Loading...
2237 Structural CalcsSTRUCTURAL DESIGN INFORMATION GOVERNING CODE: 20U91ntemational Residential Code (IRC) 2009 International Building Code (IBC) This engineering pertains to the dcsipt of the Lateral Force Resistittg System and a review of the home designer's framing and foundation plans. T71c home designer is responsible for making any necessary changes as required by these calculations to their framing and foundation plans. I. Dead Load: A. Roof ...................................................... .............15 psf B. Floor ....................................................... ..............10 psf C. Exterior walls ........................................... ............. IO psf D. Gxteriur walls with veneer ............................... ............. 50 psf E. Interior walls with Rvpboard each side ..................... ................5 psf Z. Floor live load :...................................................... ..............4U psf 3. Snow load: A. Uniformly distributed snow load on roof ................. ..............23 psf 4. Wind load -based on ASCE ?AS Method 2 Analytical Pro cedure: A. 3 Sceond Cust Kind Speed .................................. ...... V=11U mph B. txposure ........................................................ ...................8 C. Imponance factor ............................................. .............1= L0 U. lopographipl Factoc ........................................ ..........Kz1=1.0 E. Wind llirettionnl FacWr ..................................... .........Kd=0.85 F. Snvcturc classified to ........................................ ..........enclosed 5. Seismic load -based on ASC,'8 ?-0S Section 12.14: A. Mapped Spxtral Acceleration (or shun periods .......... .............55=1.0 d. Mapped Specual Accclcrativn for 1 stcond pcriod ...... ............S1-0.34 C. Soil Sitc Class ................................................ .....................D U. llucti lity coefficient ........................................... ............. R - 6.5 E. Seismic Uesign Cetcgory .................................... ....................D 6. Foundation Soil Properties: A. Cndishnbed sandy silt per ]BC 2009 Table 1804.2...... .....Soil Clans # 5 B. Maximum vertical bearing pressure ........................ .......... I S00 psf ?. Retaining wall latarnt loads: A. Walls free to displace laterally at Wp ................... ...............35 pef B. Walls restrained n¢ainsl lateral displacement at Wp ..... ..............45 pef 8. ConcTCtc: A. 28 day design strength F'c ................................... ...........3000 psi B. Reinforcing bars ....................................... A.STM A615, Grade 60 r, Froject pate By rso~ Atio - zZ3-r i-z~-it >~- category STRUCTURAL INFORMATION project No. Sheet SI-1 ,~ 3121 " 21608 N.E. 49th Circle Vancouver Washington 98682 oral Eng`9~ Phone: (360) 600-6084 Fax: (360) 944-0538 12.14 SImpIlFled Akemative Structural Design CriterW for SNnple Bearing Wall Systems 1.2.5 SEISMIC BASE SHEAR (Eq. 12.7411 with f.12) V • W R 5, mappedapectraiaccelerationfor 5,:=1.00 short perbds (Sac. 11.4.1) from USGS web site S, mappedspedralaccelarationfor 5<:=0.34 1 second period (Se c.11.4.i) Fa Site roefflcient (Table 11.41) fa.- 1.1 Based on So(I F~:= 1.8 Slte Class D f~ S(te coefficient (Table 11.42) SMS ~ Fa'Ss SMS = 1.1 (Eq. 11.41) SMS = f~ St SMS = 0.61 (Eq.11.42) 11.4.4 Des(gn spectrum response acceleration parameters 2 •SMS Sps = 0.73 > 0.50g SDS -= SEISMIC 3 CATEGORY 2 D PER TABLE 11.6-1 SDI := 3.SMt SOt = 0.41 1.2•Sps R := 6.5 Table 1214-1 WOOD SHEAR PANELS v:= -•w R 1.2.0.73 V:= •W V:= 0.135•W 6.5 12.4 Seismic Load Combinations E := 1.3 •V (Eq. 12.43 wtth re dundatcy factor =1.3 par 12.3.4.2) WSD:= 0.7•E 0.7.1.30.135-W 0.123~W WOCD SHEAR PANEt.S aers, Project f}NO - 22nS7 Date By O~ I-2V-11 /~t~ Category LATERAL ANALYSIS Protect No. Sheet ~~ 312 L-I G~f ~¢'~ u6o8 N.E. 49th CSrcle Vancouver Washington 98682 trap En~>,t' Yhone: (360) 600-6084 Fax: (360) 944-038 ~IMYLIFIED WINDt3NU SECS MIC GUM[' KA t50N wiNp ra r psf tt psf IA'~iR lj Lj aSb i10 ar Length L:= 50•ft Height H~:= 23•ft WIND= L•IIL•; ~~ 11•psf+ 7.4psf} WIND = 2116G Ib Fr ~ WrooF F= ~ 'sJfloor 5aismic Wwall Base Shear ~J P4~; := 50 ft 38•ft ArooF = 1900ft2 ~+noor := 50 •ft:•3B•ft P`floa - 1900ft2 W,,,,ib:= 2~18~ft~50~F W„ratr, ='800ft` SFISMIG:=(Ar,r~~15•psf+Atloor•l0~psf~}~Wwap.,~l0~ psf)~0./23 SEISMIC=8056.51b WIND GOVERN3DE IGN (~ers Project ANO - 223.7 Date By ~fi O~ i-zro-ti /~~ Category Project Vo. Sheet ~ LATERAL ANALYSIS 312 ~;2 ~~~ ezti1 2;,608 AT.E. 49th Circle Vancouver Washington y868z oral En~'o Phone: (360) 600-6o8q Fax: (360) 944-0538 WIND DESIGNIS (BASED ONe$DF 7-05 METHO D 2 • ANALYTICAL PROCEDURE fFlaura 661 VELOCITY PRESSURE qp:= .00256•k,•K,~ I(i•VZ-I (EG.6-15) EXPOSURE B WIND SPEED (3 second gust) V3a:- 110 mph IMPORTANCE FACTOR I := 1.0 TOPOGRAPHICAL FACTOR Kn=1.0 • WIND DIRECTIONAL FACTOR 1~:= 0.85 Table 6-4 EXPOSURE COEFFICIENT 0'-15' K, := 0.57 q,:= ,00256-ICi Krt, YY Y3 Z•I q~= 15.01 (varies /height) 15'-20' Ki :=0.62 qs:=.00256•Kz•KnlCe•Y~Z•I y~=16.32 za-25 xi s 0.66 q,:=.oo256~xz•x.~•x,•v~,2•I qz=n.38 25'30' K~ := 0.70 q,:= .00256•x,-K~•ICd•Vyg2~l 9== 18.43 WIND PRESSURE P:=q~~G•Cp G:-0.85 Gustfacrvr CP pressw -acoeffktsnt AT WALL Q_7~^ WINDWARD Pw := 15.01 psf 0.85.0.8 Pw =1C2' psf LEEWARD P~:=15.01psf•0.85.0.5 P~=6.38psf 15 20 WINDWARD P„ := 16.32psf•0.85.0.8 P„ = tti psf LEEWARD P~:= 16.32•psf•0.85.05 P~ = 6.94 psf TA ROOF 15'4 WINDWARD Pw;= 16.32•psf~0.85~0.3 P„=4.16 psf LEEWARD P~=16.32psf•0.85.0.6 PL=8.32psf ~0'-25' WINDWARD Pw:= 17.38-psf•0.85.0.3 pw=4.43psf LEEWARD P~:=17.38•psf•0.85.0.6 Pi-8.86 psf aers fi o 1't'pect Ago - 2z3~ Date --2~-~~ B,. ~- ~ ~ Category LATERAL ANALYSIS project No. Sheet L-~ 3iz~ ~~ ati~ ~~ ~ 2t6o8 N.E. 49th Circle Vancouver Washington 98682 'fdl EnB~~ phone: (360) 600-6084 Fax: (360) 944-0538 WIND DESIG N IS BASED ON A;$E 7-05 METHQ p 2 -ANALYTICAL PROCEDURE (Rguro 6$) cont. cp-o.3 8.86 4 43 `, ~1 Assume Cp--0.6 e := 35 n 1 . ps f 6,9 psf 102 pcf ~~ Windward leeward Loads at Roof uaparrooF roof at garage Windward 4.g3•psf•9.5•h=42.08p1 f 4.16~psf•5~h=20.8p1f Leeward 8.86psf•9.5ft=84.17p1f 8.32psf•5•h=41.6p1f Wall loads at upper level at lower level Windward 11.1•psf•4•ft=44.4p1f 10.2•psf~e.5•h=86.7pff Leawmd 6.9•paf•4•h=27.6p~f 6.9•psf•8.5~h=58.65p1f tiers O Project ~ N O - 2 237 Date 1-Zc.-II By /k~~ ~ c Category LATERAL ANALYSIS Project No. 2 Sheet ~ 4 31 - ~~~ e~S^ ~ 2i6o8 N.E. 49th Circle Vancouver Washington 98682 'ral En~~o Phone: (360) 600-6084 Fax: (360) 944-0538 psf / pcf 9.54 8ft 9ft \, ~ih~. ~iSO~ Protect ~ ~ ~ - ZZ37 Date By I-2 fc • I I ~~ L'ategory ~ AT~'12A L A~(A~-`515 protect No. Sheet ~~~ u6o8 N.E. 49th Circle Vancouver Washington 98682 oral En~~~ Phone: (360) 600-6084 Fax: (360) 944-0538 ~.I(n1D l)rl UVPER LEVEL 3~'2 3a'2 ~= W5,1~ ~ ~ ,~ Z`~1~ w~ ~ BR 3 a 9~~ ~a m 1 ~ ~ 40 4 ~ y O N a ® YtiS1ER BR ¢ ¢ (y 9R 2 ~ 4 U ~~ Z 1l V Project Date By S~~ aNO - zz37 ~-zr~-,i ~- Category Project No. Sheet LATEf2At. ANAI.~SIS 312/ ~-~ c~ <` 2z6o8 N.E. 49th Circle Vancouver Washington 9868? ~4~`dl Eri~~~~ Phone: (360) 600-6084 Fax: (360) 944-0538 WIND orl MP1~ t-~v~L. ~5~ ~ 1 ~ 11 1 II II 11 II 5i5~ II 1 1. 1. 11 1 it 11 11 II 11 11 II Sf 45 ---a II II i KITpIEN ~ GNINC ' wlr . uR GREATROOII MMM g~ MY v I1S ~ ~, _ 1 1 QJ 1 IJNNC~/~N n'-n Pdr. \ O oPnoNAt a cAR / `' ~e 2A7o GARAGE ii GARAGE ii COHERED PGRCN M ~ n'~a it II * 0 _sst>rar_c___¢~ 11 I I I .. ' ' `` =1 I ~ I I I -_-___-_______ 1 ~\. j 1 ~~' 1 1 lei 1 1 ~\ 1 2 R~ / ~S ~~~ ~~{ 0 - 22'S~7 Date By Q~ i-z1u-II Ari/} Category I,A`rE12AL AIVALYS($ Project i\o. Sheet L~ ~ 3121 ~(a 2i6o8 N.E. 49th Circle Vancouver Washington 98682 oral En~`~ Phone: (360) 600-6084 Fax: (?60) 94 ;-0538 St±FAR WALL DESICzN Pdl F'dl I Wdl ~r ~ V' ~ ~ M) P:= 'NI'1G `I t/ := BBISmIG n k-Fioldown 1j/ ~crce Bascd on ?pQ~a IBC Basb to d C<xnhin io s O.FiD + W ((:Guatktn 16-14) Qf~D ~ 0.? E (Ecuatioi?6-15` Ovrrturning Momrtnt: ~I ;- F~h fL1~ Resisting Morn ont: M. - 0.6~~N,i -'Nwa,~~~- - 0.6 P.,~-L 2 M„- - M, Hddown Folcn R ~= ------- ~aerso Pro;~t A~io - 223 ~tZ~-~~ B"~ ~ ~ ~~So4' LATERAL ANALYSIS Project No. Sheet ~,p, ~ i2 ~ 3 . y`' G~ 2i6o8 N.F.. 49th Circle Vancouver Washington g8G81 f ~ ~ra~ En~~o Phone: (360) 60o-6o8q Fax: (3Go) 994-v;;3R Shear Wa Is at Rlaht E va[ion Upper Le vet Wind Force P :- 3002.16 P = 300216 Length of wall L:=16ft+12ft L=28ft P Shear v - v=1072ipff Q L 12 10292.5716•ft Overturning M,t := P•e•ft• 26 Mot = Moment (12 ft)2 Resisting M, =.fi~(15•psf•20•ft+10•psf•8•ft)• 2 +400•Ib•12•ft Moment M; = 212161b•ft Mm. - ~ Holdown = -9102916 12•ft Force Maln Level Wind Force P:= 5757.16 P = 575716 Length ofwall L:=32ft L=32ft Shear P - v v=179 9tplf PJ :_ . L Overturning 1~:= P•9•ft Ma = 518131b~ft Moment (32 ft)2 Resisting + 600•Ib•32•ft M, :- .6~(15•psf•20•ft+ 10•psf 18 ft)• 2 Moment g lb•ft Mr=1.67x lO Holdown M~ - Mr _ -3588.6416 Farce 32•ft tiers Project /iL10 - 2237 Date By ~ Category LATERAL ANALYSIS t'''~ 'o. sheet L_~ 12 ~~ e`er 21.608 N.E. 4gth Circle Vancouver Washington 88682 ~Gral Eng~°~ Phone: (360) 600-6084 Fax: (360) 944-0538 Beer Elevation Upper Level Wind Force P:= 2970~ib P - 2970'6 Longthofwall L:=4•ft+12-ft+12•ft L=28ft S P =106 07 H p` hear v:> - v . p L 4 Overturning M,i := P•8•ft- M~ = 3384.291b•ft Moment 28 (4•ft)2 Resisting h1.._ .6 (75-psf•4•ft + t0~psf 8~ft)• * 400•Ib•4•ft 2 Moment M, = 22721b•ft Moc - I'1r Holdown = 280.5716 Force 4•ft Main Level Wind Force P:= 5145.16 P = 514516 Length ofwau L:= 5•ft+6ft+8ft L=19 ft P Shear v:= L v=270.79p1f G 8 Overtwning M,t:= P~9-ft~- M,i = 19496.841b•ft Moment 19 (&ft)Z Resl Sing r4 := .6~(15~psf~4•ft + tOpsf~6ft - 10-paf•t8•ft)• + 600-Ib~B•ft Moment 2 Mr = 105601b•ft Holdown ~ - ~ =1177.77 lb Force g•ft ~~aerso~ Project fa1-l0 - 2237 ~ty II $yA-~ (~ - ~ category LATERAL ANALYSIS Projer2 ~°' sheet 3 L1O ~~~, ~¢,~ 2i6o8 N.E. ggth CSrcle Vancouver Washington g868z ~r~~ En$~r Phone: (360) 600-6084 Fax: (360) 944-053H Shear Wa_Ua at Left Elevetlon Upper Level Wind Force P:= 3002~Ib P = 3O021b Lengtn of Wall L = zek L . zak P Shear v= - v ~ 107.21p1f O L • Overturning hbr := P•B~k hbc = zam6ib~ft Moment (2B k)1 Roaiating Mr :_ .6•(15•psf•20•k + 10•paf•8•k)- + 400•Ib•28•k Moment 2 h4 = t.O1 x 1051b•ft t'br - ~ Noldown = -2734.291b Force 28•ft Main L eve I -most conservatHe at 3 car option Wind force P:=5757~Ib-78016 P=65371b Length of Wall L:=19•ftt4k+17ft L=40ft P Shear v:= ~ v=163.43p1f 8 4 OverturMng F~:6 P•9~ft-~ M~=5883.31b•ft Moment (4'k)2 Reslating Mr := .6•(15•psf-20~ft * 10•paf-17•k)~ ~- + 600•Ib•4~k Moment 2 M, = 46561b•ft Noldown ~ - ~ = 306.831b Force Oft P at2oer: L:=44~k v:=- v= 748.57pif fiaerSO Proect At-1o - z23~ oatZ`.11 sY~~ ~ ~ ~ Category• LATERAL ANALYSIS Project No. Shect .a 3121 ~r e~~` G zi6O8 N.F.. 49th Circle Vancouver Washington 98682 ~a1 Eng'~ Phone: (360) 600-6084 Pr~.k: i ^6,,? ~~.