MOB fees email From: Gary Carlson
Sent: Monday, May 18, 2009 4:43 PM
To: Community Development
Subject: MOB
????? If you would double check my permit calculations for the shell I would appreciate it. The eru’s are based on 3. TFC’s are based on 3.06 peak pm trips for a 33352 sf medical
building with a 564 trip credit for the LID. Steve check my meter sizes. The plans call for 2” domestic and 1” irrigation. Thanks.
Gary