Loading...
FW ACU Yelm final drawings for fire sprinkler lay outIPM.Note FW: ACU Yelm final drawings for fire sprinkler lay out FW: Gary Carlson Doug Palmer Gary Carlson SMTP DougP@meritnw.com ACU Yelm final drawings for fire sprinkler lay out EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=GARY EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=GARY Microsoft Mail Internet Headers Version 2.0 Received: from psmtp.com ([64.18.0.79]) by yelmmailserver.ci.yelm.wa.us with Microsoft SMTPSVC(6.0.3790.4675); Tue, 23 Aug 2011 11:07:20 -0700 Received: from meritnw.com ([65.102.128.100]) by exprod5mx220.postini.com ([64.18.4.10]) with SMTP; Tue, 23 Aug 2011 11:02:53 PDT Content-class: urn:content-classes:message Subject: FW: ACU Yelm final drawings for fire sprinkler lay out MIME-Version: 1.0 Content-Type: multipart/mixed; boundary="----_=_NextPart_001_01CC61BE.E0B34CC6" Date: Tue, 23 Aug 2011 11:02:24 -0700 Message-ID: <DBF5D8831D06A04CAC9B7F8289AF67D65CD312@server.MeritNW.local> X-MimeOLE: Produced By Microsoft Exchange V6.5 In-Reply-To: <00e101cc5e84$5b85c850$129158f0$@com> X-MS-Has-Attach: X-MS-TNEF-Correlator: Thread-Topic: ACU Yelm final drawings for fire sprinkler lay out Thread-Index: AcxXbr2PHRowgNZiStGZ7JnyYFnsWwE0UhrgAI9t6OAAAZ+fUADOJ80A References: <DBF5D8831D06A04CAC9B7F8289AF67D65CD073@server.MeritNW.local> <005d01cc5c40$73c7ad70$5b570850$@com> <DBF5D8831D06A04CAC9B7F8289AF67D65CD25F@server.MeritNW.local> <00e101cc5e84$5b85c850$12 158f0$@com> From: "Doug Palmer" <DougP@meritnw.com> To: <garyc@ci.yelm.wa.us> Cc: <corryh@olympicfiresuppression.com>, <tmartell@live.com>, "Tom Motland" <TomM@meritnw.com>, "Rick Adams" <studio@zpaaia.com>, <mtexidor@youracu.org> X-pstn-levels: (S:99.90000/99.90000 CV:99.9000 FC: 0.1839 LC:95.5390 R:95.9108 P:95.9108 M:97.0282 C:98.6951 ) X-pstn-settings: 5 (2.0000:2.0000) s cv gt3 gt2 gt1 r p m c X-pstn-addresses: from <DougP@meritnw.com> [565/23] Return-Path: DougP@meritnw.com X-OriginalArrivalTime: 23 Aug 2011 18:07:20.0640 (UTC) FILETIME=[8051E400:01CC61BF] ------_=_NextPart_001_01CC61BE.E0B34CC6 Content-Type: multipart/alternative; boundary="----_=_NextPart_002_01CC61BE.E0B34CC6" ------_=_NextPart_002_01CC61BE.E0B34CC6 Content-Type: text/plain; charset="us-ascii" Content-Transfer-Encoding: quoted-printable ------_=_NextPart_002_01CC61BE.E0B34CC6 Content-Type: text/html; charset="us-ascii" Content-Transfer-Encoding: quoted-printable ------_=_NextPart_002_01CC61BE.E0B34CC6-- ------_=_NextPart_001_01CC61BE.E0B34CC6 Content-Type: application/pdf; name="ACU FP UNDERGROUND SKETCH.pdf" Content-Transfer-Encoding: base64 Content-Description: ACU FP UNDERGROUND SKETCH.pdf Content-Disposition: attachment; filename="ACU FP UNDERGROUND SKETCH.pdf" ------_=_NextPart_001_01CC61BE.E0B34CC6-- Doug Palmer SMTP DougP@meritnw.com corryh@olympicfiresuppression.com; tmartell@live.com; Tom Motland; Rick Adams; mtexidor@youracu.org Gary Carlson ACU Yelm final drawings for fire sprinkler lay out Good morning Gary I just have discussed the proposed fire system for the America’s Credit Union here in Yelm with Tim Peterson. Tim said he would spend some time with you to discuss the water departments requirements for the supply feed to the riser and FDC. · Some key items that have been discussed is Stainless pipe with Vick fitting from the riser flange at the north east corner of the building in the building to the back check valve in the mechanical room. · Potential for a meter and box at the fire system supply. I would like to get any comments back as early as possible so that I can have our fire system contractor put together the final design for your review and approval. We will be installing Plumbing and Under slab utilities next week before we install the cap break. Let me know as soon as you have reviewed with Tim Doug Palmer Merit Construction Northwest Cell 253-588-9100 Fax 253-588-9176 meritnw.com From: Corry Hella [mailto:corryh@olympicfiresuppression.com] Sent: Friday, August 19, 2011 8:26 AM To: Doug Palmer Subject: RE: ACU Yelm final drawings for fire sprinkler lay out Doug, Here is a sketch for the Fire underground. From: Doug Palmer [mailto:DougP@meritnw.com] Sent: Friday, August 19, 2011 7:40 AM To: Corry Hella Subject: RE: ACU Yelm final drawings for fire sprinkler lay out Corry How we doing on design and pricing for modified work at the ACU Yelm project? Doug Palmer Merit Construction Northwest Cell 253-588-9100 Fax 253-588-9176 meritnw.com From: Corry Hella [mailto:corryh@olympicfiresuppression.com] Sent: Tuesday, August 16, 2011 11:15 AM To: Doug Palmer; 'Rick Adams' Cc: 'JBEC'; mike@narrowsheating.com; chauney@transitplumbing.com; 'Randy Porcher'; timm@olympicfiresuppression.com Subject: RE: ACU Yelm final drawings for fire sprinkler lay out Doug, I still have not received the plans that I need to finish the Fire Sprinkler design. I need a full set with the current structural truss plans. We are going to be behind schedule if we do not receive these ASAP. Sincerely, Corry Hella Olympic Fire Suppression 3006 South 96th Street Lakewood, WA 98499 O: 253-512-1944 F: 253-512-1943 C: 253-514-9527 mailto:corryh@olympicfiresuppression.com <mailto:timm@olympicfiresuppression.com> http://www.olympicfiresuppression.com <http://www.olympicfiresuppression.com/> From: Doug Palmer [mailto:DougP@meritnw.com] Sent: Wednesday, August 10, 2011 8:41 AM To: Rick Adams Cc: corryh@olympicfiresuppression.com; JBEC; mike@narrowsheating.com; chauney@transitplumbing.com Subject: ACU Yelm final drawings for fire sprinkler lay out Good morning Rick I have our fire sprinkler contractor requesting cad drawings. Do you have the final construction set completed. The one question that came about was weather we wanted a wall PIV or a yard PIV in our meeting with Gary Carlson. Please let me know how soon I can get drawings out to our mechanicals for final review. I would rather wait on the Friday meeting until we get the drawings out for their review and give them a chance to put some for thought into their layout throughout the whole building and not just the mechanical room. Thank you Doug Palmer Merit Construction Northwest Cell 253-588-9100 Fax 253-588-9176 meritnw.com <DBF5D8831D06A04CAC9B7F8289AF67D65CD312@server.MeritNW.local> <DBF5D8831D06A04CAC9B7F8289AF67D65CD073@server.MeritNW.local> <005d01cc5c40$73c7ad70$5b570850$@com> <DBF5D8831D06A04CAC9B7F8289AF67D65CD25F@server.MeritNW.local> <00e101cc5e84$5b85c850$129158f0$@com> FW%3A ACU Yelm final drawings for fire sprinkler lay out.EML Gary Carlson urn:content-classes:message <00e101cc5e84$5b85c850$129158f0$@com> Gary Carlson EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=GARY gary garyc@ci.yelm.wa.us SMTP garyc@ci.yelm.wa.us corryh@olympicfiresuppression.com SMTP corryh@olympicfiresuppression.com corryh@olympicfiresuppression.com corryh@olympicfiresuppression.com tmartell@live.com SMTP tmartell@live.com tmartell@live.com tmartell@live.com Tom Motland SMTP TomM@meritnw.com Tom Motland Tom Motland Rick Adams SMTP studio@zpaaia.com Rick Adams Rick Adams mtexidor@youracu.org SMTP mtexidor@youracu.org mtexidor@youracu.org mtexidor@youracu.org ACU FP UNDERGROUND SKETCH.pdf