Loading...
20100129 ACU Letter 02142012r I U. L~le. ~' City of Yelm Attn: Gary Carlson Yelm, Washington 98597 Re: America's Credit Union 415 Yelm Ave. East Yelm, WA B Y: ----- Below is a list and associated cost of items identified by the City of Yelm during our final site walk. We would like to request the assigned savings in lieu of completion of improvements although our contractor does intend to complete the listed items below. Please find attached check in the amount of $2599.58. Description Actual Cost Assigned Savings Cost Completed By Hydro Seeding $ 400.00 $ 600.00 April 24, 2012 Sidewalk Panel Replacement $1333.05 $1999.58 March 2, 2012 Breakdown of Sidewalk Panel Replacement Demolition 613.05 Remove existing concrete and haul from site Concrete 150.00 Labor 520.00 8 hours @ 85.00/hour Small Tools 25.00 Puel/Mileage 25.00 Thank you, ~~ ~~~ Mary Texidor Director of Projects/Quality Control America's Credit Union Mtexidor@~ouracu.or~ 253-964-6184 irc~, ~:~mi ~~~~~o~~ : md~~„ny ~~„~~~<~n ~~y mo N.,ro~~~i crora u„~~„ nd~~,,d~,o-.,ro~.