~ ~ ~,;~5 Shear Wal Is at F root E levatlon Upper Level Wind Foroe P:= 2970.16 P = 297016 Length of wall L:=B•ft+2fi-4 L=16ft P g Shear v:= v=185.63pif ~ 8 Overturning M~:= P~8•ft~ MOZ =1189016•ft Moment 16 (8~ft}2 Resisting M,:=.6•(15-psf-4•ft+10•psf•8~ft)~ +400-Ib-8-ft Moment 2 Mr = 588816•ft Moc -- M, Holdown = 74916 Force 8•h Maln Leval - Wal ls at Living Room and Rear Garage wall Wind Foroe P:= 6095.16 P = 609516 Length of wall L:= 2•ft-2+13-ft+3ft L=20ft P Shear v:= L v=304.75p1f 2 Overturning Mot := P•8-ft- M~ =487616-ft Moment 20 (2•ft)z Resisting h4:_.6•(15-psf~4-ft+l0psf-5ft+t0•psf•t8~ft)• +600 .16-2•ft Moment 2 ~ =15481b•ft M~ - M. Holdown h-(~ 4 ~ =166416 5ri•tnl4 Q 2~ W4L1.3 Force 2•ft Project Date By ~,~. erso~ Auo - 2237 (-z`-n ~ Category Project No. Sheet ,~ LATERAL ANALYSIS 3i~1 ~~~ G~f ~¢,~c zt6o8 N.F.. 49th Circle Vancouver Washington 98682 `fal gn4~`r Phone: (360) 60o-6o8q Fax: (360) 944-0538 $~ear Walls at Garage Front 2 Gar OpUOn WindFon;a P:= 2095-Ib P=20951b Lengthofwail L:= 2•ft+2ft L=oft P Shear v:= - v=523.75p1f E L Overturning M~: 1 = P•7-ft ) M~=7332.51b•ft Moment 2 (2 •ft)1 Resisting M,.:= .6-l15~psf~2ft+10• pst~8~ft;~ +400•Ib•2ft Moment 2 hl = 9321b•ft Moc - M. Holdarn = 3200.251b s fiµgly Face 2 ft 3 Car Option Wend Fon;e P = 2095-Ib P = 20951b Length of wall L:= 2fb4 L=Bft P Shear v:= - v=261.88p:f G L 1 Overturning M,t : = PJ-ft Ma = 3666.251b ft Moment 4 (2 -ft)z Resisting M,:= .6•;15•psf•2•ft+10• psf•8-ft)• +400-ib•2•ft Moment 2 M - 93216•ft M~ - M, Holdown =1367.131b 5"lND~¢ Force 2- k tiers ~ ~ Project f}NO - 2237 Date 1 •Z V - I I By /~c+-~ ~ ~ ~ Category LATERAL ANALYSIS Project No. Sheet ~(3 •~ X21 3 ~f e¢S u6o8 N.E. 49th Circle Vancouver Washington 98682 ~'ral En~~° Phone: (360) 600-6084 Fax: C36o) 944-0538 RObP Fa~Mi~G u~,= 15ptP w~ = zSpsF Project Date $y sO~ ~~u - Z23T !-Zfo-fl A'h.~1' Category Project No. Sheet ~ a (=RiaMWb 3f2! F-J c,~ ~ u6o8 N.E. 49th Circle Vancouver Washington 98682 `~1"dl Eri~'~~ Phone: (360) 600-6084 Fax: (360) 944-0538 ~'3~ TaACK R-c~¢ w,e~o$ Ptnject Dafe $y {~. l~O~ a~NQ - 223"1 I-Ziv-11 ~- ~•~~rj' Category FRAMInIC~ ~oject No. Sheet ~ 3~2! ~ Z t`p 2i6o8 N.E. 49th Circle Vancouver Washington y8682 e~ Phone (,~60} 6no-6044 Fax: (360) 944-0538 ~fal Ent' ,rr.~~ "'~`„ o'InID !/Lo~rz ('12nM1A1Ls Heal ~~ Wd --1 ~ Psf yy W <q~r5f y 1 ~XbOF~z_ 1 F nox T,wstP ,gEMt owl w.AL~ O a fit[ a Di M L 1- w -- q xto of +~ 2 -r~. {IWu NITCNOI r DINING • f rn . uA ~ 1,.a ° IC5 °~ , „ a o . i !' ~`0 ~ l LIMi 5 exl3fs ~ ~ P6. ^ uaa i I OP71ONAL 3 CM GARAGE GARAGE ~ COVERED PORCN 2 n.w I 4Xlo of ~` 2 l - ~~:--~------- a= -,'.--': ° ___- u J : ISx to = ISb { `~~~[.~ j ~ B~ ~"'.' ' It x'~lo Y GN hD Rl. + + - ' ' 3 0 FIGTt2 aJ : lltlr°r~s fft.xt2 a~ 1 ~ p ~, tLJ~ s 1lY2~} ~' 2~ 7J " J-TT~ 3y2 x I I+(s is t_ e e '1'1C (0 OG ~-2 -- E3 .(~. S ~ ~~~ ~{{{ 0 - 22 ~? Date gy. Category Project No. Sheet ~ FRAMII.(G 8121 ~3 C~ 2t6o8 N.E. ggth Circlc Vancouver Washington 88682 ~~IEII~~~ Phone: (360)600 (illRi F,~ ~,r~n'o~~ir.~.;h Mule-Loaded BeamJ2DD61nternational BuildinA Code (05 NDS1 T Ver. 7.01.10 ev: Anne ,Anderson Structure) Engineering on: Of- 25-2010:12:52:22 AM Project: AHO 2222 -Location: Bt Summary: 3.5 IN x 11.875 IN x 10 0 FT / 1.5E Timberstrand LSL - Trus Jdst Section Adequate By 81.9% Controlling Factor: Section Modulus /Depth Required 9.761n Center Span Deflections: Dead load: DLD-Center- 0.05 IN Live Load: LLD-Center= 0.18 IN -0651 Total Load: TL0.Center- 0.23 IN = 0512 Center Span Left End Reactions (Support A): Live Load: LL-Rxn-A= 3000 LB Dead load: DL-Wcn-A= 815 LB TotalLOad: TL-Rxn-A= 3815 LB Bearing Length Required (Beam only. support capacity rid checked): BL-A= 1.45 IN Center Span Right End Reactions (Support B): Live Load: LL-Rxn-B= 3000 LB Dead Load: OL-Rxrr-8= 8P5 L8 Total Load: TL-Rxn-B= 3815 LB Bearing Length Required (Beam only, support capacity not checked): BL-B= 1.45 IN Beam Data: Center Span Length: L2= 10.0 FT Center Span Unbraced Length-Top of Beam: Lug-Topes 0.0 FT Center Span Unbraced Length-Bottom of Beam: Lug-Bottom= 10.0 FT Live Load Duration Factor: Cd= 1.00 Live Load Deflect. Criteria: U 360 Total Load Defied. Criteria: U 240 Center Span Loading: Uniform Load: Live Load. wL-2= 600 PLF Dead Load: w0.2= 150 PLF Beam Self Weight: BSW= 13 PLF Total Load: wT-2= 783 PLF Properties For: i.5c Timberstrerrd LSL• 7nrs Jaat Bending Stress: Fb= 2250 PSI Shear Stress: Fv= 400 PSI Modulus of ElastiriN: E= 1500000 PSI Adjusted Modulus of Etasticity: E-Min= 58000U PSI Stress Perpendicular to Grain: Fc-peril= 750 PSI Adjusted PropeNes Fb' (TensionT: Fb'= 2252 PSI Adjustment Factors: Cd=1.00 CF~1.00 Fv': Fv'= 400 PSI Adiustment Factors: Cd=1.00 Design Requirements: ConNdling MomenC M= 9537 FT'-LB 5.0 Ft 6om left support of span 2 (Center Span) Critical moment created by combining all dead loads and live loads on span(s) 2 Contrdling Shear: V= 3128 LB Af a distance d from ripbt support of span 2 (Center Span) Crdipl shear created by comblNng all dead toads and live k>ads on span(s) 2 Comparisons With Required Sections: Section Modulus (Moment): Sreq= 50.82 IN3 S= 82.28 IN3 Area (Shear): Area= 11.73 IN2 A= 41.56 IN2 Moment of Inertia (Deflection): Iraq= 