SIDF_0742557-16_1.rev_1Page 1 of 1 Report No: SIDF:0742557-16/1 Special Inspection Daily Field Report Issue No: 1 Professional Service Industries, Inc. 10025 South Tacoma Way, #H1 Tacoma, WA 98499 Phone: (253) 589-1804 Fax: (253) 589-2136 Project: No: AMERICAS CREDIT UNION YELM WA Client: AMERICAS CREDIT UNION PO BOX 33338 FT. LEWIS, WA 98433 These test results apply only to the specific locations and materials noted and may not represent any other locations or elevations. This report may not be reproduced, except in full, without written permission by Professional Service Industries, Inc. Approved Signatory: Donald Miller (Special Project Manager) Date of Issue: 10/20/2011 CC: DOUG PALMER, GARY CARLSON, JOHN BARTHELD, KATHY DEGMAN, MARY TEXIDOR, RICK ADAMS Date: 10/18/2011 General Contractor: Merit Construction Northwest Permits: 20110151 Weather: Clear Type of Inspection Performed Reinforced Concrete Structural Masonry High Strength Bolting Fireproofing New Inspection Re-Inspection Reinforcing Steel Soils Welding Other Standby T?????ime: Field Observations & Comments Special Inspection Continuous Periodic Location(s)/Item(s): Overframing at exterior building perimeter Referenced Details/Drawings: Detail 2/S3.2 -2x6 at 24" on center with A34 at top and bottom at 48" on center Remarks: On site to conduct visual verification of the installation of A34 clips per detail 2/S3.2 at the over framing at exterior building perimeter, to include tower area. Drive through over framing is excluded. (Note: Misinterpretation of detail caused double the A34 clips to top portion). No additional exceptions noted. To the best of PSI’s knowledge, the work inspected to the approved construction documents are: Conforming Non-Conforming Inspector: Del Spicer Inspector Cert No.: SI 01049 Jobsite Representative: