Project Manual Reroof SchoolsMAY 1 0) 2010
BY- --- -- --------- - - - ---
ADDENDUM NO. 1
Cover
FOR PROJECT MANUAL, SPECIFICATIONS
AND RELATED DOCUMENTS FOR
FT. STEVENS / MILL POND REROOF
April 2 2010
1
ERICKSON McGOVERN, PLLC
2
120 1315' Street South
s
Tacoma, WA 98444
4
(253) 531 -0206
5
This Addendum No. 1 contains the following list of attachments:
5
Cover
1 Page
7
Civil Addendum No. 1
No Pages
e
Landscape Addendum No. 1
No Pages
9
Architectural Addendum No. 1
22 Pages
10
Structural Addendum No. 1
No Pages
11
Mechanical Addendum No. 1
No Pages
12
Electrical Addendum No. 1
No Pages
MAY 1 0) 2010
BY- --- -- --------- - - - ---
ADDENDUM NO. 1 Page Al
FOR PROJECT MANUAL, SPECIFICATIONS AND RELATED DOCUMENTS FOR
FORT STEVENS /MILL POND REROOF
April 2, 2010
1 ERICKSON McGOVERN, PLLC
2 120 131st Street South
3 Tacoma, WA 98444
4 (253) 531 -0206
5 This Addendum is issued for purposes of clarification and /or revision of the contract documents. There are
6 22 pages in this addendum, including all attachments.
7 SPECIFICATIONS — ARCHITECTURAL
e A. SECTION 00120 - INSTRUCTIONS TO BIDDERS
9 1. DELETE Paragraph B. Listing of Subcontractors Page 4 in its entirety.
10 B. SECTION 00300 - FORM OF PROPOSAL
11 1. ADD Section 00300 -FORM OF PROPOSAL in its entirety per Attachment Al -A
12 C. SECTION 00830 - PREVAILING WAGE RATES
13 1. DELETE Section 00830 -PREVAILING WAGE RATES Department of Labor and Industries dated
14 09 -02 -09 and ADD new prevailing wage rates effective date 03 -03 -10 per Attachment Al -B.
15 D. SECTION 07620 - SHEET METAL FLASHING AND TRIM
16 1. DELETE ITEM 3 IN PARAGRAPH 2.04 Gutter and Downspout Fabrication.
17 E. SECTION 09900 - PAINTINGS AND COATINGS
18 1. ADD THE FOLLOWING TO 3.07a Exterior Paint and Coating Systems:
19 a. Existing Bare Wood Fascia behind gutters.
20 i. EXT 6.4K - Latex finish (over latex primer).
21 (1) Latex Primer 11 Coat I Product -#6
22 (2) Semi Gloss Waterborne Finish 12 Coats I Product #11.
23 (a) The first coat shall be applied at a 50% tinting of the color selected.
24 (b) Architect or Owner shall be contacted between coats to verify and approve first
25 application
26 (c) The second coat shall be applied at a 100% tinting of the color selected.
27 b. Note the Following For Exterior Paint:
28 i. Downspouts: Shall be painted out same color as their background. PVC downspouts
29 painting preparations: Fine sand to degloss and provide tooth. Provide one coat primer
30 ICI Devoe, Devguard #4160, or equivalent and two finish coats 100% acrylic satin enamel.
31 (Tint primer coat similar to top coat for best hide).
32 DRAWINGS— ARCHITECTURAL
33 B. SHEET A2.01 - FT. STEVENS - OVERALL ROOF PLAN
34 1. Clarification: all existing 4" D.S. to remain.
35 2. ADD new 4" D.S. as shown on attached drawing Al -1.
36 C. SHEET 2.02 - MILL POND - OVERALL ROOF PLAN
37 1. REVISE all 3" D.S. TYP. to 4" D,S. except new 6" D.S.
38 D. SHEET A5.01 - ROOF DETAILS
39 1. Provide brackets at gutter 141A5.01 as specified.
ADDENDUM NO. 1 Page A2
FOR PROJECT MANUAL, SPECIFICATIONS AND RELATED DOCUMENTS FOR
FORT STEVENS /MILL POND REROOF
1 THERE ARE 22 PAGES IN THIS ADDENDUM, INCLUDING ALL ATTACHMENTS.
2 BIDDERS SHALL NOTIFY ALL SUB - BIDDERS INVOLVED AND SHALL ACKNOWLEDGE RECEIPT OF
3 THIS ADDENDUM ON THE COMPLETED AND SUBMITTED FORM OF BID.
a THIS ADDENDUM MUST BE CLIPPED DIRECTLY TO YOUR COPY OF THE SPECIFICATIONS AND
5 BOTH RETURNED AFTER BID DATE.
END OF ARCHITECTURAL ADDENDUM NO. ?
Fort Stevens / Mill Pond
Yelm Community Schools - No. 02
Erickson McGovern
SECTION 00300
3 FORM OF PROPOSAL
4 FORM OF PROPOSAL
5 1.01 GENERAL
6 A. In this Section 00300 there is a Form of Proposal, of which must be submitted with the correct bid
7 package and at the appropriate time as specified in Section 00030, Advertisement For Bids.
8 TO: Yelm Community Schools No. 2
9 107 1st Street North, P.O. Box 476
10 Yelm, WA 98597
11 B. Having carefully examined the Project Manual and Drawings entitled Fort Stevens / Mill Pond ReRoof,
12 as well as the premises and conditions affecting the work, the Undersigned proposes to furnish all
13 labor, materials, and supplies and to construct the project and perform all work as required by the
14 Contract Documents for the following sums:
15 C. Amount shall be shown in both words and figures. In case of discrepancy, the amount shown In
16 words will govern.
17 D. The PROJECT BASE BID shall be the summation of the BASE BID A (Fort Stevens) and BASE BID B
18 (Mill Pond).
19 E. BASE BID A (Fort Stevens)
20 1. For the Base Bid A, as defined in the Specifications, the sum of:($ )
21
22
23 (Written format)
24 Dollars
25 F. BASE BID B (Mill Pond)
26 1. For the Base Bid B, as defined in the Specifications, the sum of:($_
27
28
29 (Written format)
30 Dollars
31 G. PROJECT BASE BID (The summation of Base Bid A and Base Bid B)
32 1. For the Project Base Bid, as defined in the Specifications, the sum of:($
33
34
35 (Written format)
36 Dollars
37 H. TRENCH EXCAVATION SAFETY PROVISIONS
38 1. (Include also in Base Bid) .......................................... .............................($ )
39 2. If the bid amount contains any work which requires trenching exceeding a depth of four feet, all
40 costs for trench safety shall be included In the Base Bid and indicated above for adequate trench
41 safety systems in compliance with Chapter 39.04 RCW, 49.17 RCW and WAC 296 - 155 -650.
42 Bidder must include a lump sum dollar amount in blank above (even if the value is $0.00) to be
43 responsive.
44
45
46
47
48
ATTACHMENT Al —A
.200161 Fort Stevens/ MITI Pond FORM OF PROPOSAL 00300-1
Fort Stevens / MIII Pond
Yelm Community Schools - No. 02
Erickson McGovern
ADDENDA
1. Receipt of the following Addenda is hereby acknowledged and costs of the work therefore have
been included in the proposal.
Addendum
No.
dated
Addendum
No.
dated
Addendum
No.
dated
I Addendum
No.
dated
Addendum
No.
dated
I Addendum
No.
dated
5 J. SALES TAX AND PERMITS
6 1. The retail sales tax shall not be included in the Bid sums; the Owner will pay such taxes
7 proportionally with each periodic payment. The City of Yelm plan check and building permit fees
8 have been paid by the Owner and shall not be Included in the Bid. Additional fees and permits
9 identified as to be paid by the Contractor in Section 01100 - SUMMARY shall be paid by the
30 Contractor and included the Bid.
11 K. OVERHEAD AND PROFIT
12 1. All of the above Bid prices Include overhead and profit
13 L. THE UNDERSIGNED ALSO AGREES AS FOLLOWS
14 1. To do any extra work, not covered by the above schedule of prices which may be ordered by the
15 Owner, pursuant to the Contract Documents.
16 M. TIME OF COMPLETION/ LIQUIDATED DAMAGES
17 1. The Undersigned agrees If awarded the Contract, to complete the entire project as stipulated in
18 the Contract Documents. The Undersigned further agrees that the Owner may retain from the
19 compensation otherwise due, the liquidated damage costs Incurred by the Owner, for each
20 calendar day expiring beyond the time fixed for completion that the work remains not substantially
21 completed, this sum not to be construed in any sense as penally, but as agreed liquidated
22 damages which the Owner shall sustain in the case of the failure of the Undersigned to complete
23 the work at the time stipulated. For dates of completion and liquidated damages amount, see
24 Section 01100 - SUMMARY
25 N. CONTRACT AND BOND
26 1. If the Undersigned be notified of the acceptance of this Bid within forty -five (45) days after the
27 time set for opening bids, he agrees to execute a Contract for the above work for a compensation
28 established by adjusting the Base Bid by any Alternate Bids selected by the Owner, in the Form
29 of Agreement required by the Specifications, and to furnish Performance and Labor and Material
30 Payment Bonds as required by the Specifications.
31 2. The Standard Form of the American Institute of Architects, No. A101, entitled "Standard Form of
32 Agreement Between Owner and Contractor," 2007 Edition, has been modified and made the
33 FORM OF AGREEMENT for this Contract. Form is bound herein after this Section.
34 O. BID GUARANTEE
35 1. The Undersigned further agrees that the check or bid bond accompanying this Bid is left in
36 escrow with the Owner, that Its amount Is the measure of the damages which the Owner will
37 sustain by the failure of the Undersigned to execute said agreement and bonds, and that if the
38 Undersigned fails to deliver said documents within ten (10) days after written notice of the award
39 of the Contract to him, then the check shall become the property of the Owner or the bid bond
40 shall remain in full effect. But if this Bid Is not accepted within forty -five (45) days after the time
41 set for opening bids, or if the Undersigned delivers said Contract and bonds, then the check shall
42 be returned to him or the bid bond shall become void.
43
44
45
46
47
48
ATTACHMENT Ai -A
.290151 Fort Stevens/ Mill Pond FORM OF PROPOSAL 00300-2
Fort Stevens / MIII Pond
Yelm Community Schools - No. 02
Erickson McGovern
COMPANY NAME
SIGNATURE
TITLE
ADDRESS
STATE
ZIP
TELEPHONE #
CONTRACTOR'S
REGISTRATION
END OF SECTION 00300
ATTACHMENT Al —A
.280101 Fort $[ovens/ Mill Pond FORM OF PROPOSAL 00300 -3
THURSTON- Effective: 3/3/2010 Page 4 of 19
THURSTON- Effective: 3/3/2010
Prevailing Wage Rates for Public Works Contracts
Select an Effective Date .3/3/10 t "
1 want to look up
OO lonmeyman wages 0 Apprentice wages
I went to search U by Counly O by Trade
Please select acounty
Thurston
AtteMlont Due to changes that may occur in wage rates between the publication date on Feb. 1 and the effective data of March 3, it is critical for all parties
utilizing the March 3 wage ales to confirm they ars using the correct rates on or anerhsarch 3.
LOOKUP Journeyman Wages by County
THURSTON -- Effective 3/3/2010 -- Benefit Code Key
Classification
ASBESTOS ABATEMENT WORKERS
JOURNEY LEVEL
BOILERMAKERS
JOURNEY LEVEL
BRICK MASON
BRICK AND BLOCK FINISHER
JOURNEY LEVEL
BUILDING SERVICE EMPLOYEES
JANITOR
SHAMPOOER
WAXER
WINDOW CLEANER
CABINET MAKERS (IN SHOP)
JOURNEY LEVEL
CARPENTERS
ACOUSTICAL WORKER
Prevailing Overtime Holiday Note
Wage Code Code Code
$40.03 IH 5D
$50.03
1
$39.49
iM _5A
$46.35
1M SA
$8.55
1
$10.32
1
$8.97
1
$10.84
1
$13.02 1
$48.60 IH 5D
ATTACHMENT Al —B
I> ttp:// www. lni .wa.gov /PrevailingWage /jwages /20101 /co34.asp 4/1/2010
THURSTON- Effective: 3/3/2010
BRIDGE, DOCK AND WARF CARPENTERS
CARPENTER
CREOSOTED MATERIAL
DRYWALL APPLICATOR
FLOOR FINISHER
FLOOR LAYER
FLOOR SANDER
MILLWRIGHT AND MACHINE ERECTORS
PILEDRIVERS, DRIVING, PULLING, PLACING
COLLARS AND WELDING
SAWFILER
SHINGLER
STATIONARY POWER SAW OPERATOR
STATIONARY WOODWORKING TOOLS
CEMENT MASONS
JOURNEY LEVEL
DIVERS & TENDERS
DIVER
DIVER ON STANDBY
DIVER TENDER
SURFACE RCV & ROV OPERATOR
SURFACE RCV & ROV OPERATOR TENDER
DREDGE WORKERS
ASSISTANT ENGINEER
ASSISTANT MATE (DECKHAND)
BOATMEN
ENGINEER WELDER
LEVERMAN, HYDRAULIC
MAINTENANCE
MATES
OILER
DD YWALL TAPERS
JOURNEY LEVEL
Page 5 of 19
$48.47
1H
51)
$48.47
111
5D
$48.57
1H
SD
$48.74
1H
5D
$48.60
1H
SD
$48.60
1H
5D
$48.60
1H
D
$49.47
IH
5D
$48.67
IH
5D
$48.60
1H
5D
$48.60
IH
5D
$48.60
IH
5D
$48.60
1H
5D
$49.15 Im 5D
$100.28
1M
5D
8A
$56.68
IM
5D
$52.23
1M
5D
$52.23
1M
5D
$48.85
1B
5A
$49.57
IT
5D
8L
$49.06
IT
5D
8L
$49.57
IT
5D
8L
$49.62
IT
5D
ALL
$51.19
IT
5D
$L
$49.06
IT
5D
8L
$49.57
IT
5D
8L
$49.19
IT
5D
8L
$48.79 lE 5P
ATTACHMENTAI —B
http:// www. lnLwa.gov/PrevailingWagefjwages /20101 /co34.asp 4/l/2010
THURSTON- Effective: 3/3/2010
ELECTRICAL FIXTURE MAINTENANCE WORKERS
JOURNEY LEVEL
ELECTRICIANS .= INSIDE
CABLE SPLICER
JOURNEY LEVEL
LEAD COVERED CABLE SPLICER
WELDER
ELECTRICIANS - MOTOR SHOP
CRAFTSMAN
JOURNEY LEVEL
ELECTRICIANS - POWERLINE CONSTRUCTION
CABLE SPLICER
CERTIFIED LINE WELDER
GROUNDPERSON
HEAD GROUNDPERSON
HEAVY LINE EQUIPMENT OPERATOR
JACKHAMMER OPERATOR
JOURNEY LEVEL LINEPERSON
LINE EQUIPMENT OPERATOR
POLE SPRAYER
POWDERPERSON
ELECTRONIC TECHNICIANS
ELECTRONIC TECHNICIANS JOURNEY LEVEL
ELEVATOR CONSTRUCTORS
MECHANIC
MECHANIC IN CHARGE
FABRICATED PRECAST CONCRETE PRODUCTS
ALL CLASSIFICATIONS
FENCE ERECTORS
FENCE ERECTOR
FLAGGERS
JOURNEY LEVEL
Page 6 of 19
$29.54
1
$56.37
1G
5C
$52.74
1G
5Q
$60.01
1G
5C
$56.37
1G
Sc_
$15.37
2A
6C
$14.69
2A
6C
$59.79
4A
5A
$54.59
4A
5A
$39.07
4A
5A
$41.22
4A
$A
$54.59
4A
5A
$41.22
4A
5A
$54.59
4A
5A
$46.32
4A
5A
$54.59
4A
5A
$41.22
4A
5A
$22.99 1
$67.91 4AA 6Q
$73.87 4A
$13.50 1
$33.93 1H 5D
$33.93 1H 5D
ATTACHMENT Al —B
http:// www. Ini. Nva. gov/ PrevailingWage /jwages/20101 /Co34.asp 4/1/2010
THURSTON- Effective: 3/3/2010
GLAZIERS
Page 7 of 19
JOURNEY LEVEL
$22.30
1
MEAT & FROST INSULATORS AND ASBESTOS WORKERS
MECHANIC
$50.28
1S
5J
HEATING EQUIPMENT MECHANICS
MECHANIC
$59.32
1 E
OL
HOD CARRIERS & MASON TENDERS
JOURNEY LEVEL
$41.28
1H
5D
INDUSTRIAL ENGINE AND MACHINE MECHANICS
MECHANIC
$15.65
1
INDUSTRIAL POWER VACUUM CLEANER
JOURNEY LEVEL
$9.24
1
INLAND BOATMEN
CAPTAIN
$48.39
IK
5B
COOK
$45.36
1K
5B
DECKHAND
$45.36
1K
5B
ENGINEER/DECKHAND
$46.25
IK
5B
MATE, LAUNCH OPERATOR
$47.35
1K
5B
INSPECTION /CLEANING /SEALING OF SEWER & WATER SYSTEMS
BY REMOTE
CONTROL
CLEANER OPERATOR, FOAMER OPERATOR
$9.73
1
GROUT TRUCK OPERATOR
$11.48
1
HEAD OPERATOR
$12.78
1
TECHNICIAN
$25.00
1
TV TRUCK OPERATOR
$10.53
1
INSULATION APPLICATORS
JOURNEY LEVEL
$48.47
1M
IRONWORKERS
JOURNEY LEVEL
$54.27
14
5A
LABORERS
ASPHALT RAKER
$41.28
1H
51)
BALLAST REGULATOR MACHINE
$40.03
1 H
5D
BATCH WEIGHMAN
$33.93
IH
5D
ATTACHMENT Al —B
l ittp:// www.I ni.wa.gov/PrevailingWage /J*wages /20101 /Co34.asp 4/1/2010
THURSTON- Effective: 3/3/2010
BRUSH CUTTER
BRUSH HOG FEEDER
BURNERS
CARPENTER TENDER
CASSION WORKER
CEMENT DUMPER/PAVING
CEMENT FINISHER TENDER
CHANGE - HOUSE MAN OR DRY SHACKMAN
CHIPPING GUN (OVER 30 LBS)
CHIPPING GUN (UNDER 30 LBS)
CHOKER SETTER
CHUCK TENDER
CLEAN -UP LABORER
CONCRETE DUMPER/CHUTE OPERATOR
CONCRETE FORM STRIPPER
CONCRETE SAW OPERATOR
CRUSHERFEEDER
CURING LABORER
DEMOLITION, WRECKING & MOVING
(INCLUDING CHARRED MATERIALS)
DITCH DIGGER
DIVER
DRILL OPERATOR (HYDRAULIC, DIAMOND)
DRILL OPERATOR, AIRTRAC
DUMPMAN
EPDXY TECHNICIAN
EROSION CONTROL WORKER
FALLER/BUCKER, CHAIN SAW
FINAL DETAIL CLEANUP (i.e., dusting, vacuuming,
window cleaning; NOT constriction debris cleanup)
FINE GRADERS
FIRE WATCH
FORM SETTER
Page 8 of 19
$40.03
IH
50
$40.03
1H
5D
$40.03
H
5D
$40.03
IH
5D
$41.28
1H
5D
$40.77
1H
5D
$40.03
1H
5D
$40.03
1 H
5D
$40.77
1H
5D
$40.03
H
5D
$40.03
IH
5D
$40.03
H
5D
$40.03
1H
5D
$40.77
1H
5D
$40.03
1H
5D
$40.77
1 jI
5D
$33.93
IH
5D
$40.03
IH
5D
$40.03
1H
5D
$40.03
1H
5D
$41.28
IH
5D
$40.77
IH
5D
$41.28
1H
5D
$40.03
1H
5D
$40.03
IH
5D
$40.03
1 H
5D
$40.77
1H
5D
$30.84
1H
5D
$40.03
1H
5D
$33.93
H
5D
$40.03
1H
5D
ATTACHMENT Al -B
http:// www. Ini.wa.gov /PrevailingWage /jwagcs /20101 /co34.asp 4/1/2010
THURSTON- Effective: 3/3/2010
GABION BASKET BUILDER
GENERAL LABORER
GRADE CHECKER & TRANSIT PERSON
GRINDERS
GROUT MACHINE TENDER
GUARDRAIL ERECTOR
HAZARDOUS WASTE WORKER LEVEL A
HAZARDOUS WASTE WORKER LEVEL B
HAZARDOUS WASTE WORKER LEVEL C
HIGH SCALER
HOD CARRIER/MORTARMAN
JACKHAMMER
LASER BEAM OPERATOR
MANHOLE BUILDER - MUDMAN
MATERIAL YARDMAN
MINER
NOZZLEMAN, CONCRETE PUMP, GREEN
CUTTER WHEN USING HIGH PRESSURE AIR &
WATER ON CONCRETE & ROCK, SANDBLAST,
GUNITE, SHOTCRETE, WATER BLASTER
PAVEMENT BREAKER
PILOT CAR
PIPE POT TENDER
PIPE RELINER (NOT INSERT TYPE)
PIPELAYER & CAULKER
PIPELAYER & CAULKER (LEAD)
PIPEWRAPPER
POT TENDER
POWDERMAN
POWDERMAN HELPER
POWERJACKS
RAILROAD SPIKE PULLER (POWER)
RE- TIMBERMAN
Page 9 of 19
$40.03
1H
5D
$40.03
1H
5D
$41.28
IH
5D
$40.03
1H
5D
$40.03
1H
5D
$40.03
1H
5D
$41.28
1H-
SD
$40.77
1H
5D
$40.03
1H
5D
$41.28
H
5D
$41.28
1H
5D
$40.77
H
SD
$40.77
1H
5D
$40.77
H
5D
$40.03
IH
5D
$41.28
114
5D
$40.77
H
5D
$40.77
IH
5D
$33.93
1H
5D
$40.77
1H
5D
$40.77
1H
SD
$40.77
H
5D
$41.28
IH
5D
$40.77
1H
5D
$40.03
1H
5D
$41.28
1H
51)
$40.03
H
5D
$40.77
IH
5D
$40.77
IH
5D
$41.28
1H
5D
e e . u :[i•1 /_m.
http:// www. lni. wa. gov/ PrevailingWage ljwages/20101 /Co34.asp 4/1/2010
THURSTON- Effective: 3/3/2010
RIPRAP MAN
$40.03
1H
5D
RODDER
$40.77
IH
5D
SCAFFOLD ERECTOR
$40.03
li
5D
SCALEPERSON
$40.03
1H
5D
SIGNALMAN
$40.03
1H
5D
SLOPER (OVER 20 ")
$40.77
IH
5D
SLOPER SPRAYMAN
$40.03
1H
5D
SPREADER (CLARY POWER OR SIMILAR TYPES)
$40.77
1 H
5D
SPREADER (CONCRETE)
$40.77
1H
5D
STAKE HOPPER
$40.03
111
SD
STOCKPILER
$40.03
IH
5D
TAMPER & SIMILAR ELECTRIC, AIR & GAS
$40.77
1H
51)
TAMPER (MULTIPLE & SELF PROPELLED)
$40.77
111
SD
TOOLROOM MAN (AT JOB SITE)
$40.03
1 H
5D
TOPPER - TAILER
$40.03
IH
5D
TRACK LABORER
$40.03
111
5D
TRACK LINER (POWER)
$40.77
1H
5D
TRUCK SPOTTER
$40.03
1H
5D
TUGGER OPERATOR
$40.77
1H
5D
VIBRATING SCREED (AIR, GAS, OR ELECTRIC)
$40.03
1H
SD
VIBRATOR
$40.77
1H
5D
VINYL SEAMER
$40.03
1H
5D
WELDER
$40.03
IH
SD
WELL -POINT LABORER
$40.77
1H
5D
LABORERS - UNDERGROUND SEWER & WATER
GENERAL LABORER & TOPMAN
$40.03
1 H
SD
PIPE LAYER
$40.77
1H
5D
LANDSCAPE CONSTRUCTION
IRRIGATION OR LAWN SPRINKLER INSTALLERS
$14.41
1
LANDSCAPE EQUIPMENT OPERATORS OR
$14.41
1
TRUCK DRIVERS
LANDSCAPING OR PLANTING LABORERS
$14.41
1
LATHERS
Page 10 of 19
ATTACHMENT Ai —B
littp:// www. lni .wa.gov/PrevoilingWage /jwages /20101 /co34.asp 4/1/2010
THURSTON- Effective: 313/2010
JOURNEY LEVEL
MARBLE SETTERS
JOURNEY LEVEL
METAL FABRICATION (IN SHOP)
FITTER
LABORER
LAYEROUT
MACHINE OPERATOR
WELDER
MODULAR BUILDINGS
CABINET ASSEMBLY
ELECTRICIAN
EQUIPMENT MAINTENANCE
PLUMBER
PRODUCTION WORKER
TOOL MAINTENANCE
UTILITY PERSON
WELDER
PAINTERS
JOURNEY LEVEL
PLASTERERS
JOURNEY LEVEL
PLAYGROUND & PARK EQUIP—MENT INSTALLERS
JOURNEY LEVEL
PLUMBERS & PIPEFITTERS
JOURNEY LEVEL
POWER EQUIPMENT OPERATORS
ASPHALT PLANT OPERATOR
ASSISTANT ENGINEERS
BACKHOE, EXCAVATOR SHOVEL, OVER 50
METRIC TONS TO 90 METRIC TONS
BACKHOE, EXCAVATOR SHOVEL, OVER 90
METRIC TONS
Page 11 of 19
$48.74 1H 5D
$46.35
IM
5A
$27.10
2U
6T
$16.91
2U
6T
$30.63
2U
6T
$20.86
2U
6T
$24.74
2U
6T
$9.98
1
$9.98
1
$9.98
1
$9.98
1
$9.75
1
$9.98
1
$9.98
1
$9.98
1
$34.87 213 6Z
$46.63 IR 5$
$8.55 1
$56.07 1G 5A
$50.39
IT
5D 8P
$47.12
IT
5D 8P
$50.94
1T
5D 8P
$51.51
IT
5D 8P
ATTACHMENT Ai —B
http:// www. Ini .wa.gov /PrevailingWage /jwages /20101 /co34.asp 4/1/2010
THURSTON- Effective: 3/3/2010
BACKHOE, EXCAVATOR, SHOVEL, OVER 30
METRIC TONS TO 50 METRIC TONS
BACKHOE, EXCAVATOR, SHOVEL, TRACTORS
UNDER 15 METRIC TONS
BACKHOE, EXCAVATOR, SHOVEL, TRACTORS:
15 TO 30 METRIC TONS
BARRIER MACHINE (ZIPPER)
BATCH PLANT OPERATOR, CONCRETE
BELT LOADERS (ELEVATING TYPE)
BOBCAT (SKID STEER)
BROKK - REMOTE DEMOLITION EQUIPMENT
BROOMS
BUMP CUTTER
CABLEWAYS
CHIPPER
COMPRESSORS
CONCRETE FINISH MACHINE - LASER SCREED
CONCRETE PUMPS
CONCRETE PUMP -TRUCK MOUNT WITH BOOM
ATTACHMENT
CONCRETE PUMP -TRUCK MOUNT WITH BOOM
ATTACHMENT OVER 42 METERS
CONVEYORS
CRANE, FRICTION 100 TONS THROUGH 199
TONS
CRANE, FRICTION OVER 200 TONS
CRANES, THRU 19 TONS, WITH ATTACHMENTS
CRANES, 20 - 44 TONS, WITH ATTACHMENTS
CRANES, 45 TONS - 99 TONS, UNDER 150 FT OF
BOOM (INCLUDING JIB WITH ATACHMENTS)
CRANES, 100 TONS - 199 TONS, OR 150 FT OF
BOOM (INCLUDING JIB WITH ATTACHMENTS)
CRANES, 200 TONS TO 300 TONS, OR 250 FT OF
BOOM (INCLUDING JIB WITH ATTACHMENTS)
