentice Utilization Requirement including but not limited to the specific steps as described elsewhere in this specification. 5.Labor Hours are the total hours performed by all workers receiving an hourly wage who are subject to prevailing wage requirements for work performed on the Contract as defined by RCW 39.04.310.Labor Hours are determined based on the scope of work performed by the individuals, rather than the title of their occupations in accordance with WAC 296-127. 6.State-approved Apprenticeship Training Program is an apprenticeship training program approved by the Washington State Apprenticeship Council. 7.Apprentice Wage Rates are the applicable wage rates that are to be paid for an apprentice registered in a training program, separate from Journey Level rates, as set by the Washington State Apprenticeship Training Council and Washington State Department of Labor and Industries (L&I). Electronic Reporting The Contractor shall use the PWIA System to submit the “Apprentice Utilization Plan”. Reporting instructions are available in the application. Apprentice Utilization Plan The Contractor shall submit an “Apprentice Utilization Plan” by filling out the Apprentice Utilization Plan Form (WSDOT Form 424-004) or other form approved by the Contracting Agency within 30 calendar days of Contract execution, however no later than the preconstruction meeting, demonstrating how and when they intend to achieve the Apprentice Utilization Requirement. The Plan shall be in sufficient detail for the Engineer to track the Contractor’s progress in meeting the utilization requirements. An Appren tice Utilization Plan shall be updated and resubmitted as the Work progresses or when requested by the Engineer or other Contracting Agency representative. If the Contractor is unable to demonstrate the ability to meet the Apprentice Utilization Requirement with their initial Apprentice Utilization Plan submission, an effort must be made to find additional registered apprentices to perform on the contract. If after attempts have been made at every tier and every scope, the Contractor must submit GFE documentation to the Contracting Agency. The Contractor shall actively seek out opportunities to meet the Apprentice Utilization Requirement during the constructio n Work. Subcontracts The Contractor must not require subcontractors to attain more than 15% of a subcontract’s proposed labor hours for the subcontract’s scope of Work. Contacts The Contractor may obtain information on State-approved Apprenticeship Training Programs by using the Apprentice Registration and Tracking System (ARTS)https://secure.lni.wa.gov/arts- public/#/program-search or contacting the Department of Labor and Industries directly at: Specialty Compliance and Services Division, Apprenticeship Section, P.O. Box 44530, Olympia, WA 98504-4530 or by phone at (360) 902-5320. Compliance The Contractor is expected to make attempts to employ Apprentices and shall include the requirement in any subcontracts at any tier. In the event that the Contractor is unable to achieve the Apprentice Utilization Requirement, the Contractor shall submit G FE documentation demonstrating the efforts and DIVISION 1 19 attempts they made. Final GFE documentation shall be submitted to the Contracting Agency after Substantial Completion but no later than 30 days after Physical Completion. If the Contractor fails to actively attempt to employ Apprentices, submit GFE documentation, or if the Engineer does not approve the GFE, the Contractor will be assessed a penalty. The Engineer will provide the Contractor with a written notice at Final Acc eptance of the project informing the Contractor of the failure to comply with this specification which will include a calculation of the penalty to be assessed as provided for in the Payment section in this special provision. If the Contractor achieves the required Apprentice Utilization an incentive will be assessed with Final Payment. Good Faith Efforts The GFE shall document the attempts (efforts) the Contractor (and any subcontractor at any tier) made to meet the Apprentice Utilization Requirement. Emails, letters, or other written communications with letterhead, titles, and contact information are requ ired. Documentation must include one or more of the following accepted GFEs: 1.Demonstrated Lack of Availability of Apprentices. Correspondence from State-approved Apprenticeship Training Program(s), with project specific responses confirming there is a lack of availability of Apprentices for this project. 2.Demonstrated Disproportionate Ratio of Material/Equipment/Products to Labor Hours. Documentation explaining the bid includes a disproportionate high cost of material/equipment/products to Labor Hours. (E.g., a $2 M estimated contract includes $1 M or more in procurement costs of equipment to be installed.) 3.Demonstrated Lack of Necessary Labor Hours. Correspondence from a State-approved Apprentice Training Programs confirming there is not enough time in the project to meet required journey level to apprentice training ratios. 4.Demonstrated Lack of Available Approved Programs. Correspondence from State-approved Apprentice Training Programs, confirming there are no programs that train for the scopes included/anticipated on the project. Contractor and state programs to submit train ing program detail needs and details that could be used for future program creation. 5.Funding Precedent. Documentation that shows conflicting, more restrictive, or precedent requirements for other training on the Project. Examples include, but are not limited to, Tribal Employment Rights (TERO), Federal Training Hours, or Special Training t hat affect the ability to use state-registered apprentices. 6.Warranty Work. Documentation from Original Equipment Manufacturers, or similar, confirming that Work performed must only be completed by certified journey-level installers or risk voiding warranty, or similar. 7.Other Effort. The Contractor may submit other evidence, documentation, or rationale for not being able to achieve the required Apprentice Utilization that are not covered in the other efforts named. Other efforts will still need to be corroborated by an in dependent, knowledgeable third- party. DIVISION 1 20 Contractors may receive a GFE credit for graduated Apprentice hours through the end of the calendar year for all projects worked on as long as the Apprentice remains continuously employed with the same Contractor/subcontractor they were working for when th ey graduated. If an Apprentice graduates during employment on a project of significant duration, they may be counted towards a GFE credit for up to one year after their graduation or until the end of the project (whichever comes first). Determination of wh ether Contract requirements were met in good faith will be made by subtracting the hours from the journeyman total reported hours for the project and adding them to the apprentice hour total. If the new utilization percentage meets the Contract requirement, the Contractor will be reported as meeting the requirement in good faith. Approving Good Faith Efforts The Contracting Agency will review submitted Good Faith Efforts and issue a determination. The Engineer may request additional information, documentation, evidence or similar in order to approve such efforts. A determination by the Engineer is final. The a pproved Good Faith Efforts will be loaded into the PWIA system by the Contracting Agency. 1-07.11(1)Regulatory Authorities Nondiscrimination Authorities Section 1-07.11(1)C is revised to read: (March 9, 2026) During the performance of this Contract, the Contractor, for itself, its assignees, and successors in interest agrees to comply with the following nondiscrimination statues and authorities; including but not limited to: 1.Title VI of the Civil Rights Act of 1964 (42 U.S.C. § 2000d et seq., 78 stat. 252), and its implementing regulations and case law, prohibit discrimination on the basis of race, color, or national origin. 49 C.F.R. 21.5(b)(2) prohibits a recipient of federa l funds from utilizing “criteria or methods of administration which have the effect of subjecting persons to discrimination because of their race, color, or national origin, or have the effect of defeating or substantially impairing accomplishment of the o bjectives of the program with respect to individuals of a particular race, color, or national origin.” This includes taking reasonable steps to provide limited English proficiency (LEP) persons meaningful access to all programs, activities and services, wh ere necessary to avoid discrimination on the basis of national origin. 2.The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 U.S.C §4601), (prohibits unfair treatment of persons displaced or whose property has been acquired because of Federal or Federal-aid programs and projects). 3.Federal-Aid Highway Act of 1973, (23 U.S.C. § 324 et. seq.), as amended, (prohibits discrimination on the basis of sex). 4.Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. § 794 et seq.), as amended (prohibits discrimination on the basis of disability); and 49 C.F.R. Part 27. 5.The Age Discrimination Act of 1975, as amended (42 U.S.C. § 6101 et seq.), (prohibits discrimination on the basis of age). 6.Airport and Airway Improvement Act of 1982, (49 U.S.C. § 471, Section 47123), as amended, (prohibits discrimination based on race, creed, color, national origin, or sex). DIVISION 1 21 7.The Civil Rights Restoration Act of 1987, (PL 100-209), (Broadened the scope, coverage and applicability of Title VI of the Civil Rights Act of 1964, The Age of Discrimination Act of 1975 and Section 504 of the Rehabilitation Act of 1973, by expanding the definition and terms “programs or activities” to include all of the programs or activities of the Federal-aid recipients, sub-recipients and contractors, whether such programs or activities are Federally funded or not). 8.Titles II and III of the Americans with Disabilities Act, which prohibit discrimination on the basis of disability in the operation of public entities, public and private transportation systems, places of public accommodation, and certain testing entities(42 U.S.C. § 12131-12189) as implemented by Department of Transportation regulations at 49 C.F.R. parts 37 and 38. 9.The Federal Aviation Administration’s Nondiscrimination statute (49 U.S.C. § 47123), (prohibits discrimination on the basis of race, color national origin, and sex). 10.Title IX of the Education Amendments of 1972, as amended, which prohibits you from discriminating because of sex in education programs or activities (20 U.S.C. 1681 et seq.). 1-07.11(2)Contractual Requirements (November 25, 2024 APWA GSP) Delete item 11 of the first paragraph of Section 1-07.11(2). 1-07.16 Protection and Restoration of Property 1-07.16(1)Private/Public Property Private Property Section 1-07.16(1)C is supplemented with the following: (October 3, 2022) The Contractor shall not access the worksite from adjacent properties without permission from the Engineer. The Contractor shall submit a Type 2 Working Drawing to the Engineer in accordance with Section 1-05.3 prior to accessing the project site from adja cent properties. The Working Drawing shall include the methods, materials, equipment, and restoration measures used to access the worksite. 1-07.16(2)Vegetation Protection and Restoration Section 1-07.16(2) is supplemented with the following: (August 2, 2010) Vegetation and soil protection zones for trees shall extend out from the trunk to a distance of 1 foot radius for each inch of trunk diameter at breast height. Vegetation and soil protection zones for shrubs shall extend out from the stems at ground level to twice the radius of the shrub. Vegetation and soil protection zones for herbaceous vegetation shall extend to encompass the diameter of the plant as measured from the outer edge of the plant. DIVISION 1 22 1-07.17 Utilities and Similar Facilities This section is supplemented with the following: Locations and dimensions shown on the plans for existing utilities are in accordance with available information obtained without uncovering, measuring, or other verification unless stated otherwise. Depths, when shown, are as commonly expected for utilitie s unless surveyed. No guarantee is made or implied on the location of utilities that were not exposed and measured. Section 1-07.17 is supplemented with the following: (October 3, 2022) Locations and dimensions shown in the Plans for existing facilities are in accordance with available information obtained without uncovering, measuring, or other verification. Public and private utilities, or their Contractors, will furnish all work necessary to adjust, relocate, replace, or construct their facilities unless otherwise provided for in the Plans or these Special Provisions. Such adjustment, relocation, replacement, or construction will be done during the prosecution of the work for this project. 1-08 PROSECUTION AND PROGRESS Add the following new section: 1-08.0 Preliminary Matters (May 25, 2006 APWA GSP) Add the following new section: 1-08.0(1)Preconstruction Conference (October 21, 2025 APWA GSP) Prior to the Contractor beginning the work, a preconstruction conference will be held between the Contractor, the Engineer and such other interested parties as may be invited. The purpose of the preconstruction conference will be: 1.To review the initial progress schedule; 2.To establish a working understanding among the various parties associated or affected by the work; 3.To establish and review procedures for progress payment, notifications, approvals, submittals, etc.; 4.To review Training or Apprenticeship Plans, when applicable. 5.To discuss FSBE Goals when applicable. 6.To establish normal working hours for the work; 7.To review safety standards and traffic control; and 8.To discuss such other related items as may be pertinent to the work. The Contractor shall prepare and submit at the preconstruction conference the following: 1.A breakdown of all lump sum items; 2.A preliminary schedule of working drawing submittals; and 3.A list of material sources for approval if applicable. DIVISION 1 23 Add the following new section: 1-08.0(2) Hours of Work (February 17, 2026 APWA GSP) Except in the case of emergency or unless otherwise approved by the Engineer, the normal working hours for the Contract shall be any consecutive 8-hour period between 7:00 am and 5:00 pm If the Contractor desires different than the normal working hours stated above, the request must be submitted in writing prior to the preconstruction conference, subject to the provisions below. The working hours for the Contract shall be established at or p rior to the preconstruction conference. All working hours and days are also subject to local permit and ordinance conditions (such as noise ordinances). If the Contractor wishes to deviate from the established working hours, the Contractor shall submit a written request to the Engineer for consideration. This request shall state what hours are being requested, and why. Requests shall be submitted for revie w no later than 5 days prior to the day(s) the Contractor is requesting to change the hours. If the Contracting Agency approves such a deviation, such approval may be subject to certain other conditions, which will be detailed in writing. For example: 1.On non-Federal aid projects, requiring the Contractor to reimburse the Contracting Agency for the costs in excess of straight-time costs for Contracting Agency representatives who worked during such times. (The Engineer may require designated representativ es to be present during the W ork. Representatives who may be deemed necessary by the Engineer include, but are not limited to: survey crews; personnel from the Contracting Agency’s material testing lab; inspectors; and other Contracting Agency employees or third party consultants when, in the opinion of the Engineer, such W ork necessitates their presence.) 2.Considering the W ork performed on Saturdays, Sundays, and holidays as working days with regard to the contract time. 3.Considering multiple work shifts as multiple working days with respect to contract time even though the multiple shifts occur in a single 24-hour period. 4.If a 4-10 work schedule is requested and approved the non-working day for the week will be charged as a working day. If Davis Bacon wage rates apply to this Contract, all requirements must be met and recorded properly on certified payroll. Add the following new section: 1-08.0(3) Days of Work No work will be allowed on the following days: New Years Day, Martin Luther King Jr., President’s Day, Memorial Day, June 19 th, July 4 th, Labor Day, Veteran’s Day, Thanksgiving and the day after, Christmas and the day after. If any of the above days falls on a Friday, the preceding Thursday. If any of the above days falls on a Saturday, the preceding Friday. If any of the above days falls on a Sunday, the following Monday. All Saturdays and Sundays. DIVISION 1 24 Requests to work on any of the days listed above must be made in writing to the Owner no less than two weeks prior to the event and include the reason for the request. Approval of any such request is not guaranteed. If approval is given, each day will be counted as a working day. 1-08.1 Subcontracting 1-08.1(7)A Payment Reporting (November 25, 2024 APWA GSP Delete this section and replace it with the following: 1-08.1(7)A VACANT 1-08.1(8)B Clauses Required in Subcontracts of All Tiers (November 25, 2024 APWA GSP) Delete item 8 of the second paragraph of Section 1-08.1(8)B. 1-08.1(9)Submittal of Executed Subcontracts (April 22, 2025 APWA GSP, Option B) Section 1-08.1(9) content and title are deleted and replaced with the following: Vacant 1-08.3 Progress Schedule 1-08.3(2)General Requirements 1-08.3(2)A Type A Progress Schedule (February 17, 2026 APWA GSP) Revise this section to read: The Contractor shall submit a Type A Progress Schedule no later than at the preconstruction conference, or some other mutually agreed upon submittal time. The schedule may be a critical path method (CPM) schedule, bar chart, or other standard schedule format. Regardless of which form at is used, the schedule shall identify the critical path. The Engineer will evaluate the Type A Progress Schedule and accept or return the schedule for corrections within 15 calendar days of receiving the submittal. 1-08.4 Prosecution of Work Delete this section and replace it with the following: 1-08.4 Notice to Proceed and Prosecution of Work (February 17, 2026 APWA GSP) Notice to Proceed will be given after the C ontract has been executed and the contract bond and evidence of insurance have been approved and filed by the Contracting Agency. The Contractor shall not commence with the W ork until the Notice to Proceed has been given by the Engineer. The Contractor shall commence construction activities on the project site within ten days of the Notice to Proceed Date, unless otherwise approved in writing. The Contractor shall diligently p ursue the W ork to the P hysical C ompletion D ate within DIVISION 1 25 the time specified in the C ontract. Voluntary shutdown or slowing of operations by the Contractor shall not relieve the Contractor of the responsibility to complete the W ork within the time(s) specified in the C ontract. When shown in the Plans, the first order of W ork shall be the installation of high visibility fencing to delineate all areas for protection or restoration, as described in the Contract. Installation of high visibility fencing adjacent to the roadway shall occur after the placement of all necessary si gns and traffic control devices in accordance with 2-04.3. Upon construction of the fencing, the Contractor shall request the Engineer to inspect the fence. No other W ork shall be performed on the site until the Contracting Agency has accepted the installation of high visibility fencing, as described in the Contract. 1-08.5 Time for Completion (February 17, 2026 APWA GSP, Option A) Revise the third and fourth paragraphs to read: Contract time shall begin on the first working day following the Notice to Proceed Date. Each working day shall be charged to the C ontract as it occurs, until the C ontract W ork is physically complete. If substantial completion has been granted and all the authorized working days have been used, charging of working days will cease. Each week the Engineer will provide the Contractor a statement that shows the number of working days: (1) charged to the C ontract the week before; (2) specified for the physical completion of the C ontract; and (3) remaining for the physical completion of the C ontract. The statement will also show the nonworking days and all partial or whole days the Engineer declares as unworkable. The statement will be identified as a Written Determination by the Engineer. If the Contractor does not agree with the Written Dete rmination of working days, the Contractor shall pursue the protest procedures in accordance with Section 1-04.5. By failing to follow the procedures of Section 1-04.5, the Contractor shall be deemed as having accepted the statement as correct. If the Contr actor is approved to work 10 hours a day and 4 days a week (a 4-10 schedule) and the fifth day of the week in which a 4-10 shift is worked would ordinarily be charged as a working day then the fifth day of that week will be charged as a working day whether or not the Contractor works on that day. Revise the sixth paragraph to read: The Engineer will give the Contractor written notice of the C ompletion D ate of the C ontract after all the Contractor’s obligations under the C ontract have been performed by the Contractor. The following events must occur before the Completion Date can be established: 1.The physical Work on the project must be complete; and 2.The Contractor must furnish all documentation required by the Contract and required by law, to allow the Contracting Agency to process final acceptance of the C ontract. The following documents must be received by the Engineer prior to establishing a completion date: a.Certified Payrolls (per Section 1-07.9(5)). b.Material Acceptance Certification Documents c.Monthly Reports in DMCS of the amounts paid including the final payment confirmation to all firms required by Section 1-08.1(7)A if applicable d.Final Contract Voucher Certification e.Copies of the approved “Affidavit of Prevailing Wages Paid” for the Contractor and all subcontractors f.A copy of the Notice of Termination sent to the Washington State Department of Ecology (Ecology); the elapse of 30 calendar days from the date of receipt of the Notice of Termination by Ecology; and no rejection of the Notice of Termination by Ecology. Th is requirement will not apply DIVISION 1 26 if the Construction Stormwater General Permit is transferred back to the Contracting Agency in accordance with Section 8-01.3(16). g.Property owner releases per Section 1-07.24 1-09 Measurement and Payment 1-09.2 Weighing Equipment 1-09.2(1)General Requirements for Weighing Equipment (November 25, 2024 APWA GSP, Option B) Revise item 4 of the fifth paragraph to read: 4.Test results and scale weight records for each day’s hauling operations are provided to the Engineer daily. Reporting shall utilize WSDOT form 422-027LP, Scaleman’s Daily Report, unless the printed ticket contains the same information that is on the Scale man’s Daily Report Form. The scale operator must provide AM and/or PM tare weights for each truck on the printed ticket. 1-09.2(1)General Requirements for Weighing Equipment (July 8, 2024.Option C) Revise the sixth and seventh paragraph to read: Trucks and Tickets–Each truck to be weighed shall bear a unique identification number. This number shall be legible and in plain view of the scale operator. The Contractor shall provide Electronic tickets or Physical tickets for all weighed materials. All Tickets shall, r egardless of medium, at a minimum, contain the following information: 1. Date of haul; 2. Contract number; 3. Contract unit Bid item; 4. Unit of measure; 5. Identification number of hauling vehicle; and 6. Weight delivered: a. Net weight in the case of batch and hopper scales. b. Gross weight, tare (a.m. and p.m. minimum) and net weight in the case of platform scales (tare may be omitted if a tare beam is used). c. Approximate load out weight in the case of belt conveyor scales. Electronic-tickets shall be uploaded to the designated site so that they can be accessed by the material receiver at the material delivery point. Physical tickets shall be handed to the inspector at the delivery point at the time materials are delivered. T he material delivery point is defined as the location where the material is incorporated into the permanent Work. The Contractor’s representative shall make report summaries available to the Engineer’s designated receiver, not later than the end of shift,for reconciliation. Tickets for loads not verified as delivered will receive no pay. DIVISION 1 27 1-09.2(5)Measurement (December 30, 2022 APWA GSP) Revise the first paragraph to read: Scale Verification Checks–At the Engineer’s discretion, the Engineer may perform verification checks on the accuracy of each batch, hopper, or platform scale used in weighing contract items of Work. 1-09.6 Force Account (December 30, 2022 APWA GSP) Supplement this section with the following: The Contracting Agency has estimated and included in the Proposal, dollar amounts for all items to be paid per force account, only to provide a common proposal for Bidders. All such dollar amounts are to become a part of Contractor's total bid. However, th e Contracting Agency does not warrant expressly or by implication, that the actual amount of work will correspond with those estimates. Payment will be made on the basis of the amount of work actually authorized by the Engineer. 1-09.9 Payments (February 17, 2026 APWA GSP, Option B) Delete the fourth paragraph and replace it with the following: Progress payments for completed Work and material on hand will be based upon progress estimates prepared by the Engineer. A progress estimate cutoff date will be established at the preconstruction conference. The initial progress estimate will be made not later than 30 days after the Contractor commences the Work, and successive progress estimates will be made every month thereafter until the Completion Date. Progress estimates made during progress of the Work are tentative, and made only for the purpose of determining progress payment. The progress estimates are subject to change at any time prior to the calculation of the Final Payment. The value of the progress estimate will be the sum of the following: 1.Unit Price Items in the Bid Form—the approximate quantity of acceptable units of Work completed multiplied by the unit price. 2.Lump Sum Items in the Bid Form—based on the approved Contractor’s lump sum breakdown for that item, or absent such a breakdown, based on the Engineer’s determination. 3.Materials on Hand—100 percent of invoiced cost of material delivered to Job site or other storage area approved by the Engineer. 4.Change Orders—entitlement for approved extra cost or completed extra Work as determined by the Engineer. Progress payments will be made in accordance with the progress estimate less: 1.Retainage per Section 1-09.9(1), on non FHWA-funded projects; 2.The amount of Progress Payments previously made; and 3.Funds withheld by the Contracting Agency for disbursement in accordance with the Contract Documents. DIVISION 1 28 Progress payments for Work performed shall not be evidence of acceptable performance or an admission by the Contracting Agency that any Work has been satisfactorily completed. The determination of payments under the Contract will be final in accordance wit h Section 1-05.1. The sixth paragraph of Section 1-09.9 is deleted. 1-09.11 Disputes and Claims 1-09.11(3)Time Limitation and Jurisdiction (December 30, 2022 APWA GSP) Revise this section to read: For the convenience of the parties to the Contract it is mutually agreed by the parties that all claims or causes of action which the Contractor has against the Contracting Agency arising from the Contract shall be brought within 180 calendar days from the date of final acceptance (Section 1-05.12) of the Contract by the Contracting Agency; and it is further agreed that all such claims or causes of action shall be brought only in the Superior Court of the county where the Contracting Agency headquarters is located, provided that where an action is asserted against a county, RCW 36.01.050 shall control venue and jurisdiction. The parties understand and agree that the Contractor’s failure to bring suit within the time period provided, shall be a complete bar t o all such claims or causes of action. It is further mutually agreed by the parties that when claims or causes of action which the Contractor asserts against the Contracting Agency arising from the Contract are filed with the Contracting Agency or initiate d in court, the Contractor shall permit the Contracting Agency to have timely access to all records deemed necessary by the Contracting Agency to assist in evaluating the claims or action. 1-09.13 Claims Resolution 1-09.13(3)A Arbitration General (January 19, 2022 APWA GSP) Revise the third paragraph to read: The Contracting Agency and the Contractor mutually agree to be bound by the decision of the arbitrator, and judgment upon the award rendered by the arbitrator may be entered in the Superior Court of the county in which the Contracting Agency’s headquarters is located, provided that where claims subject to arbitration are asserted against a county, RCW 36.01.050 shall control venue and jurisdiction of the Superior Court. The decision of the arbitrator and the specific basis for the decision shall be in writi ng. The arbitrator shall use the Contract as a basis for decisions. 1-09.13(4)Venue for Litigation (December 30, 2022 APWA GSP) Revise this section to read: Litigation shall be brought in the Superior Court of the county in which the Contracting Agency’s headquarters is located, provided that where claims are asserted against a county, RCW 36.01.050 shall control venue and jurisdiction of the Superior Court. I t is mutually agreed by the parties that when litigation occurs, the Contractor shall permit the Contracting Agency to have timely access to all records deemed necessary by the Contracting Agency to assist in evaluating the claims or action. DIVISION 1 29 Add the following new section: 1-09.14 Attorney Fees In the event any action is filed in connection with the Contract, the substantially prevailing party shall be entitled to recover its costs and a reasonable sum for attorney fees. The parties further agree that the substantially prevailing party shall be e ntitled to recover its costs and a reasonable sum for attorney fees incurred through any Final Order as a result of an Appeal. END DIVISION 1 DIVISION 1 30 Division 2 Temporary Features 2-01 Mobilization Replace this section in its entirety with the following: 2-01 Mobilization/Demobilization 2-01.3 Construction Requirements Mobilization consists of preconstruction expenses, administration, preparatory work, and indirect operations performed by the Contractor prior to and during initial phases of the Work. Demobilization consists of costs and work associated with removal of eq uipment and materials, site cleanup, and project closeout, unless such work is specifically identified in other bid items. Public Convenience and Safety Construction Requirements Construction Under Traffic This section is supplemented with the following: Where flagging is used for traffic control, traffic shall not be stopped for more than 5 minutes. The following locations have specific delay requirement: If the Engineer determines the permitted closure hours adversely affect traffic, the Engineer may adjust the hours accordingly. The Engineer will notify the Contractor in writing of any change in the closure hours. Exceptions to these restrictions are list ed below and when applicable take precedence over closures listed above. The Engineer may also consider on a case-by-case basis additional exceptions following a written request by the Contractor. Lane, ramp, shoulder, and roadway closures are not allowed on any of the following: 1.A holiday, 2.A holiday weekend; holidays that occur on Friday, Saturday, Sunday or Monday are considered a holiday weekend. A holiday weekend includes Saturday, Sunday, and the holiday. 3.After 2 p.m.on the day prior to a holiday or holiday weekend, and 4.Before 10 a.m.on the day after the holiday or holiday weekend. 5.The two-hour period prior to and the two-hour period after the following special events: -At City’s discretion It shall be the Contractor’s responsibility to obtain the dates and times of all events. DIVISION 2 1 Traffic Delays When Automated Flagger Assistance Devices (AFADs) or flaggers are used to control traffic, traffic shall not be stopped for more than 5 minutes at any time. All traffic congestion shall be allowed to clear before traffic is delayed again. If the delay becomes greater than 5 minutes, the Contractor shall immediately begin to take action to cease the operations that are causing the delays. If the 5 minute delay limit has been exceeded, as determined by the Engineer, the Contractor shall provide to the Engineer, a written proposal to revise their work operations to meet the 5 minute limit. This proposal shall be accepted by the Engineer prior to resuming any work requiring traffic control. There shall be no delay to medical, fire, or other emergency vehicles. The Contractor shall alert all flaggers and personnel of this requirement. General Restrictions Construction vehicles using a closed traffic lane shall travel only in the normal direction of traffic flow unless expressly allowed in an accepted traffic control plan. Construction vehicles shall be equipped with flashing or rotating amber lights. No two consecutive on-ramps, off-ramps, or intersections shall be closed at the same time and only one ramp at an interchange shall be closed, unless specifically shown in the Plans. Roads or ramps that are designated as part of a detour shall not be closed or restricted during the implementation of that detour, unless specifically shown in the Plans. Controlled Access No special access or egress shall be allowed by the Contractor other than normal legal movements or as shown in the Plans. Contractor’s vehicles of 10,000 GVW or greater shall not exit or enter a lane open to public traffic except as follows: Egress and ingress shall only occur during the hours of allowable lane closures, and: 1.For exiting an open lane of traffic, by decelerating in a lane that is closed during the allowable hours for lane closures. 2.For entering an open lane of traffic, by accelerating in a closed lane during the allowable hours for lane closures. Traffic control vehicles are excluded from the gross vehicle weight requirement. If placing construction signs will restrict traveled lanes, then the work will be permitted during the hours of allowable lane closures. Advance Notification The Contractor shall notify the Engineer in writing of any traffic impacts related to lane closure, shoulder closure, sidewalk closure, or any combination for the week by 12:00 p.m. (noon) Wednesday the week prior to the stated impacts. The Contractor shall notify the Engineer in writing ten working days in advance of any traffic impacts related to full roadway closure, ramp closure, or both. DIVISION 2 2 The Contractor shall notify the Engineer in writing of any changes to the stated traffic impacts a minimum of 48 hours prior to the traffic impacts. Add the following new section: 2-03.3(4) Temporary Road Closures Closures to through traffic on Creek Street will not be allowed between the hours of 5 a.m. and 8 p.m. unless approved by the Engineer. The Contractor shall phase work to allow at least one pedestrian accessible route along Creek Street at all times. Closures to through traffic on 103 rd Ave SE will be allowed only by approval from the Engineer. Closures to through traffic on State Route 507 will not be allowed at any time during construction. Local access to the school, individual residences and emergency vehicle access shall be maintained at all times. The Contractor shall maintain all necessary construction signs during non-working hours. The Contractor shall maintain driveway approach access to adjacent properties at all times. This includes temporary construction and maintenance of gravel approaches as well as construction of concrete driveway approaches half at a time (unless otherwise agreed upon by the property owner and Engineer) with sufficient cure time between concrete pours as defined in the standard specifications. The Contractor shall coordinate construction of driveway approaches with individual property owners and provide a minimum of 2 business days’ notice prior to driveway approach construction. Road closure notices shall be published by the contractor at least one week in advance in the local newspaper. Temporary Traffic Control Materials Construction Signs Section 9-35.2 is revised to read: (January 5, 2026) Construction signs shall conform to the requirements of the MUTCD and shall meet the requirements of NCHRP Report 350 for Category 2 devices or MASH. Except as noted below, any sign/sign stand combination that satisfies these requirements will be acceptabl e. Post mounted Class A construction signs shall conform to the requirements of this section and additionally shall conform to the requirements stated in Section 9-28. Aluminum sheeting shall be used to fabricate all construction signs. The signs shall have a minimum thickness of 0.080 inches and a maximum thickness of 0.125 inches. All construction signs shall be fabricated with reflective sheeting in accordance with Section 9-28.12. All post mounted signs shall use a nylon washer between the twist fasteners (screw heads, bolts or nuts) and the reflective sheeting. The use of plywood, fiberglass reinforced plastic, fabric rollup signs, and any other previously approved sign materials except aluminum or aluminum composite is prohibited. DIVISION 2 3 All Class A and Class B signs shall utilize materials and be fabricated in accordance with Section 9- 28 and the Washington State Sign Fabrication Manual M 55-05. A fabrication decal as stated in Section 9-28.1 is not required for construction signs. Barricades Section 9-35.6 is revised to read: (January 5, 2026) Barricades shall conform to the requirements of the MUTCD. The alternating orange and white reflective bands shall be fabricated with reflective sheeting in accordance with Section 9-28.12. Traffic Safety Drums The third and fourth paragraphs of Section 9-35.7 are revised to read: (January 5, 2026) Until December 31, 2026, traffic safety drums may have 4-inch or 6-inch reflective bands fabricated from Type III or Type IV or higher sheeting type as described in Section 9-28.12. Beginning January 1, 2027, traffic safety drums shall have 6-inch reflective bands. A minimum of 4 reflective horizontal bands, alternating fluorescent orange and white starting with the top stripe being fluorescent orange, shall be used. Reflective bands shall be fabricated from Type IV or higher (reflective sheeting as described in Section 9-28.12. Drums of different reflective band types shall not be intermixed within the same closure. When recommended by the manufacturer, drums shall be treated to ensure proper adhesion of the reflective sheeting. Traffic Cones The last paragraph of Section 9-35.9 is revised to read: (January 5, 2026) White reflective bands shall be fabricated with reflective sheeting in accordance with Section 9-28.12. Tubular Markers The last paragraph of Section 9-35.10 is revised to read: (January 5, 2026) White reflective bands shall be fabricated with reflective sheeting in accordance with Section 9-28.12. When recommended by the manufacturer, tubular markers shall be treated to ensure proper adhesion of the reflective sheeting. 42-Inch Tall Channelizing Devices The third and fourth paragraphs of Section 9-35.13 are revised to read: (January 5, 2026) Until December 31, 2026, 42-inch tall channelization devices may have 4-inch or 6-inch reflective bands fabricated from Type III or Type IV or higher sheeting type as described in Section 9-28.12. Beginning January 1, 2027, 42-inch tall channelization devices shall have 6-inch reflective bands. A minimum of 4 reflective horizontal bands, alternating fluorescent orange and white starting with the top stripe being fluorescent orange, shall be used. Reflective bands shall be fabricated from Type IV or higher IV (reflective sheeting as described in Section 9-28.12. 42-inch tall channelization devices of different reflective band types shall not be intermixed within the same closure. When recommended DIVISION 2 4 by the manufacturer, 42-inch tall channelization devices shall be treated to ensure proper adhesion of the reflective sheeting. Pedestrian Channelizing Devices Section 9-35.16 is revised to read: (January 5, 2026) When exposed to vehicular traffic, pedestrian channelizing devices shall meet the crashworthiness requirements of NCHRP 350 or MASH as described in Section 2-04.3(3). The bottom and top surfaces of the pedestrian channelizing device shall have 6-inch reflective bands matching the body color of the device fabricated from reflective sheeting as described in Section 9-28.12. Traffic Control Management Section 2-04.3(1) is supplemented with the following: (October 3, 2022) The Traffic Control Supervisor shall be certified by one of the following: The Northwest Laborers-Employers Training Trust 27055 Ohio Ave. Kingston, WA 98346 (360) 297-3035 https://www.nwlett.edu Evergreen Safety Council 12545 135 th Ave. NE Kirkland, WA 98034-8709 1-800-521-0778 https://www.esc.org The American Traffic Safety Services Association 15 Riverside Parkway, Suite 100 Fredericksburg, Virginia 22406-1022 Training Dept. Toll Free (877) 642-4637 Phone: (540) 368-1701 https://atssa.com/training Integrity Safety 13912 NE 20th Ave. Vancouver, WA 98686 (360) 574-6071 https://www.integritysafety.com US Safety Alliance (904) 705-5660 https://www.ussafetyalliance.com K&D Services Inc. 2719 Rockefeller Ave. Everett, WA 98201 (800) 343-4049 DIVISION 2 5 https://www.kndservices.net 2-04.3(1)B Traffic Control Supervisor (TCS) The last paragraph is revised to read: The TCS may perform the Work described in Section 1-10.3(1)A Flaggers or in Section 1-10.3(1)B Other Traffic Control Labor, however, all compensation shall be included in the lump sum bid price for Traffic Control Supervisor unless specified otherwise in 1-10.5(2). If TCS duties are not being performed to the satisfaction of the Engineer, this provision will be revoked. 2-04.3(2) Traffic Control Plans This section is supplemented with the following: Where no project specific traffic control plans have been provided in the Contract Documents, WSDOT Work Zone Typical Traffic Control Plans shall be used. 2-04.3(4)B Other Traffic Control Labor This section is supplemented with the following: Personnel needed to ensure construction equipment is operating without encroaching into traveled ways and/or needed to guide construction equipment through the workzone shall be incidental to the project. 2-04.3(6)A Construction Signs The third paragraph is supplemented with the following: Class B signs are allowed on this project, including locations where signs may be in place for more than 3 days. END DIVISION 2 DIVISION 2 6 Division 3 Earthwork 3-01 Clearing, Grubbing, and Roadside Cleanup 3-01.1 Description Supplement this section with the following: The Contractor shall perform clearing and grubbing within the construction limits, as necessary to perform the work. The limits of clearing and grubbing shall be staked and flagged by the Contractor for approval by the Engineer prior to construction. 3-01.2 Disposal of Usable Material and Debris 3-01.2(1) Disposal Method No. 1–Open Burning Replace this section with the following: Open burning is prohibited under this contract. 3-01.3 Construction Requirements 3-01.3(1) Clearing Supplement this section with the following: Removal of trees for utility trenching shall include removal of the stump and root ball within 3 feet of the pipe on all sides. Removal of trees for site improvements shall include removal of the entire stump and root ball. Move any existing materials stockpiled in the work zone as necessary to perform the work. Do not dispose without written permission of the owner of said materials. Return materials back to their approximate original locations at completion of construction. Item number 1 of Section 3-01.3(1) is revised to read: (April 2, 2018) 1.Trees identified for removal shall be felled into the Contracting Agency right of way or areas that will be cleared of vegetation. 3-01.3(1)A Root Protection The following section is new: Roots on living trees, shrubs, or hedges that are to be retained may be encountered during the work. Notify the Owner of root systems when discovered. Hand dig where machine excavation may irreparably damage the vegetation. Where, in the Owner’s opinion, hand digging is impractical, or root systems must be cut, the Owner will determine if the new work will be relocated, or if the work shall continue and will determine the acceptable methods for cutting and treating roots. DIVISION 3 1 The Owner will determine if the work to avoid, cut, treat, or otherwise accommodate the existing vegetation is payable by Force Account. Force Account will only be considered for locations of impacted vegetation that are not noted on the plans. 3-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS 3-02.3 Construction Requirements 3-02.3(3) Removal of Pavement, Sidewalks, Curbs, and Gutters Supplement Item 1 of this section with the following: Arrange to dispose of waste at no expense to the Contracting Agency and any such disposal shall meet the requirement of section 2-03.3(7)C of the Standard Specifications. Supplement this section with the following: The approximate thickness of the asphalt pavement to be removed is 3-inches. The approximate thickness of concrete sidewalk to be removed is 4-inches. 3-02.3(4) Asbestos Handling and Disposal The following section is new: Prior to and during the performance of any contract work, the Contractor shall verify that no asbestos- containing materials are involved or will be disturbed. If the Contractor discovers hazardous asbestos materials, they shall notify the Owner as to where hazardous asbestos materials are located. Due to the OSHA Right to Know Laws, the Owner is required to notify the Contractor that hazardous asbestos materials exist or if not known but discovered, the Owner is required to mitigate the removal of the hazar dous asbestos materials. When asbestos is encountered, the Contractor shall be responsible for obtaining all permits from, and provide notification to, the Washington State Department of Labor and Industries, the U.S. EPA, the local air pollution control agency, and other permitti ng and regulatory agencies with jurisdiction over the work involving asbestos as the law requires. Prior to commencing asbestos related work, the Contractor shall provide the Engineer with written verification of approvals and notification that have been given and/or obtained from the required jurisdictional agencies, and the Contractor’s schedule for a ll work involving asbestos removal. The schedule shall include the sequencing and scheduling of asbestos-related work, and coordination with subcontractors. The Contractor shall notify the Engineer when all approvals have been received and notifications ha ve been made, as required by the agencies involved. The Contractor shall ensure the safety of all workers, visitors to the site, and the general public in accordance with all applicable laws, rules, and regulations. The Contractor shall designate a Washington State Certified Asbestos Supervisor (CAS) to personally supervise the asbestos removal and to ensure that the handling and removal of asbestos is accomplished by certified asbestos workers, pursuant to Washington State Department of Labor and Industries standards. The Contractor shall ensure that the removal and disposal of asbestos meets the requirements of EPA regulations 40 CFR Part 61, local health department regulations, and all other applicable regulations. DIVISION 3 2 3-02.3(4)A Asbestos-Cement Pipe Removal or Abandonment The following section is new: Description The Contractor shall remove or abandon in place asbestos-cement (AC) pipe where shown on the Plans, as may be required where out-of-service asbestos-cement water main intrudes or may intrude into or otherwise interfere with the Work, and/or as may be direc ted by the Engineer. The work under this section includes handling and disposing the AC pipe, together with any asbestos containing waste materials such as pipe fragments, protective clothing, HEPA filters, decontamination rinse water, asbestos-contaminate d containers and debris. For the purposes of this contract, and regulatory compliance, AC pipe shall be considered nonabsorbent, friable asbestos-containing material. For the purposes of WAC 296-62-077 and 296-65, the work under this section shall be classified as “Class II asbest os work.” Asbestos is classified as a Class 9 hazardous material, Identification Number NA 2212, under CFR Title 49 “Transportation.” Under no circumstances will review, approval, or acknowledgement of the Contractor’s proposed or actual activities by the Contracting Agency or Engineer relieve the Contractor from responsibility to comply with all asbestos regulations. Certifications The Contractor shall designate a Competent Person [a Washington State Certified Asbestos Supervisor (CAS)] to personally supervise the removal, handling, and disposal of the asbestos, and to ensure that the Work involving the asbestos is accomplished by ce rtified asbestos workers pursuant to the requirements of the Washington State Department of Labor and Industries, and federal law. The CAS shall be on-site during removal and handling of the asbestos, including cutting the pipe, placing and sealing the asb estos in containers, labeling the containers for transport and disposal, and loading the containers into the transport vehicle(s) that will remove the material from the site. All work must be performed by certified asbestos workers unless the Contractor provides documentation that the work does not qualify as an “asbestos project” as defined in WAC 296- 62-07722(3)(ii)(C). Documentation includes L&I approval of the asbestos trai ning program as defined in WAC 296-65-015. After existing AC pipe is exposed, the CAS will be allowed to determine if the pipe is friable or non-friable, and based on such determination the CAS may propose alternate methods for working with AC pipe than are described herein. Such determination will not change the general scope of the work to remove and/or abandon pipe where specified. Prior to commencing asbestos related work, the Contractor shall furnish the Engineer with copies of the current certifications for the CAS and asbestos workers. Permits and Notifications The Contractor shall ensure that the removal, handling, haul, and disposal of the waste asbestos meets the requirements of EPA regulation 40 CFR Part 61, local health department regulations, Federal Motor Carrier Safety Act, all other applicable regulation s, and these contract provisions. Prior to performing any contract work, the Contractor shall obtain all permits from, and provide notification to, the Washington State Department of Labor and Industries,the Puget Sound Air DIVISION 3 3 Pollution Control Authority (PSCAA),and other permitting and regulatory agencies with jurisdiction over the work involving asbestos as the law requires. Prior to commencing asbestos related work, the Contractor shall provide the Engineer with written verification, including copies, of approvals and notifications that have been given and/or obtained from the required jurisdictional agencies (WAC 296-65-020), and the Contractor’s schedule for all work involving asbestos activities. The schedule shall include the sequencing and scheduling of asbestos related work, identify the proposed waste disposal site, and describe the site cleanup procedures. The proposed waste disposal site shall be located in the State of Washington, and shall be permitted to accept asbestos waste material. Procedures The Contractor shall ensure the safety of all workers, visitors to the site, and the general public in accordance with all applicable laws, rules, and regulations. Work areas involving asbestos, including areas of removal and handling AC and associated mat erials, shall be controlled, clearly marked with barriers and asbestos warning signs, Access to the controlled area shall be restricted to authorized personnel only. Wet methods using appropriate equipment, wetting agents and methods as set forth in Section 4.05(b) of the PSCAA’s Regulation III and not prohibited under WAC 296 62 07712(4), are the presumed standard controls and practices for the work.More specifically, following the work procedures described in Appendices A and C in the “Evaluation of Asbestos Exposures During Selected Procedures Involving Underground Asbestos Containing Pipe” (by Schumacher and Associates under contract with the Snoho mish County PUD, as published by the Washington Education Training and Resource Center, WETRC). Using proper procedures while cutting pipe with a hand operated carbide wheel, cutting pipe with a hand saw, installing a repair band onto a pipe, cutting pipe with a snap cutter, and installing a tap while the pipe is under pressure can keep asbestos ex posure below the permissible exposure limits. Use of alternative controls and practices as recognized in Chapter 296 62 WAC, or that may result in time-weighted average or excursion concentrations exceeding permissible exposure limits, will require initial and subsequent air monitoring, exposure assessments, supplemental control measures, establishment of regulated area, and associated actions as provided in WAC 296 62-07712(10)(f) and WAC 296 62-07711. All AC water pipe designated for removal as shown on the Plans, that has been determined to potentially or actually interfere with the Work, or as may be directed by the Engineer for removal, and any asbestos containing waste materials, including pipe frag ments, protective clothing, HEPA filters and asbestos-contaminated containers and debris, shall be sealed in a leak tight container or containers as soon as possible after removal, but no later than the end of each work shift. If disposal bags are used to contain and transport the removed asbestos cement materials, the bags shall be: specifically formulated and approved for asbestos material removal, haul, and disposal; a minimum thickness of 6-mil.; and yellow in color. All containers shall be labeled, in cluding asbestos warning, in accordance with regulatory requirements. Immediately following placement and sealing of the asbestos containing materials in a bag or bags, the sealed bags shall be placed and sealed in a second bag. Each leak-tight container shall be permanently marked with the name of the waste generator (e.g.,City of Yelm Public Services), date, location (address) of the generated waste, and quantity of material within the container. For AC pipe designated on the plans to be abandoned in place, the pipe shall be filled completely with flowable grout or controlled density fill. Provide injection and vent ports if there are not DIVISION 3 4 enough useable existing lateral connections or service taps. Provide a filling plan to the Engineer for review and approval no less than two weeks prior to starting. Crushing and burying AC pipe is not allowed. Haul and Disposal Properly sealed and labeled containers of removed asbestos shall be hauled from the site and disposed at a waste site permitted to accept such waste. Such containers of removed asbestos may be temporarily stored in an on-site location agreed to by the Cont ractor, Contracting Agency, and jurisdictional road agency provided that the location is secured and signed in accordance with applicable rules and regulations. If a mutually acceptable on-site location for the secure, temporary storage of the containers c annot be determined, the Contractor shall remove the containers from the site no later than the end of each work shift. In no event shall the Contractor allow the removed asbestos and containers to remain on private property, or to be transshipped to an in termediate off-site storage area or comingled with other materials. The Contractor shall dispose asbestos within 10 days of removal in accordance with the provisions of Section 4.07 of the PSCAA’s Regulation III. Transportation vehicles and drivers that move the asbestos waste material from the project to the disposal site shall comply with federal and state labeling, shipment record-keeping, and licensing requirements. The Contractor shall be responsible to track the removed asbestos using the disposal site’s or Contracting Agency’s prescribed Waste Material Shipment Record form or if one does not exist, the form available on the Puget Sound Clean Air Agency website, and to ensure that the requisite signatures are obtained of the material transfer and disposal process. The material information on the form shall provide a direct correlation between the removed asbestos, the sealed and labeled containers of removed asbestos, and the transported and disposed containers of removed asbestos. The Contractor shall provide the original copy of the completed Waste Material Shipment Record form(s) to the Engineer within 10-calendar day following disposal. 3-03 ROADWAY EXCAVATION AND EMBANKMENT 3-03.1 Description Supplement this section with the following: The work shall include excavation and embankment necessary to construct temporary driveway accesses for all residences and businesses and shall include sawcutting and removal of existing pavement as shown in the plans. 3-05 Subgrade Preparation 3-05.3 Construction Requirements 3-05.3(2) Subgrade for Pavement Supplement this section with the following: Prior to placing paving, the prepared subgrade shall be proof-rolled with a fully-loaded dump truck or equivalent to identify any soft or unsuitable material. All soft or otherwise unsuitable material shall be removed to the satisfaction of the Owner and replaced with suitable material compacted as specified herein DIVISION 3 5 3-06 WATERING 3-06.1 Description Supplement this section with the following: The Contractor shall control dust at all times throughout the project, including weekends and holidays. Watering, or other approved dust control measures, are required whenever dust conditions are present on the roadway, on adjacent streets when dust resul ts from construction activities, and on cut and fill slopes as determined by the Owner. The Contractor shall obtain a source of water at their expense.No separate payment will be made for dust control. 3-06.2 Watering for Compaction The following section is new: Cost for watering is incidental to the contract. Contractor shall provide watering as necessary to achieve optimal moisture content for compaction. The Contractor shall coordinate with a water purveyor, who may require a meter and backflow preventer setup for construction water. The maximum flow rate allowed from this meter may be restricted at the purveyor’s discretion. The Contractor is responsible for protection of the meter assembly from theft, vandalism, damage, and freezing. 3-07 STRUCTURE EXCAVATION 3-07.3 Construction Requirements 3-07.3(1) General Requirements 3-07.3(1)E Backfilling Supplement this section with the following: Cure CDF used for fill or pipe encasement for the following minimum durations prior to placement of any material directly over the CDF. CDF must also have reached a stiffness that will resist movement regardless of the minimum duration noted. If traffic mu st be restored prior to the duration stated, or the open excavation must be closed for safety, span the excavation with temporary plating appropriate for the anticipated loading. Cold weather may require more time. Curing accelerators may be used to reduce these times. Pipe encasement at least 2 ft below grade: 4 hours. Any use 2 ft or less below grade that may receive construction traffic: 24 hours. Vehicular traffic under 5,000 lbs per axle: 48 hours Vehicular traffic over 5,000 lbs per axle: 72 hours Permanent structures: 7 days. END DIVISION 3 DIVISION 3 6 Division 5 Surface Treatments and Pavements 5-04 Hot Mix Asphalt (December 12, 2025 APWA GSP) Delete Section 5-04 and replace it with the following: 5-04.1 Description This Work shall consist of providing and placing one or more layers of plant-mixed hot mix asphalt (HMA) on a prepared foundation or base in accordance with these Specifications and the lines, grades, thicknesses, and typical cross-sections shown in the Pl ans. The manufacture of HMA may include warm mix asphalt (WMA) processes in accordance with these Specifications. WMA processes include organic additives, chemical additives, and foaming. HMA shall be composed of asphalt binder and mineral materials as may be required, mixed in the proportions specified to provide a homogeneous, stable, and workable mixture. 5-04.2 Materials Materials shall meet the requirements of the following sections: Asphalt Binder 9-02.1(4) Cationic Emulsified Asphalt 9-02.1(6) Anti-Stripping Additive 9-02.4 HMA Additive 9-02.5 Aggregates 9-03.8 Recycled Asphalt Pavement (RAP)9-03.8(3)B, 9-03.21 Reclaimed Asphalt Shingles (RAS)9-03.8(3)B, 9-03.21 Mineral Filler 9-03.8(5) Recycled Material 9-03.21 The Contract documents may establish that the various mineral materials required for the manufacture of HMA will be furnished in whole or in part by the Contracting Agency. If the documents do not establish the furnishing of any of these mineral materials by the Contracting Agency, the Contractor shall be required to furnish such materials in the amounts required for the designated mix. Mineral materials include coarse and fine aggregates, and mineral filler. The Contractor may choose to utilize recycled asphalt pavement (RAP) in the production of HMA. The RAP may be from pavements removed under the Contract, if any, or pavement material from an existing stockpile. The Contractor may use up to 20 percent RAP by total weight of HMA with no additional sampling or testing of the RAP. If the Contractor wishes to utilize High RAP/Any RAS, the design must be listed on the WSDOT Qualified Products List (QPL). DIVISION 5 1 The grade of asphalt binder shall be as required by the Contract. Blending of asphalt binder from different sources is not permitted. The Contractor may only use warm mix asphalt (WMA) processes in the production of HMA with 20 percent or less RAP by total weight of HMA. The Contractor shall submit to the Engineer for approval the process that is proposed and how it will be used in the m anufacture of HMA. Production of aggregates shall comply with the requirements of Section 3-01. Preparation of stockpile site, the stockpiling of aggregates, and the removal of aggregates from stockpiles shall comply with the requirements of Section 3-02. 5-04.2(1) How to Get an HMA Mix Design on the QPL If the Contractor wishes to submit a mix design for inclusion in the Qualified Products List (QPL), please follow the WSDOT process outlined in Standard Specification 5-04.2(1). 5-04.2(1)A Vacant 5-04.2(2) Mix Design-Obtaining Project Approval No paving shall begin prior to the approval of the mix design by the Engineer. Nonstatistical evaluation will be used for all HMA not designated as Commercial HMA in the Contract documents. Commercial evaluation will be used for Commercial HMA and for other classes of HMA in the following applications: sidewalks, road approaches, ditches, slopes, paths, trails, gores, prelevel, temporary pavement, and pavement repair. Other nonstructural applications o f HMA accepted by commercial evaluation shall be as approved by the Project Engineer. Sampling and testing of HMA accepted by commercial evaluation will be at the option of the Project Engineer. The Proposal quantity of HMA that is accepted by commercial evaluation will be excluded from the quantities used in the determination of nonstatistical evaluation. Nonstatistical Mix Design. Fifteen days prior to the first day of paving the Contractor shall provide one of the following mix design verification certifications for Contracting Agency review; The WSDOT Mix Design Evaluation Report from the current WSDOT QPL, or one of the mix design verification certifications listed below. The proposed HMA mix design on WSDOT Form 350-042 with the seal and certification (stamp & signature) of a valid licensed Washington State Professional Engineer. * (see below) The Mix Design Report for the proposed HMA mix design developed by a qualified City or County laboratory that is within one year of the approval date. * (see below) The mix design shall be performed by a lab accredited by a national authority such as Laboratory Accreditation Bureau, L-A-B for Construction Materials Testing, The Construction Materials Engineering Council (CMEC’s) ISO 17025 or AASHTO Accreditation Progr am (AAP) and shall supply evidence of participation in the AASHTO: resource proficiency sample program. Mix designs for HMA accepted by Nonstatistical evaluation shall: DIVISION 5 2 Be designed for 1 million equivalent single axle loads (ESALs). Have the aggregate structure and asphalt binder content determined in accordance with WSDOT Standard Operating Procedure 732 and meet the requirements of Sections 9-03.8(2), except that Hamburg testing for ruts and stripping are at the discretion of the En gineer, and 9-03.8(6). Have anti-strip requirements, if required, for the proposed mix design determined in accordance with AASHTO T 283 or T 324 or based on historic anti-strip and aggregate source compatibility from previous WSDOT lab testing. *At the discretion of the Engineer, agencies may accept verified mix designs older than 12 months from the original verification date with a certification from the Contractor that the materials and sources are the same as those shown on the original mix desig n. Commercial Evaluation Mix Design.Approval of a mix design for “Commercial Evaluation” will be based on a review of the Contractor’s submittal of WSDOT Form 350-042 (for commercial mixes, AASHTO T 324 evaluation is not required) or a Mix Design from the current WSDOT QPL or from one of th e processes allowed by this section. Testing of the HMA by the Contracting Agency for mix design approval is not required. 5-04.2(2)B Using Warm Mix Asphalt Processes The Contractor may elect to use additives that reduce the optimum mixing temperature or serve as a compaction aid for producing HMA. Additives include organic additives, chemical additives and foaming processes. The use of Additives is subject to the follo wing: Do not use additives that reduce the mixing temperature more than allowed in Section 5-04.3(6) in the production of mixtures. Before using additives, obtain the Engineer’s approval using WSDOT Form 350-076 to describe the proposed additive and process. 5-04.3 Construction Requirements 5-04.3(1) Weather Limitations Do not place HMA for wearing course on any Traveled Way beginning October 1st through March 31st of the following year without written concurrence from the Engineer. Do not place HMA on any wet surface, or when the average surface temperatures are less than those specified below, or when weather conditions otherwise prevent the proper handling or finishing of the HMA. Minimum Surface Temperature for Paving Compacted Thickness (Feet)Wearing Course Other Courses Less than 0.10 55°F 45°F 0.10 to .20 45°F 35°F More than 0.20 35°F 35°F DIVISION 5 3 5-04.3(2) Paving Under Traffic When the Roadway being paved is open to traffic, the requirements of this Section shall apply. The Contractor shall keep intersections open to traffic at all times except when paving the intersection or paving across the intersection. During such time, and provided that there has been an advance warning to the public, the intersection may be closed for the minimum time required to place and compact the mixture. In hot weather, the Engineer may require the application of water to the pavement to accelerate the finish roll ing of the pavement and to shorten the time required before reopening to traffic. Before closing an intersection, advance warning signs shall be placed, and signs shall also be placed marking the detour or alternate route. During paving operations, temporary pavement markings shall be maintained throughout the project. Temporary pavement markings shall be installed on the Roadway prior to opening to traffic. Temporary pavement markings shall be in accordance with Section 8-2 3. All costs in connection with performing the Work in accordance with these requirements, except the cost of temporary pavement markings, shall be included in the unit Contract prices for the various Bid items involved in the Contract. 5-04.3(3) Equipment 5-04.3(3)A Mixing Plant Plants used for the preparation of HMA shall conform to the following requirements: 1.Equipment for Preparation of Asphalt Binder–Tanks for the storage of asphalt binder shall be equipped to heat and hold the material at the required temperatures. The heating shall be accomplished by steam coils, electricity, or other approved means so that no flame shall be in contact with the st orage tank. The circulating system for the asphalt binder shall be designed to ensure proper and continuous circulation during the operating period. A valve for the purpose of sampling the asphalt binder shall be placed in either the storage tank or in the supply line to the mixer. 2.Thermometric Equipment–An armored thermometer, capable of detecting temperature ranges expected in the HMA mix, shall be fixed in the asphalt binder feed line at a location near the charging valve at the mixer unit. The thermometer location shall be convenient and safe for access by Inspectors. The plant shall also be equipped with an approved dial-scale thermometer, a mercury actuated thermometer, an electric pyrometer, or another approved thermometric instrument placed at the discharge chute of the drier to automatically register or indicate the temperature of the heated aggregates. This device shall be in full view of the plant operator. 3.Heating of Asphalt Binder–The temperature of the asphalt binder shall not exceed the maximum recommended by the asphalt binder manufacturer nor shall it be below the minimum temperature required to maintain the asphalt binder in a homogeneous state. The asphalt binder shall be h eated in a manner that will avoid local variations in heating. The heating method shall provide a continuous supply of asphalt binder to the mixer at a uniform average temperature with DIVISION 5 4 no individual variations exceeding 25°F. Also, when a WMA additive is included in the asphalt binder, the temperature of the asphalt binder shall not exceed the maximum recommended by the manufacturer of the WMA additive. 4.Sampling and Testing of Mineral Materials–The HMA plant shall be equipped with a mechanical sampler for the sampling of the mineral materials. The mechanical sampler shall meet the requirements of Section 1-05.6 for the crushing and screening operation. The Contractor shall provide for the setu p and operation of the field-testing facilities of the Contracting Agency as provided for in Section 3-01.2(2). 5.Sampling HMA–The HMA plant shall provide for sampling HMA by one of the following methods: a.A mechanical sampling device attached to the HMA plant. b.Platforms or devices to enable sampling from the hauling vehicle without entering the hauling vehicle. 5-04.3(3)B Hauling Equipment Trucks used for hauling HMA shall have tight, clean, smooth metal beds and shall have a cover of canvas or other suitable material of sufficient size to protect the mixture from adverse weather. Whenever the weather conditions during the work shift include, or are forecast to include precipitation or an air temperature less than 45°F or when time from loading to unloading exceeds 30 minutes, the cover shall be securely attached to protect the HMA. The Contractor shall provide an environmentally benign means to prevent the HMA mixture from adhering to the hauling equipment. Excess release agent shall be drained prior to filling hauling equipment with HMA. Petroleum derivatives or other coating materi al that contaminate or alter the characteristics of the HMA shall not be used. For live bed trucks, the conveyer shall be in operation during the process of applying the release agent. 5-04.3(3)C Pavers HMA pavers shall be self-contained, power-propelled units, provided with an internally heated vibratory screed and shall be capable of spreading and finishing courses of HMA plant mix material in lane widths required by the paving section shown in the Plan s. The HMA paver shall be in good condition and shall have the most current equipment available from the manufacturer for the prevention of segregation of the HMA mixture installed, in good condition, and in working order. The equipment certification shall li st the make, model, and year of the paver and any equipment that has been retrofitted. The screed shall be operated in accordance with the manufacturer’s recommendations and shall effectively produce a finished surface of the required evenness and texture without tearing, shoving, segregating, or gouging the mixture. A copy of the manufacturer’s recommendat ions shall be provided upon request by the Contracting Agency. Extensions will be allowed provided they produce the same results, including ride, density, and surface texture as obtained by the primary screed. Extensions without augers and an internally he ated vibratory screed shall not be used in the Traveled Way. DIVISION 5 5 When specified in the Contract, reference lines for vertical control will be required. Lines shall be placed on both outer edges of the Traveled Way of each Roadway. Horizontal control utilizing the reference line will be permitted. The grade and slope for intermediate lanes shall be controlled automatically from reference lines or by means of a mat referencing device and a slope control device. When the finish of the grade prepared for paving is superior to the established tolerances and when, in the opini on of the Engineer, further improvement to the line, grade, cross-section, and smoothness can best be achieved without the use of the reference line, a mat referencing device may be substituted for the reference line. Substitution of the device will be sub ject to the continued approval of the Engineer. A joint matcher may be used subject to the approval of the Engineer. The reference line may be removed after the completion of the first course of HMA when approved by the Engineer. Whenever the Engineer dete rmines that any of these methods are failing to provide the necessary vertical control, the reference lines will be reinstalled by the Contractor. The Contractor shall furnish and install all pins, brackets, tensioning devices, wire, and accessories necessary for satisfactory operation of the automatic control equipment. If the paving machine in use is not providing the required finish, the Engineer may suspend Work as allowed by Section 1-08.6. Any cleaning or solvent type liquids spilled on the pavement shall be thoroughly removed before paving proceeds. 5-04.3(3)D Material Transfer Device or Material Transfer Vehicle A Material Transfer Device/Vehicle (MTD/V) shall only be used with the Engineer’s approval, unless otherwise required by the Contract. Where an MTD/V is required by the Contract, the Engineer may approve paving without an MTD/V, at the request of the Contractor. The Engineer will determine if an equitable adjustment in cost or time is due. When used, the MTD/V shall mix the HMA after delivery by the hauling equipment and prior to placement by the paving machine. Mixing of the HMA shall be sufficient to obtain a uniform temperature throughout the mixture. If a windrow elevator is used, the le ngth of the windrow may be limited in urban areas or through intersections, at the discretion of the Engineer. To be approved for use, an MTV: 1.Shall be self-propelled vehicle, separate from the hauling vehicle or paver. 2.Shall not be connected to the hauling vehicle or paver. 3.May accept HMA directly from the haul vehicle or pick up HMA from a windrow. 4.Shall mix the HMA after delivery by the hauling equipment and prior to placement into the paving machine. 5.Shall mix the HMA sufficiently to obtain a uniform temperature throughout the mixture. To be approved for use, an MTD: DIVISION 5 6 1.Shall be positively connected to the paver. 2.May accept HMA directly from the haul vehicle or pick up HMA from a windrow. 3.Shall mix the HMA after delivery by the hauling equipment and prior to placement into the paving machine. 4.Shall mix the HMA sufficiently to obtain a uniform temperature throughout the mixture. 