Plan Review ACUgary
gary
2
Normal
Microsoft Office Word
Plan Review ACU,
A1.1
Note 5 – Need demo permit from Olympic Region Clean Air Agency (ORCAA)
Note 8 and 9 may need ORCAA permits also
A1.2
Detail 3 note
cmu wall height should be 6 feetA3.1
Door #13 see
notes on A5.1A4.1
Cut section C-verify truss loads and seismic restraint of TV’s
A4.3
Cut section H-verify access for hot water tank
A5.1.
Verify access control doors meet IBC 1008.1.4.4
and if key operated state “This door to remain unlocked when building is occupied”A6.1
105 toilet
room (typ) should say “max ht. of mirror bot. edge of reflective surface”A6.2
117 break
room sink height 2’-10” max.S1.1
FYI Simpson has reduced the hold down values for Seismic D, E and F in the 2011-2012
catalog.P1.1
Note future 3 compartment sink will need floor sink.
H20 tank in mech
. room. Where does drain and pressure relief valve drain to. Also note location difference on M2.P1.2
Verify inlet elevation of step tanks. Fall of less
then 2% may require waste line upsizing .E1.1
Need site illumination plan
E1.2
Verify emergency lighting
Verify exterior lighting type H are mounted at 80 inches above accessible paths
E1.3
Coordinate backing in walls for TV’s
General notes
Verify submitted energy work sheets meet the requirements of the 2009 WEC