CRANES, A- FRAME, 10 TON AND UNDER
CRANES, A- FRAME, OVER 10 TON
Page 12 of 19
$50.39 IT 51) BE
$49.48 IT 5D 8P
$49.90 IT 5D 8P
$49.90
1T
5D
81'
$49.90
IT
5D
8P
$49.48
T
D
8P
$47.12
IT
51)
8P
$47.12
IT
5D
8P
$47.12
IT
5D
8P
$49.90
IT
51)
R
$50.39
]T
5D
8P
$49.90
11
5D
8P
$47.12
1T
5D
8P
$47.12
IT
D
8P
$49.48
1T
5D
$49.90
IT
5D
8P
$50.39 IT 5D 8P
$49.48 1T 5D 8P
$51.51 1T SD 8P
$52.07
1T
5D
$49.48
1T
5D
8P
$49.90
1T
D
8P
$50.39
IT
5D
8P
$50.94 1T 51) 8P
$51.51 1T 5D 8P
$47.12 1T
$49.48 IT
SD 8P
8P
ATTACHMENT Al —B
http:// www. Ini. wa. gov/ PrevailingWage /jwages/20101 /co34.asp 4/1/2010
THURSTON- Effective: 3/3/2010
CRANES, OVER 300 TONS, OR 300' OF BOOM
INCLUDING JIB WITH ATTACHMENTS
CRANES, OVERHEAD, BRIDGE TYPE (20 - 44
TONS)
CRANES, OVERHEAD, BRIDGE TYPE (45 - 99
TONS)
CRANES, OVERHEAD, BRIDGE TYPE (100 TONS
& OVER)
CRANES, TOWER CRANE UP TO 175' IN HEIGHT,
BASE TO BOOM
CRANES, TOWER CRANE OVER 175' IN HEIGHT,
BASE TO BOOM
CRUSHERS
DECKENGINEER/DECK WINCHES (POWER)
DERRICK, BUILDING
DOZER, QUAD 9, D -10, AND HD -41
DOZERS, D -9 & UNDER
DRILL OILERS - AUGER TYPE, TRUCK OR
CRANE MOUNT
DRILLING MACHINE
ELEVATOR AND MANLIFT, PERMANENT AND
SHAFT -TYPE
EQUIPMENT SERVICE ENGINEER (OILER)
FINISHING MACHINE /BIDWELL GAMACO AND
SIMILAR EQUIP
FORK LIFTS, (3000 LBS AND OVER)
FORK LIFTS, (UNDER 3000 LBS)
GRADE ENGINEER
GRADECHECKER AND STAKEMAN
GUARDRAIL PUNCH
HOISTS, OUTSIDE (ELEVATORS AND
MANLIFTS), AIR TUGGERS
HORIZONTAUDIRECTIONAL DRILL LOCATOR
HORIZONTAUDIRECTIONAL DRILL OPERATOR
HYDRALIFTS/BOOM TRUCKS (10 TON & UNDER)
HYDRALIFTS/BOOM TRUCKS (OVER 10 TON)
$52.07
$49.90
$50.39
$50.94
$50.94
$51.51
$49.90
$49.90
$50.39
$50.39
$49.48
$49.48
$49.90
$47.12
$49.48
$49.90
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
1T
IT
IT
Page 13 of 19
5D 8P
51) 8P
5D 8P
5D 8P
5D 8P
5D 8P
5D 8P
5D 8P
5D 8P
5D 8P
5D 8P
SD U
5D i3P
51) 8P
5D $P
5D 8P
$49.48 IT 5D 8P
$47.12 IT 5D 8P
$49.90 1T 51) 8P
$47.12 IT 5D $P
$49.90 .IT 5D 81?
$49.48 IT 5D 8P
$49.48 ]T SD BE
$49.90 IT 5D 8P
$47.12 IT 513 8P
$49.48 IT 5D 8P
ATTACHMENT Al —B
http:// www. Ini.wa.gov /PrevailingWage /jwages /20101 /co34.asp 4/1/2010
THURSTON- Effective: 3/3/2010
LOADERS, OVERHEAD (6 YD UP TO 8 YD)
LOADERS, OVERHEAD (8 YD & OVER)
LOADERS, OVERHEAD (UNDER 6 YD), PLANT
FEED
LOCOMOTIVES, ALL
MECHANICS, ALL
MIXERS, ASPHALT PLANT
MOTOR PATROL GRADER (FINISHING)
MOTOR PATROL GRADER (NON- FINISHING)
MUCKING MACHINE, MOLE, TUNNEL DRILL
AND /OR SHIELD
OIL DISTRIBUTORS, BLOWER DISTRIBUTION
AND MULCH SEEDING OPERATOR
PAVEMENT BREAKER
PILEDRIVER (OTHER THAN CRANE MOUNT)
PLANT OILER (ASPHALT, CRUSHER)
POSTHOLE DIGGER, MECHANICAL
POWER PLANT
PUMPS, WATER
QUICK TOWER -NO CAB, UNDER 100 FEET IN
HEIGHT BASED TO BOOM
REMOTE CONTROL OPERATOR ON RUBBER
TIRED EARTH MOVING EQUIP
RIGGER AND BELLMAN
ROLLAGON
ROLLER, OTHER THAN PLANT ROAD MIX
ROLLERS, PLANTMIX OR MULTILIFT
MATERIALS
ROTO -MILL, ROTO- GRINDER
SAWS, CONCRETE
SCRAPERS - SELF PROPELLED, HARD TAIL END
DUMP, ARTICULATING OFF -ROAD EQUIPMENT
(45 YD AND OVER)
SCRAPERS, CONCRETE AND CARRY ALL
SCRAPER -SELF PROPELLED, HARD -TAIL END
DUMP, ARTICULATING OFF -ROAD EQUIPMENT
Page 14 of 19
$50.39
IT
5D
8P
$50.94
IT
5D
8P
$49.90
.1T
5D
9-
$49.90
1T
5D
8P
$50.94
1T
5D
R
$49.90
IT
5D
8P
$50.39
11
5D
8P
$49.48
IT
5D
8P
$50.39
1T
5D
$1_'
$47.12 IT 5D 8P
$47.12
IT
5D
8P
$49.90
11
5p
R
$49.48
11
5-D
SP
$47.12
IT
5D
SP
$47.12
IT
SD
8P
$47.12
1T
SD
8P
$47.12
IT
5D
8P
$50.39 1T SD 8P
$47.12
IT
5D
8P
$50.39
1T
5D
8P
$47.12
IT
5D
8P
$49.48
IT
5D
8P
$49.90
IT
5D
UP
$49.48
IT
5D
8P
$50.39
IT
5D
8P
$49.48
IT
5D
8P
$49.90
IT
5D
8P
ATTACHMENT Ai —B
http:// www.I ni. wa. gov/ PrevaiiingWage /jwages/20101 /co34.asp 4/l/2010
THURSTON- Effective: 3/3/2010 Page 15 of 19
(UNDER 45 YARDS)
SHOTCRETE GUNITE
$47.12
1l
5D
8P
SLIPFORM PAVERS
$50.39
1T
5D
8P
SPREADER, TOPSIDER & SCREEDMAN
$50.39
IT
5D
$E
SUBGRADE TRIMMER
$49.90
IT
5D
8P
TOWER BUCKET ELEVATORS
$49.48
IT
5D
8P
TRACTORS, (75 HP & UNDER)
$49.48
11T
SD
8P
TRACTORS, (OVER 75 HP)
$49.90
IT
5D
BE
TRANSFER MATERIAL SERVICE MACHINE
$49.90
1T
5D
8P
TRANSPORTERS, ALL TRACK OR TRUCK TYPE
$50.39
1T
5D
$E
TRENCHING MACHINES
$49.48
IT
5D
BP
TRUCK CRANE OILER/DRIVER ( UNDER 100
$49.48
IT
5D
8P
TON)
TRUCK CRANE OILER/DRIVER (100 TON &
$49.90
IT
5D
8P
OVER)
TRUCK MOUNT PORTABLE CONVEYER
$49.90
IT
5D
8P
WELDER
$50.39
IT
5D
8P
WHEEL TRACTORS, FARMALL TYPE
$47.12
IT
5D
8P
YO YO PAY DOZER
$49.90
IT
5D
SP
POWER LINE CLEARANCE TREE TRIMMERS
JOURNEY LEVEL IN CHARGE
$40.79
4A
5A
SPRAY PERSON
$38.73
4A
5A
TREE EQUIPMENT OPERATOR
$39.25
4A
5A
TREE TRIMMER
$36.50
4A
5A
TREE TRIMMER GROUNDPERSON
$27.55
4A
5A
REFRIGERATION & AIR CONDITIONING MECHANICS
MECHANIC
$26.64
1
RESIDENTIAL BRICK MASON
JOURNEY LEVEL
$27.50
1
RESIDENTIAL CARPENTERS
JOURNEY LEVEL
$23.30
1
RESIDENTIAL CEMENT MASONS
JOURNEY LEVEL
$14.00
I
ATTACHMENT Ai —B
http: / /www.Ini.wa.gov/ Prevai lingWage /jwages/20101 /Co34.asp 4/l /2010
THURSTON- Effective: 3/3/2010
RESIDENTIAL DRYWALL TAPERS
JOURNEY LEVEL
$18.00
1
RESIDENTIAL ELECTRICIANS
JOURNEY LEVEL
$27.28
1B 5A
RESIDENTIAL GLAZIERS
JOURNEY LEVEL
$23.30
1
RESIDENTIAL INSULATION APPLICATORS
JOURNEY LEVEL
$18.70
1
RESIDENTIAL LABORERS
JOURNEY LEVEL
$20.00
1
RESIDENTIAL MARBLE SETTERS
JOURNEY LEVEL
$27.50
1
RESIDENTIAL PAINTERS
JOURNEY LEVEL
$18.27
1
RESIDENTIAL PLUMBERS & PIPEFITTERS
JOURNEY LEVEL
$20.40
1
RESIDENTIAL REFRIGERATION & AIR CONDITIONING
MECHANICS
JOURNEY LEVEL
$26.64
1
RESIDENTIAL SHEET METAL WORKERS
JOURNEY LEVEL (FIELD OR SHOP)
$35.25
HR 6L
RESIDENTIAL SOFT FLOOR LAYERS
JOURNEY LEVEL
$16.00
1
RESIDENTIAL SPRINKLER FITTERS (FIRE PROTECTION)
JOURNEY LEVEL
$21.67
1
RESIDENTIAL STONE MASONS
JOURNEY LEVEL
$27.50
1
RESIDENTIAL TERRAZZO WORKERS
JOURNEY LEVEL
$8.55
1
RESIDENTIAL TERRAZZO /TILE FINISHERS
JOURNEY LEVEL
$17.00
1
RESIDENTIAL TILE SETTERS
JOURNEY LEVEL
$8.55
1
Page 16 of 19
ATTACHMENT At —B
http:// www.i ni. wa. gov/ PrevailitigWage /jwages /20101/co34.asp 4/l/2010
THURSTON- Effective: 3/3/2010
1.��__:_
JOURNEY LEVEL
$37.54
20
5A
USING IRRITABLE BITUMINOUS MATERIALS
$40.54
20
5A
SHEET METAL WORKERS
JOURNEY LEVEL (FIELD OR SHOP)
$59.32
lE
6L
SHIPBUILDING & SHIP REPAIR
BOILERMAKER
$32.56
111
6W
SIGN MAKERS & INSTALLERS (ELECTRICAL)
JOURNEY LEVEL
$18.04
1
SIGN MAKERS & INSTALLERS (NON- ELECTRICALI
JOURNEY LEVEL
$15.50
1
SOFT FLOOR LAYERS
JOURNEY LEVEL
$38.26
IB
SA
SOLAR CONTROLS FOR WINDOWS
JOURNEY LEVEL
$10.31
1B
50
SPRINKLER FITTERS (FIRE PROTECTION)
JOURNEY LEVEL
$46.50
1
STAGE RIGGING MECHANICS (NON STRUCTURALI
JOURNEY LEVEL
$13.23
1
STONE MASONS
JOURNEY LEVEL
$46.35
1M
5A
STREET AND PARKING LOT SWEEPER WORKERS
JOURNEY LEVEL
$16.00
1
SURVEYORS
CHAIN PERSON
$9.35
1
INSTRUMENT PERSON
$11.40
1
PARTY CHIEF
$13.40
1
TELECOMMUNICATION TECHNICIANS
TELECOMMUNICATION TECHNICIANS
$22.00
1
JOURNEY LEVEL
TELEPHONE LINE CONSTRUCTION - OUTSIDE
CABLE SPLICER
$32.27
2B
5A
HOLE DIGGER/GROUND PERSON
$18.10
la
5A
Page 17 of 19
ATTACHMENT Ai —B
http:// www. Ini.wa.gov /PrevailingWagefjwages /20101 /co34.asp 4/1/2010
THURSTON- Effective: 3/3/2010
Page 18 of 19
INSTALLER (REPAIRER)
$30.94
2D
5A
JOURNEY LEVEL TELEPHONE LINEPERSON
$30.02
2B
5A
SPECIAL APPARATUS INSTALLER 1
$32.27
2B
SA
SPECIAL APPARATUS INSTALLER II
$31.62
2B
5A
TELEPHONE EQUIPMENT OPERATOR (HEAVY)
$32.27
2B
SA
TELEPHONE EQUIPMENT OPERATOR (LIGHT)
$30.02
2B
SA
TELEVISION GROUND PERSON
$17.18
213
5A
TELEVISION LINEPERSON /INSTALLER
$22.73
2B
5A
TELEVISION SYSTEM TECHNICIAN
$27.09
2B
5A
TELEVISION TECHNICIAN
$24.35
2$
5A
TREE TRIMMER
$30.02
2B
5A
TERRAZZO WORIKERS
JOURNEY LEVEL
$45.26
1M
5A
TILE SETTERS
JOURNEY LEVEL
$45.26
1M
5A
TILE, MARBLE & TERRAZZO FINISHERS
FINISHER
$39.09
1B
5A
TRAFFIC CONTROL STRIPERS
JOURNEY LEVEL
$38.90
1K
5A
TCK DR�.VERS
ASPHALT MIX (TO 16 YARDS)
$45.63
IT
5D
ASPHALT MIX (OVER 16 YARDS)
$46.47
IT
SD
DUMP TRUCK
$17.23
1
DUMP TRUCK & TRAILER
$17.23
1
OTHER TRUCKS
$46.47
IT
5D
TRANSIT MIXER
$31.64
2H
WELL DRILLERS & IRRIGATION PUMP INSTALLERS
IRRIGATION PUMP INSTALLER
$17.53
1
OILER
$12.44
1
WELL DRILLER
$18.00
1
• Find a Law _(RCW1gr Rule (WAC)
• Get a Form or Publication
• Report Fraud
8L
81,
8L
ATTACHMENT Al —B
littp:// www. Ini .wa.gov/PrevailingWage /jwages /20101 /Co34.asp 4/1/2010
THURSTON- Effective: 3/3/2010
. About L &I
• News and Media Center
• Find a Job at L &I
Office Locator
• Site Feedback
For Business
• JYhaat to do if your employees re injured
. Find a safety nile
. File a Quarterly Report
• Find safety training materials
• Electrical perm-its and inspections
• Running a business: What you need to do
• More For Business
For Workers
. Worker's comp claims
. Find out about breaks
• Learn workplace safety requirements
. Understanding — overtime p
• Minimum wage is $8.55
• More For Workers
For Medical Providers
• Managing claims for injured workers
• Medical treatment guidelines
• Provider billing & payment
. Check what needs pre - authorization
• More For Medical Providers
Access
�11'ash6tgtonw
Page 19 of 19
0 Washington State Dept. of Labor and Industries. Use of this site is subject to the laws of the state of
Washington.
• Access Agreement
• Privacy & Security Statement
• Intended Use/External Content Policy
• Staff Only
ATTACHMENT Al —B
littp:// www.] ni. wa, gov/ PrevailingWage /jwages/20101 /co34.asp 4/1/2010
v I 1'•6" 1 24.•0..
RIDGE
REUSE AND REPRIME EXIST.
KITCHEN HOOD EXHAUST
PROVIDE SHEATHING, 2
LAYERS OF'ISO' INSULATION
& SHEATHING (# 500 SQ. FT.)
PROVIDE Y'O D.S.
\ 1t E.J.
ERIC K ON•McGOVERN
rc ec ure• no ys s-School Des gn
OVERALL ROOF PLAN
SCALE: 1/ 16" = 1' -0"
FORT STEVENS / MILL POND ELEMENTARY
YELM SCHOOL DISTRICT M2
SMEEIREEERIME DME
ROOF PLAN A2.01 4/1/10
@ WINDC
/LOUVER
/Udl