City of Yelm Inspection Form 2 Lee PaulingCity of Yelm Date: si2oios
CONSTRUCTION PROGRESS AND INSPECTION REPORT Day: Tuesday
Time⢠4.40 .m.
Project Name: Proiect Number
Creek Street Plaza BLA-07-0367-YL
Project Description: Contractor's Name:
Residential Grubbar Construction / Excavating
1. Brief Weather Summary: (On earthwork jobs include soil conditions)
Sunn ,Cool. Soil conditions are Dr and rock ,
2. Contract Time: No. Days Charged To Date Last Working Day Charged (Date)
Description of Construction Phases (Include items such as clearing, grading, drainage, base, paving, surface, utilities,
curb and gutter, sidewalk, etc.) Contractor completed placing step tank and hookups.
4. Summary of Field Testing (Note failing tests and any retests. Condition of
material) Contractor completed step tank installation.
Sketch or Paste Pictures Below: