Loading...
20080347 Final Punchlist itemsofTHFp City of Yelm 4 ~9~ ~, Community Development Department 105 Yelm Avenue West Yelm, WA 98597 YELM WASHINGTON May 3, 2011 Scott Ritter Eagle Plaza LLC 201 Tahoma Blvd Yelm, WA 98597 Re: Eagle Plaza Punchlist Application Dear Mr. Ritter: The Community Development Department received an application for final punchlist items for the above referenced project. The following items must be completed prior to recording the final binding site plan: 1. Stabilize soils. Exposed soils (building pads) shall be stabilized by application of effective BMP's that prevent erosion. 2. Upon final inspection of the roadway along Eagle Plaza, it was noted that the fill slope south of the property is steeper than allowed. Refer to WSDOT Design Manual M 22-01, Chapter 1600. The slope is actually 2H (Horizontal): 1 V (Vertical). The WSDOT Manual states a definition of nonrecoverable fill slope is steeper than 4H:1 V, but not steeper than 3H:1 V are considered nonrecoverable. At a minimum, an extruded curb to protect vehicles and pedestrians would be needed. Contact Tim Peterson, Public Works Director with questions, (360) 458-8499. If you have any further questions, please feel free to contact me at (360) 458-8496 Sincerely, Associate Planner Department of Community Development cc: Shea Carr Jewell Tim Peterson (360) 458-3835 (360) 458-3144 FAX www.ci.yelm.wa.us