20120151 Blower Door Test 08312012�� 0
1 INSULATION
NORTHWEST
BLOWER DOOR TEST RESULTS FORM
Customer/Builder Name: t (we `ZOY Q—
Development Name: 0 AN (A
Address/Lot #: I j 2 6
City /State /Zip:
Phone:
Email:
Comments:
Test # 1
Depress: x Press:
Pretest Baseline Pressure: (Pa)
House/Unit Pressure: ^ (Pa)
Flow Ring Installed: R
Fan Pressure: II0 (Pa)
Flow ( cfin ): l � a
Post Test Baseline Pressure: (Pa)
Fan Model /SN:
Results:
SLA: fj n C) 3�,
CFM50:
ACH50:
CFM50 (sq ft):
Mpls Leakage Ratio:
Date: 0 1 7lµ L
Time:
Indoor Temp:
Outdoor Temp:
Volume (sq ft):
Floor Area (sq ft): Jq 3 (o
Surface Area (sq ft):
# Bedrooms:
# Occupants:
Test # 2
Depress: Press:
Pretest Baseline Pressure: (Pa)
House/Unit Pressure: (Pa)
Flow Ring Installed:
Fan Pressure:
Flow ( cfm ):
Post Test Baseline Pressure:
Fan Model /SN:
Results:
SLA:
CFM50:
ACH50:
CFM50 (sq ft):
Mpls Leakage Ratio:
(Pa)
(Pa)