269.96 IN4 I~ 488.41 ItJ4 1'~ Mufti-Loaded 8eamf 2006 Inlemational Buildino Code (05 NDS)1 Ver: 7.01.10 Bv; Anne .Anderson Structural Engineering on: Ot-26-2011 : 3:(1H:53 PM Dry Use Required 11.58 In DLD-Center- LLD-Center= TL0.Center- C= LL-Rxn-A= DL-Rxn-A= TL-Rxn-A= BL-A~ LL-Rxn-B= OL-Rxn-6= TL-Rxn-6= BL-B= L2= Lug-Top= Lug-Bottom= Cd= U U wL-2= wD-2= BSW= wT-2= Fb= Fv= E_ E-Min= Fc peril= Fb_cpr- Fb'= rv: y'= Adjustment Factors: Cd=1.15 Oeslgn Requirements: Controlling Moment: M= 9.0 Ft from left support of span 2 (Center Span) Critical moment created by combining all dead loads and live loads on span(s) 2 Controlling Shear: V= At a distance d from right support of span 2 (Center Span) Critical shear created Dy combining all dead loads and live Toads on span(s) 2 Comparisons With Required Sections: Section Modulus (Moment): Sreq= Area (Shear): S= Areq= Moment of Inertia (DeBection): A= Iraq= 1= 0.22 IN 0.34 IN = L/629 0.57 IN = Ll380 0.34 IN 2475 l8 1620 LB 4095 LB 1.23 IN 2475 LB 1620 L8 4095 LB 1.23 IN 18.0 FT 0.0 FT 18.0 FT 1.15 360 240 275 PLF 185 PLF 15 PLF 455 PLF 2400 PSI 265 PSI 1800000 PSI 930000 PSI 850 PSI 1850 PSI 80.12 IN3 155.67 IN3 17.74 IN2 69.19 IN2 663,28 IN4 1050,79 IN4 FS Multi-Loaded Beamf 2006 International Bulking Code (05 NDS) 1 Ver 7.01.10 By: Anne ,Anderson Structural Engineering on: 04-20-2009:7:38:27 PM IepN Required 8.45 In DLD-Center- LLD•CeMer- TLD-Center= LL-Pom-A= DL-Ftxn-A= TL-Rxn•A= BL-A= LL-Rrn-6= DL-Rxrt-8= TL-RxrrB= BL-B= L2= Lug-Top= Lug-Bottom= Cd= U U wL-2= w0.2= BSW= wT-2= Fb= Fv= E_ E-Min= Fcyerp= Fb'= r•v: Fv'= Adiuatment Fedora: Cd=1.15 Design Requirements: Controlling Moment: M= 3.0 Ft from left support of span 2 (Center Span) Critical moment created by combining all dead loads and live loads on span(s) 2 Controlling Shear: V= At adistance dfrom right suDDOrt of span 2 (Center Span) Critical shear created bV combining all dead loads and live loads on span(s) 2 Comparisons Wlth Required Sections: Sedlon Modulus (Moment): Sneq= S= Area (Shear): Areq= A= Momem of Inertia (Deflection): freq. 0.03 I N 0.05 IN = U1520 0.08 IN = L/953 1800 LB 7071 LB 2871 LB 1.31 IN 1800 LB 1071 LB 2871 LB 1.31 IN 6.0 FT 0.0 FT 8.0 FT 1.15 360 240 800 PLF 350 PLF 7 PLF 957 PLF 900 PSI 180 PSI 1600000 PSI 580000 PSi 625 PSI 207 PSI 4307 FT-LB 2182 LB 41.61 IN3 49.91 IN3 15.81 IN2 32.38 IN2 58.13 IN4 230.84 IN4 F- ~ Multi-Loaded Beam12006 International Budding Code 105 NDS)1 Ver 7.01-10 ev: Anne ,Anderson Structural Engineering on: 04-20-2008 7:39:10 PM >opth Requlred 7.7 In DLD-Center= LLD-Center- TLD-Center-- LL-Rxn-A= OL-Rxn-A= TL-Rwt-A= Bl-A= LL-Rxn-B= DL-Pom-B= TL-Rxn-B= BI-B= L2= Lug-Top= Lug-Bottom= Cd= U u wL-2= w0.2= BSVV= wT-2= Fb= Fv= E= E-Min= Fc~erp= Fb'= rv: Fv = Adjustment Factors: Cd=1.16 Design Requlroments: Controlling Moment: M= 4.0 Ft from left wpport of Wan 2 (Center SpaN Critiral moment created by combining all dead bads and live loads on span(s) 2 Cantroitinq Shear. V= At a distance d from bfl wppon of span 2 (Gamer Span) Critical shear seated by combining all dead loads and live loads on span(s) 2 Comparisons WM Required Sections. Section Modulus (Moment): Sreq= S= Area (Shear): Aroq= A= Moment of lnerlla (Deflection): ' Iraq= 1= 0.04 IN 0.07 IN = U1399 0.11 IN = L1861 1100 LB 888 LB 1768 LB 0.82 IN 1100 LB 888 LB 1788 L9 0.82 IN 8.0 FT 0.0 FT 8.0 FT 1.15 360 240 275 PLF 185 PLF 7 PLF 447 PLF 900 PSI 180 PSt 1800000 PSI 580000 PSI 625 PSt 1212 PSI 207 PSI 1486 LB 34.55 IN3 49.91 IN3 10.82 IN2 32.38 IN2 64 36 IN4 230 84 IN4 F- ~ /~O/ f ~I ~l`/1 f.J f.-~ r-----------------------------°------------------~ r_- ___ -- -'- -- -- -- --- -- -- --- -- --- -• i I 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I l l l l l 1 l 1 1 1 1 1 l I I II I. 1 I I I i I I I I I I I I I I !. .J-. I I i I I I I o°I i I I I =I 1 I I s~ l I I~ I I ~~~1 I~ 20 m I f •, .. - I. I I ' I I I V I I I I I I I I' I I I I ,I- 1~-, J~ 1 I. G I• I• I I I I ' I I ~ l i i 1 1 1 1 1 I I r I -- ---~ --~ -- ~~--• -, I I I I I I I --- ~~ ~~ ----------------------~ ~' __ '_~ ~ i i ~ I ~I IP. I r__ '-1 L --_ __ __ _I 1 I; I I t I I• I 1 L-----------------l I I, I 111 I 7 I I I ~~ II I f I I I • / • i II II 3 I f •• 1 ~_a II 1 1 J I ~ i 1 ~1 II 1 I l II II I _____________ _____J I ___- _______________________J ~. ers~ Project Ado - 223"[ Date By Category ProjeM No. Sheet FaArtir~l(~ 3iz1 F8 zt6o8 N.E. 49th Circle Vancouver Washington 98682 ~~1 Env'p~ Phone: (360) 600-6084 Fax: (360) 944-0538 FoundatbnDeslgn Soil Bearing Pressure SBP:= 1500•psf (assummed) LARGEST ALLOWABLE POINT LOAD ON 14" WIDE PROCTOR FOOTING -TWO STORY FIOUSE: to[al engaged area Allowed Load A:= (18~in ~ 8•In+ 18dn}•14 •In A = 4.3ft2 1 Allowed Load SBP•A = 6416.71b - 1 ALLOWABLE LOAD ON PAD FOOTINGS: Size Area Capacity 18"dlmnoLer A:=9•In•9•in•3.14 Paii:=1500•psf•A Pall=2649.416 24"diameter A:=12•In~12~1n3.i4 P,il 1500•psf~A P1i11=4710 16 20'k20° A:= 20•In•20•In Pa11:= 1500•psf A Paq=4166.71b 30540' A:= 30 In30 In Pall := 1500•psf•A Pa1i = 93751b 40'k40" A:= 40~Im40~ln Pee := 1500•psf•A P,li = 16666.71b ALLOWABLE LOAD ON CONTINWUS F0071NG: 14 inch wide: CapaCLy 1500 psf X 14 Inches =1750 pif Project Date By SO~ AI-l0 - 2237 t-2to-N fi~'".>- Category ~R A M1 ~~ Project No. Sheet ~q ~ 31z~ J Cp 2i6o8 N.E. 49th Circle Vancouver Washington 98682 ~~`d] En~'~'~ Phone: (360) 600-6084 Fax: (360) 944-0538