20120117 Blower Door Test 0623201220 /L 0 ll7
INSULATION
NORTHWEST
BLOWER DOOR TEST RESULTS FORM
T
Customer/Builder Name:" 1(]lLQ
Development Name: C.6oru
Address/Lot #: LQ n` I `'C( Al(i S f S E
City /State /Zip: i PAM
Phone:
Email:
Date:
Time: 1 1.0 nn
Indoor Temp:
Outdoor Temp:
Volume (sq ft): —7
Floor Area (sq ft):
Comments: Surface Area (sq ft):
Test # 1
Depress: _9 Press: /1
Pretest Baseline Pressure: . T (Pa)
House/Unit Pressure: 3 (Pa)
Flow Ring Installed:
Fan Pressure:
co
(Pa)
Flow ( cfm ):
Post Test Baseline Pressure: 3 (Pa)
Fan Model /SN: 2;:1
Results:
SLA: . ob O 9-lo ' t
CFM50:
ACH50:
CFM50 (sq ft):
Mpls Leakage Ratio:
# Bedrooms:
# Occupants:
Test # 2
Depress: Press
Pretest Baseline Pressure:
(Pa)
House/Unit Pressure:
(Pa)
Flow Ring Installed:
Fan Pressure:
(Pa)
Flow ( cfm ):
Post Test Baseline Pressure:
(Pa)
Fan Model /SN:
Results:
SLA:
CFM50:
ACH50:
CFM50 (sq ft):
Mpls Leakage Ratio: