20100044 Pressure Test 080510~ 2.~lovayY
BACKFLO PRO'S, INC. Backflow Prevention Assembl
855 Trosper Rd SW Suite 108-230 )/
Tumwater, WA 98512 Test Report
Phone:360-951-6130 Fax: 360-352-1990
Mailing Address Meter #-
RANDY-AHO Device: FEBCO 850 l .000 DC
AHO
10041 COCHRANE AVE SE
YELM, WA 98597 '~
Accountnum: 8875
:-• >~:
Serial #: HC24080 ~ ~~~ ,,,~~.
Test Due: 08/01/1 I `~' ~'
Service Address
Address: 10041 COCHRANE AVE SE
Company: AHO
Hazard: Irrigation-Residential
Location: NEXT TO METER
~~~~.
Reduced Pressure Princi
le Assembl oc
p
y ® RPDA ^
Double Check Valve Assembly Pve ^ Air Gap
SVB ^ AVB
Check Valve #1 Check Valve #2 Relief Valve PVB/SVB
Initial Leaked ^ AIR INLET
Test Leaked ^ Closed Tight ® Did not Open ^ Did not Open ^
Held at ~ •4 PSID Held at Z•1 PSID Opened at PSID Opened at PSID
CHECK VALVE
Buffer PSiD Leaked ^
Hetd at PSID
Repairs Repaired ^ Repaired^
Final Closed Tight^ AIR INLET
Test Held at PSID Held at PSID Opened at PSID Opened at PSID
CHECK VALVE
Buffer PSID Held at PSID
Comments
~~, ~~~~~ 60
Line Pressure
Held Sackpressure
#2 Shutoff®
The above report is certifed to be true. Reliet Valve Exercised^
Date Tester Signature Tester # Test Kit Passed Failed
n. a
Test 08/05/10 BRIAN BOLINSKI ' L 85432 05071592 ® ^
Repairs
Final
t ^ ^
b0/E0 3~Jdd DNI SDad O~~JiDtig 066TZ5E09E 5E ~bT 0T0Z/50/80