Loading...
20080347 Mitigation Cost AllocationProject Name (STIP) 93rd/Burnett Realignment/Signal Existing Peak PM Trips - 2008 Background Peak PM Trips - 2010 Total Peak PM Trips - 2010 Total Number of new Peak PM Trips Total Number of new Development generated Peak PM Trips Percent of Peak PM Trips generated by new development Local Share of Total Improvement Cost Development Share of Local Improvement Cost Cost per Peak PM Trip (Mitigation Charge) Capacity Related Improvement x 1334 1807 2281 947 474 0.207803594914511 2410000 500806.6637 322.6847 Aniticpated Cost 2410000 From TIA. Number of Peak PM trips in 2010 with no new development, from TIA. Number of Peak PM trips in 2010 with proposed development, from TIA. Existing Peak PM trips subtracted from total new trips. Background Peak PM trips subtracted from total new trips. Total Trips divided by new development trips. Total cost of improvement multiplied by 37% (63% of traffic in Yelm is regional and not local). Total of Local Share of Improvement Costs multiplied by the percentage of Peak PM trips generated by new development. Developments share of costs divided by the number of trips generated by new development. Project Name (STIP) Coates Road Connection Existing Peak PM Trips - 2008 Background Peak PM Trips - 2010 Total Peak PM Trips - 2010 Total Number of new Peak PM Trips Total Number of new Development generated Peak PM Trips Percent of Peak PM Trips generated by new development Local Share of Total Improvement Cost Development Share of Local Improvement Cost Cost per Peak PM Trip (Mitigation Charge) Capacity Related Improvement x 164 259 282 118 23 8.15602836879433E-02 1200000 97872.3404 63.0621 Aniticpated Cost 1200000 From TIA. Number of Peak PM trips in 2010 with no new development, from TIA. Number of Peak PM trips in 2010 with proposed development, from TIA. Existing Peak PM trips subtracted from total new trips. Background Peak PM trips subtracted from total new trips. Total Trips divided by new development trips. Total cost of improvement multiplied by 37% (63% of traffic in Yelm is regional and not local). Total of Local Share of Improvement Costs multiplied by the percentage of Peak PM trips generated by new development. Developments share of costs divided by the number of trips generated by new development. Project Name (STIP) Longmire Signal Existing Peak PM Trips - 2008 Background Peak PM Trips - 2010 Total Peak PM Trips - 2010 Total Number of new Peak PM Trips Total Number of new Development generated Peak PM Trips Percent of Peak PM Trips generated by new development Local Share of Total Improvement Cost Development Share of Local Improvement Cost Cost per Peak PM Trip (Mitigation Charge) Capacity Related Improvement x 1404 2202 2938 1534 736 0.250510551395507 850000 212933.9687 137.1997 Aniticpated Cost 850000 From TIA. Number of Peak PM trips in 2010 with no new development, from TIA. Number of Peak PM trips in 2010 with proposed development, from TIA. Existing Peak PM trips subtracted from total new trips. Background Peak PM trips subtracted from total new trips. Total Trips divided by new development trips. Total cost of improvement multiplied by 37% (63% of traffic in Yelm is regional and not local). Total of Local Share of Improvement Costs multiplied by the percentage of Peak PM trips generated by new development. Developments share of costs divided by the number of trips generated by new development.