Loading...
20100129 Updated Sewer #1 03222011WRFOps Karen Bennett 2 Normal Microsoft Office Word CITYOFYELM City of Yelm Sewer Dept. Civil Plan Review America’s Credit Union 1 st review - 3/21/11Reviewed by Randy H. and Jim D. 2” Future Service Stub-out is not on this Property, but on the Lot NW of this one. It is Possible to make this a “gang” system which will bring a service line to the credit Union. Service line needs to be at least 24” deep from finished grade to top of pipe for Protection. No 90° bends in the side sewer. Will there be any conflict with service line and Storm Drain? 1500 gallon Step Tank will need to be rated H-20 for traffic. If this building is turned into a restaurant or something similar in the future, will the 1500 gallon step tank be adequate? In the event of a espresso stand going into the property, Grease waste pretreatment will be needed. Plans do not show sewer mainline. Plans do not show air release valve at approx. STA 4+06. Air release valve must have at least 10 ft. of horizontal separation from any fire hydrants or water meters. See Sewer Spec. addendum in Chapter 7 of Yelm Development Guidelines for updates to sewer specs.