Loading...
20100129 Peer Cmt 2 05312011SHEA - CARR - ~1EWELL ENGINEERING AND PLANNING SERVICES May 31, 2011 Mrs. Karen T. Bennett Administrative Support City of Yelm Community Development Department 105 Yelm Avenue West Yelm, WA 98597 Re: Peer Review #2 America's Credit Union SCJ Project #0605-05/24 Dear Karen: As you requested, Shea Carr Jewell has reviewed the resubmittal of the America's Credit Union project, which addressed the comments from our first peer review. The review documents included: • Civil engineering plans signed May 12, 2011 • Stormwater Site Plan signed May 12, 2011 • STEP System Report signed May 11, 2011 • Comment Response Letter dated May 12, 2011 Our comments are as follows: STEP System Report: 1. Appendix B: Overall the flows used for tank sizing, especially for the future coffee house, seem too low. Further, the methodology used to calculate the amount of flow for the patrons of the coffee house is incorrect. The category of "restaurants additional for bars and cocktail lounges" on Table 2 of Chapter 7 of the Yelm Development Guidelines is not meant to be a stand- alone category. The intent is that this would be an additive flow to a restaurant already generating 8-10 gallons per day per person. As Table 2 does not have category for the coffee house use, another methodology shall be used to estimate this flow. Perhaps water records of existing similar uses can be obtained and used. If this information is unavailable, the restaurant category could be used with an 8-10 gallon per day per person flow. We also suggest using water records for the bank flow as well. This will provide more accurate flow information than the office flow category that has been estimated for this use. 2102H Carriage Drive SW -Olympia, WA 98502 Office: 360.352.1465 ~ Fax: 360.3521509 ~ Email: inFo(~sheacarrjewell.com ~ www.sheacarrjewell.com ~~ . Construction Plans: General: Mrs. Karen Bennett May 31, 2011 Page 2 of 2 2. The methodology for restricting right turns at the eastern driveway would not provide much of a deterrent for performing a left turn movement. Please use a "pork chop" to deter left turning. Also, please provide signage noting the turning restriction. Sheet 1 of 12: 3. It is the policy of the City to include the conditions of approval on the cover sheet of the plans. Please include. Sheet 3 of 12: 4. Although labeled as 2%, I calculated a slope at about 2.1%. See plan and revise. 5. The maximum allowed slope for ADA access without installing a ramp is 5%. I calculate one edge of the sidewalk between the front door and the public sidewalk to be in excess of this amount. See plan and revise. Sheet 4 of 12: 6. When the contractor determines the depth of the existing roadway infiltration trench along SR 507, please contact the City immediately to identify whether or not changes to the existing infiltration trench will be required. Further, if trench changes are required, roadway flooding prevention during trench modification construction will need to be addressed. Should you have any questions or comments, please contact me at (360) 352-1465 at your earliest convenience. Associate Principal N:\Projects\0605 City of Yelm\605-OS Civil Plan Reviews\Phase 24 -America's Credit Union\Correspondence\L-2011-0527 2nd Review Itr.doc Sincerely, ch.,-, r^.,- i,,....,ii