20110115 Structural Notes 12312010STRUCTURAL NOTES General Notes: These structural notes supplement the drawings. Any discrepancy found among the drawings, these notes, and the site conditions shall be reported to the Engineer, who shall correct such discrepancy in writing. Any work done by the Contractor after discovery of such discrepancy shall be done at the Contractor's risk. The Contractor shall verify and coordinate the dimensions among all drawings prior to proceeding with any work or fabrication. The Contractor shall coordinate between the architectural drawings and the structural drawings. The architectural dimensions are taken to be correct when in conflict with the structural drawings. The Contractor is responsible for all bracing and shoring during construction. All construction shall conform to the applicable portions of the latest edition of the International Building Code except where noted Design Criteria: 1. Live Load = 40 PSF (Floors) = 25 PSF (Snow) 2. Dead Load = 15 PSF (Roof) = 12 PSF (Floor) = 10 PSF (Walls) = 150 PCF (Concrete) 3. Partition = 10 PSF (Floors) 4. Wind = 2009 IBC Exposure B @ 85 mph 5. Earthquake = 200916C Site Class = D Design Cat. = D Use Group = I R = 6.5 Cd = 4 W° = 3 6. Soil = 1500 PSF, Assumed bearing capacity Concrete & Reinforcing Steel: 1. All concrete work shall be per the 2009 IBC Chapter 19. Tolerances shall be per IBC Chapter 19, Section 07. Mixing, placement, and inspection shall be per Sections 03, 04, 05, and 06. 2. All reinforcing shall be ASTM A615 Grade 60 except as shown on the plans. 3. Concrete shall be in accordance with ASTM 150. fc = 2500 PSI @ 28 day slump = 4" maximum, 6% Air entrained. Steel: FILE 1. Anchor bolts shall be ASTM A307 and will have a 3x3x1/4" plate washer. Carpentry: t! ~ l~ 1. 2X structural framing shall be #2 Douglas Fir_ {~ ~ -- ~_~ i_r__ eY--------------------- 4x structural members shall be #2 Douglas Fir. 6X members shall be #1 Douglas Fir. 2. Provide solid blocking in floor system below all bearing walls and point loads. 3. 2X joists shall be kiln dried and stored in a dry area prior to installation. The moisture content of all wood shall be less than 15%. 4. Roof trusses shall be by apre-approved manufacturer and constructed according to the specifications of the Truss Plate Institute. Truss shop drawings must be stamped by a licensed engineer and be on site at the time of construction. Preliminary truss drawings must be reviewed prior to construction. It is the truss manufacturer's responsibility to inform the engineer of record of any changes from the preliminary truss lay-out. Girder trusses to have a minimum of bearing studs equal to number of plies of truss. All girder trusses shall have Simpson HGT tie down at either end to match number of plies. Truss manufactures are responsible for all bracing of the trusses including end wall bracing and all other bracing between the building and the trusses unless specifically shown otherwise on the drawings. Contractor to coordinate bracing with engineer of record as required. 5. Glue laminated beams shall be 24F-V8 for cantilevered or continuous beams and 24F-V4 for simple spans. (Fb = 2,400 PSI) (Fv = 190 PSI) (E = 1,800,000 PSI) (FcL = 650 PSI) 6. Continuous and cantilevered glue laminated beams shall not be cambered. All other glue laminated beams shall be cantilevered for L/480. See the framing plans for any exceptions. 7. Sheathing at roof and floor shall be laid with face grain perpendicular to supports and end joints staggered 4'-0" on center. Provide 1/8" space at panel edges as required by panel manufacturers. Floor sheathing shall be nailed 6" o.c. edges and 12"field with 10d's and roof sheathing shall be nailed 6" o.c. edges and 12" o.c field with 10d's unless otherwise noted on the drawings. Block and nail all horizontal panel edges at designated shear walls. Hardware: All connection hardware shall be Simpson "Strong Tie". Connection hardware exposed to the weather or soil shall be treated as in steel above. CAUTION: PLACE TRUSSES PER MANUFACTURER'S RECOMMENDATIONS AND BRACE PER TRUSS COMPANY RECCOMENDATIONS. CONTRACTOR IS RESPONSIBLE FOR ALL TEMPORARY BRACING AND SHORING REQUIRED FOR PLACING TRUSSES. NOTE THESE DRAWINGS DO NOT INCLUDE ANY TEMPORARY SHORING OR BRACING. PRECISE ENGINEERING RECCOMENDS ALL SHORING AND BRACING BE DESIGNED AND DETAILED BY A LISENCED ENGINEER. CONTRACTOR TO FIELD VERIFY ALL CONDITIONS AND ALL ELEVATIONS. HOLD DOWN SCHEDULE It is the responsibility of the contractor to locate hold down anchor bolt to accommodate all structural framing. Anchor bolt to be located nearest the corner or opening at the end of the shear wall. All foundation vents to be a minimum of 12"off centerline of the anchor bolt on either side. Holdown stud to be coordinated with shear wall panel edge framing requirements. Larger stud size controls ® HDU2 attaches to concrete foundation with a 5/8" dia bolt with 15" minimum embedment into concrete or a Simpson SSTB 16. HDU2 attaches to double 2x studs or 4x or 6x stud with (6) Simpson SDS 1/4 X 3 Wood Screws in wall above. (~jS) HDU4 attaches to concrete foundation with a 5/8" dia bolt with 16" minimum ~~ embedment into concrete or a Simpson SSTB 20. HDU4 attaches to double 2x studs or 4x or 6x stud with (10) Simpson SDS 1/4 X 3 Wood Screws in wall above. TYPICAL SHEAR WALL NOTES Use 1/2" dia. by 10" Anchor Bolts (AB's) with single plates and 1/2" dia. by 12" AB's with double and 3x plates spaced as shown on the drawings. AB's shall have 7" of embedment into footing, shall be centered in the stud wall, and shall project through the bottom plate of the wall and have a 3x3/xl/4 plate washer. All wall sheathing shall be 1 /2" CDX plywood, 5/8" T 1-11 siding, or 7/16" OSB with exterior exposure glue and span rated "SR 24/0" or better. All free sheathing edges shall be blocked with 2x4 or 2x6 flat blocking except where noted on the drawings or below. All nails shall be 8d or l Od common (8d common nails must be 0.131 inch diameter, Senco KC27 Nails are equivalent. If l Od common nails are called for the diameter must be 0.148 inches, Senco MD23 Nails are equivalent). Nail size and spacing at all sheathing edges shall be as required below or as in the drawings. Nail spacings shall be 12" o.c. for all field nailing except as noted. Hold downs are Simpson "Strong Tie" and shall be installed per the manufacture's recommendation. Equivalent hold downs by United Steel Products Company "Kant-Sag" that have ICBO approval can be substituted in place of Simpson hold downs. All floor systems must be blocked solid below member that the hold down is attached to. This block should be equal to or larger than the member the hold down is attached to and be placed as a "squash block". All double and triple studs shall glued and nailed together with l Od's at 3" o.c. for each layer. All 4x studs are to be #2 DF and a116x studs are to be #1 DF when used for hold downs and shear walls. ALL WALL AND ROOF FRAMING LUMBER SHALL BE DOUG-FIR #2 OR BETTER. NOTE: MST STRAPS attaches to (2) 2x or 4x studs in wall above and below unless noted otherwise. Nail all holes with 16d sinkers. SHEAR WALL SCHEDULE sheathing nailed with 8d's at 6" on center all edges. sheathing nailed with 8d's at 4" on center all edges and 4x or 6x studs at panel edges.