20120161 Blower Door Test 08312012�y7 Co p � , � `J-eA � �Lo
� INSULA ION
NORTHWEST
BLOWER DOOR TEST RESULTS FORM
Customer/Builder Name: T7��e Z5�
Development Name: O (1 W
Address/Lot #: , I� 3 �ta
City/State /Zip: �l Q
Phone: h
Email:
Comments:
Test # 1
Depress: X Press:
Pretest Baseline Pressure: (Pa)
House/Unit Pressure: (Pa)
Flow Ring Installed:
Fan Pressure: y (7 (Pa)
Flow ( cfm ):
Post Test Baseline Pressure: (Pa)
Fan Model /SN: 2
Results: p
SLA:
CFM50:
ACH50:
CFM50 (sq ft):
Mpls Leakage Ratio:
Date: % 1 31 1 GUI L
TimeC�
Indoor Temp:
Outdoor Temp:
Volume (sq ft):
Floor Area (sq ft):
Surface Area (sq ft):
# Bedrooms:
# Occupants:
Wind Shielding:
Test # 2
Depress: Press:
Pretest Baseline Pressure: (Pa)
House/Unit Pressure: (Pa)
Flow Ring Installed:
Fan Pressure:
Flow ( cfm ):
Post Test Baseline Pressure:
Fan Model /SN:
Results:
SLA:
CFM50:
ACH50:
CFM50 (sq ft):
Mpls Leakage Ratio:
(Pa)
(Pa)