Salmon Run Yelm Civil Review Comments 09022011Date: Grant Beck Karen Bennett 2 Letter Microsoft Office Word City of Yelm City of Yelm???? Community Development 105 Yelm Avenue West Yelm, WA 98597 September 2, 2011 Chad Heimbigner, PE, LEED AP Senior Civil Engineer Coffman Engineers, Inc. 10 North Post Street, Suite 500 Spokane, WA 99201 Mr. Heimbigner: The City of Yelm has reviewed the latest civil plan set for the Salmon Run Apartments, revised July 27, 2011, and has the following remaining issues that must be addressed prior to approval.A pedestrian pathway must be provided within the complex to provide access from Buildings B, C, and D to the community building. The pathway must be of a different material than the asphalt parking lot. It should be noted that water connections will be required to be hot tapped. The STEP tanks sizing analysis is accepted. However, the “primary tanks” that serve Buildings B, D, and E do not provide 100 percent of the required detention volume, which is proposed to be split between the “primary tank”and “pump tank”. The entire required detention volume will need to be provided in the “primary tank” in order to provide full treatment to solids.Sincerely, Grant Beck, Director Community Development Department (360) 458-3835 (360) 458-3144 FAX www.ci.yelm.wa.us September 2, 2011 Page 2 of 1