5-04.3(3)E Rollers Rollers shall be of the steel wheel, vibratory, oscillatory, or pneumatic tire type, in good condition and capable of reversing without backlash. Operation of the roller shall be in accordance with the manufacturer’s recommendations. When ordered by the En gineer for any roller planned for use on the project, the Contractor shall provide a copy of the manufacturer’s recommendation for the use of that roller for compaction of HMA. The number and weight of rollers shall be sufficient to compact the mixture in compliance with the requirements of Section 5-04.3(10). The use of equipment that results in crushing of the aggregate will not be permitted. Rollers producing pickup, washboard, uneven compaction of the surface, displacement of the mixture or other undesi rable results shall not be used. 5-04.3(4) Preparation of Existing Paved Surfaces When the surface of the existing pavement or old base is irregular, the Contractor shall bring it to a uniform grade and cross-section as shown on the Plans or approved by the Engineer. Preleveling of uneven or broken surfaces over which HMA is to be placed may be accomplished by using an asphalt paver, a motor patrol grader, or by hand raking, as approved by the Engineer. Compaction of preleveling HMA shall be to the satisfaction of the Engineer and may require the use of small steel wheel rollers, plate compactors, or pneumatic rollers to avoid bridging across preleveled areas by the compaction equipment. Equipment used for the compaction of prele veling HMA shall be approved by the Engineer. Before construction of HMA on an existing paved surface, the entire surface of the pavement shall be clean. All fatty asphalt patches, grease drippings, and other objectionable matter shall be entirely removed from the existing pavement. All pavements or bituminous surfaces shall be thoroughly cleaned of dust, soil, pavement grindings, and other foreign matter. All holes and small depressions shall be filled with an appropriate class o f HMA. The surface of the patched area shall be leveled and compacted thoroughly. Prior to the application of tack coat, or paving, the condition of the surface shall be approved by the Engineer. A tack coat of asphalt shall be applied to all paved surfaces on which any course of HMA is to be placed or abutted; except that tack coat may be omitted from clean, newly paved surfaces at the discretion of the Engineer. Tack coat shall be uniformly appli ed to cover the existing pavement with a thin film of residual asphalt free of streaks and bare spots at a rate between 0.02 and 0.10 gallons per square yard of retained asphalt. The rate of application shall be approved by the Engineer. A heavy applicatio n of tack coat shall be applied to all joints. For Roadways open to traffic, the application of tack coat shall be DIVISION 5 7 limited to surfaces that will be paved during the same working shift. The spreading equipment shall be equipped with a thermometer to indicate the temperature of the tack coat material. Equipment shall not operate on tacked surfaces until the tack has broken and cured. If the Contractor’s operation damages the tack coat it shall be repaired prior to placement of the HMA. The tack coat shall be CSS-1, or CSS-1h emulsified asphalt. The CSS-1 and CSS-1h emulsified asphalt may be diluted once with water at a rate not to exceed one-part water to one-part emulsified asphalt. The tack coat shall have sufficient temperature such t hat it may be applied uniformly at the specified rate of application and shall not exceed the maximum temperature recommended by the emulsified asphalt manufacturer. PG grade asphalt or non-tracking tack formulas may be used upon approval of the Engineer. 5-04.3(4)A Crack Sealing When the Proposal includes a pay item for crack sealing, seal cracks in accordance with Section 5-03. 5-04.3(4)B Vacant 5-04.3(4)C Pavement Repair The Contractor shall excavate pavement repair areas and shall backfill these with HMA in accordance with the details shown in the Plans and as marked in the field. The Contractor shall conduct the excavation operations in a manner that will protect the pav ement that is to remain. Pavement not designated to be removed that is damaged as a result of the Contractor’s operations shall be repaired by the Contractor to the satisfaction of the Engineer at no cost to the Contracting Agency. The Contractor shall excavate only within one lane at a time unless approved otherwise by the Engineer. The Contracto r shall not excavate more area than can be completely finished during the same shift, unless approved by the Engineer. Unless otherwise shown in the Plans or determined by the Engineer, excavate to a depth of 1.0 feet. The Engineer will make the final determination of the excavation depth required. The minimum width of any pavement repair area shall be 40 inches unless sho wn otherwise in the Plans. Before any excavation, the existing pavement shall be sawcut or shall be removed by a pavement grinder. Excavated materials will become the property of the Contractor and shall be disposed of in a Contractor-provided site off the Right of Way or used in accordance with Sections 2-02.3(3) or 9-03.21. Asphalt for tack coat shall be required as specified in Section 5-04.3(4). A heavy application of tack coat shall be applied to all surfaces of existing pavement in the pavement repair area. Placement of the HMA backfill shall be accomplished in lifts not to exceed 0.35-foot compacted depth. Lifts that exceed 0.35-foot of compacted depth may be accomplished with the approval of the Engineer. Each lift shall be thoroughly compacted by a mechani cal tamper or a roller. 5-04.3(5) Producing/Stockpiling Aggregates and RAP Aggregates and RAP shall be stockpiled according to the requirements of Section 3-02. Sufficient storage space shall be provided for each size of aggregate and RAP. Materials shall be removed from stockpile(s) in a manner to ensure minimal segregation when being moved to the HMA plant for DIVISION 5 8 processing into the final mixture. Different aggregate sizes shall be kept separated until they have been delivered to the HMA plant. 5-04.3(5)A Vacant 5-04.3(6) Mixing After the required amount of mineral materials, asphalt binder, recycling agent and anti-stripping additives have been introduced into the mixer the HMA shall be mixed until complete and uniform coating of the particles and thorough distribution of the asp halt binder throughout the mineral materials is ensured. When discharged, the temperature of the HMA shall not exceed the optimum mixing temperature by more than 25°F as shown on the reference mix design report or as approved by the Engineer. Also, when a WMA additive is included in the manufacture of HMA, the d ischarge temperature of the HMA shall not exceed the maximum recommended by the manufacturer of the WMA additive. A maximum water content of 2 percent in the mix, at discharge, will be allowed providing the water causes no problems with handling, stripping, or flushing. If the water in the HMA causes any of these problems, the moisture content shall be reduced as directed by the Engineer. Storing or holding of the HMA in approved storage facilities will be permitted with approval of the Engineer, but in no event shall the HMA be held for more than 24 hours. HMA held for more than 24 hours after mixing shall be rejected. Rejected HMA shall b e disposed of by the Contractor at no expense to the Contracting Agency. The storage facility shall have an accessible device located at the top of the cone or about the third point. The device shall indicate the amount of material in storage. No HMA shall be accepted from the storage facility when the HMA in storage is below the top of the cone of the storage facility, except as the storage facility is being emptied at the end of the working shift. Recycled asphalt pavement (RAP) utilized in the production of HMA shall be sized prior to entering the mixer so that a uniform and thoroughly mixed HMA is produced. If there is evidence of the recycled asphalt pavement not breaking down during the heating and mixing of the HMA, the Contractor shall immediately suspend the use of the RAP until changes have been approved by the Engineer. After the required amount of mineral materials, RAP, new asphalt binder and asphalt rejuvenator have been introduced into the mixer the HMA shall be mixed until complete and uniform coating of the particles and thorough distribution of the asphalt binder throughout the mineral mat erials, and RAP is ensured. 5-04.3(7) Spreading and Finishing The mixture shall be placed upon an approved surface, spread, and struck off to the grade and elevation established. HMA pavers complying with Section 5-04.3(3) shall be used to distribute the mixture. Unless otherwise directed by the Engineer, the nominal compacted depth of any layer of any course shall not exceed the following: HMA Class 1”0.35 feet HMA Class ¾” and HMA Class ½” wearing course 0.30 feet other courses 0.35 feet HMA Class ”0.15 feet DIVISION 5 9 On areas where irregularities or unavoidable obstacles make the use of mechanical spreading and finishing equipment impractical, the paving may be done with other equipment or by hand. When more than one JMF is being utilized to produce HMA, the material produced for each JMF shall be placed by separate spreading and compacting equipment. The intermingling of HMA produced from more than one JMF is prohibited. Each strip of HMA placed dur ing a work shift shall conform to a single JMF established for the class of HMA specified unless there is a need to make an adjustment in the JMF. 5-04.3(8) Aggregate Acceptance Prior to Incorporation in HMA For HMA accepted by nonstatistical evaluation, the aggregate properties of sand equivalent, uncompacted void content, and fracture will be evaluated in accordance with Section 3-04. Sampling and testing of aggregates for HMA accepted by commercial evaluat ion will be at the option of the Engineer. 5-04.3(9) HMA Mixture Acceptance Acceptance of HMA shall be as provided under nonstatistical, or commercial evaluation. Nonstatistical evaluation will be used for the acceptance of HMA unless Commercial Evaluation is specified. Commercial evaluation will be used for Commercial HMA and for other classes of HMA in the following applications: sidewalks, road approaches, ditches, slopes, paths, trails, gores, prelevel, temporary pavement, and pavement repair. Other nonstructural appl ications of HMA accepted by commercial evaluation shall be as approved by the Engineer. Sampling and testing of HMA accepted by commercial evaluation will be at the option of the Engineer. The mix design will be the initial JMF for the class of HMA. The Contractor may request a change in the JMF. Any adjustments to the JMF will require the approval of the Engineer and may be made in accordance with this section. HMA Tolerances and Adjustments 1.Job Mix Formula Tolerances–The constituents of the mixture at the time of acceptance shall be within tolerance. The tolerance limits will be established as follows: For Asphalt Binder and Air Voids (Va), the acceptance limits are determined by adding the tolerances below to the approved JMF values. These values will also be the Upper Specification Limit (USL) and Lower Specification Limit (LSL) required in Section 1-0 6.2(2)D2 Property Non-Statistical Evaluation Commercial Evaluation Asphalt Binder+/-0.5%+/-0.7% Air Voids, Va 2.5% min. and 5.5% max N/A For Aggregates in the mixture: a.First, determine preliminary upper and lower acceptance limits by applying the following tolerances to the approved JMF. DIVISION 5 10 Aggregate Percent Non-Commercial Passing Statistical Evaluation Evaluation 1”, ¾”, ½”, and 3/8”+/-6%+/-8% sieves No. 4 sieve+/-6%+/-8% No. 8 Sieve+/-6%+/-8% No. 200 sieve+/-2.0%+/-3.0% b.Second, adjust the preliminary upper and lower acceptance limits determined from step (a) the minimum amount necessary so that none of the aggregate properties are outside the control points in Section 9-03.8(6), except as specified below in (c). The resul ting values will be the upper and lower acceptance limits for aggregates, as well as the USL and LSL required in Section 1-06.2(2)D2. c.These tolerances and specification limits constitute the allowable limits as described in Section 1-06.2. The tolerance limit for aggregate shall not exceed the limits of the control points, except the No. 8 tolerance is +/-6% from the JMF, the No. 200 t olerance is +/- 2.0% from the JMF with a minimum of 2% and a maximum of 8.0% passing the No. 200 sieve. Other tolerance limits for sieves designated as 100 percent passing will be 99-100 2.Job Mix Formula Adjustments–An adjustment to the aggregate gradation or asphalt binder content of the JMF requires approval of the Engineer. Adjustments to the JMF will only be considered if the change produces material of equal or better quality and may require the development of a new mix design if the adjustment exceeds the amounts listed below. a.Aggregates–2 percent for the aggregate passing the 1½, 1, ¾, ½,, and the No. 4 sieves, 1 percent for aggregate passing the No. 8 sieve, and 0.5 percent for the aggregate passing the No. 200 sieve. The adjusted JMF shall be within the range of the control poi nts in Section 9-03.8(6). b.Asphalt Binder Con tent–The Engineer may order or approve changes to asphalt binder content. The maximum adjustment from the approved mix design for the asphalt binder content shall be 0.3 percent. 5-04.3(9)A Vacant 5-04.3(9)B Vacant 5-04.3(9)C Mixture Acceptance–Nonstatistical Evaluation HMA mixture which is accepted by Nonstatistical Evaluation will be evaluated by the Contracting Agency by dividing the HMA tonnage into lots. 5-04.3(9)C1 Mixture Nonstatistical Evaluation–Lots and Sublots A lot is represented by randomly selected samples of the same mix design that will be tested for acceptance. A lot is defined as the total quantity of material or work produced for each Job Mix Formula placed. Only one lot per JMF is expected. A sublot shall be equal to one day’s production or 800 tons, DIVISION 5 11 whichever is less except that the final sublot will be a minimum of 400 tons and may be increased to 1200 tons. All of the test results obtained from the acceptance samples from a given lot shall be evaluated collectively. If the Contractor requests a change to the JMF that is approved, the material produced after the change will be evaluated on the basis of the new JMF for the remaining sublots in the current lot and for acceptance of subsequent lots. For a lot in progress with a CPF less than 0.75, a new lot will begin at the Contractor’s request after the Engineer is satisfied that material conforming to t he Specifications can be produced. Sampling and testing for evaluation shall be performed on the frequency of one sample per sublot. 5-04.3(9)C2 Mixture Nonstatistical Evaluation Sampling Samples for acceptance testing shall be obtained by the Contractor when ordered by the Engineer. The Contractor shall sample the HMA mixture in the presence of the Engineer and in accordance with AASHTO T 168. A minimum of three samples should be taken for each class of HMA placed on a project. If used in a structural application, at least one of the three samples shall be tested. Sampling and testing HMA in a structural application where quantities are less than 400 tons is at the discretion of the Engineer. For HMA used in a structural application and with a total project quantity less than 800 tons but more than 400 tons, a minimum of one acceptance test shall be performed. In all cases, a minimum of 3 samples will be obtained at the point of acceptance, a m inimum of one of the three samples will be tested for conformance to the JMF: If the test results are found to be within specification requirements, additional testing will be at the Engineer’s discretion. If test results are found not to be within specification requirements, additional testing of the remaining samples to determine a CPF shall be performed. 5-04.3(9)C3 Mixture Nonstatistical Evaluation–Acceptance Testing Testing of HMA for compliance of V a will at the option of the Contracting Agency. If tested, compliance of V a will use WSDOT SOP 731. Testing for compliance of asphalt binder content will be by WSDOT FOP for AASHTO T 308. Testing for compliance of gradation will be by FOP for WAQTC T 27/T 11. 5-04.3(9)C4 Mixture Nonstatistical Evaluation–Pay Factors For each lot of material falling outside the tolerance limits in 5-04.3(9), the Contracting Agency will determine a CPF using the following price adjustment factors: DIVISION 5 12 Table of Price Adjustment Factors Constituent Factor “f” All aggregate passing: 1½, 1, ¾, ½,2 and No.4 sieves All aggregate passing No. 8 sieve 15 All aggregate passing No. 200 sieve 20 Asphalt binder 40 Air Voids (Va) (where applicable)20 Each lot of HMA produced under Nonstatistical Evaluation and having all constituents falling within the tolerance limits of the job mix formula shall be accepted at the unit Contract price with no further evaluation. When one or more constituents fall outs ide the nonstatistical tolerance limits in the Job Mix Formula shown in Table of Price Adjustment Factors, the lot shall be evaluated in accordance with Section 1-06.2 to determine the appropriate CPF. The nonstatistical tolerance limits will be used in th e calculation of the CPF and the maximum CPF shall be 1.00. When less than three sublots exist, backup samples of the existing sublots or samples from the Roadway shall be tested to provide a minimum of three sets of results for evaluation. 5-04.3(9)C5 Vacant 5-04.3(9)C6 Mixture Nonstatistical Evaluation–Price Adjustments For each lot of HMA mix produced under Nonstatistical Evaluation when the calculated CPF is less than 1.00, a Nonconforming Mix Factor (NCMF) will be determined. The NCMF equals the algebraic difference of CPF minus 1.00 multiplied by 60 percent. The total job mix compliance price adjustment will be calculated as the product of the NCMF, the quantity of HMA in the lot in tons, and the unit Contract price per ton of mix. If a constituent is not measured in accordance with these Specifications, its individual pay factor will be considered 1.00 in calculating the CPF. 5-04.3(9)C7 Mixture Nonstatistical Evaluation-Retests The Contractor may request a sublot be retested. To request a retest, the Contractor shall submit a written request within 7 calendar days after the specific test results have been received. A split of the original acceptance sample will be retested. The s plit of the sample will not be tested with the same tester that ran the original acceptance test. The sample will be tested for a complete gradation analysis, asphalt binder content, and, at the option of the agency, V a. The results of the retest will be used for the acceptance of the HMA in place of the original sublot sample test results. The cost of testing will be deducted from any monies due or that may come due the Contractor under the Contract at the rate of $500 per sample. 5-04.3(9)D Mixture Acceptance–Commercial Evaluation If sampled and tested, HMA produced under Commercial Evaluation and having all constituents falling within the tolerance limits of the job mix formula shall be accepted at the unit Contract price with no DIVISION 5 13 further evaluation. When one or more constituents fall outside the commercial tolerance limits in the Job Mix Formula shown in 5-04.3(9), the lot shall be evaluated in accordance with Section 1-06.2 to determine the appropriate CPF. The commercial toleranc e limits will be used in the calculation of the CPF and the maximum CPF shall be 1.00. When less than three sublots exist, backup samples of the existing sublots or samples from the street shall be tested to provide a minimum of three sets of results for e valuation. For each lot of HMA mix produced and tested under Commercial Evaluation when the calculated CPF is less than 1.00, a Nonconforming Mix Factor (NCMF) will be determined. The NCMF equals the algebraic difference of CPF minus 1.00 multiplied by 60 percent. Th e Job Mix Compliance Price Adjustment will be calculated as the product of the NCMF, the quantity of HMA in the lot in tons, and the unit Contract price per ton of mix. If a constituent is not measured in accordance with these Specifications, its individual pay factor will be considered 1.00 in calculating the CPF. 5-04.3(10) HMA Compaction Acceptance HMA mixture accepted by nonstatistical evaluation that is used in traffic lanes, including lanes for intersections, ramps, truck climbing, weaving, and speed change, and having a specified compacted course thickness greater than 0.10-foot, shall be compact ed to a specified level of relative density. The specified level of relative density shall be a CPF of not less than 0.75 when evaluated in accordance with Section 1-06.2, using a LSL of 92.0 (minimum of 92 percent of the maximum density). The maximum density shall be determined by WSDOT FOP for AASHTO T 729. The specified level of density attained will be determined by the evaluation of the density of the pavement. The density of the pavement shall be determined in accordance with WSDOT FOP for WAQTC TM 8, except that gauge correlation will be at the discretion of the Engineer, when using the nuclear density gauge and WSDOT SOP 736 when using cores to determine density. Tests for the determination of the pavement density will be taken in accordance with the required procedures for measurement by a nuclear density gauge or Roadway cores after completion of the finish rolling. If the Contracting Agency uses a nuclear density gauge to determine density the test procedures FOP for WAQTC TM 8 and WSDOT SOP T 729 will be used on the day the mix is placed and prior to opening to traffic. Roadway cores for density may be obtained by either the Contracting Agency or the Contractor in accordance with WSDOT SOP 734. The core diameter shall be 4-inches minimum, unless otherwise approved by the Engineer. Roadway cores will be tested by the Contr acting Agency in accordance with WSDOT FOP for AASHTO T 166. If the Contract includes the Bid item “Roadway Core”, the cores shall be obtained by the Contractor in the presence of the Engineer on the same day the mix is placed and at locations designated by the Engineer. If the Contract does not include the Bid item“Roadway Core”, the Contracting Agency will obtain the cores. For a lot in progress with a CPF less than 0.75, a new lot will begin at the Contractor’s request after the Engineer is satisfied that material conforming to the Specifications can be produced. DIVISION 5 14 HMA mixture accepted by commercial evaluation and HMA constructed under conditions other than those listed above shall be compacted on the basis of a test point evaluation of the compaction train. The test point evaluation shall be performed in accordance with instructions from the Engineer. The number of passes with an approved compaction train, required to attain the maximum test point density, sha ll be used on all subsequent paving. HMA for preleveling shall be thoroughly compacted. HMA that is used for preleveling wheel rutting shall be compacted with a pneumatic tire roller unless otherwise approved by the Engineer. Test Results For a sublot that has been tested with a nuclear density gauge that did not meet the minimum of 92 percent of the reference maximum density in a compaction lot with a CPF below 1.00 and thus subject to a price reduction or rejection, the Contractor may req uest that a core be used for determination of the relative density of the sublot. The relative density of the core will replace the relative density determined by the nuclear density gauge for the sublot and will be used for calculation of the CPF and acce ptance of HMA compaction lot. When cores are taken by the Contracting Agency at the request of the Contractor, they shall be requested by noon of the next workday after the test results for the sublot have been provided or made available to the Contractor. Core locations shall be outsi de of wheel paths and as determined by the Engineer. Traffic control shall be provided by the Contractor as requested by the Engineer. Failure by the Contractor to provide the requested traffic control will result in forfeiture of the request for cores. Wh en the CPF for the lot based on the results of the HMA cores is less than 1.00, the cost for the coring will be deducted from any monies due or that may become due the Contractor under the Contract at the rate of $200 per core and the Contractor shall pay for the cost of the traffic control. 5-04.3(10)A HMA Compaction–General Compaction Requirements Compaction shall take place when the mixture is in the proper condition so that no undue displacement, cracking, or shoving occurs. Areas inaccessible to large compaction equipment shall be compacted by other mechanical means. Any HMA that becomes loose, broken, contamina ted, shows an excess or deficiency of asphalt, or is in any way defective, shall be removed and replaced with new hot mix that shall be immediately compacted to conform to the surrounding area. The type of rollers to be used and their relative position in the compaction sequence shall generally be the Contractor’s option, provided the specified densities are attained. Unless the Engineer has approved otherwise, rollers shall only be operated in t he static mode when the internal temperature of the mix is less than 175°F. Regardless of mix temperature, a roller shall not be operated in a mode that results in checking or cracking of the mat. Rollers shall only be operated in static mode on bridge decks. 5-04.3(10)B HMA Compaction-Cyclic Density Low cyclic density areas are defined as spots or streaks in the pavement that are less than 90 percent of the theoretical maximum density. At the Engineer’s discretion, the Engineer may evaluate the HMA pavement for low cyclic density, and when doing so wi ll follow WSDOT SOP 733. A $1500 Cyclic Density Price Adjustment will be assessed for any 500-foot section with two or more density readings below 90 percent of the theoretical maximum density. DIVISION 5 15 5-04.3(10)C Vacant 5-04.3(10)D HMA Nonstatistical Compaction 5-04.3(10)D1 HMA Nonstatistical Compaction-Lots and Sublots HMA compaction which is accepted by nonstatistical evaluation will be based on acceptance testing performed by the Contracting Agency dividing the project into compaction lots. A lot is represented by randomly selected samples of the same mix design that will be tested for acceptance. A lot is defined as the total quantity of material or work produced for each Job Mix Formula placed. Only one lot per JMF is expected. A sublot shall be equal to one day’s production or 400 tons, whichever is les s except that the final sublot will be a minimum of 200 tons and may be increased to 800 tons. Testing for compaction will be at the rate of 5 tests per sublot per WSDOT T 738. The sublot locations within each density lot will be determined by the Engineer. For a lot in progress with a CPF less than 0.75, a new lot will begin at the Contractor’s request after the Engineer is satisfied that material conforming to the Specification s can be produced. HMA mixture accepted by commercial evaluation and HMA constructed under conditions other than those listed above shall be compacted on the basis of a test point evaluation of the compaction train. The test point evaluation shall be performed in accordance with instructions from the Engineer. The number of passes with an approved compaction train, required to attain the maximum test point density, sha ll be used on all subsequent paving. HMA for preleveling shall be thoroughly compacted. HMA that is used to prelevel wheel ruts shall be compacted with a pneumatic tire roller unless otherwise approved by the Engineer. 5-04.3(10)D2 HMA Compaction Nonstatistical Evaluation–Acceptance Testing The location of the HMA compaction acceptance tests will be randomly selected by the Engineer from within each sublot, with one test per sublot. 5-04.3(10)D3 HMA Nonstatistical Compaction–Price Adjustments For each compaction lot with one or two sublots, having all sublots attain a relative density that is 92 percent of the reference maximum density the HMA shall be accepted at the unit Contract price with no further evaluation. When a sublot does not attain a relative density that is 92 percent of the reference maximum density, the lot shall be evaluated in accordance with Section 1-06.2 to determine the appropriate CPF. The maximum CPF shall be 1.00, however, lots with a calculated CPF in excess of 1.00 will be used to offset lots with CPF values below 1.00 but greater than 0.90. Lots with CPF lower than 0.90 will be evaluated for compliance per 5-04.3(11). Additional testing by either a nuclear moisture- density gauge or cores will be completed as r equired to provide a minimum of three tests for evaluation. For compaction below the required 92%, a Non-Conforming Compaction Factor (NCCF) will be determined. The NCCF equals the algebraic difference of CPF minus 1.00 multiplied by 40 percent. The Compaction Price Adjustment will be calculated as the product of C PF, the quantity of HMA in the compaction control lot in tons, and the unit Contract price per ton of mix. DIVISION 5 16 5-04.3(11) Reject Work 5-04.3(11)A Reject Work General Work that is defective or does not conform to Contract requirements shall be rejected. The Contractor may propose, in writing, alternatives to removal and replacement of rejected material. Acceptability of such alternative proposals will be determined at t he sole discretion of the Engineer. HMA that has been rejected is subject to the requirements in Section 1-06.2(2) and this specification, and the Contractor shall submit a corrective action proposal to the Engineer for approval. 5-04.3(11)B Rejection by Contractor The Contractor may, prior to sampling, elect to remove any defective material and replace it with new material. Any such new material will be sampled, tested, and evaluated for acceptance. 5-04.3(11)C Rejection Without Testing (Mixture or Compaction) The Engineer may, without sampling, reject any batch, load, or section of Roadway that appears defective. Material rejected before placement shall not be incorporated into the pavement. Any rejected section of Roadway shall be removed. No payment will be made for the rejected materials or the removal of the materials unless the Contractor requests that the rejected material be tested. If the Contractor elects to have the rejected material tested, a minimum of three representative samples will be obtained and tested. Acceptance of rejected material will be based on conformance with the nonstatistical acceptance Specification. If the CPF for the rejected material is less than 0.75, no payment will be made for the rejected material; in addit ion, the cost of sampling and testing shall be borne by the Contractor. If the CPF is greater than or equal to 0.75, the cost of sampling and testing will be borne by the Contracting Agency. If the material is rejected before placement and the CPF is great er than or equal to 0.75, compensation for the rejected material will be at a CPF of 0.75. If rejection occurs after placement and the CPF is greater than or equal to 0.75, compensation for the rejected material will be at the calculated CPF with an additi on of 25 percent of the unit Contract price added for the cost of removal and disposal. 5-04.3(11)D Rejection-A Partial Sublot In addition to the random acceptance sampling and testing, the Engineer may also isolate from a normal sublot any material that is suspected of being defective in relative density, gradation or asphalt binder content. Such isolated material will not includ e an original sample location. A minimum of three random samples of the suspect material will be obtained and tested. The material will then be statistically evaluated as an independent lot in accordance with Section 1-06.2(2). 5-04.3(11)E Rejection-An Entire Sublot An entire sublot that is suspected of being defective may be rejected. When a sublot is rejected a minimum of two additional random samples from this sublot will be obtained. These additional samples and the original sublot will be evaluated as an independ ent lot in accordance with Section 1-06.2(2). 5-04.3(11)F Rejection-A Lot in Progress The Contractor shall shut down operations and shall not resume HMA placement until such time as the Engineer is satisfied that material conforming to the Specifications can be produced: DIVISION 5 17 1.When the CPF of a lot in progress drops below 1.00 and the Contractor is taking no corrective action, or 2.When the Pay Factor (PF) for any constituent of a lot in progress drops below 0.95 and the Contractor is taking no corrective action, or 3.When either the PF for any constituent or the CPF of a lot in progress is less than 0.75. 5-04.3(11)G Rejection-An Entire Lot (Mixture or Compaction) An entire lot with a CPF of less than 0.75 will be rejected. 5-04.3(12) Joints 5-04.3(12)A HMA Joints 5-04.3(12)A1 Transverse Joints The Contractor shall conduct operations such that the placing of the top or wearing course is a continuous operation or as close to continuous as possible. Unscheduled transverse joints will be allowed, and the roller may pass over the unprotected end of t he freshly placed mixture only when the placement of the course must be discontinued for such a length of time that the mixture will cool below compaction temperature. When the Work is resumed, the previously compacted mixture shall be cut back to produce a slightly beveled edge for the full thickness of the course. A temporary wedge of HMA constructed on a 20H:1V shall be constructed where a transverse joint as a result of paving or planing is open to traffic. The HMA in the temporary wedge shall be separated from the permanent HMA by strips of heavy wrapping paper o r other methods approved by the Engineer. The wrapping paper shall be removed and the joint trimmed to a slightly beveled edge for the full thickness of the course prior to resumption of paving. The material that is cut away shall be wasted and new mix shall be placed against the cut. Rollers or tamping irons shall be used to seal the joint. 5-04.3(12)A2 Longitudinal Joints The longitudinal joint in any one course shall be offset from the course immediately below by not more than 6 inches nor less than 2 inches. All longitudinal joints constructed in the wearing course shall be located at a lane line or an edge line of the Tr aveled Way. A notched wedge joint shall be constructed along all longitudinal joints in the wearing surface of new HMA unless otherwise approved by the Engineer. The notched wedge joint shall have a vertical edge of not less than the maximum aggregate size or more than ½ of the compacted lift thickness and then taper down on a slope not steeper than 4H:1V. The sloped portion of the HMA notched wedge joint shall be uniformly compacted. 5-04.3(13) Surface Smoothness The completed surface of all courses shall be of uniform texture, smooth, uniform as to crown and grade, and free from defects of all kinds. The completed surface of the wearing course shall not vary more than inch from the lower edge of a 10-foot straig htedge placed on the surface parallel to the centerline. The transverse slope of the completed surface of the wearing course shall vary not more than ¼ inch in 10 feet from the rate of transverse slope shown in the Plans. DIVISION 5 18 When deviations in excess of the above tolerances are found that result from a high place in the HMA, the pavement surface shall be corrected by one of the following methods: 1.Removal of material from high places by grinding with an approved grinding machine, or 2.Removal and replacement of the wearing course of HMA, or 3.By other method approved by the Engineer. Correction of defects shall be carried out until there are no deviations anywhere greater than the allowable tolerances. Deviations in excess of the above tolerances that result from a low place in the HMA and deviations resulting from a high place where corrective action, in the opinion of the Engineer, will not produce satisfactory results will be accepted with a price adjustment. The Engineer s hall deduct from monies due or that may become due to the Contractor the sum of $1500.00 for each and every section of single traffic lane 100 feet in length in which any excessive deviations described above are found. When utility appurtenances such as manhole covers and valve boxes are located in the traveled way, the utility appurtenances shall be adjusted to the finished grade prior to paving. This requirement may be waived when requested by the Contractor, at the di scretion of the Engineer or when the adjustment details provided in the project plan or specifications call for utility appurtenance adjustments after the completion of paving. Utility appurtenance adjustment discussions will be included in the Pre-Paving and Pre-Planing Briefing (5-04.3(14)B3). Submit a written request to waive this requirement to the Engineer prior to the start of paving. 5-04.3(14) Planing (Milling) Bituminous Pavement The planing plan must be approved by the Engineer and a pre-planing meeting must be held prior to the start of any planing. See Section 5-04.3(14)B2 for information on planing submittals. Where planing an existing pavement is specified in the Contract, the Contractor must remove existing surfacing material and to reshape the surface to remove irregularities. The finished product must be a prepared surface acceptable for receiving an HMA overlay. Use the cold milling method for planing unless otherwise specified in the Contract. Do not use the planer on the final wearing course of new HMA. Conduct planing operations in a manner that does not tear, break, burn, or otherwise damage the surface which is to remain. The finished planed surface must be slightly grooved or roughened and must be free from gouges, deep grooves, ridges, or other imperfections. The C ontractor must repair any damage to the surface by the Contractor’s planing equipment, using an Engineer approved method. Repair or replace any metal castings and other surface improvements damaged by planing, as determined by the Engineer. DIVISION 5 19 A tapered wedge cut must be planed longitudinally along curb lines sufficient to provide a minimum of 4 inches of curb reveal after placement and compaction of the final wearing course. The dimensions of the wedge must be as shown on the Drawings or as spe cified by the Engineer. A tapered wedge cut must also be made at transitions to adjoining pavement surfaces (meet lines) where butt joints are shown on the Drawings. Cut butt joints in a straight line with vertical faces 2 inches or more in height, producing a smooth transition t o the existing adjoining pavement. After planing is complete, planed surfaces must be swept, cleaned, and if required by the Contract, patched and preleveled. The Engineer may direct additional depth planing. Before performing this additional depth planing, the Contractor must conduct a hidden metal in pavement detection survey as specified in Section 5- 04.3(14)A. 5-04.3(14)A Pre-Planing Metal Detection Check Before starting planing of pavements, and before any additional depth planing required by the Engineer, the Contractor must conduct a physical survey of existing pavement to be planed with equipment that can identify hidden metal objects. Should such metal be identified, promptly notify the Engineer. See Section 1-07.16(1) regarding the protection of survey monumentation that may be hidden in pavement. The Contractor is solely responsible for any damage to equipment resulting from the Contractor’s failure to conduct a pre-planing metal detection survey, or from the Contractor’s failure to notify the Engineer of any hidden metal that is detected. 