Loading...
Plan Review ACUgary gary 2 Normal Microsoft Office Word Plan Review ACU, A1.1 Note 5 – Need demo permit from Olympic Region Clean Air Agency (ORCAA) Note 8 and 9 may need ORCAA permits also A1.2 Detail 3 note cmu wall height should be 6 feetA3.1 Door #13 see notes on A5.1A4.1 Cut section C-verify truss loads and seismic restraint of TV’s A4.3 Cut section H-verify access for hot water tank A5.1. Verify access control doors meet IBC 1008.1.4.4 and if key operated state “This door to remain unlocked when building is occupied”A6.1 105 toilet room (typ) should say “max ht. of mirror bot. edge of reflective surface”A6.2 117 break room sink height 2’-10” max.S1.1 FYI Simpson has reduced the hold down values for Seismic D, E and F in the 2011-2012 catalog.P1.1 Note future 3 compartment sink will need floor sink. H20 tank in mech . room. Where does drain and pressure relief valve drain to. Also note location difference on M2.P1.2 Verify inlet elevation of step tanks. Fall of less then 2% may require waste line upsizing .E1.1 Need site illumination plan E1.2 Verify emergency lighting Verify exterior lighting type H are mounted at 80 inches above accessible paths E1.3 Coordinate backing in walls for TV’s General notes Verify submitted energy work sheets meet the requirements of the 2009 WEC