Loading...
20090210 Bus BarnIPM.Note Bus Barn Karen Bennett Gary Carlson Karen Bennett EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=GARY Bus Barn EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=KARENB EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=KARENB Gary Carlson EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=GARY Karen Bennett Bus Barn Attached are the review comments sent to the Arch. They are called Yelm Support Operations Center Notes <AF5BA03431078A4AA31E0C07CE8843296E59F2@yelmmailserver.ci.yelm.wa.us> Bus Barn.EML Gary Carlson 12.0 Yelm Support Operations Center Notes Karen Bennett EX /O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=KarenB KarenB@ci.yelm.wa.us KarenB Karen Bennett Karen Bennett KarenB@ci.yelm.wa.us Yelm Support Operations Center Notes.docx gary gary 3 Normal Microsoft Office Word Yelm Support Operations Center Notes 1.A1.02 Accessible path should be continuous to the ramp landing. Spill Control plan.2. A2 .10 detail hand rails on both sides of stairs. Hand rail extend 12 inches beyond the top riser and return to a wall, guard or walking surface.3.A7.00 C. Lavatory height 34 inches max.4. M5.01 Verify outside air requirements met. Plan shows WPL but no power or controls. 5. M6.02 duct heater. Show detail for suspension and seismic bracing Civil notes Site plan photometricsFire lane and access to FDC We need STEP Tank sizing calculations to ensure the system is large enough for the proposed use. The depth to the STEP Tank can be no greater than 5 feet to the invert. The bus wash facility will be required to be covered. (alt. bid A-1)A revised landscaping plan is required per the conditions of approval. Clearly show changes to the impervious surfaces on the site, including ‘gravel’ areas and new pavement. Show existing fire hydrants and water lines. Need specifications of oil/water separator. .docx YELMSU~1.DOC Yelm Support Operations Center Notes.docx