5-04.3(14)B Paving and Planing Under Traffic 5-04.3(14)B1 General In addition, the requirements of Section 1-07.23 and the traffic controls required in Section 1-10, and unless the Contract specifies otherwise or the Engineer approves, the Contractor must comply with the following: 1.Intersections: a.Keep intersections open to traffic at all times, except when paving or planing operations through an intersection requires closure. Such closure must be kept to the minimum time required to place and compact the HMA mixture, or plane as appropriate. For paving, schedule such closure to individual lanes or portions thereof that allow s the traffic volumes and schedule of traffic volumes required in the approved traffic control plan. Schedule work so that adjacent intersections are not impacted at the same time and comply with the traffic control restrictions required by the Traffic Eng ineer. Each individual intersection closure or partial closure must be DIVISION 5 20 addressed in the traffic control plan, which must be submitted to and accepted by the Engineer, see Section 1-10.2(2). b.When planing or paving and related construction must occur in an intersection, consider scheduling and sequencing such work into quarters of the intersection, or half or more of an intersection with side street detours. Be prepared to sequence the work to individual lanes or portions thereof. c.Should closure of the intersection in its entirety be necessary, and no trolley service is impacted, keep such closure to the minimum time required to place and compact the HMA mixture, plane, remove asphalt, tack coat, and as needed. d.Any work in an intersection requires advance warning in both signage and a number of Working Days advance notice as determined by the Engineer, to alert traffic and emergency services of the intersection closure or partial closure. e.Allow new compacted HMA asphalt to cool to ambient temperature before any traffic is allowed on it. Traffic is not allowed on newly placed asphalt until approval has been obtained from the Engineer. 2.Temporary centerline marking, post-paving temporary marking, temporary stop bars, and maintaining temporary pavement marking must comply with Section 8-23. 3.Permanent pavement marking must comply with Section 8-22. 5-04.3(14)B2 Submittals-Planing Plan and HMA Paving Plan The Contractor must submit a separate planing plan and a separate paving plan to the Engineer at least 5 Working Days in advance of each operation’s activity start date. These plans must show how the moving operation and traffic control are coordinated, as they will be discussed at the pre-planing briefing and pre-paving briefing. When requested by the Engineer, the Contractor must provide each operation’s traffic control plan on 24 x 36 inch or larger size Shop Drawings with a scale showing both the area of operation and sufficient detail of traff ic beyond the area of operation where detour traffic may be required. The scale on the Shop Drawings is 1 inch = 20 feet, which may be changed if the Engineer agrees sufficient detail is shown. The planing operation and the paving operation include, but are not limited to, metal detection, removal of asphalt and temporary asphalt of any kind, tack coat and drying, staging of supply trucks, paving trains, rolling, scheduling, and as may be discussed at the b riefing. When intersections will be partially or totally blocked, provide adequately sized and noticeable signage alerting traffic of closures to come, a minimum 2 Working Days in advance. The traffic control plan must show where police officers will be stationed when signalization is or ma y be, countermanded, and show areas where flaggers are proposed. At a minimum, the planing and the paving plan must include: DIVISION 5 21 1.A copy of the accepted traffic control plan, see Section 1-10.2(2), detailing each day’s traffic control as it relates to the specific requirements of that day’s planing and paving. Briefly describe the sequencing of traffic control consistent with the pro posed planing and paving sequence, and scheduling of placement of temporary pavement markings and channelizing devices after each day’s planing, and paving. 2.A copy of each intersection’s traffic control plan. 3.Haul routes from supplier facilities, and locations of temporary parking and staging areas, including return routes. Describe the complete round trip as it relates to the sequencing of paving operations. 4.Names and locations of HMA supplier facilities to be used. 5.List of all equipment to be used for paving. 6.List of personnel and associated job classification assigned to each piece of paving equipment. 7.Description (geometric or narrative) of the scheduled sequence of planing and of paving and intended area of planing and of paving for each day’s work, must include the directions of proposed planing and of proposed paving, sequence of adjacent lane paving, sequence of skipped lane paving, intersection planing and paving schedu ling and sequencing, and proposed notifications and coordinations to be timely made. The plan must show HMA joints relative to the final pavement marking lane lines. 8.Names, job titles, and contact information for field, office, and plant supervisory personnel. 9.A copy of the approved Mix Designs. 10.Tonnage of HMA to be placed each day. 11.Approximate times and days for starting and ending daily operations. 5-04.3(14)B3 Pre-Paving and Pre-Planing Briefing At least 2 Working Days before the first paving operation and the first planing operation, or as scheduled by the Engineer for future paving and planing operations to ensure the Contractor has adequately prepared for notifying and coordinating as required in the Contract, the Contractor must be prepared to discuss that day’s operations as they relate to other entities and to public safety and convenience, including driveway and business access, garbage truck operations, transit operations and working around energized overhead wires, school and nursing home and hospital and other accesses, other Contractors who may be operating in the area, pedestrian and b icycle traffic, and emergency services. The Contractor, and Subcontractors that may be part of that day’s operations, must meet with the Engineer and discuss the proposed operation as it relates to the submitted planing plan and paving plan, approved traffic control plan, and public convenience and safety. Such discussion includes, but is not limited to: 1.General for both the Paving and Planing: DIVISION 5 22 a.The actual times of starting and ending daily operations. b.In intersections, how to break up the intersection, and address traffic control and signalization for that operation, including use of peace officers. c.The sequencing and scheduling of paving operations and of planing operations, as applicable, as it relates to traffic control, public convenience and safety, and other Contractors who may operate in the Project limits. d.Notifications required of Contractor activities and coordinating with other entities and the public as necessary. e.Description of the sequencing of installation and types of temporary pavement markings as it relates to planing and paving. f.Description of the sequencing of installation of, and the removal of, temporary pavement patch material around exposed castings and as may be needed. g.Description of procedures and equipment to identify hidden metal in the pavement, such as survey monumentation, monitoring wells, streetcar rail, and castings, before planing as per Section 5-04.3(14)B2. h.Description of how flaggers will be coordinated with the planing, paving, and related operations. i.Description of sequencing of traffic controls for the process of rigid pavement base repairs. j.Other items the Engineer deems necessary to address. 2.Paving–additional topics: a.When to start applying tack and coordinating with paving. b.Types of equipment and numbers of each type of equipment to be used. If more pieces of equipment than personnel are proposed, describe the sequencing of the personnel operating the types of equipment. Discuss the continuance of operator personnel for each type of equipment as it relates to meeting Specification requirements. c.Number of JMFs to be placed, and if more than one JMF is used, how the Contractor will ensure different JMFs are distinguished, how pavers and how MTVs are distinguished, and how pavers and MTVs are cleaned so that one JMF does not adversely influence the other JMF. d.Description of contingency plans for that day’s operations such as equipment breakdown, rain out, and supplier shutdown of operations. DIVISION 5 23 e.Number of sublots to be placed, sequencing of density testing, and other sampling and testing. 5-04.3(15) Sealing Pavement Surfaces Apply a fog seal where shown in the plans. Construct the fog seal in accordance with Section 5-02.3. Unless otherwise approved by the Engineer, apply the fog seal prior to opening to traffic. 5-04.3(16) HMA Road Approaches Construct HMA approaches at the locations shown in the Plans or where staked by the Engineer, in accordance with Section 5-04. END DIVISION 5 DIVISION 5 24 Division 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains, and Conduits 7-04 STORM SEW E RS 7-04.3 Construction Requirements Supplement this section with the following: The Contractor must keep the existing storm sewer system operational and maintain drainage control of the project area at all times during the work. The Contractor is responsible for preventing sediment-laden water from entering the existing storm sewer sy stem. All costs for equipment, labor, and temporary drainage facilities are incidental to the project. 7-05 MANHOLES, INLETS, CATCH BASINS, AND DRYWELLS 7-05.2 Materials Supplement this section with the following: Contractor shall verify required knock out and core drill locations prior to delivering new catch basins and manholes. 7-05.3 Construction Requirements 7-05.3(1) Adjusting Manholes and Catch Basins to Grade Supplement this section with the following: Existing manholes and catch basins shall be temporarily lowered when necessary to allow for the construction of other improvements where called out in the plans. Once other work is complete, the structures shall be adjusted to final grade. Manhole adjustm ent shall be in accordance with the Plans and with the City of Yelm’s standard details. 7-08 GENERAL PIPE INSTALLATION REQUIREMENTS 7-08.1 Description Supplement this section with the following: This section applies to irrigation 3-inch diameter and larger, domestic water, and sanitary sewer, except where superseded by Sections 7-09 through 7-19. 7-08.3 Construction Requirements Supplement this section with the following: Provide pipe, fittings and appurtenances necessary to make all piping systems complete, tested, and ready for operation as specified herein and as shown on the Contract Drawings. Some fittings that are necessary for proper piping system installation and op eration may not have been shown. Provide fittings and appurtenances as necessary, whether shown or not shown on the Contract Drawings, to complete all piping systems. Not all temporary equipment, thrust blocking, and tie rods are shown on the Contract Drawings. Provide temporary equipment, thrust blocking, and tie rods as required by accepted design criteria and to support and restrain the loads encountered. DIVISION 7 1 Threaded materials shall be screwed together with an application of approved sealing compound applied to all male threads. Once a joint has been tightened, it shall not be backed off unless threads are re- cleaned and new sealing compound applied. 7-08.3(1) Excavation and Preparation of Trench Supplement this section with the following: Dispose of debris resulting from the clearing and grubbing in accordance with the terms of all applicable permits. Boulders, rocks, roots, and other obstructions shall be entirely removed or cut out to the width of the trench and to a depth at least 4 inches below the bottom of the pipe to provide adequate bedding. The trench shall be kept free from water until complete.Surface water, nuisance flows, and stormwater runoff shall be diverted so as not to enter the trench. Maintain necessary pumping equipment on the job to ensure that these provisions are carried out. Where material is removed from below subgrade, the trench shall be backfilled to grade with material satisfactory to the Engineer and thoroughly compacted to 95% of maximum dry density within +/- 2% of optimum moisture content as defined by ASTM D1557. Compaction testing shall be performed, at a minimum of one (1) per 500 linear feet of trench per 2 feet of backfill and not less than one (1) per day’s work when backfilling operations are under way unless approved by the Engineer. Trenching operation shall not proceed more than 200 feet in advance of pipe laying without written approval of the Owner. When trenching operations cut through asphalt or concrete pavement, the pavement shall be saw cut and removed to a clean edge along the width of the trench as approved by the Owner.Pulverizing to a base course or smaller aggregate size may be allowed for the initial surfacing removal at the discretion of the Owner, but only if the pulverizing leaves a uniform pavement edge. The Contractor is responsible for meeting current Labor and Industry Trench and Shoring Protection and Washington State Safety Standards. Additional surface restoration or import fill material required because of insufficient shoring, operating equipment too close to the trench edge, or other causes, as the Owner deems were reasonably avoidable, are incidental and the quantities required wil l be deducted from the final total quantities when the contract includes applicable unit bid prices, or are incidental if the contract does not include applicable unit bid prices. 7-08.3(1)A Trenches Supplement this section with the following: To reduce restoration of the same areas multiple times, removal of existing surface improvements in advance of trenching shall be kept to a minimum. No extra payment will be made for any duplicated work performed more than 20 feet in advance of pipelaying. If there is excess of material obtained from excavation at one location on the project and is acceptable (as determined by sieve analysis) for reuse as bedding, backfill, or general fill, it shall be stockpiled and reused at other locations on the project. Disposal of reusable material is only allowed with the permission of the Engineer. The cost of haul and disposal of this material is inc idental to the project. DIVISION 7 2 A ll excavation required for utility installation, including removal of asphalt and concrete, shall be included in the costs of the utility bid item unless specifically identified in other bid items. Dispose the asphalt, concrete, and other waste at no expen se to the Contracting Agency. 7-08.3(1)D Potholing This section is new: Pothole at utility crossings a sufficient distance ahead of pipe-laying and where noted on the plans to allow room to adjust to avoid existing utilities. Pothole at least three working days in advance of utility installation. Failure to pothole identified utility crossings per these specifications shall not be cause for cost or time claim for subsequent adjustments. If a pothole is in a travelled area that will be reopened to traffic more th an one calendar day in advance of pipelaying, the hole shall be patched with hot or cold mix, the cost of which shall be incidental. Provide the results of potholing to the Owner no less than two working days in advance of utility installation. Provide a written record of material, size, type, and location for found utilities to an accuracy of 0.5 ft horizontal and 0.1 ft vertical. Failure to record locations accurately, clearly, and legibly will result in non-payment. 7-08.3(1)F Handling of Pipe This section is new: Pipe, materials, and accessories shall be new, unused, and undamaged at the time of installation. Deliver pipe to the trench in sound, undamaged condition. Do not drop, drag, skid,or roll pipes against any hard objects, including other pipes. Prevent damage to any pipe markings. Place no other pipe or material of any kind inside the pipe or fitting. Damaged, out-of-round, or sun-bleached pipe will be rejected, be immediately removed from the jobsite by the Contractor, and not be used on the project as part of the Work. Prevent dirt and other foreign material from entering the pipe or fittings during handling or laying operations.Thoroughly clean the interior of the pipe of dirt or foreign matter before lowering the pipe into the trench. Cover stockpiled domestic water pipe ends with caps, plugs, or otherwise enclose by a method approved by the Engineer. 7-08.3(2)B Pipe Laying-General Supplement this section with the following: Keep openings in pipe closed during the progress of work. Install plugs to prevent water and debris from entering pipe. No payment will be made to clean pipes. Install tracer wire and marking tape per the plans and standard details. 7-08.3(2)E Rubber Gasketed Joints Supplement this section with the following: For push-on joint PVC pipe, joints shall not be pushed home. Stop the assembly when the marked insertion line is at the face of the bell. This is to allow for thermal expansion of the pipe. If the pipe has been pushed home, pull back to expose the insertio n line. Anchor each pipe prior to installing the next to prevent pushing home a previously installed pipe. DIVISION 7 3 7-08.3(2)K Restrained Joint Pipe and Fitting Installation This section is new: All bends, tees, and crosses that utilize restrained joints shall be restrained on all legs. Set-screw style restraints are not allowed. Bedding material must consist of sand and gravels for proper soil-to-pipe adhesion and shall not be clay, pea gravel, washed rock, or poorly graded large aggregate. Compact bedding around restrained pipe in maximum 9-inch loose (approx. 6-inch compacted) l ifts using mechanical compaction equipment. Owner may review and approve silty sand as bedding material at the request of the Contractor. If approved, the required length of restrained joint pipe shall be increased by 33-percent over that calculated using sand and gravel mixtures, unless the restrained lengths shown already considered silty sand (or sandy silt) bedding or specifically identify other length adjustments. Initial setting of exterior wedge (tooth) style restraints may use any commonly used hand or power tools until the wedge touches the pipe surface, after which non-power tools must be used. Impact tools are not allowed for wedge engagement and final torquin g. If external wedge (tooth) style restraints on metal pipe are removed for any reason after the restraints have been engaged, the restraints shall be disposed of and not reused. The section of pipe to which the restraints were secured shall be cut off and di sposed of regardless of pipe material. For PVC pipes that use gripper-tooth gaskets, the Contractor may need to provide a manual assembly system to prevent over-insertion because gripper-tooth gaskets cannot be re-extended after insertion.Optionally, an excavator may be used if “walked” to push in the pipe. If a PVC pipe with a gripper-tooth gasket has been pushed past the maximum assembly mark, do not attempt to pull back. Cut out the bell and replace with an unused pipe or restrained slee ve at the Owner’s discretion. All costs will be borne by the Contractor. When installing PVC pipe with gripper-tooth gaskets through a casing, the pipe must be pulled through the casing, not pushed, to prevent homing the pipe into the bell. 7-08.3(3) Backfilling Supplement this section with the following: The Standard Specification requires backfill above the pipe zone in lifts not exceeding 6-inch loose thickness. At the Owner’s sole discretion, lifts may be thicker if compaction testing proves the compaction requirements are met. However, in no circumstan ces will lifts exceeding 18-inch loose thickness be permitted. Equipment mounted compactors (hoe-pack, sheepsfoot, vibratory rollers, etc.) shall not be used within 12-inches directly above the pipe. Backfill only after inspection and approval of the installed pipe. Carefully place backfill material in strict accordance with this section of the Standard Specifications. The use of native material for backfill shall obtain approval from the Engineer prio r to backfilling. DIVISION 7 4 Cure CDF used for pipe bedding, trench backfill, or against structures prior to placing any material directly over the CDF to prevent displacement of the CDF. If traffic must be restored prior to the durations stated below, or the open excavation must be c losed for safety, span the excavation with temporary plating appropriate for the anticipated loading. Cold weather may require more time. Curing accelerators may be used to reduce these times. Cure for the following minimum durations or until the CDF reach es a stiffness that will resist movement, whichever is longer. Pipe bedding or encasement at least 2 ft below grade: 4 hours. Any use 2 ft or less below grade that may receive construction traffic: 24 hours. Vehicular traffic under 5,000 lbs per axle: 48 hours Vehicular traffic over 5,000 lbs per axle: 72 hours Permanent structures: 7 days. The Owner may allow a reduction in cure duration if the Contractor can show, to the satisfaction of the Owner, the CDF has reached adequate strength. Screen native materials excavated for reuse as trench backfill. Provide screen to remove all material larger than 4-inch. Cost to screen material is incidental, no separate payment. Haul and dispose of unsuitable screened material and replace with bank run gravel for trench backfill. 7-08.3(4) Plugging Existing Pipe Supplement this section with the following: All existing non-functional pipes 3-inch and larger, regardless of original purpose, cut or broken during the course of construction shall be plugged. 7-08.3(5) Pipe Crossing Existing Utilities This section is new: Where a pipe crosses an existing utility with less than 6-inches of clearance, a sand or foam cushion acceptable to the engineer shall be placed between the utilities. This work shall be included in the various contract bid prices, no separate payment will be made. 7-08.3(6) Existing Unlocated Wet Utilities This section is new: Avoidance or repair of utilities that are within 2 feet horizontal of that shown on the plans shall be included in the Contractor’s bid price. The Owner will not pay for multiple repairs within 30 feet of each other on an unlocated pipe if the pipe runs st raight. Should the new work be filled or contaminated from a line break due to failure of the Contractor to use a pipe plug, no payment will be made for cleaning of the new work. Should an existing utility be damaged, the Contractor shall immediately stop work and notify the Owner and affected property owner(s). The Contractor shall pump out any fluid that has accumulated in the trench and, if necessary, remove saturated material and replace with suitable fill. All costs to find and re-locate previously broken line s shall be at the Contractor’s expense. There are existing customer side sewer lines throughout the project limits. For the purposes of bidding, the Contractor shall assume that sewer conflicts are inevitable, and repairs will be necessary. The Contractor shall have on hand a set of standard rep air fittings for 2-inch to 6-inch pipe,compliant with the City of Yelm’s standards. The Contractor shall repair all damaged pipes prior to continuing work beyond the area damaged, no exceptions (unless sufficient crew is available to perform the repair concurrent with other work). Repair work shall continue until complete regardless of the day of the week or the time of day. DIVISION 7 5 There are existing irrigation lines throughout the project limits. The Contractor shall contact adjacent property owners to determine locations of existing irrigation systems within the construction area and shutoff valves. For the purposes of bidding, the Contractor shall assume that irrigation conflicts are inevitable, and repairs will be necessary. The Contractor shall have on hand a set of standard repair fittings for 1-inch through 3-inch PVC and steel pipe. The Contractor shall repair damaged active supply pipes by the end of the day. Damaged active landscape sprinkler system pipes shall be repaired no later than the following calendar day. For inactive systems during the irrigation off-season, repairs shal l be made within one week. 7-08.3(7) General Surface Restoration This section is new: Backfill trenches to a safe depth at the end of each day. Restore all trenches as shown in the plans. When not otherwise specified, restore existing surface improvements to a condition equal or better than that prior to construction. On trenches crossing the roadway or intersections, install cold or hot mix asphalt no later than 48 hours after asphalt removal. Maintain until final patching is complete.Asphalt used for temporary patching is incidental unless a pay item specifically identifies temporary patching as payable. On trenches parallel to the roadway and in drivable areas,install cold or hot mix asphalt no less than 24 hours following backfill and maintain to a smooth and level grade with the existing pavement until final patching is complete. Temporary asphalt depth under traffic to be no less than 2-inches. Maintain asphalt temporary patching continuously, including inspection,and repairs, including over weekends and other non-working periods.Temporary patching material is incidental to the project cost. No additional payment.Cost for maintenance of patching is incidental, no separate payment. Contractor may plate trenches at their discretion in lieu of temporary patching. Plates must be free of dents and bumps and be able to withstand legal weight loads. Key plates into the trench or place asphalt tapers to prevent movement. Provide appropriate signage when using plates. Permanent trench patches in paved areas shall be installed no later than the second Friday following excavation for trenches parallel to the road, and no later than two days following excavation for trenches crossing the road and across intersections. Surface restoration that must be removed and replaced due to any failed testing will not warrant additional payment. Existing grassy areas disturbed by construction shall be re-vegetated with the same grass species using sod, hydroseed, or other methods of stabilization if approved by the Engineer. 7-09 WATER MAINS 7-09.1 Description Replace this section with the following: This Work consists of constructing water mains accordance with the Plans, these Standard Specifications, the Special Provisions and the Standard Plans, at the location shown on the Plans. 7-09.2 Materials Replace the first sentence of paragraph 2 with the following: DIVISION 7 6 If requested by the Owner, the pipe manufacturer shall test all pipe and fittings as required by these Standard Specifications and the standards referenced. 7-09.3 Construction Requirements Supplement this section with the following: The requirements of Section 7-08 of these Special Provisions also apply to domestic water construction except where superseded herein. 7-09.3(3) Clearing and Grubbing in Ungraded Streets Supplement this section with the following: Ungraded streets includes unimproved areas. Replace the last sentence with the following: Such material shall be disposed of by the Contractor with the cost incidental to the contract bid price, no separate payment. 7-09.3(4) Removal of Existing Street Improvements Supplement this section with the following: Cost for this work includes removal and disposal, or salvage and replacement of existing surface improvements and is incidental to other bid items. No separate payment. 7-09.3(5) Grade and Alignment Replace the first sentence of the third paragraph with the following. The depth of trenching for the water main shall be as shown on the purveyor’s standard trench detail, unless superseded by dimension callouts on the plan or profile drawings. 7-09.3(7) Trench Excavation Replace the third sentence of the second paragraph with the following: Trench shall be excavated to a sufficient width to allow for pipe installation, compaction equipment, and shoring when necessary. 7-09.3(8) Removal and Replacement of Unsuitable Materials Supplement the second paragraph with the following: The Engineer will determine if existing materials are unsuitable for reuse as trench backfill. The Contractor will not receive payment for material the Contractor removes and replaces without prior approval. 7-09.3(9) Bedding the Pipe Replace the first two sentences with the following: See t rench d etail s on the plans for bedding depths. Owner shall determine if native materials are acceptable for use as bedding and will determine if the Contractor’s submitted import bedding is acceptable when applicable. Provide one to five gallons of a physical sample of intended import bedding in addition to a sieve analysis. DIVISION 7 7 Bedding for restrained joint pipe must be a granular material composed of crushed rock, gravels, and/or sand. Poorly graded rounded rock (pea gravel or drain rock) or clay are not acceptable. See Special Provisions section 9-03.12(3). For the purposes of bidding, it is assumed native material will not be satisfactory for bedding and import bedding will be required for the entire project. 7-09.3(10) Backfilling Trenches Supplement this section with the followin g: Equipment mounted compactors (hoe-pack, sheepsfoot, vibratory rollers, etc.) shall not be used within 12-inches directly above the pipe. 7-09.3(13) Handling of Pipe Supplement this section with the following. Do not run lifting chains, cables, or forks through the interior of pipe or fittings as this can damage the interior linings or gasket seating areas. Use only fabric slings when lifting through the interior. 7-09.3(14) Cutting Pipe Supplement this section with the following: Pipe that has been cut and will be joined in a push-on joint connection shall be beveled by methods recommended by the pipe manufacturer. If the cut end is not round enough to insert into a joint, the Contractor may attempt to re-round the pipe using a method approved by the manufacturer and the Owner. Do not point load the pipe when applying pressure nor over-correct in an attempt to perman ently set the new shape. Once rounded, install into the next joint before relieving pressure on the re-rounding equipment. The Owner will not provide compensation to re-round pipe. 7-09.3(15) Laying of Pipe on Curves This section is new: Installation of restrained joint push-on pipe that will be deflected typically requires the pipe to be inserted into the bell at a straight alignment then deflected. This will require the trench to be excavated wider for horizontal deflection or deeper for upwards vertical deflection. For upwards deflection, lift the pipe after insertion then broadcast bedding to fully support the pipe at finished alignment, then lower the pipe. The bedding directly under the pipe does not need to be compacted. If the manuf acturer’s instructions provide differing, or additional instructions, those instructions shall be followed. Not all restraint systems can be deflected. The amount of deflection at each ductile iron mechanical joint fitting end shall not exceed the following, or the manufacturer’s recommendation, whichever is less. 3-inch to 6-inch diameter: 4.0 degrees (15 inches over 18 feet) 8-inch to 12-inch diameter: 3.0 degrees (11 inches over 18 feet) 14-inch to 16-inch diameter: 2.0 degrees (7 inches over 18 feet) 18-inch to 20-inch diameter: 1.5 degrees (5.5 inches over 18 feet) 24-inch diameter: 1.2 degrees (4.5 inches over 18 feet) Above 24-inch diameter, 50% of the fitting manufacturer’s maximum. DIVISION 7 8 7-09.3(15)B Laying Pipe on Curves-PVC Pipe (4 Inches and Over) Supplement this section with the following: The amount of deflection shall not exceed the manufacturer’s recommendations regardless of the values shown in the Standard Specifications. When manufacturer’s information is not available, do not exceed 1.0 degree per push-on joint. 7-09.3(19) Connections 7-09.3(19)A Connections to Existing Mains Supplement this section with the following: Pothole to verify the configuration, alignment, and size of the existing facilities. Pothole far enough in advance to procure required fittings without delaying the work. When knowledge of the exact alignment of existing facilities is required, such as when laying new work to line up with existing pipe or fittings, expose enough of the existing facilities so that an accurate alignment can be determined. Do not construct new work until the existing configuration and alignment is confirmed. If the alignment or configuration of the existing facilities varies significantly from the design plans, contact the Owner for review prior to installing new work. Install the new work to align with the existing facilities. Procurement and installation of additional fittings required due to failure of the Contractor to identify the existing configuration will not be reimbursed by the Owner. Provide notice to the Owner two full working days prior to making connections. Connections to existing mains may only be performed on Tuesdays, Wednesdays, or Thursdays unless permission is otherwise obtained from the Owner. Connections shall not be performed on Owner recognized holidays. Make no connections until the new main has been tested and approved by the Owner. An approved double check valve must be used between existing potable water sources and the new work. The Contractor shall size the double check valve as appropriate for the f illing and flushing rates needed. Owner will notify customers no less than 24-hours in advance of service interruption. Connections to the existing water system will require time for draining. Standby time for draining is incidental to the work, no separate payment. 7-09.3(19)B Maintaining Service Supplement this section with the following: Fire service connections must be maintained at a capacity sufficient to provide adequate fire protection, except during service reconnections, unless approved otherwise by the Purveyor. 7-09.3(21) Concrete Thrust Blocking Supplement this section with the following: DIVISION 7 9 Concrete shall not be poured around joints. All fittings to be blocked shall be wrapped with 4-mil polyethylene plastic. Precast concrete blocking is allowed. The surface area of the block must be no less than shown in the City of Yelm’s Standard Detail for horizontal thrust blocking.Backfill behind the block must be crushed surfacing, watered and mechanically compacted. Precast blocking with a thickness of 20- inches or less in any direction must include steel reinforcing no less than #5 bar at 6-inches on center each way. 7-09.3(22) Blowoff Assemblies Supplement this section with the following: Temporary (construction) blowoff assemblies shall be provided as shown on the plans and as required for testing and flushing and shall be incidental to the contract. No separate payment will be made for temporary blowoff assemblies. 7-09.3(23) Hydrostatic Pressure Test Replace the first sentence with the following: Water main, appurtenances, and service connections to the meter setter shall be tested in sections not to excee d 1,500 feet in length under a hydrostatic pressure equal to 200 psi at the low point of the test section, unless otherwise directed by the Owner. Keep hydrant foot valves closed during the test. See special provision 9-30.3(8) for pressure testing of tapping sleeves. Supplement this section as follows: The total time the water mains are exposed to test pressure shall be no less than 15 minutes. Pressure gauges shall be legible and accurate (+-3% of scale). Scale range shall not exceed 200% of the test pressure, nor be less than 110% of the test pressure. For example, for a 250-psi test, the gauge scale shall not exceed 2 x 250 = 500 psi nor be l ess than 1.1 x 250 = 275 psi. The gauge face must be no smaller than 2.5-inch diameter. The Owner has the right to reject any gauges that are suspect in their accuracy. Any gauge that does not read zero when there is no pressure will be rejected. Fittings and sections of pipe that cannot be pressure tested, such as connections to the existing system, shall be left exposed for a visual inspection under system pressure. Ductile Iron and C900 PVC testing: The following test method will be used unless otherwise directed by the Owner. Pressure drop shall not exceed 1-percent (2.0 psi for 200 psi test)per hour, regardless of water loss quantity. Owner has the authority to require more stringent criteria if they determine that field conditions warrant such measures. Only with the Owner’s approval will the WSDOT calculated water loss method be allowed. In such case, the term “appreciable or abrupt loss in pressure” will mean 1.5-percent (4 psi)or more in 15 minutes. 7-09.3(23)D Valve Pressure Test The following section is new: DIVISION 7 10 All valves shall be pressure tested in the presence of the Owner. Do not exceed the rated working pressure of the valve when operating the valve. Bleed off test pressure prior to operating. Test all valve bonnet and actuator enclosure nuts and bolts for ti ghtness. Provide equipment, end plugs, blind flanges, assembly kits, and appurtenances necessary for pressure testing. Failing valves provided by the Contractor shall be replaced at the Contractor’s expense.If a valve provided by the Owner fails, consult the Owner for direction. Assemble valve clusters outside of the trench and pressure test prior to installation.At the Owner’s discretion, gate valves which will be installed on or adjacent to existing water mains shall also be pre- tested on both sides of the closed valve seat. Pre-installation testing procedure: 1. Close the valve. 2. Install plug or flange (with test port). 3. Connect test apparatus and pump. 4. Pressurize to test pressure.200 psi for gate valves. 5. There shall be zero drop in pressure or visible leakage for ten minutes. This includes leaking through the shaft packing. 6. If test fails, check for defects, correct, and retest. Replace valves that do not pass testing at no additional cost to the Owner. Post-installation testing procedure: After installation, test for water tightness under differential working pressure (do NOT exceed working pressure rating). To perform this test, pressurize pipe section with valve in place, close valve and relieve pressure on one side of the valve. The valv e shall not pass water during a 10-minute test period. Operate all valves at least once from closed-to-open-to-closed positions while valve is under system (not test) pressure. 7-09.3(24) Disinfection of Water Mains Supplement this section with the following: Samples will not be taken on Fridays unless approved by the Owner and special arrangements made with the testing lab. Water mains used solely for fire supply lines, including those isolated with a backflow prevention assembly, shall be disinfected and tested in accordance with this section. 7-09.3(24)A Flushing This section is supplemented with the following: Flush for a period sufficient to change the entire water volume at least two times. The Engineer has discretion to require additional flushing. If the existing water system cannot provide the required flow capacity, the contractor shall supply the source of water or shall “pig” the main. All costs shall be incidental. The following table shows the minimum quantity and sizes of equipment for flushi ng, assuming at least 60 psi is available on the supply side. Higher pressure may warrant fewer or smaller blow-offs. If the plans show more or larger blow off assemblies, the plans will govern. DIVISION 7 11 Main Approx.Flow Blow-off and Hydrant ports Hydrant ports diam.Gallons(gpm)backflow device size and no. of hoses and no. of hoses per foot at 2.5 and no.(20 ft or less of(up to 100 ft of fps hose)hose) 6”1.5 230(1) 2”(1) 2.5”(2) 2.5” 8”2.7 400(2) 2”, or (1) 3”(2) 2.5”(3) 2.5”, or (1) 4” 10”4.2 640(3) 2”, or (2) 3”, or(2) 2.5”(3) 2.5”, or (1) 4” (1) 4” 12”6.1 900(4) 2”, or (2) 3”, or(2) 2.5”(4) 2.5”, or (1) 4” (1) 4” Rental backflow devices are acceptable if provided with backflow device test documentation. For new devices, conduct backflow test(s) and provide documentation. Tests must be performed by a certified backflow specialist. If, in the Owner’s sole opinion, the pipe has been kept free of heavy debris (rocks, gravel, etc.), the flushing velocity may be reduced to 1.5 fps. Pipe Cleaning by Pig: Pigging shall be performed as shown on the Plans and specified herein. Provide all labor, equipment, and materials required for pig launch and recovery. If a separate pipe cleaning by pig (or similar) pay item is not provided, include all costs in the most closely applicable pay items. Unless specified otherwise, the Contractor shall work with a pig manufacturer to select the material and style. The pig shall be appropriate for the inside diameter of the pipe and shall be of a material, size, and configuration recommended by the pig manu facturer for cleaning and removing loose debris and not damage the interior lining of the pipe. The pig shall not have abrasive coatings or strips that might damage the pipe lining. Provide the pig manufacturer the following information, at a minimum: The inside diameter of the pipe measured to the nearest 0.10 inch. The type and number of inline valves. The type and number of fittings that cause changes in direction. The type and length of fittings or valves that have an internal diameter change. The pig must be long enough to fully seal the inlet and outlet while passing through after accounting for any length compression of the pig due to back pressure. Pigs that are too short may get stuck if water can break around the pig. Examples are reducers and eccentric (plug) valves. A remote pig tracker is recommended for all projects and is required for pipes longer than 2,000 feet. The pipe must be filled with water on the downstream side of the pig. This is to provide debris transport without damaging the pipe lining, reduce the chance of the pig sliding over debris, and minimize debris settling into the low areas of joints. Swab the pig with a minimum 200 ppm chlorine solution before inserting. During pigging, measure water usage and pressure fluctuations. At a minimum, flow and pressure readings must be recorded at 2-minute intervals. Any abrupt pressure fluctuations shall be recorded and noted on a record sheet. Pressure increases may indicate the presence of a blockage. Ensure pressure surges do not exceed the rated working pressure of the piping, fittings, and appurtenanc es. Any damage from pressure surges during pigging shall be paid for and repaired by the Contractor.At least 2 passes shall be performed. DIVISION 7 12 Submit the time and pressure log to the Owner for their maintenance records including; 1) the number of pig passes and number of pigs used; 2) objects found during flushing and their approximate locations in the water main; 3) approximate pig velocity and location; 4) flushing time before water appeared clear; and 5) date. Inspect the pig upon removal to determine if it has been damaged. If the pig is damaged, determine the location of the blockage that caused the damage using the pressure log. The blockage shall be removed, and the pipeline inspected and repaired to a like new condition. After the blockage(s) has been removed and the pipeline repaired, another pig shall be run using the same process and procedures identified in the previous paragraphs. Do not allow the swabbed debris to reenter the pipe following a pig pass. Pipe ends shall be capped or fittings replaced to prevent debris from entering the cleaned pipe. Any fittings or valves not capable of passing a pig shall be flushed or swept clean.After the pig has been removed, flush water through the piping system until the water is clear and approved in writing by the Owner. 7-09.3(24)B Requirement of Chlorine Supplement this section with the following: Chlorine residual tests must be taken immediately following the initial filling. At a minimum, a test shall be taken at each end of the watermain. If the initial chlorine residual is between 50 mg/l and 100 mg/l, the minimum residual limits stated after the retention times in the next sections will be increased proportionally. If the initial chlorine residual exceeds 100 mg/l, the Owner, at their sol e discretion, may require the water be flushed and refilled with a lower residual. 7-09.3(24)K Retention Period Supplement this section with the following: If the water temperature is less than 41° F, the retention time before testing shall be at least 48 hours. Total retention time shall not exceed 3 days, or 24 hours more than the minimum retention time, whichever is less, after which the chlorinated water shall be immediately flushed out. 7-09.3(24)M Chlorinating Connections to Existing Water Mains and Water Service Connections Replace the second sentence with the following: All closure fittings shall be swabbed with a very strong chlorine solution of at least 1 percent C hlorine(10,000 ppm). 7-09.3(24)N Final Flushing and Testing Supplement this section with the following: If after the retention period in section 7-09.3(24)K the chlorine residual is less than 1 mg/l, the system must be flushed and re-chlorinated. If the residual is between 1 mg/l and 25 mg/l, the Contractor may choose to either flush and re-chlorinate or may flush and fill with system water and have samples taken at their risk. Standard Sampling Procedures DIVISION 7 13 Take bacteriologic samples at the following locations, at a minimum. All samples must pass for approval. Every 1,200 feet, and At all laterals longer than 18 feet, and At the end of the main. Take samples using one of the following two options (per AWWA C651). Option A: Take the first samples after flushing is complete. Take the second samples 16- hours later. Option B: After flushing is complete, take the first samples 16-hours later, and the second samples 15-minutes after that. The sampling port shall be left running during the 15- minute interval. For either option, the Owner has the sole discretion to require additional tests up to one week after flushing. For temporary water systems using new HDPE pipe stored with the ends continuously capped just prior to installation, samples may be taken immediately following flushing rather than waiting 16-hours. Replace the last sentence of the third paragraph with the following: Samples will be collected, and bacteriological tests obtained by the Contractor. The Contractor must coordinate with the Owner so the Owner may witness the sampling process. 7-09.3(25) Abandonment / Removal of Terminated Water Facilities This section is new: Owner shall be sole determiner of appropriate abandonment procedures and methods. Restore all disturbed surfaces to original condition and to the satisfaction of the Owner and land owner/agency. The Owner owns all existing water system materials and has th e right of salvage for any equipment at their discretion. Return all removed equipment (hydrants, fittings, valves, etc., but not pipe.) to the Owner at 901 NW Rhoton Rd, Yelm, WA 98597,at the discretion of the Owner. Equipment deemed unusable by the Owner shall become the property of and be disposed of by the contractor. Should the contractor unnecessarily damage any existing functional and salvageable equipment, said equipment shall be repaired or replaced by the contractor at their cost. The following methods are approved abandonment procedures for terminated facilities. Lateral Pipes 1.Abandoned hydrants, services, branch mains, etc. shall be terminated at the facility location and at the mainline. The lateral shall not be left connected to the mainline. Valves 1.Remove valves and valve boxes. Plug or blind flange the water main. 2.An alternative method of abandonment is acceptable if, at the discretion of the Owner, the valve should not be removed. Close the valve, install a plug or flange on the open end, then remove the valve box. Water Services and Air Valve Assemblies 1.Remove all boxes, vaults, setters and miscellaneous fittings. Backfill with crushed rock and compact. Native soils may be used for backfill if approved by the Owner. DIVISION 7 14 2.Cut service pipe at the main and remove the stub from corp stop. Close corp stop and install a threaded cap. 3.Remove entire service line back to water main (excavate or pull). 4.At the discretion of the Owner, the service line may remain in place, but must be terminated at the mainline as described in item 2. Hydrants 1.Remove entire hydrant, abandon pipe, and abandon / remove isolation valve as detailed above. 2.Remove any bollards. 3.Backfill with crushed rock, or native material if approved by the Owner. Water Mains Left in Place 1.Cut and drain the abandoned water main at all low points and where exposed during construction. 2.Remove mains in the way of new construction. Saw cut and remove short sections of pipe. Mains shall not be forcibly removed with heavy equipment due to potential damage to surrounding utilities. 3.Mains that will be terminated but not encountered during new trenching may be left in place, but all valves must be removed or abandoned as described under "valves". 4.Plug ends of abandoned mains with grout plug, blind flange, or cap as directed by the Owner depending on the type of pipe and soil conditions. Removal of Terminated Water Mains 1.Remove the existing mains in their entirety where shown on the plans. Provide and install select bedding (or trench backfill if approved by the Owner) to replace lost volume. 7-12 VALVES FOR WATER MAINS 7-12.3(2) Adjust Valve Box The following section is new: This work consists of rehabilitating and/or adjusting those existing valve boxes, which will remain active at project completion, to temporary and finished grade in accordance with the Plans. Any existing valve box components that are broken during construction shall be replaced. If a valve box is blocked with debris, the Contractor shall remove such debris leaving the valve installation in a fully operable condition. Remove any asphalt or debr is from valve box tops and lids so that lid and handle are loose and free. Maintain existing valve boxes at all times to allow the Purveyor access for operation. The Contractor shall notify the Purveyor of any existing valve boxes in a condition of disrepair. Adjust all valve boxes as described below unless shown otherwise on the plans. In travelled areas, including sidewalks and shoulders, adjust the valve box to between 0 and 1/8–inch below finished grade. In untraveled areas adjust the valve box to between 0 and 1/2–inch above finished grade. The final installation shall be made in accordance with the applicable portions of Section 7-12 of the Standard Specifications. Valve box adjustment within new paving shall be done per the following procedure: Lower the box so the lid is below the finished surface by at least 1/4 inch. Mark lid location with flexible indicator, 3-point measurement, or other method acceptable to the Owner. DIVISION 7 15 Install paving. Cut paving at least 6 inches clear around valve box and remove. Cuts must be made using a circular cutter, or other method that does not result in cut lines extending beyond the patch area. Raise the valve box. Install paving. When valve box top sections have lug slots, align the slots with the flow direction of water through the valve. If uncertain of direction, contact the Purveyor for clarification. 7-14 HYDRANTS Throughout this section, replace the words “Standard Plans” with “Purveyor’s Standard Details”. 7-14.1 Description Supplement this section with the following: Refer to the City of Yelm’s Standard Detail for additional requirements. 7-14.2 Materials Supplement this section with the following: Provide and install 5-inch Storz adapter for all hydrants. 7-14.3 Construction Requirements 7-14.3(1) Setting Hydrants Supplement this section with the following: Contractor shall verify required hydrant bury depth for each individual hydrant location prior to ordering hydrants. Bury depth may vary along the project based on topography and water main depth. 7-14.3(2)A Hydrant Restraints Supplement this section with the following. Refer to the City of Yelm’s Standard Detail for restraint methods if the distance between the auxiliary valve and hydrant is more than 16 feet, thereby requiring more than one stick of pipe. 7-14.3(2)C Hydrant Guard Post The first sentence is replaced with the following: Hydrant guard posts shall be constructed at the locations shown on the plans or as directed by the Owner’s Inspector. 7-14.3(6) Hydrant Extensions Supplement this section with the following: Contractor shall determine correct bury depth for ordering hydrants. Hydrant extensions shall be incidental to the contract. No additional payment will be made. DIVISION 7 16 7-15 SE V R ICE CONNECTIONS 7-15.2 Materials Replace this section in its entirety: Refer to the City of Yelm’s Standard Details for construction materials. 7-15.3 Construction Requirements Replace the first two sentences with the following: All service connections to water mains shall be made using saddles as shown on the City of Yelm’s Standard Details. Direct taps are not allowed. Replace the first sentence of the second paragraph with the following: The depth of trenching for service connection piping shall provide a minimum of 3.5 feet of cover over the top of the pipe, unless shown otherwise on the Purveyor’s standard detail. Replace the first sentence of the fourth paragraph with the following: Reconnect all existing service connections along the project route to the new main, unless specifically identified otherwise on the plans or directed otherwise by the Owner. Supplement this section with the following: Restore all disturbed surfaces to original conditions or better, including that on private property. Restore landscaping to original condition. Maintain water service at all times except when temporary outages are approved by the Purveyor. Tap hole size in mainline to be no smaller than 1/8-inch less than the nominal service pipe size. E.g. 1- inch service pipe requires 7/8-inch hole minimum. The Contractor will relocate the existing flow meter to the new setter. END DIVISION 7 DIVISION 7 17 Division 8 Miscellaneous Construction 8-01 EROSION CONTROL AND WATER POLLUTION CONTROL 8-01.1 Description Supplement this section with the following: Watering for dust control shall NOT be considered erosion control and water pollution control. See Section 2-07 in these Special Provisions. 8-01.3 Construction Requirements 8-01.3(1) General Supplement this section with the following: Erodible earth not being worked, whether at final grade or not, shall be covered within the specified time period using a soil covering practice approved by the Engineer. Western Washington October 1 through 5 June 30 days July 1 through 10 September 30 days The tenth paragraph of Section 8-01.3(1) is revised to read: (January 25, 2010) Erodible Soil Wester n Washington Erodible soil not being worked whether at final grade or not, shall be covered within the following time period using an approved soil cover practice: July 1 through September 30 1 0 days October 1 through June 30 5 days 8-01.3(1)F Vehicular Transport of Sediment This section is new: Wherever construction vehicle access routes intersect paved roads, provisions must be made by the Contractor to minimize the transport of sediment onto the paved road. The Contractor shall remove all dirt, mud, rocks, vegetation, or other deleterious mater ial from all construction equipment prior to leaving the site. This may include spray washing, sweeping, or other physical methods as necessary to remove materials. If sediment or other debris is transported onto a paved road surface, the road shall be cleaned thoroughly by the end of the work day. Debris shall be removed from roads by shoveling or sweeping. Street washing shall be allowed only after debris has been r emoved in this manner. 8-02 ROADSIDE RESTORATION 8-02.2 Materials Supplement this section with the following: DIVISION 8 1 The Contractor shall only use Topsoil Type C. Topsoil Type B will be permitted in place of Topsoil Type C if sufficient soils meeting the Specifications exist within the project limits. 8-02.3 Construction Requirements 8-02.3(15) Lawn Installation Supplement this section with the following: Preparation of Planting and Lawn Areas (General) Spread topsoil to minimum compacted depth of 3 inches. After topsoil has been improved and tilled, the area shall be raked and rock picked to a depth of 3" to remove all additional stones over 1/2", roots, lumps or any other foreign matter and bring to fi nal finish grade, as approved. The finished surface shall be loose, smooth, pulverized, and weed and grass free. Grade of lawn seed beds shall be set to allow for continuation of drainage patterns, flush at uphill side and 1" below at down hill sides of adjacent curb tops, walks and slabs. Crown any areas surrounded by sidewalks or curbs to provide proper drain age and pleasing appearance. All surfaces adjacent to building or walls shall slope away from wall at a minimum slope of 2%. All grades must be approved by the Contracting Agency before continuing with seeding. 8-04 CURBS, GUTTERS, AND SPILLWAYS 8-04.3 Construction Requirements 8-04.3(1) Cement Concrete Curbs, Gutters, and Spillways Supplement this section with the following: Pedestrian curbing adjacent to ramps shall be included with the ramp bid item. Pedestrian curbing adjacent to driveways shall be included with the driveway bid item. 8-05 QUALITY OF WORKMANSHIP (NEW SECTION) This Section 8-05 is added to the Contract Special Provisions. 8-05.3 Construction Requirements 8-05.3(1) Cast-in-place concrete Although only curb, gutter, and sidewalk is mentioned, this section shall apply to all curb, gutter, spillway, sidewalk, driveway, stair, ramp, wall, or other cast-in-place concrete. Unless otherwise approved by the Engineer, the Contractor shall have all forms and string lines set at least 24 hours before any concrete pour. Staking shall include all curb cuts, ramps, driveways, and other features shown in the Plans as well allowing time for the Engineer to check locations, lines, and grades. The Contract or shall adjust forms and string lines to ensure proper drainage and ADA compliance. The Engineer’s inspection of the forms, string lines, and stakes shall not be considered acceptance of the work. If after construction, any section of curb or gutter fails to drain, or sidewalk and/or curb ramps exceed the maximum slopes/grades specified, these items shall be removed and replaced at the Contractor’s expense. DIVISION 8 2 Curb, gutter, and sidewalk shall be placed to the horizontal and vertical position as indicated in the Plans or as otherwise specified. Where elevations are not provided, the Contractor shall match the existing cross slope as projected with a 10-foot strai ght edge. Tie-ins to existing curb, gutter, and sidewalk shall have a 10-foot transition to match existing heights and widths. The following criteria will be the basis by which the concrete curb, gutter, and sidewalk is measured against: The completed surface of the curb, gutter, and sidewalk shall not vary more than 1/8-inch from the edge of a 10-foot straightedge placed on any surface parallel to centerline. Curb widths and heights (regardless of curb type) shall not vary by more than 1/8-inch of planned dimensions. Sidewalk widths shall not vary by more than 1/4-inch of planned dimensions. No bulges and/or indentations shall be visible from placement of expansion joints. The completed surface of the concrete shall be uniform and free of blemishes from floats, trowels, rain drops, curing compound, etc. All joints shall be perpendicular to the centerline of the roadway. All broomed curb and gutter surfaces shall be parallel to the centerline of the roadway. All broomed sidewalk surfaces shall be perpendicular to the centerline of the roadway. Should any section of curb, gutter, or sidewalk fail to adhere to the established standards, that section of concrete shall be removed to the nearest expansion joint and replaced at the Contractor’s expense. At the option of the Engineer, sub-standard cur b, gutter, or sidewalk may be left in place but is subject to a penalty fee of 20% of the unit bid price for the applicable item(s). Should the Contractor not be able to adhere to the established standards, the Contractor shall make proper modifications t o such items as equipment, methods, personnel, etc. to correct the situation. Time spent for removal and replacement of substandard concrete shall not be grounds for additional contract time and/or compensation. The Contractor shall be responsible to barricade, patrol, or otherwise protect the newly placed concrete to prevent damage from occurring to the concrete. Damaged, vandalized or unsightly concrete shall be removed and replaced at the expense of the Contra ctor. All costs for completing the work listed in this section shall be included in the unit bid prices of the applicable items. 8-06 Cement Concrete Driveway Entrances 8-06.3 Construction Requirements Supplement this section with the following: All commercial driveway entrances shall be poured one half at a time to allow access unless alternate access is available. DIVISION 8 3 The Contractor shall be responsible to barricade, patrol, or otherwise protect the newly placed concrete to prevent damage from occurring to the concrete. Damaged, vandalized or unsightly concrete shall be removed and replaced at the expense of the Contra ctor. Construction of Cement Concrete Driveway Entrances shall be in accordance with this section. Modifications of existing driveways shall be accomplished by cutting the existing pavement cleanly and in a straight line with cutting equipment approved by the En gineer. Monument Cases Adjust Monument Case and Cover Reinstalling Monument Case and Cover The first sentence of Section 8-13.3(2)B is revised to read: (October 3, 2022) The adjusted or reinstalled monument case and cover shall be reset to ¼-inch below the finished pavement as indicated in the plans and in accordance with the following additional requirements: 8-14 Cement Concrete Sidewalks 8-14.3 Construction Requirements Section 8-14.3 is supplemented with the following: (October 3, 2022) The Contractor shall request a pre-construction meeting with the Engineer to be held two to five working days before any work can start on cement concrete sidewalks, curb ramps or other pedestrian access routes to discuss construction requirements. Those a ttending shall include: 1.The Contractor and subcontractor in charge of constructing forms, and placing, and finishing the cement concrete. 2.Engineer (or representative) and Project Inspectors for the cement concrete sidewalk, curb ramp or pedestrian access route Work. Items to be discussed in this meeting shall include, at a minimum, the following: 1.Slopes shown on the Plans. 2.Inspection 3.Traffic control 4.Pedestrian control, access routes and delineation 5.Accommodating utilities 6.Form work 7.Installation of detectable warning surfaces DIVISION 8 4 8.Contractor ADA survey and ADA Feature as-built requirements 9.Cold Weather Protection (January 7, 2019) Timing Restrictions Curb ramps shall be constructed on one leg of the intersection at a time. The curb ramps shall be completed and open to traffic within five calendar days before construction can begin on another leg of the intersection unless otherwise allowed by the Engin eer. Unless otherwise allowed by the Engineer, the five calendar day time restriction begins when an existing curb ramp for the quadrant or traffic island/median is closed to pedestrian use and ends when the quadrant or traffic island/median is fully functional and open for pedestrian access. (January 7, 2019) Layout and Conformance to Grades Using the information provided in the Contract documents, the Contractor shall lay out, grade, and form each new curb ramp, sidewalk, and curb and gutter. 8-14.3(5) Detectable Warning Surface Supplement this section with the following: Detectable warning surfaces shall extend along the entire width of the ramp. Any joints shall be uniformly and equally spaced. Detectable warning surfaces panels shall be no less than 24” x 24”. 8-22 PAVEMENT MARKING 8-22.2 Materials Supplement this section with the following: Plastic pavement marking material shall conform to the following: Long Line Markings:Type D-Liquid Cold Applied Methyl Methacrylate (spray or extruded) Transverse and Symbol Markings:Type B–Pre-Formed Fused Thermoplastic (heat fused) or Type D-Liquid Cold Applied Methyl Methacrylate (spray) 8-22.3 Construction Requirements Supplement this section with the following: All stencils used for pavement markings shall become the property of the City of Yelm Public Services upon project completion. Stencils provided to the City of Yelm Public Services shall be comprised of polyethylene or steel materials. Where called out in the Plans, the Contractor shall paint the entire face and 6-inch top of curb. Contractor is responsible for establishing the necessary control points to enable spotting of the new pavement markings prior to installation. Prior to installing pavement markings, the Contractor shall pre-mark the layout of all channelization and receive approval from the Engineer. Pre-marks shall consist of painted spot markings. The Contractor shall notify the Engineer and request approval of the pre-mark channelization at least 48 hours prior to placement of the pavement markings. DIVISION 8 5 8-23 Temporary Pavement Markings 8-23.3 Construction Requirements Supplement this section with the following: Temporary broken centerline striping shall be provided this contract at either the current roadway centerline or the construction centerline. The Contractor’s Traffic Control Manager or Traffic Control Supervisor shall be responsible for scheduling when to place, renew, and remove temporary pavement markings. END DIVISION 8 DIVISION 8 6 Division 9 Materials 9-03 AGGREGATES 9-03.12 Gravel Backfill Section 9-03.12(3) Gravel Backfill for Pipe Zone Bedding Supplement this section with the following: The table in the Standard Specifications does not apply to pressurized pipe or gravity sanitary sewer. The last paragraph of the Standard Specification does not apply to pressurized pipes. Definitions: “Bare” pipe means no poly-bags, thick epoxy coating, tape wrap, or similar exterior protection. Asphaltic or primer coated ductile iron qualifies as “bare”. The Owner has sole discretion to qualify the coating. Unrestrained: Push-on joints or similar. Fully restrained: All pipes and fittings are restrained. Partially restrained: Some pipes and fittings are restrained. Use the following gradations unless shown otherwise on the plans. Pressurized pipe, fittings, and valves. The following bedding materials are approved if provided with WSDOT Aggregate Source Approval documentation. 9-03.4(2) Aggregate for BST: ¾”-½”; 5/8”-No.4, ½”-No. 4 (4” and larger pipe). 9-03.4(2) Aggregate for BST: 3/8”-No. 4 (3” and smaller pipe). 9-03.8(6) HMA Proportions of Materials: ¾-inch (4” and larger non-metallic pipe and poly- bagged metallic pipe) (see Note 1). 9-03.9(3) Top Course (4” and larger pipe).Can be used for bare metallic pipes only if it meets the sand equivalent criteria shown in Table 1. 9-03.9(4) Maintenance Rock (3” and smaller non-metallic pipe, unrestrained or fully restrained). 9-03.12(4) Gravel Backfill for Drains (4” and larger pipe). 9-03.13 Backfill for Sand Drains (3” and smaller non-metallic pipe, unrestrained or fully restrained). For bedding materials other than those listed above: Non-metallic pipes (unrestrained or fully restrained): Table 1 or Table 2. Non-metallic pipes (partially restrained): Table 1. Non-metallic pipes (partially restrained): Table 2 (see Note 1) Metallic pipes (all restrained types, no poly-bags): Table 1. Metallic pipes with poly-bags (unrestrained or fully restrained). Table 1 or Table 2. Metallic pipes with poly-bags (partially restrained). Table 1 or Table 2 (see Note 1) Note 1: If either No. 40 sieve exceeds 25% or No. 200 sieve exceeds 5% then additional restrained joint lengths may be required unless the restrained lengths were calculated using silty-sand or finer material. See special provision 7-08.3(2)K. DIVISION 9 1 Table 1 Table 2 Sieve Size% Passing by Weight% Passing by Weight Pipe 4”Pipe < 4”Pipe 4”Pipe < 4” 1”99–100 100 99–100 100 3/4”80–100 100 75–100 100 5/8”70–100 99–100 50–100 99–100 3/8”50–100 99–100 40-100 99–100 U.S. No. 4 30–100 30–100 20-100 20–100 U.S. No. 10 15–85 15–85 10–85 10-85 U.S. No. 40 2–25 2–25 3–50 3–50 U.S. No. 200 0–5 0–5 0–10 0–10 Sand equivalent 50 min 50 min 35 min 35 min Non-metallic sanitary sewer and storm sewer pipes (5.0-inch outside diameter and larger). The following bedding materials are approved if provided with WSDOT Aggregate Source Approval documentation. 9-03.4(2) Aggregate for BST: ¾”-½”; 5/8”-No.4, ½”-No. 4 (All pipe sizes). 9-03.4(2) Aggregate for BST: 3/8”-No. 4 (3” and smaller pipe). 9-03.8(6) HMA Proportions of Materials: ¾-inch (4” and larger pipe). 9-03.9(3) Top Course (4” and larger pipe). 9-03.9(4) Maintenance Rock (3” and smaller pipe). 9-03.12(4) Gravel Backfill for Drains (4” and larger pipe). 9-03.13 Backfill for Sand Drains (3” and smaller pipe). For bedding materials other than those listed above, use Table 3. Table 3 Sieve Size SDR 26 or Thicker Thinner than SDR 26 % Passing by Weight% Passing by Weight 1¼”99-100 1”75-100 99-100 3/4"75-100 5/8”50-100 50-100 U.S. No. 4 20-100 20-100 U.S. No. 40 3-50 3-50 U.S. No. 200 10.0 max 10.0 max Sand equivalent 35 min 35 min Non-pressurized pipe and conduit smaller than 5.0-inch outside diameter. The following bedding materials are approved if provided with WSDOT Aggregate Source Approval documentation. 9-03.4(2) Aggregate for BST: 5/8”-No.4, ½”-No. 4 (All pipe sizes). 9-03.4(2) Aggregate for BST: 3/8”-No. 4 (3” and smaller pipe). 9-03.8(6) HMA Proportions of Materials: ¾-inch (4” pipe). 9-03.9(3) Top Course (4” pipe). 9-03.9(4) Maintenance Rock (3” and smaller pipe). DIVISION 9 2 9-03.12(4) Gravel Backfill for Drains (4” pipe). 9-03.13 Backfill for Sand Drains (All pipe sizes). 9-05 DRAINAGE STRUCTURES, CULVERTS, AND CONDUITS 9-05.12 Polyvinyl Chloride (PVC) Pipe 9-05.12(1) Solid Wall PVC Culvert Pipe, Solid Wall PVC Storm Sewer Pipe, and Solid Wall PVC Sanitary Sewer Pipe Supplement this section with the following: PVC pipe for culverts and storm shall be solid white throughout the entire resin. 9-05.12(3) Tracer Wire and Splices Add the following new section: Tracer wire (locator wire) shall be #12 AWG minimum, single conductor solid, bare annealed copper, 30-Volt construction, with blue water-resistant insulation.Supply in 2,500-foot coils minimum. Direct bury splice enclosures shall be Spears DS-500 Splice Wire Connector, 3M DBY, or approved equal. 9-05.12(4) Buried Utility Marking Tape Add the following new section: Where locating wire is not included along the pipeline, the tape shall have a metallic foil core to provide positive detection for pipeline locators. Where locating wire is used, locating tape shall not include any metal components, unless shown otherwise on the plans. This is to prevent locating signal conflicts. Detectable marking tape shall consist of inert polyethylene plastic that is impervious to all known alkalis, acids, chemical reagents, and solvents likely to be encountered in the soil. The tape shall be color coded and shall be imprinted continuously over its entire length in permanent black ink. The message shall convey the type of line buried below and shall also have the word “Caution” prominently shown. Color coding of the tape shall be as follows: Utility Tape Color Water Blue The width of the tape shall be as recommended by the manufacture for the depth of installation. 9-30 WATER DISTRIBUTION MATERIALS Replace the first paragraph with the following: This Specification addresses pipe and appurtenances 24-inches in nominal inside diameter and smaller. Water distribution material incorporated in the Work shall be new. All materials shall comply with the most current version of the AWWA standard applicable for that material unless specifically stated otherwise. All materials to be pressure tested shall be rated by the manufacturer for the largest of the following test pressure references: DIVISION 9 3 1.7-09.(23) for ductile iron and PVC, or 2.The Owner’s standard details, or 3.The applicable AWWA standard (often 1.5 times the material’s rated working pressure). The Contractor is responsible for verifying the materials supplied meet the working pressure and test pressure requirements. Submit documentation of nonconformities for the Owner’s review no later than during the submittal process. 9-30.1 Pipe 9-30.1(5) Polyvinyl Chloride (PVC) 9-30.1(5)A PVC Pipe (4 Inches and Over) Supplement this section with the following: PVC pipe used on the project shall be new, having been manufactured within 18 months prior to the date of delivery, and shall be kept clean and protected against sunlight and heat damage. Pipe that is older than 18 months at the time of delivery, or that i s damaged due to sunlight or heat, shall be removed from the project site and replaced by the Contractor at no cost to the Owner.Damage includes loss of pigment (“sun bleached”). See Section 9-30.1(8) for pipe joint restraint systems. PVC pipe for domestic water shall be solid blue throughout the entire resin. PVC pipe for domestic water shall have a wall thickness no thinner than that of SDR 18. 9-30.1(8) Restrained Joint Pipe Add the following new section: Contractor is responsible for the compatibility of the pipe and restraint system proposed in their bid. Restraint system must be rated to no less than the maximum test pressure. See Section 9-30.2(6) and 9-30.2(6)A for restrained fittings and material/coating requirements for all external restraints. Restraints using a gasket with imbedded gripper teeth shou ld not be used where deflection of more than 0.5 degrees (2-inches over 18-feet, or 2,050 ft radius) for push-on restrained joints is needed. C900 PVC: Unless shown otherwise on the plans, push-on restrained joint pipe 12-inch diameter and smaller shall use a restrained gasket equal to Hultec HydroGrip (previously called RieberLok), or external bell restraints equal to EBAA Iron model 1900. C900 PVC TRJ: The bell to have an integral gasket and retainer. Diamond Plastics Lok-21, Westlake Certa-Lok, or approved equal. Pipe using a single gasket for both pressure and restraint (e.g. HydroGrip-RieberLok) are not a TRJ system. 9-30.2 Fittings Supplement this section with the following: Steel bolts, nuts and washers shall be zinc plated. Flange bolts to be ASTM A307 Grade A (or SAE J429 Grade 5); or ASTM A307 Grade B (or SAE J429 Grade 2). 9-30.2(1) Ductile Iron Pipe Fittings Replace the fourth sentence with the following: DIVISION 9 4 Gaskets for flanged fittings shall be ring type. Full face type gaskets are not allowed. Gaskets must be minimum 1/8” thick, with a durometer of 55 to 65, and rated for 250 psi working pressure. Gasket material may be neoprene, cloth inserted rubber, nitrile rubber (Buna-N, NBR), styrene-butadiene rubber (Buna-S, SBR), or chlorinated butyl. Provide fastener torque requirement from the gasket manufacturer. Do not use SBR, nitrile, or neoprene in fittings used for air transport in wastewater treatment systems. 9-30.2(6) Restrained Joint Fittings Supplement this section with the following: Restraint system must be rated to no less than the maximum test pressure. External restraints for fittings and pipe in all buried applications, and in exposed areas when not being field coated shall be corrosion resistant.Iron parts: Coated at the factory with fusion bonded polyester based coating (e.g. Romac Romabond, EBAA Mega-bond, Ford Armorguard E-Coat) or approved equal. Wrapping external restraints with polyethylene sheets or wax tape in lieu of corrosion resistant s teel and/or coatings may be allowed if approved by the Owner. 9-30.2(7) Bolted, Sleeve-Type Couplings for Plain End Pipe Supplement this section with the following: This section is specifically for unrestrained couplings. Couplings for DI, C900 PVC, CI, or AC pipe shall be Hymax or approved equal.Couplings for 3-inch and larger pipe shall have a center barrel no less than 7-inches long. 9-30.3 Valves 9-30.3(1) Gate Valves (3 to 16 inches) Replace this section with the following: This section applies to gate valves 3-inch through 48-inch diameter. Gate valves shall be rated for 250 psi working pressure and meet the requirements of AWWA C509 or C515. All exterior valve body bolting (bonnet, stuffing box, gear box) shall use Cor-Ten, 304 (18-8) SS, or 316 SS bolts and nuts. 9-30.3(4) Valve Boxes Supplement this section with the following: Refer to Owner’s Standard Detail for additional requirements. 9-30.3(5) Valve Marker Posts Replace this section with the following: Refer to Owner’s Standard Detail. 9-30.3(6) Valve Stem Extensions Supplement this section with the following: DIVISION 9 5 Refer to Owner’s Standard Detail for additional requirements. 9-30.3(7) Combination Air Release/Air Vacuum Valves Supplement this section with the following: Refer to Owner’s Standard Detail for additional requirements. 3-inch diameter and larger valves with a high-capacity air vent function (typical for air/vacuum and combination air valves) shall include a throttling device specifically for the air vent function to prevent slamming. The throttling device shall not restr ict any vacuum or air release function the valve may also have. APCO CSV surge check, Val-Matic CSS surge suppression, or approved equal. 9-30.6 Water Service Connections 9-30.6(1) Saddles Replace this section with the following. Refer to Owner’s Standard Details. Select a saddle where the pipe outside diameter falls within the saddle fitting range. The pipe outside diameter must be larger than, not equal to, the smallest value of the saddle fitting range. 9-30.6(3) Service Pipes 9-30.6(3)B Polyethylene Tubing Replace the third paragraph in this section with the following. Tubing used for 2-inch and smaller shall be Phillips Drisco Pipe 5100. 9-30.6(5) Meter Setters Replace this section with the following: Refer to Owner’s Standard Details. 9-30.6(7) Meter Boxes Replace this section with the following: Refer to Owner’s Standard Details. END DIVISION 9 DIVISION 9 6 DIVISION 10 MEASUREMENT AND PAYMENT 10.00 G ENERAL It is the intention of these Specifications that the performance of all work under the bid for each item shall result in the complete construction in an accepted operating condition, of each item. Work and material not specifically listed in the proposal, but required according to the contract Plans, Specifications, and general practice shall be included in the Contractor's bid price. No separate payment of any kind will be made for these incidental items. Bid Schedule A–Water System Improvements Bid Item 1 01–Mobilization, Demobilization,Site Preparation, and Cleanup(10%) The lump sum price shall cover the complete cost of providing, furnishing, and installing all work and materials necessary to move or organize equipment and personnel onto the site, provide and maintain support facilities and obtaining all necessary permit s, licenses, bonds, and any other items not covered elsewhere.This lump sum shall also cover the cost of coordinating with other utility owners such as the fiber optic,gas, power, police,school district,etc. The lump sum price shall cover the complete cost of demobilization final cleanup dressing and trimming the project area after construction of improvements,moving all personnel and equipment off the site after contract completion of the bid items. This Bid Item shall also include the cost of providing two project si gn s to be installed as directed by the owner.Additionally, the Contractor shall video film and document the site conditions of the proposed alignment prior to commencing any construction activity. This Bid Item shall also include the cost for negotiation,securing,maintaining and restoring staging areas needed for this project.The project site shall be restored to existing conditions as documented at the commencement of the project with the video documentation as previously stated. No more than 80-percent of bid amount for this item will be paid before final payment request, and this bid amount may not be more than 10-percent of the total contract value. Bid Item 10 2–Construction Survey and As-Built Record Drawings The lump sum price for construction survey will be full compensation for all surveying needed to construct the improvements to the line and grade per the approved plans, pavement markings indicating stationing along the alignment, locating and punching of survey monuments, locating property corners, and providing the required construction and as-constructed field notes. A copy of all cut sheets and/or similar work shall be given to the owner 24 hours in advance of construction and a copy of the survey contr ol notes shall be given to the owner when done. Partial payments for this item will be made in connection with the monthly pay estimates based upon work completed. Up to 50 percent of this bid item will be paid for prior to receiving as-builts from the Contractor. After receipt and approval of as-builts, the City shall pay the remaining 50 percent of the bid item.This bid item shall also cover utility locating and marking. Bid Item 10 3–Temporary Sedimentation and Erosion Control The lump sum price shown shall cover the complete cost of furnishing, installing, maintaining, and removing sedimentation and erosion control devices. The price shall also include erosion control measures necessary following construction to restore areas d isturbed by this project. The plans identify the minimum measures required. The price shall include additional measures as necessary to meet the Specifications.Partial payment for this item will be made in connection with the monthly pay estimates based upon the work completed. Bid Item 10 4–Potholing Existing Utilities The unit price per each shall be full compensation for furnishing all materials and equipment for potholing at existing connection locations, utility crossings, and other locations as shown on the plans and/or requested by the City inspector. This bid item shall include all work, equipment, and labor necessary to remove,haul,and dispose of excavated materials,to perform potholing, backfilling, compaction, and temporary pavement restoration as described in the specifications. Payment shall be based on each pothole.The owner may adjust quantities, and the per each unit price shall be used for said adjustments. No additional payments will be made for saw cutting or surface restoration. Bid Item 10 5–Shoring and Trench Safety Systems The lump sum price shown shall cover the complete cost of furnishing, installing, maintaining,and removing all shoring, cribbing and coffer dams necessary to support trench and excavation walls as described in the standard specification. The price shall also cover the complete cost to sheet and barricade the trench each night to protect the general public. Bid Item 106, 107,& 1 0 8–6-inch, 8-inch,&1 2-inch C900 Water Main The price s per linear foot shall be full compensation for furnishing C900 PVC water main in place as shown on the plans and specified herein, including all equipment, labor, and work necessary for trench excavation (excavation is unclassified), haul,and disposal of displaced material; furnishing,placement, and compaction of pipe bedding material;furnishing and installing all necessary fittings(regardless of fitting material),thrust blocks and restrain rods;furnishing and installing ductile iron c asings,and associated casing appurtenances in pla ce;furnishing, placement,and compaction of backfill material;furnishing, placement, and compaction of roadway subgrade material;flushing, cleaning, testing,chlorination, dechlorination,and placing pipe into service; temporary trench surface restoration and maintenance,and any other improvements not covered in any other bid items. The price shall also include the cost of materials, equipment, and labor to install and test the utility tracing system. Measurement will be along the pipe centerline, including all fittings, restraints, and thrust blocks for each respective pipe size. This Bid Item captures water main installation costs in both the WSDOT and City of Yelm right of ways. Note s:The cost of furnishing and installing final trench patch material is included in Bid Item 120 –Hot M ix Asphalt (HMA)-Trench Restoration. This Bid Item only includes water main shown on the plan for which the lengths are specified (called out on the plan sheets). All other water main necessary to make connections will be included in other bid items. Bid Item 1 09, 11 0, 1 11, & 11 2–6-inch, 8-inch, 1 0-inch, &12-in ch Gate Valve The gate valves shall be measured and paid for at the applicable unit price for each,in place, complete, which shall constitute full compensation for furnishing, equipment and labor required to install:valve, valve marker, valve box, valve riser, concrete pad, and all other necessary appurtenances. Notes:The intent of the above b id i tem is to cover the cost for all valves shown in the plans excluding valves needed for fire hydrant assemblies. Bid Item 11 3–Service Connections The unit price per each shall be full compensation for furnishing all materials,equipment, and labor necessary for installing service line s,regardless of the size;installation of a new water service includ es meter box,meter setter,flow splitting manifold where applicable,and reconnection to the existing service line. This price includes the customer notification of service disruption;relocation of new meter box and setter;extension of existing service line to new meter box;trench excavation;boring of service lines crossing under pavement;crossing of existing utilities;flushing, cleaning, testing, sterilization,and dichlorination.This unit price shall also include the removal and salvage of existing meter;removal of existing meter box, manifold, fittings, adapters as necessary to install the water service.The unit price shall also include all costs to install locating wire for service line s, testing,and any other items not covered in the other bid items requi red for the installation of service connections in place. P ayment for this unit price shall be measured per each new service line(counted from the tap at the water main). When reconnecting a customer’s service line outside the right-of-way, the Contractor shall contain the work area within the City’s easement (approximately 15-feet). Note s:Contractor to salvage and install existing meter on to new setter. Labor shall be incidental to the unit price.Backflow prevention devices, where encountered, shall not be altered. Bid Item 11 4–Service Connections–Yelm Creek Apartments The unit price per each shall be full compensation for furnishing all materials, equipment, and labor necessary for installing 2-inch service lines;installation of a new water service includ es water service pipe and reconnection to the existing meter setter. This price includes the customer notification of service disruption;f ire watch;trench excavation; flushing, cleaning, testing, sterilization,and dichlorination. The unit price shall also include all costs to install locating wire for service line s, testing,and any other items not covered in the other bid items required for the installation of service connections in place. Payment for this unit price shall be measured per each new service line (counted from the tap at the water main). When reconnecting a customer’s service line outside the right-of-way, the Contractor shall contain the work area within the City’s easement (approximately 15-feet). Notes:Existing meter box, meter, and setter shall remain in place.Contractor shall coordinate with the City and the S.E. Thurston Fire Authority for guidance prior to removing fire service to the Yelm Creek Apartment complex. Bid Item 11 5–Removal or Abandonment of Inactive Water System The lump sum unit price shall be full compensation for furnishing all materials and equipment necessary to remove or abandon the existing water system as shown on the Plans. The price shall include excavation, disposal, and haul of displaced material;plugging or capping the existing pipe;removal, disposal, and haul of the existing pipe, valves boxes, valve nuts, meter boxes, setters,fire hydrants,and pipe necessary to make the connections of the new system to the existing system; abandoning pipe in place as noted in the specifications. Bid Item 11 6–Disposal of Asbestos Cement W ater Main The price per linear foot shown shall be full compensation for the disposal of existing asbestos cement (AC) water mains and will be per linear foot of existing AC water main that is removed, hauled and disposed of at a certified hazardous waste disposal f acility in conformance with the Contract Documents,regardless of pipe diameter. This bid item shall not apply to AC main that is abandoned in place.Only AC pipe necessary for the construction of improv ements and as approved by the Owner shall be counted and measured. Payment for disposal of AC water mains shall cover the complete cost of providing all labor, materials, tools, and equipment required to complete the work specified in the contract documents and plans and shall include but not be limited to the following:Handling, hauling, and disposal of asbestos cement pipe and fittings. Payment for disposal of AC water main will be made at the amount bid per linear foot of AC main removed. If no removal of AC main is required, no payment will be made on this bid item. Note: The intent of this Bid Item is to cover the cost for the handling, hauling, and disposal of AC water main. All work required to expose and remove AC water main will be covered under Bid Item 119–Demolition and Bid Item 115–Removal or Abandonment of Inactive Water System. Bid Item 11 7–Fire Hydrant Assembly The unit price per each shall be full compensation for furnishing all materials and installing the new fire hydrant assembly as shown in the standard details and plans. This price includes the excavation, hauling, disposal of displaced material; furnishing main line tee,gate valve, valve box, ductile iron pipe,thrust restraints, fire hydrant, Storz adapter, concrete bearing block, washed rock, backfill, necessary rock retaining walls for cut/fill installations, hydrant pads, trench backfill, necessary storm drain pipe, rip rap,bollards as called for on the Plans, blue reflector in pavement, flushing, testing, painting, restoration of existing improvements and any other items not covered in the other bid items for the complete fire hydrant in place.P ayment for this bid item shall be based on each new fire hydrant assembly installed. Bid Item 1 1 8–Connection to Existing System The unit price per each shall be full compensation for furnishing the materials and completing the connections as shown on the Plans and specified herein. This bid item shall include all equipment, labor, and materials associated with trench excavation; trench dewatering and control of discharge water; installing pipe, fittings, thrust blocks, restraint rods; placing and compacting of bedding material and backfill material; furnishing, placing and compacting temporary trench patching, and steel plates; and all other equipment labor, and materials needed to complete the connection not included in any other Bid Item. This bid item shall include haul and disposal of displaced material, flushing, cleaning, testing, sterilization, dechlorination, installation and removal of temporary blow-off s necessary for testing, restoration of any other existing improvements not covered in the bid items and any other items necessary for the complete connection in place. This bid item shall cover the cost of all materials required as shown in the associated connection details and needed to complete said connections. This bid item shall include the cost of pipe for which a length is not specifically called out on the plans.Payment for this bid item shall be per each complete connection to existing. Bid Item 1 19–Demolition The lump sum price shall be full compensation for furnishing all tools, equipment, and labor necessary to remove asphalt, concrete sidewalk, curb and gutter, vegetation, fire hydrant assemblies, water meters, chain-link fence, guard rail, signage,valves, culverts, fittings, guy wires, and other items identified for removal as shown on the Plans. This price shall include but is not limited to: sawcutting; removal, haul, and disposal or reinstallation of the afore mentioned item, and other items identifie d in the plans for removal; and cleanup during and after demolition activities to a safe and tidy condition as identified by the City. This Bid Item shall cover the cost of removing and stockpiling items identified on the Plans to be removed and replaced. No additional payment will be made for any work done in providing traffic control devices as shown on the Plans. Bid Item 12 0–Hot Mix Asphalt (HMA)–Trench Restoration The unit price per ton shall cover the complete cost of providing all materials, equipment, and labor necessary for providing and installing all hot mix asphalt for permanent trench patch, to the depth shown on the Plans and as described by the applicable City of Yelm Standard Plan. Price shall include: preparation, placement, compaction, and testing of subgrade; HMA; delivery, placement, compaction, and testing of HMA in place. This bid item captures the cost of final HMA, used for water main trench patching, and is not intended for trench patching related to roadway overlay. Payment shall be per ton as measured by truck weight tickets. Bid Item 12 1–Concrete Cement Sidewalk–Trench Restoration The unit price shown shall cover the complete cost of providing all materials, equipment, and labor necessary for satisfactory placement of cement concrete sidewalk as specified in the contract and shall include but not be limited to the following: Furnish ing, preparation, placing, compacting, and testing of subgrade; furnishing and installing formwork; furnishing, placing, compacting, and finishing concrete. Provide barricade, patrol, or otherwise protect newly placed concrete to prevent damage from occurr ing to the concrete until it is cured. Remove and replace damaged, vandalized or unsightly concrete. All concrete sidewalk shall match existing. Payment shall be made at the unit price per square yard of finished surface and will not include the surface ar ea of the curb ramps. Note: The intent of this bid item is to replace in kind any concrete cement sidewalk, curb and gutter, that has been disturbed as a result of water main installation and does not capture the costs of items listed on Schedule B of this division. Bid Item 12 2–Site Restoration The price shall be compensation for providing all labor, materials, and equipment for restoration of damaged or otherwise altered features necessary to construct the water system improvements as detailed in the Plans. Restoration shall include but not be limited to: planting salvaged or new shrubs and trees; restoration of beauty bark, topsoil, fertilizer, excavation, planters; furnishing, and handling of hydroseed and grass sod in place; reinstalling fences, signs, monuments, guy wires, and other surface features that need to be removed and replaced or removed and relocated to construct the proposed water system improvements in accordance with the Plans and Specifications. Price shall include both permanent and temporary relocations. No additional payment will be made for any work done in providing traffic control devices as shown on the Plans. Payments or credits for changes amounting to $1 0,000 or less may be made under the Bid item “Site Restoration”. At the discretion of the City, this procedure for Site Restoration may be used in lieu of the more formal procedure as outlined General Conditions. At the time of authorization, the Owner and Contractor will agree to the basis of compensation for that work, by force account, as set forth in Section 1-09.7. Approved work performed under this bid item will be performed only after a work directive is issued by the Owner. Any additional work perfo rmed prior to the work directive being issued by the Owner will not be compensated under this bid item. For the purpose of providing a common Proposal for all Bidders, the Owner has entered an amount for “Site Restoration” in the Proposal to become a part of the Bid by the Contractor. Note: The intent of this Bid Item is to cover the cost for restoring all surface features to existing conditions that does not include HMA or concrete sidewalk restoration. Bid Item 12 3–Traffic Control The lump sum price shown shall cover the complete cost of all labor, equipment, furnishing, installing, and removing all temporary traffic and pedestrian signs and barricades, furnishing and maintaining programable message board signs, submittal and updati ng of traffic control and detouring plans to the City of Yelm,and all necessary traffic control in accordance with the traffic control plan requirements identified herein. This Bid Item shall include all labor needed throughout the duration of the project including assistance from the Yelm Police, when required. Partial payments for this item will be made in connection with the monthly pay estimates based upon work completed. Bid Item 12 4–Minor Change Payments or credits for changes amounting to $25,000 or less may be made under the Bid item “Minor Change”. At the discretion of the City, this procedure for Minor Changes may be used in lieu of the more formal procedure as outlined General Conditions. The Contractor will be provided a copy of the completed order for Minor Change. The agreement for the Minor Change will be documented by signature of the Contractor, or notation of verbal agreement. If the Contractor is in disagreement with anything requir ed by the order for Minor Change, the Contractor may protest the order as provided in Section 1-04.5, Procedure and Protest by the Contractor, in the Washington State Department of Standards and Specifications Manual. Payments or credits will be determined in accordance with Section 1-09.4, Equitable Adjustment, in the Washington State Department of Standards and Specifications Manual. For the purpose of providing a common Proposal for all Bidders, the Contracting Agenc y has entered an amount for “Minor Change” in the Proposal to become a part of the Bid by the Contractor. Bid Schedule B–Roadway Improvements(Non-Taxable) Bid Item 201–Mobilization,Demobilization Site Preparation, and Cleanup(10%) The lump sum price shall cover the complete cost of providing, furnishing, and installing all work and materials necessary to move or organize equipment and personnel onto the site, provide and maintain support facilities and obtaining all necessary permit s, licenses, bonds, and any other items not covered elsewhere. This lump sum price shall also cover the cost of coordinating with other utility owners such as the fiber optic, gas, power, police, school district, etc. The lump sum price shall cover the complete cost of demobilization, final cleanup, dressing and trimming the project area after construction of improvements, and moving all personnel and equipment off the site after contract completion of the bid items. This Bid Item shall also include the cost for the Contractor to video film and document the site conditions of the proposed alignment prior to commencing any construction activity. This Bid Item shall also include the cost for negotiation, securing, mainta ining and restoring staging areas needed for this project. The project site shall be restored to existing conditions as documented at the commencement of the project with the video documentation as previously stated. No more than 80-percent of bid amount for this item will be paid before final payment request, and this bid amount may not be more than 10-percent of value of total contract. Bid Item 202–Construction Survey and As-Built Record Drawings The lump sum price for construction survey will be full compensation for all surveying equipment and labor needed to construct the improvements to the line and grade per the approved plans, pavement markings indicating stationing along the alignment, locat ing and punching of survey monuments, locating property corners, resetting disturbed monuments, and providing the required construction and as-constructed field notes. A copy of the survey control notes shall be given to the City when finished. This bid it em shall also cover the cost for providing construction limit markings and utility markings needed for potholing.The price shall also include re- establishing all disturbed monuments, including required permitting. Partial payments for this item will be made in connection with the monthly pay estimates based upon work completed. Up to 50 percent of this bid item will be paid for prior to receiving as-builts from the Contractor. After receipt and approval by the City of the as-builts, the remaining 50 percent of the bid item will be paid. Bid Item 203–Temporary Sedimentation and Erosion Control The lump sum price shall cover the complete cost of furnishing, installing, maintaining, and removing sedimentation and erosion control devices. The price shall also include erosion control measures necessary following construction to restore areas disturb ed by this project. The plans identify the minimum measures required. The price shall include additional measures as necessary to meet the Specifications and best management practices (BMP’s) as outlined in the 2024 Stormwater Management Manual for Western Washington. Partial payment for this item will be made in connection with the monthly pay estimates based upon the work completed. Bid Item 204–Roadway Demolition The lump sum price shall be full compensation for furnishing all tools, equipment, and labor necessary to remove asphalt, and other items identified for removal as shown on the Plans. This price shall include but is not limited to: sawcutting; asphalt grin ding(milling); removal, haul, and disposal of existing HMA, and other items identified in the plans for removal; and cleanup during and after demolition activities to a safe and tidy condition as identified by the City. This Bid Item shall cover the cost of removing and stockpiling items identified on the Plans to be removed and replaced. No additional payment will be made for any work done in providing traffic control devices as shown on the Plans. Bid Item 205–Single Direction Curb Ramp (Type A) The unit price per each shall be full compensation for furnishing all materials, tools, equipment, and labor necessary for the satisfactory placement of concrete single direction curb ramp, type A, as shown on the Plans. This unit price shall include but n ot be limited to the following: survey and staking; preparing, placing and compacting of curb ramp subgrade; furnishing and installing formwork; furnishing, placing, compacting, finishing concrete; furnishing and placing detectable warning surface material. This Bid Item shall also include all costs necessary to inspect the curb ramp for compliance with ADA regulations. If installed curb ramp fails to meet ADA regulations, the Contractor shall remove and replace all work necessary to achieve compliance at no additional cost to the City. Payment for this bid item shall be based on each new single direction curb ramp (t ype A), satisfying ADA regulations,installed. Bid Item 206–Single Direction Curb Ramp (Type B) The unit price per each shall be full compensation for furnishing all materials, tools, equipment, and labor necessary for the satisfactory placement of concrete single direction curb ramp, type B, as shown on the Plans. This unit price shall include but n ot be limited to the following: survey and staking; preparing, placing and compacting of curb ramp subgrade; furnishing and installing formwork; furnishing, placing, compacting, finishing concrete; furnishing and placing detectable warning surface material. This Bid Item shall also include all costs necessary to inspect the curb ramp for compliance with ADA regulations. If installed curb ramp fails to meet ADA regulations, the Contractor shall remove and replace all work necessary to achieve compliance at no additional cost to the City. Payment for this bid item shall be based on each new single direction curb ramp (type B), satisfying ADA regulations, installed. Bid Item 207–Cement Concrete Approach (Type 1) The unit price per each shall be full compensation for furnishing all materials, tools, equipment, and labor necessary for the satisfactory placement of cement concrete approa ch (type 1), as shown on the Plans. This unit price shall include but not be limited to the following: survey and staking; preparing, placing and compacting of approach subgrade; furnishing and installing formwork; furnishing, placing, compacting, finishing concrete.This Bid Item shall also include all costs necessary to inspect the approach for compliance with the City of Yelm’s applicable standard details. If installed approach fails to meet the standards as outlined by the City, the Contractor shall remove and replace all work necessary to achieve compliance at no additional cost to the City. Payment for this bid item shall be based on each new cement concrete approach (type 1) installed. Bid Item 208–Cement Concrete Sidewalk The unit price shown shall cover the complete cost of providing all materials, equipment, and labor necessary for satisfactory placement of cement concrete sidewalk as specified in the contract and shall include but not be limited to the following: Furnish ing, preparation, placing, compacting, and testing of subgrade; furnishing and installing formwork; furnishing, placing, compacting,and finishing concrete; and adjusting existing utilities and surface features to grade. Provide barricade, patrol, or otherwise protect newly placed concrete to prevent damage from occurring to the concrete until it is cured. Remove and replace damaged, vandalized or unsightly concrete. All concrete sidewalk shall match existing. Payment sha ll be made at the unit price per square yard of finished surface and will not include the surface area of the curb ramps. Bid Item 209–Cement Concrete Traffic Curb and Gutter The unit price shown shall cover the complete cost of providing all materials, equipment, and labor necessary for satisfactory placement of cement concrete traffic curb, and gutter as specified in the contract and shall include but not be limited to the fo llowing: Furnishing, preparation, placing, compacting, and testing of subgrade; furnishing and installing formwork; furnishing, placing, compacting, and finishing concrete;and adjusting existing utilities and surface features to grade. Provide barricade, patrol, or otherwise protect newly placed concrete to prevent damage from occurring to the concrete until it is cured. Remove and replace damaged, vandalized or unsightly concrete. All traffic curb, and gutter shall match existing. Pay ment shall be made at the unit price per linear foot. Bid Item 21 0–Hot Mix Asphalt (HMA) The unit price per ton shall be full compensation for furnishing, placing and compacting HMA overlay per the plans and specifications.The price includes but is not limited to:preparation of the saw cut edges with asphalt emulsions and base preparation prior to the placement of the HMA, additional saw cutting required, sealing of pavement joints and seal coating to match existing driveways;and pre-leveling of existing roadway surface. The unit price per ton shall include adjusting existing utilities and surface features to grade, joint sealing, and providing and installing monuments in cases.No additional payment will be made for work necessary to correct HMA not installed in accordan ce with the plans and specifications.Payment shall be per ton of HMA in place based on truck weight tickets. Bid Item 211–Utility Relocation Payments or credits for changes amounting to $10,000 or less when resolving utility conflicts may be made under the this bid item. At the Owner’s discretion, additional work or payments may be authorized to resolve utility conflicts encountered during the construction of improvements. Monies in this bi d item may be used to cover the cost to resolve said conditions. At the discretion of the Owner, the procedure for Minor Changes may be used in lieu of the more formal procedure as outlined General Conditions. The Contractor will be provided a copy of the completed order as directed by the Owner prior to work approval. The agreement for the authorized work will be documented by signature of the Contractor, or notation of verbal agreement. If the Contractor is in disagreement with anything required by the order, the Contractor may protest the order as provided in Section 1-04.5, Procedure and Protest by the Contractor, in the Washington State Depa rtment of Standards and Specifications Manual. Payments or credits will be determined in accordance with Section 1-09.4, Equitable Adjustment, in the Washington State Department of Standards and Specifications Manual. For the purpose of providing a common Proposal for all Bidders, the Contracting Agenc y has entered an amount for this item in the Proposal to become a part of the Bid by the Contractor. Bid Item 21 2–Traffic Markings The lump sum price shall be full compensation for providing all materials, equipment, and labor necessary for: preliminary spotting, preparation of roadway surface, marking application, and any other materials needed for thermo-plastic striping/marking ins tallation in accordance with the Plans and Specifications. This Bid Item shall cover traffic markings as called out on the Plans, as well as the restoration of traffic markings disturbed by construction activities. Restoration of disturbed traffic markings shall be in kind. Where traffic markings are partially dis turbed, the whole making shall be removed and replaced. No payment will be made for thermo-plastic striping outside the extents shown on the Plans, unless the Engineer or City authorizes, in writing,an additional amount of thermo-plastic striping to be installed. Bid Item 213–Stormwater Pipe Replacement The unit price per linear feet shall be full compensation for furnishing all tools, equipment, and labor necessary to remove and replace existing stormwater pipes as specified per the Plans and specified herein. This price shall include but is not limited to: sawcutting, removal of HMA; trench excavation and removal of existing stormwater pipe; placement and compaction of crushed rock pipe bedding; procurement and placement of ductile iron pipe (new stormwater pipe); integration with stormwater structure; haul and disposal of removed mat erials; handling, placement, and preparation of import temporary and final trench patch material and cleanup during and after construction activities to a safe and tidy condition as identified by the City. No additional payment will be made for any work do ne in providing traffic control devices as shown on the Plans. Bid Item 214–Roadway Site Restoration The price shall be compensation for providing all labor, materials, and equipment for restoration of damaged or otherwise altered features necessary to construct the roadway improvements as detailed in the Plans. Restoration shall include but not be limited to: planting salvaged or new shrubs and trees; restoration of beauty bark, topsoil, fertilizer, excavation, planters; furnishing, and handling of hydroseed and grass sod i n place; reinstalling fences, signs, monuments, guy wires, and other surface features that need to be removed and replaced or removed and relocated to construct the proposed improvements in accordance with the Plans and Specifications. Price shall include both permanent and tem porary relocations. No additional payment will be made for any work done in providing traffic control devices as shown on the Plans. Payments or credits for changes amounting to $10,000 or less may be made under the Bid item “Roadway Site Restoration”. At the discretion of the City, this procedure for Roadway Site Restoration may be used in lieu of the more formal procedure as outlined General Conditions. At the time of authorization, the Owner and Contractor will agree to the basis of compensation for that work, by force account, as set forth in Section 1-09.7. Approved work performed under this bid item will be performed only after a w ork directive is issued by the Owner. Any additional work performed prior to the work directive being issued by the Owner will not be compensated under this bid item. For the purpose of providing a common Proposal for all Bidders, the Owner has entered an amount for “Roadway Site Restoration” in the Proposal to become a part of the Bid by the Contractor. Note: The intent of this Bid Item is to cover the cost for restoring all surface features to existing conditions that does not include HMA or cement concrete sidewalk restoration. Bid Item 2 15–Traffic Control and Temporary Roadway Closures The lump sum price shown shall cover the complete cost of all labor, equipment, furnishing, installing, and removing all temporary traffic and pedestrian signs and barricades, furnishing and maintaining programable message board signs, submittal and updati ng of traffic control and detouring plans to the City of Yelm, and all necessary traffic control in accordance with the traffic control plan requirements identified herein. This Bid Item shall include all labor needed throughout the duration of the project including Fife Police.Partial payments for this item will be made in connection with the monthly pay estimates based upon work completed. Bid Item 216–Minor Change Payments or credits for changes amounting to $20,000 or less may be made under the Bid item “Minor Change”. At the discretion of the City, this procedure for Minor Changes may be used in lieu of the more formal procedure as outlined General Conditions. The Contractor will be provided a copy of the completed order for Minor Change. The agreement for the Minor Change will be documented by signature of the Contractor, or notation of verbal agreement. If the Contractor is in disagreement with anything requir ed by the order for Minor Change, the Contractor may protest the order as provided in Section 1-04.5, Procedure and Protest by the Contractor, in the Washington State Department of Standards and Specifications Manual. Payments or credits will be determined in accordance with Section 1-09.4, Equitable Adjustment, in the Washington State Department of Standards and Specifications Manual. For the purpose of providing a common Proposal for all Bidders, the Contracting Agenc y has entered an amount for “Minor Change” in the Proposal to become a part of the Bid by the Contractor. Appendix A Standard Plans and Details Appendix B Prevailing Wages and Benefit Code Key Benefit Code Key – Effective 9/2/202 6 thru 3/2/202 7 ************************************************************************************************************ Overtime Codes Overtime calculations are based on the hourly rate actually paid to the worker. On public works projects, the hourly rate must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits ac tually provided for the worker. 1.ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES T HE HOURLY RATE OF WAGE. B. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. C. The first two (2) hours after eight (8) regular hours Monday through Friday and the first ten (10) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other overtime hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. D. The first two (2) hours before or after a five-eight (8) hour workweek day or a four-ten (10) hour workweek day and the first eight (8) hours worked the next day after either workweek shall be paid at one and one-half times the hourly rate of wage. All additional hours worked and all worked on Sundays and holidays shall be paid at double the hourly rate of wage. E. The first two (2) hours after eight (8) regular hours Monday through Friday and the first eight (8) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. F. The first two (2) hours after eight (8) regular hours Monday through Friday and the first ten (10) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other overt ime hours worked, except Labor Day, shall be paid at double the hourly rate of w age. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. G. The first ten (10) hours worked on Saturdays and the first ten (10) hours worked on a f ifth calendar weekday in a four- ten hour schedule, shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of ten (10) hours per day Monday through Saturday and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. H. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions or equipment breakdown) shall be paid at one and one-half times the hourly rate of wage. All hours worked Monday through Saturday over twelve (12) hours and all hours worked on Sundays and holidays shall be paid at doubl e the hourly rate of wage. I.All hours worked on Sundays and holidays shall also be paid at double the hourly rate of wage. J. The first two (2) hours after eight (8) regular hours Monday through Friday and the first ten (10) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked over ten (10) hours Monday through Saturday, Sundays and ho lidays shall be paid at double the hourly rate of wage. K. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. M. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions) shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 1 | Page Benefit Code Key – Effective 9/2/202 6 thru 3/2/202 7 Overtime Codes Continued 1. N. All hours worked on Saturdays (except makeup days) shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. O. The first ten (10) hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays, holidays and after twelve (12) hours, Monday through Friday and after ten (10) hours on Saturday shall be paid at double the hourly rate of wage. P. All hours worked on Saturdays (except makeup days if circumstances warrant) and Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. Q. The first two (2) hours after eight (8) regular hours Monday through Friday and up to ten (10) hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of ten (10) hours per day Monday through Saturday and all hours worked on Sundays and holidays (except Christmas day) shall be paid at double the hourly rate of wage. All hours worked on Christmas day shall be paid at two and one-half times the hourly rate of wage. R. All hours worked on Sundays and holidays shall be paid at two times the hourly rate of wage. U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays (except Labor Day) shall be paid at two times the hourly rate of wage. All hours worked on Labor Day shall be paid at t hree times the hourly rate of wage. V. All hours worked on Sundays and holidays (except Thanksgiving Day and Christmas day) shall be paid at one and one-half times the hourly rate of wage. All hours worked on Thanksgiving Day and Christmas day shall be paid at double the hourly rate of wage. X. The first four (4) hours after eight (8) regular hours Monday through Friday and the first twelve (12) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked over twelve (12) hours Monday through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage. When holiday falls on Saturday or Sunday, the day before Saturday, Friday, and the day after Sunday, Monday, shall be c onsidered the holiday and all work performed shall be paid at double the hourly rate of wage. Y. All hours worked outside the hours of 5:00 am and 5:00 pm (or such other hours as may be agreed upon by any employer and the employee) and all hours worked in excess of eight (8) hours per day (10 hours per day for a 4 x 10 workweek) and on Saturdays and h olidays (except labor day) shall be paid at one and one-half times the hourly rate of wage. (except for employees who are absent from work without prior approval on a scheduled workday during the workweek shall be paid at the straight-time rate until they have worked 8 hours in a day (10 in a 4 x 10 workweek) or 40 hours during that workweek.) All hours worked Monday through Saturday over twelve (12) hours and all hours worked on Sundays and Labor Day shall be paid at double the hourly rate of wage. Z. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid the straight time rate of pay in addition to holiday pay. 2 | Page Benefit Code Key – Effective 9/2/202 6 thru 3/2/202 7 Overtime Codes Continued 2.ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. F. The first eight (8) hours worked on holidays shall be paid at the straight hourly rate of wage in addition to the holiday pay. All hours worked in excess of eight (8) hours on holidays shall be paid at double the hourly rate of wage. M. This code appears to be missing. All hours worked on Saturdays, Sundays and holidays shall be paid at double the hourly rate of wage. R. All hours worked on Sundays and holidays and all hours worked over sixty (60) in one week shall be paid at double the hourly rate of wage. U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked over 12 hours in a day or on Sundays and holidays shall be paid at double the hourly rate of wage. 3.ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. F.All hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on paid holidays shall be paid at two and one-half times the hourl y rate of wage including holiday pay. H. All work performed on Sundays between March 16th and October 14th and all Holidays shall be compensated for at two (2) times the regular rate of pay. Work performed on Sundays between October 15th and March 15th shall be compensated at one and one half (1-1/2) times the regular rate of pay. J. All hours worked between the hours of 10:00 pm and 5:00 am, Monday through Friday, and all hours worked on Saturdays shall be paid at a one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. K. Work performed in excess of eight (8) hours of straight time per day, or ten (10) hours of straight time per day when four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or outside the normal 5 a m to 6pm shift, and all work on Saturdays shall be paid at one and one-half times the hourly rate of wage. All work performed after 6:00 pm Saturday to 5:00 am Monday and Holidays, and all hours worked in excess of twelve (12) hours in a single shift shall be paid at double the hourly rate of wage. After an employee has worked eight (8) hours at an applicable overtime rate, all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight (8) hours or more. When an employee returns to work without at least eight (8) hours time off since their previous shift, all such time shall be a continuation of shift and paid at the applicable overtime rate until he/she shall have the eight (8) hours rest period. 3 | Page Benefit Code Key – Effective 9/2/202 6 thru 3/2/202 7 Overtime Codes Continued 4.ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. A. All hours worked in excess of eight (8) hours per day or forty (40) hours per week shall be paid at double the hourly rate of wage. All hours worked on Saturdays, Sundays and holidays shall be paid at double the hourly rate of wage C. On Monday through Friday, the first four (4) hours of overtime after eight (8) hours of straight time work shall be paid at one and one half (1-1/2) times the straight time rate of pay, unless a four (4) day ten (10) hour workweek has been established. On a four (4) day ten (10) hour workweek scheduled Monday through Thursday, or Tuesday through Friday, the first two (2) hours of overtime after ten (10) hours of straight time work shall be paid at one and one half (1-1/2) times the straight time rate of pa y. On Saturday, the first twelve (12) hours of work shall be paid at one and one half (1-1/2) times the straight time rate of pay, except that if the job is down on Monday through Friday due to weather conditions or other conditions outside the control of the employer, the first ten (10) hours on Saturday may be worked at the straight time rate of pay. All hours worked over twelve (12) hours in a day and all hours worked on Sunday and Holidays shall be paid at two (2) times the straight time rate of pay. D. All hours worked in excess of eight (8) hours per day or forty (40) hours per week shall be paid at double the hourly rate of wage. All hours worked on Saturday, Sundays and holidays shall be paid at double the hourly rate of pay. Rates include all members of the assigned crew. EXCEPTION: On all multipole structures and steel transmission lines, switching stations, regulating, capacitor stations, generating plants, industrial plants, associated installations and substations, except those substations whose primary function is to feed a distr ibution system, will be paid overtime under the following rates: The first two (2) hours after eight (8) regular hours Monday through Friday of overtime on a regular workday, shall be paid at one and one-half times the hourly rate of wage. All hours in excess of ten (10) hours will be at two (2) times the hourly rate of wage. The first eight (8) hours worked on Saturday will be paid at one and one-half (1-1/2) times the hourly rate of wage. All hours worked in excess of eight (8) hours on Saturday, an d all hours worked on Sundays and holidays will be at the double the hourly rate of wage. All overtime eligible hours performed on the above described work that is energized, shall be paid at the double the hourly rate of wage. E. The first two (2) hours after eight (8) regular hours Monday through Friday and the first eight (8) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on S undays and holidays shall be paid at double the hourly rate of wage. On a four-day, ten-hour weekly schedule, either Monday thru Thursday or Tuesday thru Friday schedule, all hours worked after ten shall be paid at double the hourly rate of wage. The Monday or Friday n ot utilized in the normal four- day, ten hour work week, and Saturday shall be paid at one and one half (1½) times the regular shift rate for the first eight (8) hours. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. G. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked Monday through Saturday over twelve (12) hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. I.The First eight (8) hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of eight (8) per day on Saturdays shall be paid at double the hourly rate of wage. All hours 4 | Page Benefit Code Key – Effective 9/2/202 6 thru 3/2/202 7 worked on Sundays and holidays shall be paid at double the hourly rate of wage. Overtime Codes Continued 4. J. The first eight (8) hours worked on a Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of eight (8) hours on a Saturday shall be paid at double the hourly rate of wage. All hours worked over twelve (12) in a day, and all hours worked on Sundays and Holidays shall be paid at double the hourly rate of wage. K. All hours worked on a Saturday shall be paid at one and one-half times the hourly rate of wage, so long as Saturday is the sixth consecutive day worked. All hours worked over twelve (12) in a day Monday through Saturday, and all hours worked on Sundays and Holidays shall be paid at double the hourly rate of wage. L. The first twelve (12) hours worked on a Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on a Saturday in excess of twelve (12) hours shall be paid at double the hourly rate of pay. All hours worked over twelve (12) in a day Monday through Friday, and all hours worked on Sundays shall be paid at d ouble the hourly rate of wage. All hours worked on a holiday shall be paid at one and one-half times the hourly rate of wage, except that all hours worked on Labor Day shall be paid at double the hourly rate of pay. S. On a four (4) day ten (10) hour workweek scheduled Monday through Thursday, or Tuesday through Friday, work performed in excess of (10) hours shall be paid at one and one half (1-1/2) times the hourly rate of pay. On Monday through Friday, work performed outside the normal work hours of 6:00 a.m. and 6:00 p.m. shall be paid at one and one-half (1-1/2) times the straight time rate, (e xcept for special shifts or multiple shift operations). All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All work performed on Sundays and holidays shall be paid at double the hourly rate of wage. When an employee returns to work without at least eight (8) hours time off since their previous shift, all such time shall be a continuation of shift and paid at the applicable overtime rate until such time as the employee has had a break of eight (8) hours. Multiple Shift Operations: When the first shift of a multiple shift (a two or three shift) operation is started at the basic straight time rate or at a specific overtime rate, all shifts of that day's operation shall be completed at that rate. Specia l Shif ts: The Special Shift Premium is the basic hourly rate of pay plus $2.00 an hour. When due to conditions beyond the control of the employer or when an owner (not acting as the contractor), a government agency or the contract specifications require more tha n four (4) hours of a special shift can only be performed outside the normal 6am to 6pm shift then the special shift premium will be applied to the basic straight time for the entire shift. When an employee works on a special shift, they shall be paid the special shift premium for each hour worked unless they are in overtime or double-time status. (For example, the special shift premium does not waive the overtime requirements for work performed on Saturday or Sunday). U. The first four (4) hours after eight (8) regular hours Monday through Friday and the first twelve (12) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. (Except on makeup days if work is lost due to inclement weather, then the first eight (8) hours on Saturday may be paid the regular rate.) All hours worked over twelve (12) hours Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 5 | Page Benefit Code Key – Effective 9/2/202 6 thru 3/2/202 7 Overtime Codes Continued 4. X. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. Work performed outside the normal shift of 6 am to 6pm shall be paid at one and one-half the straight time rate, (except for special shifts or three shift operations). All work performed on Sundays and holidays s hall be paid at double the hourly rate of wage. Shifts may be established when considered necessary by the Employer. The Employer may establish shifts consisting of eight (8) or ten (10) hours of work (subject to WAC 296-127-022), that shall constitute a normal forty (40) hour work week. The Employer can change from a 5-eight to a 4-ten hour schedule or back to the other. All hours of work on these shifts shall be paid for at the straight time hourly rate. Work performed in excess of eight hours (or ten hours per day (subject to WAC 296-127-022) shall be paid at one and one- half the straight time rate. When due to conditions beyond the control of the Employer, or when contract specifications require that work can only be performed outside the regular day shift, then by mutual agreement a special shift may be worked at the straight time rate, eight (8) ho urs work for eight (8) hours pay. The starting time shall be arranged to fit such conditions of work. When an employee returns to work without at a break of eight (8) hours since their previous shift, all such time shall be a continuation of shift and paid at the applicable overtime rate until such time as the employee has had a break of eight (8) hours. Overtime Codes Continued 11. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B After an employ ee has worked eight (8) hours, all additional hours worked shall be paid at the applicable overtime rate until such time as the employee has had a break of eight (8) hours or more. C The first two (2) hours after eight (8) regular hours Monday through Friday and the first eight (8) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other overtime hours worked, except Labor Day, and all hours on Sunda y shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. All non-overtime and non-holiday hours worked between 4:00 pm and 5:00 am, Monday through Friday, shall be paid at a premium rate of 15% over the hourly rate of wage. D. All hours worked on Saturdays and holidays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays shall be paid at double the hourly rate of wage. After an employee has worked eight (8) hours, all additional hours worked shall be paid at the applicable overtime rate until such time as the employee has had a break of eight (8) hours or more. E. The first two (2) hours after eight (8) regular hours Monday through Friday, the first ten (10) hours on Saturday, and the first ten (10) hours worked on Holidays shall be paid at one and one-half times the hourly rate of wage. All hours worked over ten (10) hours Monday through Saturday, and Sundays shall be paid at double the hourly rate of wage. After an employee has worked eight (8) hours, all additional hours worked shall be paid at the applicable overtime rate until such time as the employee has had a break of eight (8) hours or more. 6 | Page Benefit Code Key – Effective 9/2/202 6 thru 3/2/202 7 Overtime Codes Continued 11. F. The first two (2) hours after eight (8) regular hours Monday through Friday and the first eight (8) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. On a four-day, ten-hour weekly schedule, either Monday thru Thursday or Tuesday thru Friday schedule, all hours worked after ten shall be paid at double the hourly rate of wage. The Monday or Friday not utilized in the normal four- day, ten hour work week, and Saturday shall be paid at one-half times the hourly rate of wage for the first eight (8) hours. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. G. Work performed in excess of eight (8) hours of straight time per day, or ten (10) hours of straight time per day when four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or outside the normal 5 a m to 6pm shift, and all work on Saturdays shall be paid at one and one-half times the hourly rate of wage. All work performed after 6:00 pm Saturday to 5:00 am Monday and Holidays, and all hours worked in excess of twelve (12) hours in a single shift shall be paid at double the hourly rate of wage. After an employee has worked eight (8) hours at an applicable overtime rate, all additional hours shall be at the applicable overtime rate until such time as t he employee has had a break of nine (9) hours or more. When an employee returns to work without at least nine (9) hours time off since their previous shift, all such time shall be a continuation of shift and paid at the applicable overtime rate until he/she shall have the nine (9) hours rest period. H. Work performed in excess of eight (8) hours of straight time per day, or ten (10) hours of straight time per day when four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or outside the normal 5 a m to 6pm shift, and all work on Saturdays shall be paid at one and one-half times the hourly rate of wage. All work performed after 6:00 pm Saturday to 5:00 am Monday and Holidays, and all hours worked in excess of twelve (12) hours in a single shift shall be paid at double the hourly rate of wage. After an employee has worked eight (8) hours at an applicable overtime rate, all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of ten (10) hours or more. When an employee returns to work without at least ten (10) hours time off since their previous shift, all such time shall be a continuation of shift and paid at the applicable overtime rate until he/she shall have the ten (10) hours rest period. J. All hours worked on holidays shall be paid at double the hourly rate of wage. K. O n Monday through Friday hours worked outside 4:00 am and 5:00 pm, and the first two (2) hours after eight (8) hours worked shall be paid at one and one-half times the hourly rate. All hours worked over 10 hours per day Monday through Friday, and all hours worked on Saturdays, Sundays, and Holidays worked shall be paid at double the hourly rate of wage. L. An employee work ing outside 5:00 am and 5:00 pm shall receive an additional two dollar ($2.00) per hour for all hours worked that shift. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. 7 | Page Benefit Code Key – Effective 9/2/202 6 thru 3/2/202 7 Overtime Codes Continued 11. M. On Monday through Friday, the first four (4) hours of overtime after eight (8) hours of straight time work shall be paid at one and one half (1-1/2) times the straight time rate of pay, unless a four (4) day ten (10) hour workweek has been established. On a four (4) day ten (10) hour workweek scheduled Monday through Thursday, or Tuesday through Friday, the first two (2) ho urs of overtime after ten (10) hours of straight time work shall be paid at one and one half (1-1/2) times the straight time rate of pay. Work performed outside the normal work hours of 5:00 a.m. and 6:00 p.m. shall be paid at one and one-half (1-1/2) times the straight time rate, (except for special shifts or multiple shift operations). When the first shift of a multiple shift (a two or thr ee shift) operation is started at the basic straight time rate or at a specific overtime rate, all shifts of that day's operation shall be completed at that rate. When due to conditions beyond the control of the Employer or when contract specifications req uire that work can only be performed outside the regular day shift of 5:00 am to 6:00 pm, then a special shift may be worked at the straight time rate, plus the shift pay premium when applicable. The starting time of work will be arranged to fit such condi tions of work. Such shift shall consist of eight (8) hours work for eight (8) hours pay or ten (10) hours work for ten (10) hours pay for four ten shifts. On Saturday, the first twelve (12) hours of work shall be paid at one and one half (1-1/2) times the straight time rate of pay. All work performed after 6:00 pm Saturday to 5:00 am Monday, all work performed over twelve (12) hours, and all work performed o n holidays shall be paid at double the straight time rate of pay. Shift Pay Premium: In an addition to any overtime already required, all hours worked between the hours of 6:00 pm and 5:00 am shall receive an additional two dollars ($2.00) per hour. N. All work performed over twelve hours in a shift and all work performed on Sundays and Holidays shall be paid at double the straight time rate. Any time worked over eight (8) hours on Saturday shall be paid double the straight time rate, except employees assigned to work six 10-hour shifts per week shall be paid double the straight time rate for any time worked on Saturday over 10 hours. O. All work performed on Saturdays, Sundays, and Holidays shall be paid at one and one half (1-1/2) times the straight time rate of pay. 8 | Page Benefit Code Key – Effective 9/2/202 6 thru 3/2/202 7 Overtime Codes Continued 11. P. Work performed in excess of ten (10) hours of straight time per day when four ten (10) hour shifts are established and all work on Saturdays, except for make-up days shall be paid at time and one-half (1 ½) the straight time rate. Work performed outside the normal work hours of 5:00 a.m. and 6:00 p.m. shall be paid at one and one-half (1-1/2) times the straight time rate, (except for special shifts or multiple shift operations). When the first shift of multiple shift (a two or three shift) operation is started at the basic straight time rate or at a specific overtime rate, all shifts of that day’s operation shall be completed at that rate. When due to conditions beyond the control of the Employer or when contract specifications requi re that work can only be performed outside the regular day shift of 5:00 a.m. to 6:00 p.m., then a special shift may be worked at the straight time rate, plus the shift pay premium when applicable. The starting time of work will be arranged to fit such con ditions of work. Such shifts shall consist of eight (8) hours work for eight (8) hours pay or ten (10) hours work for ten (10) hours pay for four ten-hour shifts. In the event the job is down due to weather conditions, then Saturday may, be worked as a voluntary make-up day at the straight time rate. However, Saturday shall not be utilized as a make-up day when a holiday falls on Friday. All work performed on Sunday s and holidays and work in excess of twelve (12) hours per day shall be paid at double (2x) the straight time rate of pay. After an employee has worked eight (8) hours at an applicable overtime rate, all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight (8) hours. When an employee returns to work without a break of eight (8) hours since their previous shift, all such time shall be a continuation of shift and paid at the applicable overtime rate until such time as the employee has had a break of eight (8) hours. Q. All hours worked between the hours of 6:00 pm and 6:00 am, Monday through Saturday, shall be paid at a premium rate of 35% over the hourly rate of wage. Work performed on Sundays shall be paid at double time. All hours worked on holidays shall be paid at doub le the hourly rate of wage. R On Monday through Saturday hours worked outside 6:00 am and 7:00 pm, and all hours after eight (8) hours worked shall be paid at one and one-half times the hourly rate. All hours worked on Sundays and Holidays shall be paid at double the hourly rate of wage. When a holiday falls on a Sa turday, the Friday before shall be the observed holiday. When a holiday falls on a Sunday, the following Monday shall be the observed holiday. S. The first ten (10) hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. In the event the job is down due to weather conditions, or other conditions beyond the control of the Employer, then Saturday may be worked at the straight time rate, for the first eight (8) hours, or the first ten (10) hours when a four day ten hour wor kweek has been established. All hours worked Monday through Saturday over twelve (12) hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. When an employee returns to work without a break of eight (8) hours since their previous shift, all such time shall be a continuation of shift and paid at the applicable overtime rate until such time as the employee has had a break of eight (8) hours. 9 | Page Benefit Code Key – Effective 9/2/202 6 thru 3/2/202 7 Overtime Codes Continued 11. T. On Monday through Friday, the first four (4) hours of overtime after eight (8) hours of straight time work shall be paid at one and one half (1-1/2) times the straight time rate of pay, unless a four (4) day ten (10) hour workweek has been established. On a four (4) day ten (10) hour workweek scheduled Monday through Thursday, or Tuesday through Friday, the first two (2) hours of overtime after ten (10) hours of straight time work shall be paid at one and one half (1-1/2) times the straight time rate of pay. On Saturday, the first twelve (12) hours of work shall be paid at one and one half (1-1/2) times the straight time rate of pay, except that if the job is down on Monday through Friday due to weather conditions or other conditions outside the control of th e employer, the first ten (10) hours on Saturday may be worked at the straight time rate of pay. All hours worked over twelve (12) hours in a day and all hours worked on Sunday and Holidays shall be paid at two (2) times the straight time rate of pay. U. On Monday through Friday, the first four (4) hours of overtime after eight (8) hours of straight time work shall be paid at one and one half (1-1/2) times the straight time rate of pay, unless a four (4) day ten (10) hour workweek has been established. On a four (4) day ten (10) hour workweek scheduled Monday through Thursday, or Tuesday through Friday, the first two (2) hours of overtime after ten (10) hours of straight time work shall be paid at one and one half (1-1/2) times the straight time rate of pay. On Saturday, the first twelve (12) hours of work shall be paid at one and one half (1-1/2) times the straight time rate of pay, except that if the job is down on Monday through Friday due to weather conditions or other conditions outside the control of the employer, the first ten (10) hours on Saturday may be worked at the straight time rate of pay. All hours worked over twelve (12) hours in a day and all hours worked on Sunday and Holidays shall be paid at two (2) times the straight time rate of pay. If, due to conditions beyond the control of the Employer or when contract specifications require that work can only be performed outside the regular day shift, then a Special Shift may be worked, Monday through Friday, at the straight-time rate. The starti ng time of work for the Special Shift will be arranged to fit such conditions of work. Such Special Shift shall consist of eight (8) hours of work for eight (8) hours of pay or ten (10) hours of work for ten(10) hours of pay on a four-ten workday schedule. V. All hours worked on Saturdays and Sundays (except make-up days due to conditions beyond the control of the employer) shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wa ge. W. Work performed in excess of eight (8) hours of straight time per day, or ten (10) hours of straight time per day when four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or outside the normal 6 am to 6pm shift, and all work on Saturdays shall be paid at one and one-half times the hourly rate of wage. All work performed on Sundays a nd Holidays shall be paid at double the hourly rate of wage. After an employee has worked eight (8) hours at an applicable overtime rate, all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight (8) hours or more. When an employee returns to work without at least eight (8) hours time off since their previous shift, all such time shall be a continuation of shift and paid at the applicable overtime rate until he/she shall have the eight (8) hours rest period. 10 | Page Benefit Code Key – Effective 9/2/202 6 thru 3/2/202 7 X. Overtime Calculations are based on the hourly rate actually paid to the worker. On public works projects, the hourly rate must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for the worke r. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. Work performed in excess of ten (10) hours of straight time per day when four ten (10) hour shifts are established and all work on Saturdays, except for make-up days shall be paid at time and one-half (1 ½) the straight time rate. Work performed outside the normal work hours of 5:00 a.m. and 6:00 p.m. shall be paid at one and one-half (1-1/2) times the straight time rate, (except for special shifts or multiple shift operations). When the first shift of multiple shift (a two or three shift) operation is started at the basic straight time rate or at a specific overtime rate, all shifts of that day’s operation shall be completed at that rate. When due to conditions beyond the control of the Employer or when contract specifications requi re that work can only be performed outside the regular day shift of 5:00 a.m. to 6:00 p.m., then a special shift may be worked at the straight time rate, plus the shift pay premium when applicable. The starting time of work will be arranged to fit such con ditions of work. Such shifts shall consist of eight (8) hours work for eight (8) hours pay or ten (10) hours work for ten (10) hours pay for four ten-hour shifts. In the event the job is down due to weather conditions, then Saturday may, be worked as a voluntary make-up day at the straight time rate. However, Saturday shall not be utilized as a make-up day when a holiday falls on Friday. All work performed on Sunday s and holidays and work in excess of twelve (12) hours per day shall be paid at double (2x) the straight time rate of pay. After an employee has worked eight (8) hours at an applicable overtime rate, all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight (8) hours. When an employee returns to work without a break of eight (8) hours since their previous shift, all such time shall be a continuation of shift and paid at the applicable overtime rate until such time as the employee has had a break of eight (8) hours. Special Shifts: When due to conditions beyond the control of the Employer or when contract specifications require that work can only be performed outside the regular day shift, then a special shift may be worked at the straight time rate. The starting time of work will be arranged to fit such conditions of work. Such shift shall consist of eight (8) hours work for eight (8) hours pay or ten (10) hours work for ten (10) hours pay for four ten- hour shifts. Y. Overtime calculations are based on the hourly rate actually paid to the worker. On public works projects, the hourly rate must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for the worker. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions) shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. When due to conditions beyond the control of the Employer or when contract specifications require that work can only be performed outside the regular day shift, then a special shift may be worked at the straight time rate. The starting time of work will b e arranged to fit such conditions of work. Such shift shall consist of eight (8) hours work for eight (8) hours pay. Special Shift Premium for Prevailed work in Washington is basic hourly rate plus $2.00 per hour. When conditions 11 | Page Benefit Code Key – Effective 9/2/202 6 thru 3/2/202 7 beyond the control of the Employer or when an owner (not acting as the contractor), a government agency or the contract specifications requires that more than four (4) hours of the special shift can only be performed outside the normal 6 a.m. – 6 p.m. shif t, then the special shift premium will be applied to the basic straight time for the entire shift. When an Employee works on a special shift, they shall be paid the special shift premium for each hour worked unless they are in overtime or double-time stat us. Shift premium will only apply on the second shift of a two-shift operation when the language above is met. Z. Overtime calculations are based on the hourly rate actually paid to the worker. On public works projects, the hourly rate must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for the worker. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions) shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. SPECIAL SHIFT: A special shift may be established at any time, at the option of the Employer, on any job or project. Holiday Codes 5. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, and Christmas Day (7). B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, the day before Christmas, and Christmas Day (8). C. Holidays: New Year's Day, Presidents’ Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8). D. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day, And Christmas Day (8). H. Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Day after Thanksgiving Day, A nd Christmas (6). I. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiv ing Day, and Christmas Day (6). K. Holidays: New Year’s Day, Presidents’ Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day, The Day Before Ch ristmas, And Christmas Day (9). L. Holidays: New Year’s Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiv ing Day, And Christmas Day (8). N. Holidays: New Year's Day, Presidents’ Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, The Friday After Thanksgiv ing Day, And Christmas Day (9). 12 | Page Benefit Code Key – Effective 9/2/202 6 thru 3/2/202 7 P. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday And Saturday After Thanksgiving Day, The Day Before Christmas, And Christmas Day (9). If A Holiday Falls On Sunday, The Following Monday Sh all Be Considered As A Holiday. Q. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiv ing Day, and Christmas Day (6). R. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving Day, One-Half Day Before Christmas Day, And Christma s Day. (7 1/2). S. Paid Holidays: New Year's Day, Presidents’ Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, And Christmas Day (7). Z. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8). Holiday Codes Continued 6.G. Paid Holidays: New Year's Day, Martin Luther King Jr. Day, Presidents’ Day, Memorial Day, Independence Day, Labor Day, Ve terans' Day, Thanksgiving Day, the Friday a fter Th anksgiving Day, Christmas Day, a nd Christmas Eve Day (11). H. Paid Holidays: New Year's Day, New Year’s Eve Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day, Christmas Day, The Day After Christmas, And A Floating Holiday (10). T. Paid Holidays: New Year's Day, Presidents’ Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, The Last Working Day Before Christ mas Day, And Christmas Day (9). Z. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, And Christmas Day (7). If a holiday falls on Saturday, the preceding Friday shall be considered as the holiday. If a holiday falls on Sun day, the following Monday shal l be considered as the holiday. Holiday Codes Continued 7. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day, And Christmas Day (8). Any Holiday Which Falls On A Sunday Shall Be Observed As A Holiday On The Following Monday. If any of the listed holidays falls on a Saturday, the preceding Friday shall be a regular work day. B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. C. Holidays: New Year's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a h oliday on the preceding Friday. 13 | Page Benefit Code Key – Effective 9/2/202 6 thru 3/2/202 7 D. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran’s Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8). Unpaid Holidays: President’s Day. Any paid holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any paid holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. E. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. F. Holidays: New Year’s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, the last working day before Christmas day and Christmas day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the fol lowing Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. Holiday Codes Continued 7.G. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day (6). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. H. Holidays: New Year's Day, Martin Luther King Jr. Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, the Last Working Day before Christmas Day and Christmas Day (9). Any holiday which falls on a Sunday shall be obse rved as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. I.Holidays: New Year's Day, President’s Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, The Day Before Christmas Day And Christmas Day (9). Any holiday which falls on a Sunday shall be observed as a holida y on the following Monday. Any holiday which falls on a Saturday shall be observed as a ho liday on the preceding Friday. J. Holidays: New Year's Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day and Christmas Day (6). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a h oliday on the preceding Friday. K. Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. L. Holidays: New Year's Day, Memorial Day, Labor Day, Independence Day, Thanksgiving Day, the Last Work Day before Christmas Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. N. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. When Christmas fall s on a Saturday, the preceding Friday shall be observed as a holiday. P. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a h oliday on the following Monday. 14 | Page Benefit Code Key – Effective 9/2/202 6 thru 3/2/202 7 Q. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, the Last Working Day before Christmas Day and Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the fol lowing Monday. If any of the listed holidays falls on a Saturday, the preceding Friday shall be a regular work day. S. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, Christmas Day, t he Day a fter Christmas, and A Floating Holiday (9). If any of the listed holidays falls on a Sunday, the day observed by the Nation shall be considered a holiday and compensated accordingly. V. Holidays: New Year's Day, President’s Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, the day before or after Christmas, and the day before or after New Year’s Day. If any of the above listed holidays falls on a Sunday, the day observed by the Nation shall be considered a holiday and com pensated accordingly. W.Holidays: New Year's Day, Day After New Year’s, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Eve Day, Christmas Day, the day after Christmas, the day before New Year’s Day, and a Floating Holiday. Holiday Codes Continued 7. X. Holidays: New Year's Day, Day before or after New Year’s Day, Presidents’ Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Than ksgiving Day, Christmas Day, and the day before or after Christmas day. If a holiday falls on a Saturday or on a Friday that is the normal day off, then t he holiday will be taken on the last normal workday. If the holiday falls on a Monday that is the normal day off or on a Sunday, then the holiday will be taken on the next normal workday. Y.Holidays: New Year's Day, President s’ Day, Memorial Day, Independence Day, L abor Day, Thanksgiving Day, the Friday after Thanksgiving Day, and Christmas Day. (8) If the holiday falls on a Sunday, then the day observed by the federal government shall be considered a holiday and compensated accordingly. Z.Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day, Christmas Eve, and Christmas Day (9). Any holiday which falls on a Saturday shall be observed as a holiday on the precedi ng Friday. Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Holiday Codes Continued 15. G. New Year's Day, Washington’s Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, the last scheduled workday before Christmas, and Christmas Day (9). If any of the listed holidays falls on a Sunday, the day observed by the Nation shall be considered a holiday and compensated accordingly. H. Holidays: New Year's Day, Martin Luther King Jr. Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, the Last Working Day before Christmas Day and Christmas Day (9). Any holiday which falls on a Sunday shall be obse rved as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. I. Holidays: New Year's Day, President’s Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, The Day Before Christmas Day And Christmas Day (9). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be 15 | Page Benefit Code Key – Effective 9/2/202 6 thru 3/2/202 7 observed as a ho liday on the preceding Friday. J. Holidays: New Year's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day, and Christmas Day (9). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. If any of the listed holidays falls on a Saturday, the preceding Friday shall be a regular work day. K. Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. L. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving Day, and Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. If a ny of the listed holidays falls on a Saturday, the preceding Friday shall be a regular work day. M.Holidays: New Year's Day, Martin Luther King Jr. Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Eve Day and Christmas Day (9). Any holiday which falls on a Sunday shall be observed as a holida y on the following Monday. If any of the listed holidays falls on a Saturday, the preceding Friday shall be a regular work day. Holiday Codes Continued 15. N. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran’s Day, Thanksgiving Day, the Friday after Thanksgiving Day, and Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. O. Holidays: New Year's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day, the day before Christmas day, and Christmas Day (10). Any holiday which falls on a Sunday shall be observe d as a holiday on the following Monday. P. Holidays: New Year's Day, Memorial Day, Labor Day, Independence Day, Thanksgiving Day,t he Friday after Thanksgiving Day, Christmas Eve Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. Note Codes 8. D. Workers working with supplied air on hazmat projects receive an additional $1.00 per hour. L. Workers on hazmat projects receive additional hourly premiums as follows -Level A: $0.75, Level B: $0.50, And Level C: $0.25. M. Workers on hazmat projects receive additional hourly premiums as follows: Levels A & B: $1.00, Levels C & D: $0.50. N. Workers on hazmat projects receive additional hourly premiums as follows -Level A: $1.00, Level B: $0.75, Level C: $0.50, And Level D: $0.25. 16 | Page Benefit Code Key – Effective 9/2/202 6 thru 3/2/202 7 S. Effective August 31, 2012 – A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized. Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the State of Washington, Oregon, Montana, or Idaho. This classification is only effective on or after August 31, 2012. T. Effective August 31, 2012 – A Traffic Control Laborer performs the setup, maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular, bicycle, and pedestrian traffic during construction operations. Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the State of Washington, Oregon, Montana, or Idaho. This classification is only effecti ve on or after August 31, 2012. U. Workers on hazmat projects receive additional hourly premiums as follows – Class A Suit: $2.00, Class B Suit: $1.50, And Class C Suit: $1.00. Workers performing underground work receive an additional $0.40 per hour for any and all work performed underground, including operating, servicing and repairing of equipment. The premium for underground work shall be paid for the entire shift worked. Workers who work suspended by a rope or cable receive an additional $0.50 per hour. The premium for work suspended shall be paid for the entire shift worked. Workers who do “pioneer” work (break open a cut, build road, etc.) more than one hundred fifty (150) feet above grade elevation receive an additional $0.50 per hour. Note Codes Continued 8.V. In addition to the hourly wage and fringe benefits, the following depth and enclosure premiums shall be paid. The premiums are to be calculated for the maximum depth and distance into an enclosure that a diver reaches in a day. The premiums are to be paid one time for the day and are not used in calculating overtime pay. Depth premiums apply to depths of fifty feet or more. Over 50' to 100' - $2.00 per foot for each foot over 50 feet. Over 101' to 150' - $3.00 per foot for each foot over 101 feet. Over 151' to 220' - $4.00 per foot for each foot over 220 feet. Over 221' - $5.00 per foot for each foot over 221 feet. Enclosure premiums apply when divers enter enclosures (such as pipes or tunnels) where there is no vertical ascent and is measured by the distance travelled from the entrance. 25’ to 300’ - $1.00 per foot from entrance. 300’ to 600’ - $1.50 per foot beginn ing at 300’. Over 600’ - $2.00 per foot beginning at 600’. W.Meter Installers work on single phase 120/240V self-contained residential meters. The Lineman/Groundmen rates would apply to meters not fitting this description. X. Workers on hazmat projects receive additional hourly premiums as follows - Class A Suit: $2.00, Class B Suit: $1.50, Class C Suit: $1.00, and Class D Suit: $0.50. Special Shift Premium: Basic hourly rate plus $2.00 per hour. When due to conditions beyond the control of the Employer or when an owner (not acting as the contractor), a government agency or the contract specifications requires that work can only be performed outside the normal 5 am to 6pm shift, then the special sh ift premium will be applied to the basic hourly rate. When an employee works on a special shift, they shall be paid a special shift premium for each hour worked unless they are in OT or Double-time status. (For example, the special shift premium does not w aive the overtime requirements for work performed on Saturday or Sunday.) Y. Tide Work: When employees are called out between the hours of 6:00 p.m. and 6:00 a.m. to work on tide work (work located in the tide plane) all time worked shall be at one and one-half times the hourly rate of pay 17 | Page Benefit Code Key – Effective 9/2/202 6 thru 3/2/202 7 Swinging Stage/Boatswains Chair: Employees working on a swinging state or boatswains chair or under conditions that require them to be tied off to allow their hands to be free shall receive seventy-five cents ($0.75) per hour above the classification rate.. Z. Workers working with supplied air on hazmat projects receive an additional $1.00 per hour. Special Shift Premium: Basic hourly rate plus $2.00 per hour. When due to conditions beyond the control of the Employer or when an owner (not acting as a contractor), a government agency or the contract specifications require that more than (4) hours of a special shift can only be performed outside the normal 6 am to 6pm shift, then the special shift premium will be applied to the basic straight time for the entire shift. When an employee works on a special shift, they will be paid a special shift premium f or each hour worked unless they are in overtime or double- time status. (For example, the special shift premium does not waive the overtime requirements for work performed on Saturday or Sunday.) Note Codes Continued 9. A. Workers working with supplied air on hazmat projects receiv e an additional $1.00 per hour. Special Shift Premium: Basic hourly rate plus $2.00 per hour. When due to conditions beyond the control of the Employer or when an owner (not acting as the contractor), a government agency or the contract specifications require that more than four (4) hour s of a special shift can only be performed outside the normal 6 am to 6pm shift, then the special shift premium will be applied to the basic straight time for the entire shift. When an employee works on a special shift, they shall be paid a special shift premium for each hour worked unless they are in overtime or double- time status. (For example, the special shift premium does not waive the overtime requirements for work performed on Saturday or Sunday.) Certified Crane Operator Premium: Crane operators requiring certifications shall be paid $0.50 per hour above their classification rate. Boom Pay Premium: All cranes including tower shall be paid as follows based on boom length: (A) – 130’ to 199’ – $0.50 per hour over their classification rate. (B) – 200’ to 299’ – $0.80 per hour over their classification rate. (C) – 300’ and over – $1.00 per hour over their classification rate. B. The highest pressure registered on the gauge for an accumulated time of more than fifteen (15) minutes during the shift shall be used in determining the scale paid. Tide Work: When employees are called out between the hours of 6:00 p.m. and 6:00 a.m. to work on tide work (work located in the tide plane) all time worked shall be at one and one-half times the hourly rate of pay. Swinging Stage/Boatswains Chair: Employee s working on a swinging stage or boatswains chair or under conditions that require them to be tied off to allow their hands to be free shall receive seventy-five cents ($0.75) per hour above the classification rate. C. Tide Work: When employees are called out between the hours of 6:00 p.m. and 6:00 a.m. to work on tide work (work located in the tide plane) all time worked shall be at one and one-half times the hourly rate of pay. Swinging Stage/Boatswains Chair: Employees working on a swinging stage or boatswains chair or under conditions that require them to be tied off to allow their hands to be free shall receive seventy-five cents ($0.75) per hour above the classification rate. Effective August 31, 2012 – A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized. A Traffic Control Laborer performs the setup, maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular, bicycle, and pedestrian traffic during construction operations. Flaggers and Spotters shall be posted where shown on approved Traffic Control 18 | Page Benefit Code Key – Effective 9/2/202 6 thru 3/2/202 7 Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the State of Washington, Oregon, Montana, or Idaho. These classifications are only effective on or after August 31, 2012. D. Industrial Painter wages are required for painting within industrial facilities such as treatment plants, pipelines, towers, dams, bridges, power generation facilities and manufacturing facilities such as chemical plants, etc., or anywhere abrasive blastin g is necessary to prepare surfaces, or hazardous materials encapsulation is required. E. Heavy Construction includes c onstruction, repair, alteration or additions to the production, fabrication or manufacturing portions of industrial or manufacturing plants, hydroelectric or nuclear power plants and atomic reactor construction. Workers on hazmat projects receive additional hourly premiums as follows -Level A: $1.00, Level B: $0.75, Level C: $0.50, And Level D: $0.25. Note Codes Continued 9. F. I ndustrial Painter wages are required for painting within industrial facilities such as treatment plants, pipelines, towers, dams, power generation facilities and manufacturing facilities such as chemical plants, etc., or anywhere abrasive blasting is neces sary to prepare surfaces, or hazardous materials encapsulation is required. H. One (1) person crew shall consist of a Party Chief. (Total Station or similar one (1) person survey system). Two (2) person survey party shall consist of a least a Party Chief and a Chain Person. Three (3) person survey party shall consist of at least a Pa rty Chief, an Instrument Person, and a Chain Person. I. In addition to the hourly wage and fringe benefits, the following depth and enclosure premiums shall be paid. The premiums are to be calculated for the maximum depth and distance into an enclosure that a diver reaches in a day. The premiums are to be paid one time for the day and are not used in calculating overtime pay. Depth premiums apply to depths of fifty feet or more. Over 50' to 100' - $2.00 per foot for each foot over 50 feet. Over 101' to 150' - $3.00 per foot for each foot over 101 feet. Over 151' to 220' - $4.00 per foot for each foot over 220 feet. Over 221' - $5.00 per foot for each foot over 221 feet. Enclosure premiums apply when divers enter enclosures (such as pipes or tunnels) where there is no vertical ascent and is measured by the distance travelled from the entrance. 25’ to 300’ - $1.00 per foot from entrance. 300’ to 600’ - $1.50 per foot beginn ing at 300’. Over 600’ - $2.00 per foot beginning at 600’. Employees may be required to perform any combination of work within the Diving team/crew, (with the exception of dive Supervisor) provided they are paid at the highest rate at which he/she has worked for the shift. L. Workers on hazmat projects receive additional hourly premiums as follows -Level A: $0.75, Level B: $0.50, And Level C: $0.25. Tide Work: When employees are called out between the hours of 6:00 p.m. and 6:00 a.m. to work on tide work (work located in the tide plane) all time worked shall be at one and one-half times the hourly rate of pay. Swinging Stage/Boatswains Chair: Employees working on a swinging stage or boatswains chair or under conditions that require them to be tied off to allow their hands to be free shall receive seventy-five cents ($0.75) per hour above the classification rate. M. Certified Crane Operator Premium: Crane operators requiring certifications shall be paid $1.50 per hour above their classification rate. Workers on hazmat projects receive additional hourly premiums as follows - Class A Suit: $2.00, Class B Suit: $1.50, Class C Suit: $1.00, and Class D Suit: $0.50. 19 | Page Benefit Code Key – Effective 9/2/202 6 thru 3/2/202 7 Special Shift Premium: Basic hourly rate plus $2.00 per hour. When due to conditions beyond the control of the Employer or when an owner (not acting as the contractor), a government agency or the contract specifications requires that work can only be perfo rmed outside the normal 6 am to 6pm shift, then the special shift premium will be applied to the basic hourly rate. When an employee works on a special shift, they shall be paid a special shift premium for each hour worked unless they are in OT or Double-time status. (For example, the special shift premium does not waive the overtime requirements for work performed on Saturday or Sunday.) N. Tide Work: When employees are called out between the hours of 6:00 p.m. and 6:00 a.m.to work on tide work (work located in the tide plane) all time worked shall be at one and one-half times the hourly rate of pay. Swinging Stage/Boatswains Chair: Employees working on a swinging state or boatswains chair or under conditions that require them to be tied off to allow their hands to be free shall receive seventy-five cents ($0.75) per hour above the classification rate. When Laborers are required to work in or with live sanitary sewage, they will receive a premium payoff forty ($40.00) dollars per day above their regular daily classification pay. Further, the employer will pay all necessary inoculations to prevent disease if requested by the employee and as recommended by the Department of Labor and Industries (Industrial Safety and Health Division). O. Effective August 31, 2012 – A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized. Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the State of Washington, Oregon, Montana, or Idaho. This classification is only effective on or after August 31, 2012. Any laborer working in Live Sewers shall receive forty dollars ($40.00) per day in addition to regular pay. P. Tide Work: When employees are called out between the hours of 6:00 p.m. and 6:00 a.m. to work on tide work (work located in the tide plane) all time worked shall be at one and one-half times the hourly rate of pay. Swinging Stage/Boatswains Chair: Employees working on a swinging stage or boatswains chair or under conditions that require them to be tied off to allow their hands to be free shall receive seventy-five cents ($0.75) per hour above the classification rate. Effective August 31, 2012 – A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized. A Traffic Control Laborer performs the setup, maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular, bicycle, and pedestrian traffic during construction operations. Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the State of Washington, Oregon, Montana, or Idaho. These classifications are only effective on or after August 31, 2012. When Laborers are required to work in or with live sanitary sewage, they will receive a premium payoff forty ($40.00) dollars per day above their regular daily classification pay. Further, the employer will pay all necessary inoculations to prevent disease if requested by the employee and as recommended by the Department of Labor and Industries ( Industrial Safety and Health Division) Q. The highest pressure registered on the gauge for an accumulated time of more than fifteen (15) minutes during the shift shall be used in determining the scale paid. Tide Work: When employees are called out between the hours of 6:00 p.m. and 6:00 a.m. to work on tide work (work located in the tide plane) all time worked shall be at one and one-half times the hourly rate of pay. Swinging Stage/Boatswains Chair: Employee s working on a swinging stage or boatswains chair or under conditions that require them to be tied off to allow their hands to be free shall receive seventy-five cents ($0.75) per hour above the classification rate. 20 | Page Benefit Code Key – Effective 9/2/202 6 thru 3/2/202 7 When Laborers are required to work in or with live sanitary sewage, they will receive a premium payoff forty ($40.00) dollars per day above their regular daily classification pay. Further, the employer will pay all necessary inoculations to prevent disease if requested by the employee and as recommended by the Department of Labor and Industries (Industrial Safety and Health Division). 21 | Page Meeting Date: 10-27-2026 CITY COUNCIL AGENDA ITEM SUMMARY City of Yelm, Washington AGENDA ITEM: AMENDMENT NO. 2 TO THE PROFESSIONAL SERVICES AGREEMENT WITH RH2 FOR CONSTRUCTION MANAGEMENT OF THE 2026 CREEK ST. WATER MAIN IMPROVEMENTS PROJECT. COMMITTEE REVIEW: 9-22-2026 x YES NO COMMITTEE: Joseph Richardson (Chair), Brian Hess, and Terry Kaminski ATTORNEY REVIEW/APPROVAL:X YES NO N/A PROPOSED MOTION: Authorize Mayor Joe DePinto to sign Amendment No. 2 to the Professional Services Agreement with RH2 for construction management of the 2026 Creek St. Water Main Improvements project in the not to exceed amount of $123,000. KEY FACTS AND INFORMATION SUMMARY: We have 100% plans and specifications ready for construction. Amendment No. 2 will allow RH2 to oversee construction, approve materials based on specifications, implement their design, and give us full-time inspection of the project. ATTACHMENTS: Amendment No. 2 (City) Project Scope (RH2) Project Fee Breakdown (RH2) Respectfully Submitted: Brad Chatwood Projects & Programs Manager 1 | Page Public Services Department Physical Address: 901 Rhoton Road SE Mailing Address: 106 Second Street SE Yelm, WA 98597 (360) 458-8406 Fax: (360) 458-8417 Web: www.ci.yelm.wa.us AMENDMENT NO 2 TO THE PROFESSIONAL SERVICES AGREEMENT WITH RH2 FOR THE 2026 WATER MAIN IMPROVEMENT PRJECT – Creek St. Construction Management In accordance with our Professional Services Agreement for the 2026 Water Main Improvement project, dated 2/25/2026, this is an authorization to revise the project Scope of Work as described below. The work will be performed and invoiced using the terms and conditions listed in the original agreement, plus previous amendments and/or agreements. The Term of the Agreement is hereby modified as follows: This amendment includes all aspects of construction management outlined the scope below. We also will be extending the agreement completion date to 2/28/2027 The following items are hereby added to the Scope of Work and are detailed in attached Exhibit A: See Exhibit A The Compensation Amount of the Agreement is hereby modified as follows: The engineering fee authorization will increase by $123,000 for a total authorization amount of $566,500. IN WITNESS, the Parties execute this Agreement below, effective the last date written below. CITY OF YELM: ________________________________ Joe DePinto, Mayor DATE: ïðóîéóîðîê ATTEST: ________________________________ Kathy Linnemeyer, City Clerk Date: ïðóîéóîðîê APPROVED AS TO FORM: ________________________________ Brent Dille, City Attorney Date çóïêóîðîê RH2 By: ___________________________________ Printed Name: Title: City of Yelm Contract Amendment No.2 Water Main Improvements RH2 Project No.YELM 0260063.00 In accordance with our Professional Services Agreement for Design & Engineering of the 2026 Water Main Replacement Project,dated February 25, 2026,this is an authorization to revise the project parameters as described below.The work will be performed and invoiced using the terms and conditions listed in the o riginal a greement,plus previous a mendments. This Amendment incorporates the following elements of the Scope of Work,Fee Estimate, and Agreement: Provide services during construction for the Phase 2–Creek Street Water Main project as outlined in the attached Exhibit A and Exhibit B. The engineering fee authorization wil l increase by $1 2 3,0 00 for a total authorization amount of $5 6 6,5 00. The period of performance for this Agreement will be extended for a completion date of February 28,2027. Please sign this authorization in the space provided below and return to RH2 Engineering,Inc.,by mail at the address below,or by email to Contracts@RH2.com. RH2 Engineering, Inc.City of Yelm 22722 29 th Drive SE, Suite 210, Bothell, WA 98021 106 Second Street SE, Yelm, WA 98597 ïðóïíóîðîê SIGNATURE DATE SIGNATURE DATE Joe DePinto, Mayor PRINT NAME & TITLE PRINT NAME &TITLE 2 9/10/2026 9:34 AM-Creek Street SDC.docx\\corp.rh2.com\projects\Project\Data\YELM\26-0063\00 Contract\Amendment No. 2-Creek Street SDC\PSA_Amnd Agmt_Water Main Improvements Amendment No. EXHIBIT A Scope of Work Amendment No. 2 City of Yelm Water Main Improvements Creek Street Services During Construction September 2026 Background The City of Yelm (City) selected RH2 Engineering, Inc., (RH2) to prepare design documents for three water main Capital Improvement Program (CIP) projects from its 2025 Water System Plan to resolve existing system deficiencies and improve water system reliability and redundancy. The CIP projects and the work to be performed are as follows: W10–Add a pproximately 175 linear feet(lf)of water main from the existing Mountain View Road SE crossing at State Route (SR) 510, extending the water main to the entrance of Yelm High School and tying into the on-site water main to loop the high school water system. U psize approximately 1,050 lf of water main from Tahoma Boulevard SE to the Yelm High School parking lot. W11–Upsize approximately 1,480 lf of water main along portions of Creek Street SE from E Yelm Avenue(SR 507)to 103 rd Avenue SE. W12–Upsize approximately 3,8 00 lf of water main along E Yelm Avenue(SR 507)from approximately SE 4 th Street to NE Creek Street. The City elected to prepare two separate bid packages for these projects. W11(Creek Street)will be bid first because a future Washington State Department of Transportation (WSDOT) project starting in late 2026 will use Creek Street as a detour. T he City desires to design and construct the Creek Street water main improvements before the WSDOT project. W10(Yelm High School)and W12 (E Yelm Ave nue)will be design ed and bid together as the second package. RH2 has completed the design of the Creek Street Water System Improvements,and the project will be advertised soon and is anticipated to start construction in October 2026. The City requested RH2 to provide services during construction to support the construction of the Creek Street Water System Improvements project. This Scope of Work captures the effort necessary for construction phase services for W11 (Creek Street). RH2’s overall understanding and assumptions used in preparing this Scope of Work for Amendment No.2 are consistent with those presented in the original scope of work and any previous amendment, and are not repeated here for brevity. 1 9/10/2026 9:30:29 AM\\corp.rh2.com\projects\Project\Data\YELM\26-0063\00 Contract\Amendment No. 2-Creek Street SDC\PSA_SOW_Water Main Improvements Amendment No. 2-Creek Street SDC.docx City of Yelm Exhibit A Water Main Improvements Scope of Work Creek Street Services During Construction Amendment No. 2 Phase 2–Creek Street Water Main Services During Construction Task 15–Project Management Objective:Manage RH2’s project team and maintain regular client communications. Prepare monthly invoices and budget status summaries. Approach: Provide direction, coordination, and oversight to the RH2 project team. Organize, manage, and coordinate technical disciplines as described herein.Document and retain information generated during the execution of the project. Maintain communication with the City to provide schedule and budget updates. Prepare monthly invoices and budget status summaries. RH2 Deliverables: Project team and resource management. Monthly invoices and budget status summaries. Task 16–Construction Contract Administration and On-Site Observation s Objective:Assist the City with construction contract administration by attending weekly construction meetings, keeping meeting minutes, and preparing pay requests, statement s of working days, change order proposals, and closeout punchlist. Receive,review, and log submittals and requests for information (RFI s).Prepare plan revisions resulting from RFIs or changes in site conditions.Provide full-time construction observation and document construction conditions.Provide technical assistance from senior engineers as necessary. Approach: Attend one (1)pre-construction meeting with the City, contractor, and impacted utilities. Attend weekly construction meetings, document and prepare meeting minutes, and distribute meeting minutes to relevant parties. Review contractor’s monthly schedule of values and prepare monthly pay requests and statement s of working days. Review contractor’s change order proposals and prepare change order approval documentation. Receive and review contractor submittals, shop drawings,and RFIs. Prepare written responses to relevant parties, and maintain submittal and RFI tracking logs. Prepare plan revisions resulting from document review s,if requested by the City. Perform full-time construction observations to document construction conditions and confirm work observed is in accordance with the plans and specifications. Prepare a construction observation report for each site visit and a punch list at construction closeout. 2 9/10/2026 9:30:29 AM\\corp.rh2.com\projects\Project\Data\YELM\26-0063\00 Contract\Amendment No. 2-Creek Street SDC\PSA_SOW_Water Main Improvements Amendment No. 2-Creek Street SDC.docx City of Yelm Exhibit A Water Main Improvements Scope of Work Creek Street Services During Construction Amendment No. 2 Provide on-call technical assistance from the Principal in Charge, Project Manager, or senior project engineer as requested by the City.Fee Estimate includes up to 42 hours for on-call assistance. Assumptions: Subtasks 16.1 through 16.7 will be performed by an RH2 personnel who is on-site full time for the duration of construction. It is assumed that the sub tasks can be completed in the course of each day the RH2 personnel is onsite.The Fee Estimate(Exhibit B) for subtasks 16.2 through 16.7 reflects a total of one(1)full day with travel time(10 hours) for the duration of the sixty (6 0)working day s’schedule. W eekly construction meetings will be held onsite or via Microsoft Teams. The City will retain and provide a special inspector for materials testing. This will include testing of compaction of backfill and hot mix asphalt, and compressive strength testing of concrete. RH2 is not responsible for site safety, or for determining means and methods or directing the contractor or any subcontractors in their work. Provided by City: Special inspector for materials testing. Processing and approval of change orders and pay requests. Project closeout. RH2 Deliverables: Attendance at pre-construction and weekly construction meetings. W eekly construction meeting minutes, pay requests, statement s of working days, change order forms,responses to submittals and RFIs, submittal and RFI tracking logs,and project closeout punchlist. Plan revisions. Full-time construction observation and c onstruction observation reports. Task 17–Record Drawings Objective:Prepare record drawings after project completion. Approach: Prepare record drawings at the end of the project. Assumptions: RH2 will rely on the accuracy and completeness of the c ontractor’s construction records/plan markups when preparing record drawings. 3 9/10/2026 9:30:29 AM\\corp.rh2.com\projects\Project\Data\YELM\26-0063\00 Contract\Amendment No. 2-Creek Street SDC\PSA_SOW_Water Main Improvements Amendment No. 2-Creek Street SDC.docx City of Yelm Exhibit A Water Main Improvements Scope of Work Creek Street Services During Construction Amendment No. 2 Provided by City: Construction records from the contractor in electronic PDF. RH2 Deliverables: Project record drawings. Project Sch e dule It is anticipated that a Notice To Proceed (NTP)will be issued to the selected contractor in October 2026. Construction is anticipated to be completed in December 2026. RH2’s Scope of Work for this construction phase, including record drawings, is estimated to be complete in February 2027. 4 9/10/2026 9:30:29 AM\\corp.rh2.com\projects\Project\Data\YELM\26-0063\00 Contract\Amendment No. 2-Creek Street SDC\PSA_SOW_Water Main Improvements Amendment No. 2-Creek Street SDC.docx 3,250 1,370 2,810 3,110 4,620 16,560 16,560 16,560 16,560 16,560 19,300 10,360 3,110 115,270 123,000 09/10/2026 07:42 AM Total Cost $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 58 164 106 230 560 560 560 560 560 460 122 122 6,790 3,300 7,076 Expense Total RH2 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 4,456 3,144 1,312 2,580 16,000 16,000 16,000 16,000 16,000 16,000 9,900 2,988 2,988 108,480 115,924 Total RH2 Labor $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ Total Hours 18 12 6 654 12 100 100 100 100 100 100 42 16 16 688 Description PROJECT TOTAL Project Management Provide direction, coordination, and oversight to the RH2 project team Prepare monthly invoices and budget status summaries Construction Contract Administration and On-Site Observations Attend pre-construction meeting Attend weekly construction meetings and prepare meeting minutes Review schedule of values and prepare monthly pay requests Review change order proposals and prepare approval documentation Review submittals and RFIs and maintain tracking logs Prepare plan revisions resulting from document reviews Perform full-time construction observations Provide on-call technical assistance Record Drawings Prepare record drawings EXHIBIT B Fee Estimate Amendment No. 2 City of Yelm Water Main Improvements Creek Street Services During Construction Sep-26 Task 1 1.1 1.2 Task 2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 Task 3 3.1 \\corp.rh2.com\projects\Project\Data\YELM\26-0063\00 Contract\Amendment No. 2 - Creek Street SDC\PSA_FEE_Water Main Improvements Amendment No. 2 - Creek Street SDC EXHIBIT C RH2 ENGINEERING, INC. 2026 SCHEDULE OF RATES AND CHARGES RATE LIST RATE UNIT Professional I$181$/hr Professional II$160$/hr Professional III$223$/hr Professional IV$244$/hr Professional V$262$/hr Professional VI$281$/hr Professional VII$307$/hr Professional VIII$334$/hr Professional IX$338$/hr Technician I$141$/hr Technician II$154$/hr Technician III$174$/hr Technician IV$189$/hr Technician V$207$/hr Technician VI$228$/hr Technician VII$248$/hr Technician VIII$260$/hr Administrative I$95$/hr Administrative II$110$/hr Administrative III$132$/hr Administrative IV$154$/hr Administrative V$178$/hr CAD/GIS System$27.50$/hr CAD Plots - Half Size$2.50 price per plot CAD Plots - Full Size$10.00 price per plot CAD Plots - Large$25.00 price per plot Copies (bw) 8.5" X 11"$0.09 price per copy Copies (bw) 8.5" X 14"$0.14 price per copy Copies (bw) 11" X 17"$0.20 price per copy Copies (color) 8.5" X 11"$0.90 price per copy Copies (color) 8.5" X 14"$1.20 price per copy Copies (color) 11" X 17"$2.00 price per copy Technology Charge 2.50%% of Direct Labor Night Work 10.00%% of Direct Labor price per mile Mileage$0.7600(or Current IRS Rate) Subconsultants 15%Cost + Outside Services at cost Rates listed are adjusted annually. Meeting Date: _____________ CITY COUNCIL AGENDA ITEM SUMMARY City of Yelm, Washington AGENDA ITEM:BOYS AND GIRLS CLUB OF THURSTON COUNTY USE AGREEMENT AMENDMENT WITH CITY OF YELM COMMITTEE REVIEW: X YES NO COMMITTEE: General Government Committee ATTORNEY REVIEW/APPROVAL: x YES NO N/A ACTION REQUESTED: Authorize Mayor DePinto or his designee to sign Amendment No. 2 with the Boys and Girls Club of Thurston County extend ing the time of the use Agreement. KEY FACTS AND INFORMATION SUMMARY: In 2019 the City of Yelm entered into a 5-year agreement with the Thurston County Boys and Girls Club to lease half of the previous Yelm City Hall. In August of 2021 the City of Yelm and Boys and Girls Club amended the agreement to provide the entire space for the Boys and Girls Club. Due to the rapid growth of our city and the surrounding are as, as well as the success and popularity of the local Boys and Girls Club, there is a need for expansion of the current location. Leadership from the Boys and Girls Club are exploring and have applied for grants that would pay for expanding the existing b uilding, providing more space to accommodate more area youth. Due to the size, scope and costs associated with expanding the building, Boys and Girls Club Leadership has requested a longer-term agreement with the City of Yelm. Amendment No. 2 (attached) would provide that security and commitment needed to secure future funding. 1 | Page Meeting Date: _____________ CITY COUNCIL AGENDA ITEM SUMMARY City of Yelm, Washington ATTACHMENTS: Agreement Amendment No. 2 Boys and Girls Club/City of Yelm Agreement Respectfully Submitted: __________________ Todd Stancil City Administrator 2 | Page BOYS AND GIRLS CLUB OF THURSTON COUNTY/CITY OF YELM AMENDMENT NO. 2 THIS AMENDMENT NO. 2 to that certain agreement dated May 28, 2019, and Amendment No. 1 date d August 24, 2021, is made this 27 th day of October, 2026, by and between the CITY OF YELM (“City”), a municipal corporation (hereinafter referred to as the “City”), and BOYS AND GIRLS CLUBS OF THURSTON COUNTY, a Washington State non- (hereinafter referred to as (“B&G Clubs”). WITNESSETH: WHEREAS, City and B&G Club, entered into an Agreement dated May 28, 2019, covering partial use of the premises owned by the city (Known as “Old City Ha l l”) by B&G Club; and WHEREAS, City and B&G Club entered into Amendment No. 1 dated August 24, 2021, allowing B&G Club to utilize the entire building to include all parking areas, sidewalks and other common areas serving the b uilding. WHEREAS, City and B&G Clubs now desire to amend the Lease to adjust the “term” to provide for a longer lease potential. NOW THEREFORE, IT IS HEREBY MUTALLY AGREED that the Agreement between the parties shall be amended as follow: The paragraph titled “Term” shall be deleted in its entirety and replaced with the following: “This Agreement shall commence on June 1, 2019, and the parties intend for the Agreement to provide for a total term of fifty (50) years from the effective date of Amendment No. 2, structured in successive five (5)-year terms. Thereafter, provided Tenant is not in default under this Agreement and is in compliance with all applicable federal, state, and local laws, regulations, ordinances, and governmental requirements applicable to Tenant’s use and occupancy of the property, thi s Agreement shall automatically renew for successive five (5)-year terms, with such renewals continuing automatically through the fifty (50)- year term, unless earlier terminated in accordance with this Agreement. The total term of this Agreement, including all five (5)-year renewal periods, shall be fifty (50) years from the effective date of Amendment No. 2. Notwithstanding the foregoing, if at any time the City determines that the property is needed for City purposes, the City may terminate this Agreement upon not less than twelve (12) months’ prior written notice to Tenant. If Tenant secures funding to substantially expand or improve the Premises to increase services to youth and families, the parties agree to negotiate in good faith any necessary amendments to this Lease, including changes to the Premises, lease term, provis subject to mutual written agreement.” ALL OTHER TERMS AND CONDITIONS of said Agreement remain unchanged. CITY OF YELM: Todd Stancil, City Administrator City of Yelm BOYS & GIRLS CLUBS OF THURSTON COUNTY: By: Its: