Loading...
20100044 Pressure Test 080510~ 2.~lovayY BACKFLO PRO'S, INC. Backflow Prevention Assembl 855 Trosper Rd SW Suite 108-230 )/ Tumwater, WA 98512 Test Report Phone:360-951-6130 Fax: 360-352-1990 Mailing Address Meter #- RANDY-AHO Device: FEBCO 850 l .000 DC AHO 10041 COCHRANE AVE SE YELM, WA 98597 '~ Accountnum: 8875 :-• >~: Serial #: HC24080 ~ ~~~ ,,,~~. Test Due: 08/01/1 I `~' ~' Service Address Address: 10041 COCHRANE AVE SE Company: AHO Hazard: Irrigation-Residential Location: NEXT TO METER ~~~~. Reduced Pressure Princi le Assembl oc p y ® RPDA ^ Double Check Valve Assembly Pve ^ Air Gap SVB ^ AVB Check Valve #1 Check Valve #2 Relief Valve PVB/SVB Initial Leaked ^ AIR INLET Test Leaked ^ Closed Tight ® Did not Open ^ Did not Open ^ Held at ~ •4 PSID Held at Z•1 PSID Opened at PSID Opened at PSID CHECK VALVE Buffer PSiD Leaked ^ Hetd at PSID Repairs Repaired ^ Repaired^ Final Closed Tight^ AIR INLET Test Held at PSID Held at PSID Opened at PSID Opened at PSID CHECK VALVE Buffer PSID Held at PSID Comments ~~, ~~~~~ 60 Line Pressure Held Sackpressure #2 Shutoff® The above report is certifed to be true. Reliet Valve Exercised^ Date Tester Signature Tester # Test Kit Passed Failed n. a Test 08/05/10 BRIAN BOLINSKI ' L 85432 05071592 ® ^ Repairs Final t ^ ^ b0/E0 3~Jdd DNI SDad O~~JiDtig 066TZ5E09E 5E ~bT 0T0Z/50/80