Loading...
SIDF_0742557-3_1.rev_1Page 1 of 1 Report No: SIDF:0742557-3/1 Special Inspection Daily Field Report Issue No: 1 Professional Service Industries, Inc. 10025 South Tacoma Way, #H1 Tacoma, WA 98499 Phone: (253) 589-1804 Fax: (253) 589-2136 Project: No: AMERICAS CREDIT UNION YELM WA Client: MERIT COMPANY NW 3020 SOUTH 96TH STREET LAKEWOOD, WA 98499 These test results apply only to the specific locations and materials noted and may not represent any other locations or elevations. This report may not be reproduced, except in full, without written permission by Professional Service Industries, Inc. Approved Signatory: Thor Christensen (Project Engineer) Date of Issue: 8/16/2011 CC: DOUG PALMER, GARY CARLSON, JOHN BARTHELD, KATHY DEGMAN, MARY TEXIDOR, RICK ADAMS Date: 8/5/2011 General Contractor: Permits: Weather: Overcast Type of Inspection Performed Reinforced Concrete Structural Masonry High Strength Bolting Fireproofing New Inspection Re-Inspection Reinforcing Steel Soils Welding Other Standby Time: Field Observations & Comments Spec?????ial Inspection Continuous Periodic Location(s)/Item(s): See attched feild density report for location & elevations Referenced Details/Drawings: SEI TESC plan notes & details page C2 Remarks: A representative from PSI arrived on site as requested for in place density testing & observations during grading operations. Observed grading contractor DCI placing 2” material at the pad site using approximately 10” lifts, then moisture conditioning and rolling with a Bomiag 120AD steel drum vibratory roller. Two areas had been excavated for density testing and observation. PSI did not observe signs of pumping or movement of graded areas when loaded haul trucks passed over the area. Field density results indicate compaction does not meet specification. To the best of PSI’s knowledge, the work inspected to the approved construction documents are: Conforming Non-Conforming Inspector: Tony Carson Inspector Cert No.: ICC 5104640 Jobsite Representative: