Attached are the review comments sent to the Arch. They are called Yelm
Support Operations Center Notes
<AF5BA03431078A4AA31E0C07CE8843296E59F2@yelmmailserver.ci.yelm.wa.us>
Bus Barn.EML
Gary Carlson
12.0
Yelm Support Operations Center Notes
Karen Bennett
EX
/O=CITYOFYELM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=KarenB
KarenB@ci.yelm.wa.us
KarenB
Karen Bennett
Karen Bennett
KarenB@ci.yelm.wa.us
Yelm Support Operations Center Notes.docx
gary
gary
3
Normal
Microsoft Office Word
Yelm Support Operations Center Notes
1.A1.02
Accessible path should be continuous to the ramp landing. Spill Control plan.2. A2
.10 detail hand rails on both sides of stairs. Hand rail extend 12 inches beyond the top riser and return to a wall, guard or walking surface.3.A7.00
C. Lavatory height 34 inches max.4. M5.01 Verify outside air requirements met. Plan shows WPL but no power or controls.
5. M6.02 duct heater. Show detail for suspension and seismic bracing
Civil notes
Site plan
photometricsFire lane and access to FDC
We need STEP Tank sizing calculations to ensure the system is large enough for the proposed use.
The depth to the STEP Tank can be no greater than 5 feet to the invert.
The bus wash facility will be required to be covered.
(alt. bid A-1)A revised landscaping plan is required per the conditions of approval.
Clearly show changes to the impervious surfaces on the site, including ‘gravel’ areas and new pavement.
Show existing fire hydrants and water lines.
Need specifications of oil/water separator.