Loading...
20100129 Design Guidelines Chklst 062110ZENCZAK & PARTNERS ARCHITECTS, A.I.A. 4545 SOUTIi UNION AVENUE, SUITE 200 (253) 475-0380 TACOMA, WASHINGTON 98409 FAX (253) 475-3553 TOLL FREE (877) 320-5748 E-MAiI_: STUDIO@ZPAAIA.COM BOI_ESI_AW ZENZCAI<, AIA JERRY A. ISAKSEN. AIA RICK T. ADAMS, I.EED AP KAREN S. GENOWAY June 21 ~ 2010 BRIAN J. MORRISON TO: City of Yelm Community Development Department 105 Yelm Avenue West Yelm, WA 98597 REGARDING Design Guidelines Checklist for: America's Credit Union - Yelm Branch 415 Yelm Avenue East Yelm, WA 98597 The tables below list the specific guideline sections identified as applicable to this project per the preliminary staff review dated April, 2010. Our explanations of how each guideline has been met are listed under the response column. I. SITE PLANNING ITEM REQUIREMENT RESPONSE LA.(2) Relate development to street fronts The building has been placed forward with (other than pedestrian oriented minimum setback per City code. All parking streets) has been placed in back of the building. ', LB.(1) Minimize visibility and impacts of All service areas have been placed in back 'i service areas of the building and parking areas. ~ I.D.(1) Reduce impact of service areas and All service areas have been placed in back mechanical equipment of the building and parking areas. I.E.(1) Integrate biofiltration swales and Any bioswale provided by project will be ponds into the overall site design. located at the back of the property -behind the parking lot. ~~~~~~~ j B Y: _ DESIGN GUIDELINES CHECKLIST ACU YELM - 6/21 /2010 PAGE 2 OF 3 II. PEDESTRIAN ACCESS ITEM REQUIREMENT RESPONSE II.A.(1) All pedestrian paths must See sidewalks on Site plan. Plan will be correspond with federal, state and submitted to city review during permitting local codes for handicapped access, process. and the Americans with Disabilities Act. II.A.(2) Provide adequate lighting at the See conceptual lighting on site plan. The building entries and all walkways intent is to provide adequate on-site lighting, and paths throu h arkin lots. while avoidin off-site tare. II.A.(3) Develop an on-site pedestrian See site plan. There are no adjacent circulation conce t. commercial uses at this time. II.B.(1) Provide a pedestrian path at least See site plan. Entry faces the street with a 60" wide (preferably 96" wide) from sidewalk providing direct access. the street sidewalk to the main entr . II.B.(3) Provide pathways through parking See Site plan. The majority of parking spaces lots. have adjacent sidewalks leading to the buildin ent II.D.(2) Provide, where feasible, pedestrian There are no adjacent commercial uses at circulation routes to adjacent uses this time. Access is provided from main entry and transit. to Yelm Avenue. II.E.(1) Enhance building entry access. The following elements will be used: b) "200 SF landscaping", f) "adjacent window displays" & i)"entry tower form." _ _ III. VEHICULAR ACCESS AND PARKING III.B.(1) Minimize driveway impacts. With a street frontage property line of 120'; two driveways are permitted (2 for 51-150 foot frontage.) Attempts were made to share a driveway with the adjacent lot but an agreement could not be reached. III.C.(2) Meet requirements for parking lot See Site plan, conceptual lighting and design detail standards. landscape plans. Plans will be submitted to cit review durin ermittin rocess. DESIGN GUIDELINES CHECKLIST ACU YELM - 6/2 7 /2010 PAGE 3 OF 3 IV. BUILDING DESIGN IV.A.(1) Incorporate human-scale building The following elements will be used: elements. c) "150 SF pedestrian oriented space', ', d) "individual window panes <32 SF." e " able & hi roof." IV.D.(1) Enhance buildings with appropriate The following elements will be used: details. e) "decorative light fixtures", & f "decorative materials brick " IV.E.(2) Use compatible building materials. (Per Roof: Standing seam metal roof (color ', Building Material Summary Matrix.) shall be barn red.) Visible Facades: Brick, Wood Siding and Stucco w/flat finish Trim: Wood IV.F.(1) Treat blank walls that are visible from the There are no blank walls visible from the street, arkin or ad acent lots . street as defined in A endix A. IV.G.(1) Locate and/or screen roof-mounted There is no plan to mount mechanical ', mechanical equipment so as not to be equipment on the roof. ~~ visible from the street or from the ground level of ad acent ro erties. IV.G.(2) Where practical, locate and/or screen When allowed by utility companies, all utility meters, electrical conduit and other utility meters will be located on back side service and utilities apparatus so as not of the building. to be visible from the street. V. LANDSCAPING AND DESIGN V.F.(1) Use plant materials that are approved for See conceptual landscape plan. Plan will use in downtown Yelm. Proponents may be submitted to city review during use other plant materials approved by permitting process. the Cit . V.G.(1) Develop a site landscape design See conceptual landscape plan. Plan will concept. be submitted to city review during ermittin rocess. V.H.(1) Provide substantial site landscaping. See conceptual landscape plan. Plan will be submitted to city review during ermittin rocess. V.I.(1) Screen all parking lots as required by See conceptual landscape plan. Plan will Chapter 17.80, landscaping. be submitted to city review during ermittin rocess. V.I.(3) Provide internal parking lot landscaping. See conceptual landscape plan. Plan will be submitted to city review during ermittin rocess.